Travel Time Estimates

Similar documents
DOWNTOWN BRT ALTERNATIVE - 19th AVE

From personal to mass transit

Metro Green Line to LAX. January, 2012

Exposition Corridor Transit Project Phase 2

Planning for RAV: Lon LaClaire, Transportation Engineer Anita Molaro, Development Planner CITY OF VANCOUVER

WELCOME AND AGENDA DOWNTOWN REDMOND LINK EXTENSION

CENTRAL AND EAST CORRIDORS

Score. Category. Access Aesthetics Community Resources

2018 Service Implementation Plan Executive Summary

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

East Link Extension. Redmond stations Open House November 17, 2016

DESIGN AND CONSTRUCTION OPEN HOUSE

Quality of Life Study

Sound Transit Service Standards and Performance Measures Edition

Updating the vision for regional transit

CENTRA OFFICE PARK. now leasing. CentraOfficePark.com. For leasing information contact: NORTHUP WAY, BELLEVUE, WA

23,760 SF ASSEMBLAGE ZONED LR2

Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives

STUDY PROCESS. Study. PHASE I Research. PHASE II Develop & Analyze Options. PHASE III Recommendations. Regional Transit

Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016

WORK SMART ENHANCED POWER. 9.8 watts per square foot, 120v plug available ABOVE STANDARD COOLING

WORK SMART ENHANCED POWER. 9.8 watts per square foot, 120v plug available ABOVE STANDARD COOLING

Intercity Transit Short / Long Range Plan Short-Term Recommendations Transit Authority Meeting

October 12th 2015 DRAFT Service Implementation Plan

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

These elements are designed to make service more convenient, connected, and memorable.

All questions in this survey were voluntary; all results are based on number of respondents who answered the relevant question.

Silver Line Operating Plan

The vision for enhanced service on Riverside between downtown and the airport is not a new concept.

Union Station Queens Quay Transit Link Study

Lessons Learned from Rebuilding the Muni Subway Schedule Leslie Bienenfeld

October to provide

5.1 Traffic and Transportation

Key Center. Enjoy a close proximity to Downtown Bellevue s lively entertainment and shopping center, surrounded by a wide variety of dining options.

City of Sacramento Sacramento Intermodal Transportation Facility Draft WP # 3 Transit Operational Requirements

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Sound Transit Operations August 2015 Service Performance Report. Ridership

Civil and Enviromental Engineering, Gadjah Mada University. PUBLIC TRANSPORT PLANNING (Frequency, Headway, and Number of Bus)

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

Measure R Program Update

DEMOGRAPHICS AND EXISTING SERVICE

CENTRA OFFICE PARK. now leasing. CentraOfficePark.com. For leasing information contact: NORTHUP WAY, BELLEVUE, WA

2011 Illinois Department of Transportation. I-290 PHASE I STUDY Additional Round 1 Alternatives Descriptions

Connecting Cleveland 2020 Citywide Plan Transit Improvement Recommendations

2.0 Miami-Dade Transit System Overview

2015 Independence Day Travel Overview U.S. Intercity Bus Industry

WATERBORNE TRANSIT. April 21, 2010

What was Old is New Again

Sound Transit Operations June 2016 Service Performance Report. Ridership

Key Center. Enjoy a close proximity to Downtown Bellevue s lively entertainment and shopping center, surrounded by a wide variety of dining options.

Table of Contents. List of Tables

Public Outreach August 2011 Collateral Materials

Table of contents. Sound Transit 2 Plan map... A-2

Seattle Center Director s Report

BENEFITS OF YOUR FUTURE RIDE

APPENDIX M TRANSIT FARE STRUCTURE

Previous Studies. 1988: Coastal Corridor Rail Transit Project. 1991: LAX/Metro Green Line Interagency Task Force

Table E1 Summary of Annual Revenue Service Hours. System LTC Routes 581, , , , ,082 (Quick Start)

Corridor Analysis. Corridor Objectives and Strategies Express Local Limited Stop Overlay on Local Service 1 Deadhead

405 TERMINAL AVENUE OTTAWA, ON

Link Union Station (LINK US)

Exposition Light Rail Transit Project

CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON

FROM THE SEATAC AIRPORT (509 NORTHBOUND - ALTERNATE ROUTE)

Community Transit Solutions for the Suburbs CTAA Expo June 2014

Regional benefits of a major mobility hub at Toronto Pearson

Managed Lanes, Transit Access, and Economic Development: Implementing the Region s First Highway BRT Corridor

Draft Transportation White Paper

East Farmingdale Fire Department 930 Conklin Street. Source: Parsons Brinckerhoff

Bay Area High Speed Rail Service TRANSDEF / RAFT 2004 RTP. Overview for Modeling. San Francisco. Sacramento Stockton Tracy Modesto Los Angeles

1 5 l a k e bellevue UNIQUE WATERFRONT LOCATION WITH SPECTACULAR VIEWS CLOSE-IN BELLEVUE LOCATION WITH EXCELLENT VISIBILITY

Rapid Transit From Arbutus Street to UBC. Policy and Strategic Priorities Council Meeting January 30, 2019

Presentation to the DRCOG Board August 16, 2017

Granite Creek. Kristen Macken, sior CA License No

MARTA & City of Atlanta Sales Tax Referendums. Public Hearings May 25 & 26, 2016 June 1 & 2, 2016

Sound Transit. Tunnels and Underground Structures Committee January 24, 2011

Welcome! This open house provides an early look at: Garage layout and access Potential pedestrian, bicycle and transit improvements

MTA Bus Network Improvement Project July 22, 2013

The 15-day comment period will run from Thursday, April 4, 2019 to 4pm on Wednesday April 18, 2019.

Key Center. Enjoy a close proximity to Downtown Bellevue s lively entertainment and shopping center, surrounded by a wide variety of dining options.

Passenger Facility Charge (PFC) Program: Eligibility of Ground Access Projects Meeting

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

A Presentation to: Project Advisory Group Meeting #6

Head to University Avenue and save!

Dulles Corridor Improvements. Drive to Ride

I-405 Express Toll Lanes Coming in 2015

Silver Line Rail Project Update

The focus is the Central Broward County area. September 10,

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

CHAPTER 1 TRANSIT MARKET AREAS AND EXISTING SERVICE

Fremont-South Bay Corridor

Chapter 21 Route window W6 West Ealing station. Transport for London

Bus Corridor Service Options

I-26 Fixed Guideway Alternatives Analysis CHAPTER IV: Screen Two Alternatives. Draft Report February 2016

streetcars in the boomtown Keith Jones Regional Transit Planning Manager URS Corporation Fort Worth Texas

CENTRAL OREGON REGIONAL TRANSIT MASTER PLAN

Restoration of Historic Streetcar Services in Downtown Los Angeles

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time.

Transcription:

Travel Time Estimates Common Assumptions Kirkland - Seattle Kirkland - Bellevue Houghton - Seattle Houghton - Bellevue Common assumptions: I-405 BRT is built with a station at NE 85th St. (Sound Transit Corridor Study suggested this would only be created as part of a "full" buildout, not the more limited "phased" buildout that is the more plausible model for ST3. However, without a NE 85th St station, I-405 BRT is clearly irrelevant to this area). For I-405 BRT, there is a connecting service to downtown and also to Houghton. The City has asked for a fixed guideway aerial tram, but it could be bus. For our purposes, only the travel time matters (not getting into the cost implications here). Also the fixed guideway connecter wouldn't go to Houghton, so that would have to be bus. For LRT, Central Kirkland is served by a station east of 6th St S in the Everest neighborhood, as per the corridor study assumptions. Houghton does not have its own station in that study, so the parts of Houghton that aren't within walking distance would need a connector bus. Alternatively, one could think of the travel time impact as added walking time. LRT connects at Wilburton (Hospital) station, where there is a transfer to East Link. Seattle travel times are to University St (most central station in the DSTT, so as not to favor one bridge over the other). Bellevue travel times are to the downtown station. I-405 BRT terminates at Bellevue Transit Center. For Bellevue travel, I've assumed that is the terminus. For Seattle travel, I've assumed a walk to nearest East Link station, and onward travel via EastLink to University St. Detailed timing assumptions overleaf.

DOWNTOWN KIRKLAND SEATTLE Metro 255 Current Running Time Scheduled from Downtown Kirkland to University St, Seattle 41 minutes peak / 3 Downtown Kirkland to Central Seattle via Rail on Corridor with Transfer to Link at Hospital Station Bus or other connector from Downtown Kirkland to Rail Station on CKC at 6 th St based on assumed rail headway of every Assumed 2 intermediate stations with typical 30 seconds dwell time at each = 1 average wait based on ST planned headway of every 8 minutes Link from Hospital Station Bellevue to Central Seattle Estimated 5 total 26 minutes Downtown Kirkland to Central Seattle via I-405 BRT with transfer to Link at Bellevue Downtown Station (Only possible if BRT station at NE 85 th /I-405) Bus or other connector from Downtown Kirkland to I-405 BRT Station at NE 85th based on ST Study assumption of 10 minute headways Walk from Transit Center to Link Station Assumed average wait based on ST planned headway of every 8 minutes Wait Time at Downtown Station Assumed average wait based on ST planned headway of every 8 minutes Link from Downtown Station Bellevue to Central Seattle http://www.soundtransit.org/documents/pdf/projects/eastlink/factsheets/overvie w_el_factsheet_070111.pdf Estimated 5 total 2

DOWNTOWN KIRKLAND BELLEVUE Metro 235 Current Running Time Scheduled from Downtown Kirkland to Bellevue Transit Center 27 minutes peak / 2 Downtown Kirkland to Central Bellevue via Rail on Corridor with Transfer to Link at Hospital Station for connection to downtown Bellevue Bus or other connector from Downtown Kirkland to Rail Station on CKC at 6 th St based on assumed rail headway of every average wait based on ST planned headway of every 8 minutes Link from Hospital Station Bellevue to Downtown Bellevue Estimated 30 minutes total Downtown Kirkland to Bellevue Transit Center via I-405 BRT (Only possible if BRT station at NE 85 th /I-405) Bus or other connector from Downtown Kirkland to I-405 BRT Station at NE 85th based on ST Study assumption of 10 minute headways Estimated 20 minutes total

HOUGHTON BUSINESS CENTER SEATTLE Metro 255 Current Running Time Scheduled from Houghton Business Center to University St, Seattle 37 minutes peak / 30 minutes Houghton to Central Seattle via Rail on Corridor with Transfer to Link at Hospital Station Bus or other connector from Houghton Business Center to Rail Station on CKC at 6 th St based on assumed rail headway of every average wait based on ST planned headway of every 8 minutes Link from Hospital Station Bellevue to Central Seattle Estimated 51 minutes total 26 minutes Houghton to Central Seattle via I-405 BRT with transfer to Link at Bellevue Downtown Station (Only possible if BRT station at NE 85 th /I-405) Bus or other connector from Houghton to I-405 BRT Station at NE 85th based on ST Study assumption of 10 minute headways Walk from Transit Center to Link Station Assumed average wait based on ST planned headway of every 8 minutes Wait Time at Downtown Station Assumed average wait based on ST planned headway of every 8 minutes Link from Downtown Station Bellevue to Central Seattle http://www.soundtransit.org/documents/pdf/projects/eastlink/factsheets/overvie w_el_factsheet_070111.pdf Estimated 5 total 7 minutes 2

HOUGHTON BUSINESS CENTER BELLEVUE Metro 235 Current Running Time Scheduled from Houghton to Bellevue Transit Center 2 peak / 20 minutes Houghton to Central Bellevue via Rail on Corridor with Transfer to Link at Hospital Station for connection to downtown Bellevue Bus or other connector from Houghton to Rail Station on CKC at 6 th St based on assumed rail headway of every average wait based on ST planned headway of every 8 minutes Link from Hospital Station Bellevue to Downtown Bellevue Estimated 30 minutes total Houghton to Bellevue Transit Center via I-405 BRT (Only possible if BRT station at NE 85 th /I-405) Bus or other connector from Houghton to I-405 BRT Station at NE 85th based on ST Study assumption of 10 minute headways Estimated 22 minutes total 7 minutes