Kingston Transportation Master Plan Draft Report Transit Forecasting 1

Similar documents
PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys

HOUSEHOLD TRAVEL SURVEY

City of Kingston Report to Council Report Number Mayor and Members of Council Jim Keech, President & CEO, Utilities Kingston

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Summary of Proposed NH 120 Service

Passenger Infrastructure Transfer Points Kingston Centre, St. Lawrence College, Gardiners Centre Cataraqui Centre...

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905)

This report recommends two new TTC transit services in southwest Toronto.

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

CENTRAL OREGON REGIONAL TRANSIT MASTER PLAN

NORTHERN NAPA VALLEY TRANSIT STUDY

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

5.1 Traffic and Transportation

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

STUDY DESCRIPTION MEMORANDUM. DATE April 20, 2011

Treasure Island Supplemental Information Report Addendum

Word Count: 3,565 Number of Tables: 4 Number of Figures: 6 Number of Photographs: 0. Word Limit: 7,500 Tables/Figures Word Count = 2,250

Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives

KING STREET TRANSIT PILOT

PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time.

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

Service Summary. Winter Service Change Highlights WINTER 2019 CHANGES TRIP LEVEL DETAIL. Victoria Regional Transit Commission

TABLE OF CONTENTS TABLE OF CONTENTS

Reducing Garbage-In for Discrete Choice Model Estimation

11 December Inverness Airport Outline Business Case

Pedestrian Safety Review Spadina Avenue

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

TORONTO TRANSIT COMMISSION REPORT NO.

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015

PROJECTS ELIGIBLE FOR JARC FUNDING. March 2013

10.0 Recommendations Methodology Assumptions

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

ITS. Intermountain Transportation Solutions Traffic Studies Transportation Analysis Signal Design Site Planning. January 9, 2013

Table E1 Summary of Annual Revenue Service Hours. System LTC Routes 581, , , , ,082 (Quick Start)

Assessment of Travel Trends

Public Transit Services on NH 120 Claremont - Lebanon

Region of Waterloo Transportation and Environmental Services Transit Services

2010 El Paso Work Place Travel Survey Technical Summary

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

Figure 1: Route 56B Hazelwood

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

Community Transit Solutions for the Suburbs CTAA Expo June 2014

Watts St westbound thru

Table of Contents. List of Tables

Initial Road Link Capacity Assessment Land East of Elsenham, Essex The Fairfield Partnership. 31 st July 2006

Wake Bus Plan. Short Range Transit Plans. Proposed Transit Service Projects and Changes. GoTriangle. Volume 2 DRAFT

CHAPTER 1 TRANSIT MARKET AREAS AND EXISTING SERVICE

City of Murfreesboro. Transit Service and Management Alternatives

Fremont-South Bay Corridor

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code

Berkshire Flyer Working Group. February 13, 2018

From personal to mass transit

3. Proposed Midwest Regional Rail System

INNOVATIVE TECHNIQUES USED IN TRAFFIC IMPACT ASSESSMENTS OF DEVELOPMENTS IN CONGESTED NETWORKS

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report

TORONTO TRANSIT COMMISSION REPORT NO.

Northern Ontario Passenger Vehicle Travel Profile

Bus Corridor Service Options

Western Development Lands Transportation Brief Richmond Village, (Ottawa), ON Mattamy Homes. Prepared By: Stantec Consulting Ltd.

HOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING

RACINE COUNTY PUBLIC TRANSIT PLAN:

rtc transit Before and After Studies for RTC Transit Boulder highway UPWP TASK Before Conditions

SAN LUIS OBISPO TRANSIT + SAN LUIS OBISPO RTA JOINT SHORT RANGE TRANSIT PLANS: SERVICE STRATEGIES. Presented by: Gordon Shaw, PE, AICP; Principal

urbanmetrics inc. market, economic and strategic advisors

ROUTE 103. Morrisville Shopping Shuttle ROUTE OVERVIEW

Corridor Analysis. Corridor Objectives and Strategies Express Local Limited Stop Overlay on Local Service 1 Deadhead

Request to Improve Transit along the Dufferin Street Corridor

EX28.6 REPORT FOR ACTION. Advancing Fare Integration SUMMARY. Date: October 16, 2017 To: Executive Committee From: City Manager Wards: All

WESTERN EL DORADO COUNTY SHORT AND LONG-RANGE TRANSIT PLAN Executive Summary

ROUTE EVALUATION ROUTE 21 Denton County Transportation Authority

Glasgow Street Traffic Review

The following describes each route change. Each route is subject to minor adjustments prior and during implementation.

Exposition Corridor Transit Project Phase 2

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

NAPA VALLEY VISITOR INDUSTRY 2014 Economic Impact Report

BRIEFING Subject: 2017 Visitation Initiatives

YARTS ON-BOARD SURVEY MEMORANDUM

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Metropolitan Planning Authority 25-Jul Thompsons Road, Clyde Creek and Casey Fields South (Residential) PSPs 53, 54 & 57.1 Transport Modelling

COMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer)

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

PUBLIC TRANSIT IN KENOSHA, RACINE, AND MILWAUKEE COUNTIES

MEMORANDUM. for HOV Monitoring on I-93 North and the Southeast Expressway, Boston Region MPO, November, 2011.

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017

APPENDIX J MODIFICATIONS PERFORMED TO THE TOR

NAPA VALLEY VISITOR INDUSTRY 2012 Economic Impact Report

SAMTRANS TITLE VI STANDARDS AND POLICIES

Executive Summary. Introduction. Community Assessment

WATERBORNE TRANSIT. April 21, 2010

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

Memorandum. DATE: May 9, Board of Directors. Jim Derwinski, CEO/Executive Director. Fare Structure Study Fare Pilot Program

Multimodal Planning Studies

2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

Transcription:

TRANSIT FORECASTING

Transit Forecasting 1 INTRODUCTION A spreadsheet model was developed to identify existing transit deficiencies and additional transit service requirements. The model comprised transit trip projections and screenline assignment components. The details of the approach used by ENTRA Consultants in forecasting Kingston transit ridership by 2026 are presented in this appendix. INFORMATION REVIEW REVIEWED MATRICES 2001 ~ work, all mode person (3-hr PM peak period) ~ work, auto person (3-hr PM peak period) ~ non-work, auto person (3-hr PM peak period) ~ all-purpose, auto person (3-hr PM peak period) ~ all-purpose, auto driver (PM peak hour), based on: ~ peak hour factor = 0.39 ~ auto occupancy = 1.24 ~ all-purpose, auto person (PM peak hour) 2026 ~ work, all mode person (3-hr PM peak period) ~ work, auto person (3-hr PM peak period) ~ non-work, auto person (3-hr PM peak period) ~ all-purpose, auto person (3-hr PM peak period) ~ all-purpose, auto driver (PM peak hour), based on: ~ peak hour factor = 0.39 ~ auto occupancy = 1.24 ~ all-purpose, auto person (PM peak hour) MAJOR GROWTH AREAS Major growth areas (2001 2026) were derived based on the growth of all-purpose, auto person trips (PM peak hour) to identify potential new transit market areas: ~ new development areas in Cataraqui; ~ C.F.B. Kingston; ~ downtown Kingston; and ~ Queen s University/Kingston General Hospital precinct.

Transit Forecasting 2 MAJOR FUTURE TRAVEL CORRIDORS 2026 all-purpose, auto person trips (PM peak hour) were first assigned to screenlines to identify major future travel corridors or corridors with substantial transit potential. These include: ~ Eastbound Lasalle Causeway; ~ Northbound / Southbound Division Street; ~ Eastbound / Westbound Princess Street; ~ Westbound Union Street and King Street; and ~ Eastbound / Westbound Bath Road. NETWORK ASSIGNMENT REVIEW ENTRA reviewed network assignments for 2026 all-purpose, auto person (PM peak hour) to identify capacity-deficient corridors / corridors with substantial transit potential: ~ Eastbound Highway 15; ~ Eastbound LaSalle Causeway; ~ Northbound Division Street between Concession Street and Highway 401; ~ Westbound Concession Street between Division Street and Princess Street; ~ Westbound Bath Road between Portsmouth Road and Gardiners Road; ~ Eastbound / Westbound Princess Street between Division Street and Concession Street and ~ Westbound Princess Street between John A. MacDonald Boulevard and Sydenham Road. EXISTING MODAL SPLITS The existing modal splits for Kingston were obtained from data collected through the household travel survey. Data were extracted regarding mode splits for various travel trip purposes, as well as times of travel. The following is a mode split summary of the travel data. It should be noted that the transit mode split indicated excludes trips made by school bus. all-purpose, daily trips ~ non-auto = 18 percent ~ transit = 3 percent all-purpose, 3-hr PM peak period ~ non-auto = 18 percent ~ transit = 3 percent work, PM peak hour ~ non-auto = 22 percent ~ transit = 1 percent

Transit Forecasting 3 Based on the above, existing conditions were summarized: 2001 ~ 27,169 work, auto person (3-hr PM peak period) ~ 56,831 non-work, auto person (3-hr PM peak period) ~ 84,000 all-purpose auto person trips (3-hr PM peak period) ~ 102,439 all-purpose, all mode trips (3-hr PM peak period) ~ 3,073 (3%) all-purpose, transit person trips (3-hr PM peak period) ~ 31,784 work, all mode person trips (3-hr PM peak period) ~ 12,363 (39% of pk. pd.) work, all mode person trips (PM peak hour) ~ 10,569 (39% of pk. pd.) work, auto person trips (PM peak hour) ~ 1,794 (14.5%) work, non-auto person trips (PM peak hour) ~ 1,195 (39% of pk. pd.) all-purpose transit person trips (PM peak hour), comprising: ~ 124 (1%) work, transit person trips (PM peak hour) ~ 1,071 (99%) non-work, transit person trips (PM peak hour) EXISTING TRANSIT SERVICE CAPACITY ACROSS SCREENLINES The existing transit capacity across screenlines was established based on the existing PM peak hour frequencies shown in Table A.1 and the assumed vehicle capacity of 60 riders/vehicle. Table A.1 Summary of Existing Transit Service Frequencies Route No. Route Name PM Peak Hour Frequency (Min) 1 Montreal/Woodbine 30 1a Montreal/Collins Bay 30 2 Division St/Calvin Park 30 3 Polson Park 30 4 Via Rail/Strathcona Park 30 5 Mall Shuttle 60 6 Cataraqui Centre/Downtown 30 7 Henderson Place/Cataraqui Town Centre 60 9 North Service Dial-A-Ride Tuesday and Thursday only 10 Amherstview 30 12 Kingscourt/Grenadier 30 15 Industrial Park 30 17 Queen's Shuttle (Evening Service Sept-April) 30 21 Sunday Service Montreal/Malls 60 22 Sunday Service Division/Calvin Park 60

Transit Forecasting 4 TRANSIT TRIP PROJECTIONS The 2026 transit trips were projected on the basis of the following steps: ~ Derive 2001 work, non-auto person (PM peak hour) trips. ~ Adjust 2026 work, non-auto person (PM peak hour) O-Ds to achieve overall target proportion of 1 percent of work, all modes (PM peak hour) this represents the work, transit person (PM peak hour) component. ~ Derive 2026 non-work, transit person trips (PM peak hour) by using the 2001 non-work auto mode PM peak hour trip matrix and a control total of 1,071, and applying a growth factor to the 2026 non-work auto mode trip matrix. ~ Assign derived 2026 work, transit component of non-auto (PM peak hour) and non-work transit across screenlines to check demand against capacity to understand amount of transit service required to meet existing travel patterns at future population and employment levels. ~ Identify potential transit modal split target for zones, based on anticipated service concepts in response to observed future travel patterns and deficiencies. ~ Identify future potential new transit (PM peak hour) across screenlines, based on applying transit modal split assumptions to all-purpose, auto person (PM peak hour). ~ Identify total (transit component of non-auto + new transit) future transit (PM peak hour) across screenlines. TRANSIT CORRIDOR IDENTIFICATION The derived 2026 total transit (PM peak hour) was assigned across screenlines to check demand against capacity to understand amount of transit service required for an aggressive transit approach at future population and employment levels. Based on the screenline assignment, capacity-deficient transit corridors during PM peak hour are: ~ Westbound Princess Street between Division Street and Gardiners Road; ~ Westbound Bath Road east of Gardiners Road; ~ Westbound / Eastbound La Salle Causeway; and ~ Northbound Division Street. The increase in all-purpose transit (PM peak hour) demand across screenlines from 2001 to 2026 with and without new riders was identified as well to understand amount of additional transit service required to meet existing travel patterns at future population and employment levels and the implications of an aggressive transit strategy. Transit desirelines were plotted for each of the urban zones and the major transit linkages (i.e., O-D pairs) were reviewed to identify potential future transit corridors. M:\PROJECTS\DRAFT\01\019040\Deliverables\Draft Report\Report Sections\Sections for City's Web Site\Transit Forecasting.doc