Successful Experiences in Rio Grande/Rio Bravo Watershed Management

Similar documents
Dr. Christopher Brown New Mexico State University GEF Project Rio Meeting Ciudad Juárez, México 3-5 October 2006

TECHNICAL ASSISTANCE REPORT SEPTEMBER 2012

INTERNATIONAL BOUNDARY AND WATER COMMISSION, UNITED STATES AND MEXICO

DROUGHT AND SCARCITY PLANS IN THE BRAVO RIVER BASIN

A Brief Overview of the Rio Grande Compact 04/26/06

Water Use for Agriculture in Priority Rivers Basins

Income in the border region,

AVAILABLE PROPERTIES

7KH'LVSXWH2YHU6KDUHG:DWHUVRIWKH 5tR*UDQGH5tR%UDYR

AVAILABLE PROPERTIES Aguascalientes, Ags.

One Source, Multiple Challenges: The Future Evolution of Water Policy and the Case of the Colorado River

Utah Nevada California Arizona New Mexico Baja California Texas Sonora Chihuahua Coahuila de Zaragoza Sinaloa Durango Nuevo León Zacatecas San Luis

2005 Annual Report. Border Environment Cooperation Commission. Contents page. Message from Daniel Chacon, General Manager 2. Inside the CD 3.

Industrial Market Report

Spanish Land Grant History of Santa Teresa and Sunland Park Abridged by Dr. Paul Maxwell Taken from the NM Office of the State Historian

Colorado s Compacts. Craig Cotten Division Engineer

Industrial Report. Americas Research. Northeast Mexico 4Q 2013

Natural Resources Journal

QUESTION/ANSWER FORUM: MEXICO CUSTOMS AND REGULATIONS

THE STATE OF ZACATECAS, MEXICO

Actual Climatic Conditions in ERB. Online Resource 1 corresponding to:

Phoenix Habitat Restoration Projects

Projected Supply and Demand for Natural Gas over the next 10 years and Plans for Major LNG Receiving Terminals March 11, 2003 Houston, Texas

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN

Appendix A Detailed Study Area Descriptions

SPECIAL SESSIONS MONDAY

LNG Regulatory Issues

Taos Pueblo, New Mexico

Public Works Research Institute

THE GREAT MAN-MADE RIVER PROJECT

Documentation and Testing of the WEAP Model for the Rio Grande/Bravo Basin

Servicios de Agua y Drenaje de Monterrey, I.P.D. Proyecto Monterrey VI 1

Anzalduas Industrial Business Park

Multi stakeholders interactions in resource allocation in arid and semi-arid areas

PERBADANAN BEKALAN AIR PULAU PINANG (PBAPP) : Twinning Partnership with PDAM Tirta Musi, Kota Palembang A Win Win Experience

2015 Annual Water Report. City of Revelstoke Engineering and Public Works Department

MIÑO O AND LIMIA BASINS

AMERICAN INDUSTRIES. 40 years committed with Mexico.

Module 1 Educator s Guide: Representative Discussion Points Investigation 3

Victory Packaging 3555 Timmons Lane, Suite 1400, Houston, TX, 77027, USA and the sites as mentioned in the appendix accompanying this certificate

INTRODUCTION 250,000

COMPETITIVE ADVANTAGES

SUSTAINABLE ECOTOURISM DEVELOPMENT IN THE EMBERÁ INDIGENOUS COMMUNITIES, CHAGRES NATIONAL PARK, PANAMA

Binational Cooperation in the Big Bend Region

Schedules of Customs Offices Via Cargo Area. CUSTOMS AGUA PRIETA Importation. From Monday to Friday 9:00 to 18:00 hrs. Saturday 9:00 to 11:00 hrs.

Paso Del Norte Economic Indicator Review Spring 2015 UNIVERSITY OF TEXAS AT EL PASO

Two Nations, One Aquifer: The biggest pump wins

Industrial Market Report

EL PASO S DESALINATION EFFORTS

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina

PASO DEL NORTE ECONOMIC INDICATOR REVIEW SPRING 2015

regulatory perspective

Watershed: Natural Scene for Integrated Water Resource Management in the jurisdiction of Corantioquia Antioquia, Colombia. SA

RiverWare User Group Meeting, february Migration Lerma-2004 model, from Stella to RiverWare

Mercader Loan Status. Programs for the Purchase of Low Emission Vehicles in Mexico

ECOSYSTEM CONSERVATION WORKING TABLE ACTION ITEM REPORT XX Trilateral Committee Meeting San Diego, California April 13 17, 2015

Chihuahua / Copper Canyon. Tourist Institutions. Where is it? DMC s. Attractions. (52) 614 Chihuahua (52) 635 Urique

THE STATE OF ZACATECAS, MEXICO

Parks & Recreation Areas Program

Environmental Impact Assessment in Chile, its application in the case of glaciers. Carlos Salazar Hydro21 Consultores Ltda.

3.0 OVERVIEW OF HUECO BOLSON

Geoscape Toronto The Oak Ridges Moraine Activity 2 - Page 1 of 10 Information Bulletin

General Overview: Acreage:

GEOGRAPHICAL LOCATION OF colombia

Mexico's Logistics Infrastructure Update " Ciudad Juárez, Chihuahua May 16,2008

Catchment and Lake Research

Guide to MS416 Albert Bettle Papers

LAND SUBSIDENCE SOLUTIONS

Intermediate report. Letter of agreement FAO - GCB/RAB/013/ITA

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Chihuahua. Pronunciation: chee-wah-wah. the mestizo, or blending of two peoples; the lower third depicts Chihuahua Cathedral.

OFFICE OF THE SECRETARY OF ECONOMIC DEVELOPMENT

U.S. - Mexico Border Crossing Profile

U.S. - Mexico Border Crossing Profile

Town of Oakfield Agricultural and Farmland Protection Plan

Independence Headwaters Ranch /- acres Pecos County, Texas. James King, Agent Office Cell

USDBC MEXICO MONTHLY REPORT MAY 2017 NEW! FIRST 2017 MX BEAN PLANTING 2017 SPRING SUMMER CYCLE PROGRESS REPORT

Transboundary Water Management in Republic of Macedonia

2012 Colorado Planning & Management Region Report

Xaman-Ha city, an answer to the poor growth and spread population

Attachment O Verified Statement of Christopher Banet Page 1 of 7

General Customs Administration of Mexico. Regional Integration

Mexico's El Cuchillo Dam Project

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name

Cost of prostitution in ciudad juarez mexico

LVII Maquiladora Industry Outlook Meeting Mexico s Maquiladora Industry Outlook:

VIII MEETING OF NATIONAL COORDINATORS. Pilot Project Program Border Crossings Summary and Conclusions. Jorge H. Kogan

Normalizing Trade Relations with Cuba: GATTcompliant Options for the Allocation of the U.S. Sugar Tariff-rate Quota

Inland Queensland Roads Action Plan

Pantanal Forever Programme

Oak Ridges Moraine: Southern Ontario's Sponge

UNIT 5 PHYSICAL GEOGRAPHY SG 1 - PART I

Latin America. Physical Geography

Unit 9 The Middle East SG 1 - Physical Geography, Population & Demographics

Towns of Clifton and Fine Consolidation Study Water, Sewer & Lighting 7/22/15

MANAGING FRESHWATER INFLOWS TO ESTUARIES

Water resource situation of the Republic of Djibouti

Lake Mead Learning Guide

Legal Status and Governing Board

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

Transcription:

Successful Experiences in Rio Grande/Rio Bravo Watershed Management 5 th th World Water Forum Istanbul, Turkey March 22-23, 23, 2009

Introduction A watershed with many voices a medley of cultures, customs, and perceptions Rio Grande, Rio Bravo or Cheenah are all alike A common watershed inhabited by autonomous native communities, as well as twin cities from two different countries that are brought together by sharing the same sourced of supply Its geographic and weather conditions make water a scarce resource A watershed rich in plant and wildlife species that are characteristic of different climate zones

Overview An area of 850,000 km2 shared equally by the United States and Mexico M The river rises on the U.S. side in the San Juan Mountains of southwestern Colorado It flows approximately 3,000 km and discharges into the Gulf of Mexico; it begins marking the international boundary around El Paso-Juarez area One of the 20 largest rivers in the world and the 5 th largest in the Americas A predominantly arid and semi-arid water basin On the U.S. side, the main source of runoffs is snow melts from the Rocky Mountains, a major water contributor to the Pecos River, which flows f into the Rio Grande around the city of Del Rio, Texas and along the upper Rio Grande, as well as the Paso del Norte region On the Mexican side, the main source of runoffs is the Conchos River, R which supplies two thirds of the water contribution in the mid and lower portions of the water basin The area is home to more than 15 million residents 7 million residents in Mexico; water is primarily used for irrigation of 600,000 hectares; water is supplied to more than 20 cities and 9,400 industries

Issues in Mexico Irrigation relies on 80% of available surface water, and 68% of groundwater - Low irrigation efficiencies Public-Urban uses rely on 11% of surface water and 21% of groundwater. There are system inefficiencies, water losses, leaky water lines, and need for institutional capacity building/increased competitiveness 14 overexploited aquifers, some shared with the U.S. without an international agreement as to their management, monitoring, and comprehensive use Lack of an efficient water use culture and limited water metering; strong competition among the different uses, users, and federal agencies Evident signs of water supply source contamination

International Treaties for Surface Water Distribution 1906 Treaty. Provides for the delivery of 74 Mm3 of water from the U.S. to Mexico for the Juarez Valley 1944 Treaty. Negotiated since 1867. Provides for the distribution of water from the Rio Grande and Colorado River shared water basins. Mexico must make a minimum annual delivery of 432 Mm3, and the U.S. must deliver 1,850 Mm3 with a 4:1 ratio in favor of Mexico

Institutional Capacity IBWC/CILA Texas Water Master (State of Texas) Comisión n Nacional del Agua (Mexico) Consejo de Cuenca / Water Council (Mexico) Irrigation Districts (both countries) Water Utilities (both countries) Paso del Norte Water Task Force (binational) Texas Water Development Board BECC/NADB

Public Participation and BECC Certification of the Project for the Modernization of ID 005-Delicias

Geographic Region Served 300 km Area: 13 Million Población en la Franja Ampliada: 13 M 200 km Area: 7 Million The border area served by BECC and NADB encompasses 30% of the Mexican territory

CERTIFIED PROJECTS 152 MX 68 US 76 OUTCOMES TOTAL INVESTMENT (US millions) POPULATION SERVED (M) FUNDED PROJECTS $3,119 11.9 129 MX 61% US 39% FUNDING AMOUNT (MD) $968

ID 005 is located south of the capital of the State of Chihuahua. It is the largest of the three districts located in the Conchos watershed As a result of the drought, the cultivated surface area was reduced from 87,205 Has. To 46,000 Has. The efficiency rate was 33% due to its deteriorated infrastructure Predominant crops include alfalfa, pecans, peanuts, and chile peppers

Significance of ID 005 La Boquilla Reservoir is the head structure for the Irrigation District It was built in the middle of the Mexican Revolution period This structure was critical to begin small and large- scale irrigation in Mexico It involved a major technological breakthrough with the use of concrete for the curtain The combination of water and irrigation infrastructure have helped this district become one of the most productive ones in the country

Project Significance Increased efficiency from 33% to 56% Reduce the volume of water used by 343 Mm3 Technology upgrades in 76,700 Has. Includes the lining of 12 km of the main canal; lining of 518 km of lateral canals; 250 km of low-pressure piping; grading of 32,500 ha.; installation of a system of high- pressure lines, and low pressure pumping facilities and irrigation Cost is US $140 million, funded with US $30 million from NADB s s water conservation fund and the rest by CNA

BECC/NADB Water Conservation Program in U.S. irrigation districts within the watershed (Texas-New Mexico border) 19 technical improvement projects in Texas and New Mexico irrigation districts Estimated cost: US $71.64 million Annual savings of 127,081 acre-feet of water, equivalent to 156.066 million cubic meters

Impact of BECC efforts on Wastewater Treatment Coverage increases on the Mexican Side of the Rio Grande/Rio Bravo Watershed 6,001 New Wastewater Treatment Facilities 1995-2007 City State Capacity Liters/sec. Certification Date Investment (million dollars) Matamoros Tamps. 11.0 1996 31.16 Cd. Juárez, Chih. 3,500.0 1997 57.4 Reynosa Tamps. 850.0 1998 1.1 Cd. Acuña Coah. 120.0 2000 82.9 Piedras Negras Coah. 360.0 2000 20.98 Región 5 Manantiales Coah. 100.0 2000 5.18 Ojinaga Chih. 140.0 2002 5.28 Matamoros Tamps. 400.0 2003 6.24 Nuevo Laredo Tamps. 400.0 2004 57.7 Anapra, Cd. Juárez Chih. 62.0 2006 76.6 Porfirio Parra Chih. 5.0 2007 2 Guadalupe Chih. 18.0 2007 3.4 Colonia Esperanza Chih. 5.6 2007 2.18 Praxedis Guerrero Chih. 14.7 2007 4.28 El Porvenir Chih. 15.2 2007 2.27 6,001 358.67 Evolution of Wastewater Treatment Coverage in Mexico along the Rio Grande/Rio Bravo River Bank 1995= 0% 2008= >90% Between 1995 and 2007 BECC has certified 16 projects involving wastewater treatment facilities along the Rio Grande/Rio Bravo. Mexican communities disposed of 100% of their raw wastewaters by discharging them into the river; nowadays, more than 6,000 liters per second receive treatment, which represents a 0% to 90% in crease in wastewater treatment coverage with a capital investment of US $358.6 million.