Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

Similar documents
Airports and UAS: Managing UAS Operations in the Airport Vicinity

Planning and Designing Airport Infrastructure to Support GPS and PBN Approach Development

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Introduction DRAFT March 9, 2017

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

CHAPTER 1: INTRODUCTION

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview

AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION

Fly for Fun under the Special Rule for Model Aircraft

ARP Forecast Review Critical Aircraft Data Sources

Creating a Clear Vision with your Airport Layout Plan

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

UNMANNED AIRCRAFT PROVISIONS IN FAA REAUTHORIZATION BILL

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016

CHAPTER 1 EXECUTIVE SUMMARY

AIRPORT LAND USE COMPATILIBILTY AIRPORT LAND USE COMPATIBILIITY

Federal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

and Forecast Review and Approval Process

Unmanned Aircraft Systems (UAS) 101

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

ACRP 01-32, Update Report 16: Guidebook for Managing Small Airports Industry Survey

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

Unmanned Aircraft System (UAS): regulatory framework and challenges. NAM/CAR/SAM Civil - Military Cooperation Havana, Cuba, April 2015

Merritt Island Airport

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017

Planning. In preparing for battle I have always found that plans are useless, but planning is indispensable. Dwight D. Eisenhower

Harvey Field Airport. Planning Advisory Committee & Public Open House. April 1, Comment Responses

FAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: South Dakota Airports Conference

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

Update on FAA Standard Operating Procedures (SOP)

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Developing an Aircraft Weight Database for AEDT

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

TRB and ACRP Research Updates: Practical Application

Norfolk International Airport

Unmanned Aircraft Systems (UAS) 101

Federal Aviation. Administration Unmanned Aircraft Human Factors Research Program. Federal Aviation Administration

Airport Issues in Considering Spaceport Development

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN

Presented to the: NCTCOG Air Transportation Advisory Committee. Presented to the: NCTCOG Air Transportation Advisory Committee

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

Summary of UAS Provisions in H.R. 302

Appendix C AIRPORT LAYOUT PLANS

UAS Integration Activities

Unmanned Aircraft Systems (UAS) 101

Hot Topics in Land Use at GA Airports. Peter J. Kirsch

Office of Airport Safety and Standards

ACRP Problem Statement: Wingtip Collisions on the Ground. Recommended Funding Amount: $400,000. ACRP Staff Comments. No staff comments.

2015 PURDUE ROAD SCHOOL March 11, 2015

MassDOT Aeronautics Division Capital Improvements Presentation

Chapter 8.0 Implementation Plan

Municipal Drone Operations Ben Roper City of College Station

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3


Unmanned. FAA Guidelines and Regulations for the Model Aircraft Pilot. Federal Aviation Administration Aircraft Systems (UAS) Date:

CONTENTS Preface Guidebook Overview Part 1 - Master Plans: Setting the Stage Airport Master Plans

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004

CITY OF HAMMOND HAMMOND NORTHSHORE REGIONAL AIRPORT MASTER PLAN UPDATE Work Authorizatiou for Professional Services

Airport Master Plan 1

AIRPORT REGULATORY REQUIREMENTS THAT AFFECT ENVIRONMENTAL COMPLIANCE AND SUSTAINABILITY

Lake Tahoe Airport Master Plan

RNP AR APCH Approvals: An Operator s Perspective

Session 6 Airport Finance 101 Funding Sources for Airports

CHAPTER 3 ALTERNATIVES CONSIDERED

FAA Proposals for Safety Management Systems

Communications and Information Technology Alert

Alternatives. Introduction. Range of Alternatives

Municipal Drone Operations Ben Roper City of College Station

Airport Planning at the. Local and National Levels. Presented to: ICAO Airport Planning Workshop for the SAM Region

Unmanned Aircraft Operations in the National Airspace System. AGENCY: Federal Aviation Administration (FAA), DOT.

Safety Enhancement SE RE Airports Policies and Procedures to Mitigate Runway Excursion Consequences & Severity

UAS in Canada Stewart Baillie Chairman Unmanned Systems Canada Sept 2015

Finance and Implementation

4.5 Other aviation safety matters AERODROME SAFETY PROGRAMS UPDATE. (Presented by United States)

Agenda: SASP SAC Meeting 3

Chapter 2 FINDINGS & CONCLUSIONS

Appendix 6.1: Hazard Worksheet

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

Chapter 10 FAA Compliance Review

GENERAL ADVISORY CIRCULAR

Bowman Field Airport Area Safety Program

RESEARCH TOOLS IN AIRPORT LAW

Foreign Civil Aviation Authority Certifying Statements. AGENCY: Federal Aviation Administration (FAA), DOT.

Preface. Guidebook Overview

LAUNCHING YOUR UNMANNED AIRCRAFT PROGRAM

Transcription:

ACRP Problem Statement 17-03-09 Recommended Allocation: $500,000 Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Staff Comments This is one of four UAS-themed problem statements developed as a result of the ACRP UAS Panel Workshop. (The others are 17-01-21, 17-01-23, and 17-10-09.) Funding the four problem statements in toto would maximize their benefit to the airport industry. TRB Aviation Committee Comments AIRFIELD AND AIRSPACE CAPACITY AND DELAY: Support. Consider adding elements of the other four airport-focused UAS projects in this problem statement. Review Panel Recommendation and Comments Recommended. Panel recommends this proposed research; however, make sure that it is coordinated with studies that are underway or those that have been recently funded. Scope needs to be refined to be less broad and more focused on issues airports can actually incorporate. AOC Disposition This problem statement received an average rating of 4.2 points out of a possible 5 points among voting AOC members. There was significant discussion regarding the UAS-related problem statements, both those developed as part of ACRP's UAS workshop and those submitted from other authors. The AOC allocated $1.0 million for UAS-related research for FY 2017 and directed staff to ensure specific research projects would be both prioritized in terms of timing and importance and also coordinated. UAS-related research will be accomplished as ACRP Project 03-42.

1. Problem Statement Title Airport Cooperative Research Program (ACRP) Problem Statement FY 2017 ACRP Problem Number 17-03-09 Airports and Unmanned Aircraft Systems (UAS): Integrating UAS into Airport Infrastructure and Planning 2. Background UAS applications are rapidly growing in demand for services and aeronautical use applications. With UAS aircraft of all types of sizes, purpose and use, the potential positive economic impact and how an airport may incorporate UAS operations at their facility has unlimited opportunities. Airport planning and infrastructure development, requires a durational time period and process of review, that can extend long beyond the immediate facility infrastructure improvement needs. With the rapid demand and deployment of UAS operations into the National Airspace System (NAS), public use airports must be ready to accommodate facility demands for UAS operations and the rapidly changing UAS industry, while assessing the impacts on airports and aviation infrastructure to ensure compliance with regulatory guidelines and industry standards. Under the Federal Aviation Administration (FAA) Modernization and Reform Act of 2012 (FMRA) i the FAA is confronted with integrating all types of UAS operations into the NAS. While the Small Unmanned Aircraft Systems (suas) proposed rule ii (NPRM) has determined that suas may be operated safely in the NAS under limited circumstances, including the 333 exemption process iii, the use of larger UAS that will require airport infrastructure to operate in the commercial sector or as a general aviation activity is just beginning. Airport Planning for UAS operations is not only an economic opportunity for the airport, it is a federal requirement for public use facilities. Federally obligated airports are required to review and implement near-term, mid-term and long-term facility standard improvements and modifications that can support the future demand needs, to accommodate all aeronautical activities. While UAS operations have many definitions yet to be defined, their potential impact to airports is extensive. A key objective of airport planning is to assure the effective use of airport resources in order to satisfy aviation demand in a financially feasible manner.

3. Objective The objective of this statement of research intent is to provide airport industry practitioners with guidance for planning, development and integration of all types and sizes of UAS operational needs from an airport infrastructure point of view. 4. Proposed Tasks This project will produce a guidance document report that airport sponsors and airport operators may reference when considering UAS operations at the airport and what planning factors should be considered. The primary target of this report will be the estimated 3,500 federally obligated airport facilities as identified by National Plan of Integrated Airport System (NPIAS). iv The ACRP report should reference airports of all types and categories including Primary and Nonprimary facilities, Large, Medium, Small and Nonhub airports in addition to Local, Regional and Basic facilities as defined by the FAA Asset report v. While the planning factors, components and process for review do not vary much between different types of facilities, the funding alternative resources, the design standards and modifications needing to be considered to accommodate UAS operations in the airport infrastructure will require different planning considerations at airports of different sizes and categories. The guidance report should include tools (such as checklists) and a Planning Project Guide (PPG). The Planning Project Guide will provide a step by step overview of the planning review process needed to plan, design, review and implement facility infrastructure improvements required to meet the near and long term needs for safe UAS operations at airports. The airport sponsor should be able to reference the Planning Project Guide and checklist throughout the duration and at any component of the planning process. The guidance report should address key Airport and Infrastructure Planning issues as they relate specifically to Unmanned Aircraft infrastructure development, with the understanding that many of the issues impacting UAS operations at an airport are still under FAA review. The Planning Project Guide issues to address should include but are not limited to: Emerging technological trends and UAS standard practices o Technology requirement upgrades for airport infrastructure for UAS operations at airports (e.g., Radio Frequency Spectrum Analysis, ground movement surface detection systems for aircraft/vehicles and potentially UAS such as ASDE-X and "GPS track", ADS-B or GPS track transmitters for UAS, etc.) o Ground Control Station design needs o Radio Frequency Surface Obstruction Analysis (line of sight) Airport Master Planning o Forecasting UAS Aeronautical Activity Terminal Area Forecast (TAF) Long Range Forecast Passenger & Cargo Statistics Enplanement and cargo data Identifying the types of UAS operations proposed for the airport

o Land use compatibility Noise Abatement Zoning Ordinances and Avigational Easements Arrival and Departure Corridors o Airspace analysis Part 77, Terminal Instrument Procedures (TERPS) standards Controlled or non-controlled facility standards Flight Corridors and Altitude Coordination Sectors Airside/landside facility design standards o Summarize current Experimental/Restricted UAV commercial air worthiness certificates for takeoff / landing requirements and facility needs. o Identify (as a checklist) specific airport facility components for planning review to accommodate UAS activity. Identify the potential needs for Modifications of Standards. E.g. Runway Safety Area, Runway Protection Zone, Runway Length, Separation standards, Obstacle Free Zone, Arresting systems, Signage, etc. UAS specific runways, landing pads and taxiways Remote support facilities UAV ground support vehicle access to landing and departure areas (launch vehicles, recovery vehicles, airside movement considerations, etc.) Capital Improvement Planning (funding alternatives for UAS facility infrastructure improvements). o Airport Improvement Program (AIP) o State Block Grants o Grant Assurance compliance Environmental review process (National Environmental Policy Act, NEPA) o Environmental Assessments (EA s), Environmental Impact Study (EIS), Categorical Exclusions (CATEX), Record of Decisions (ROD s) o Environmental Due Diligence Audit (EDDA) o Scoping and Public Involvement Planning (as defined by NEPA) Educational Outreach and Community awareness of UAS activities in the vicinity of the airport and airspace restrictions Airport Layout Plan (ALP) revision requirements and Airports GIS standards o How to document UAS on the ALP o When is an ALP revision needed for UAS operations Potential Construction Impacts of UAS o FAA 7460: Notice of Proposed Construction or Alternation The research should include reference material regarding current rules, regulations and procedures that pertain to UAS operations at airports, in addition to the following planning and regulatory guidance document standards as they apply to UAS operations and airport infrastructure planning needs.

National System Planning as defined by the National Plan of Integrated Airport System (NPIAS). FAA Order: 5090.3C, Field Formulation of the National Plan of Integrated Airport Systems (NPIAS) Airport Master Planning: Advisory Circular 150/5070-6 Airport Master Plans Airport Design Standards: Advisory Circular: 150/5300-13 Environmental Impacts: Policies and Procedures: FAA Order 1050.1 National Environmental Policy Act (NEPA) Implementing Instructions for Airport Actions: FAA Order 5050.4 ARP SOP 2.0: Standard Procedure for FAA Review and Approval of Airport Layout Plans (ALPs) Zoning Ordinances: A Model Zoning Ordinance to Limit Height of Objects Around Airports: AC 150/5190-4 Airport Improvement Program (AIP) Handbook: FAA Order 5100.38 FAA Airport Compliance Manual: FAA Order 5190.6B Introduction to Safety Management Systems for Airport Operators: AC 150/5200-37 5. Estimated Funding In order to understand and present the full complexity of the planning review process for airports considering UAS integration, a survey of airport sponsors will be required to define the repeated planning features airports should evaluate when considering planning alternatives for UAS operations at the airport. Sample airports should be selected from all FAA regions and sizes to incorporate any potential fluctuations in facility standards as a result of airport location (weather impacts) and to identify any characteristics or assumptions that can be made about a particular planning component dataset, geographic region, or the availability of a beneficial data source. The estimated funding for this research is $500,000. 6. Estimated Research Duration The time needed to complete the estimated research and produce the guidance report and Planning Project Guide for UAS integration at airports is estimated to be 18 months. A limiting factor will be the time required to gather data from specific airports where UAS operations are currently taking place or are in the planning review process, including airport interviews and potential site visitation requirement needs. 7. Related Research Previous research efforts include the completion of ACRP, Report 144 (2015) Unmanned Aircraft Systems (UAS) at Airports: A Primer. Using the initial findings from Report 144 and other UAS studies as identified below, further research specific to airport planning requirements is recommended. 1. ACRP LRD 11: Survey of Minimum Standards: Commercial Aeronautical Activities at Airports; 2. ACRP Report 1: A Guidebook for Airport Safety Management Systems;

3. ACRP Synthesis 37: Lessons Learned from Airport Safety Management Systems Pilot Studies; 4. ACRP Synthesis 29: Ramp Safety Practices; 5. ACRP Report 50: Improved Models for Risk Assessment of Runway Safety Areas (RSA) 6. ACRP Report 51: Risk Assessment Method to Support Modification of Airfield Separation Standards 7. ACRP Report 107: Runway Veer-off Location Distribution Risk Assessment Model 8. GAO-13-346T Unmanned Aircraft Systems: Continued Coordination, Operational Data, and Performance Standards Needed to Guide Research and Development 9. FAA Report: Integration of Civil Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) Roadmap 8. Process Used to Develop the Problem Statement This problem statement has been developed through cooperative effort and review of previously submitted problem statements including: 16-10-04: Integration of Unmanned Aerial Systems into Airport Infrastructure and Operations, 15-03-11: UAS Impacts on Ground Operations Considerations for Airport Operators and Tenants and coordination with industry representatives during a UAS panel workshop of industry Airport and UAS Subject Matter Experts (SME) conducted on March 16, 2016 at the National Academy of Sciences Keck Center. It is recommended that this research project be considered as part of a UAS initiative suite of projects that can be conducted simultaneously to ensure they do not overlap in scope or research efforts. This would also ensure that UAS concepts of similar scope, definition and priorities will be developed and reviewed consistently on the applicability of UAS at airports, while providing airport sponsors and public use facilities with clear direction and understanding of airport requirements related to potential different UAS applications and the economic vitality of UAS as a transportation resource in the vicinity of an airport. It is also recommended that this project coordinate with current ACRP UAS projects including: A11-01/08-03: Evolving Law on Airport Implications by Unmanned Aerial Systems Operations. 9. Person Submitting Problem Statement and Date Heather Hasper, Ph.D. DHJ Alaska PO BOX 2757 Belleville, MI 48112 DATE Submitted: March 25, 2016 i FAA Modernization and Reform Act of 2012 (FMRA), Public Law: 112-95, 336(a). ii Operation and Certification of Small Unmanned Aircraft Systems, Proposed Rule, 80 Federal Register 9544 (February 23, 2015) (Docket FAA-2015-0150) (NPRM). iii http://www.faa.gov/uas/legislative_programs/section_333/

iv As codified under Title 49 U.S.C. 47101 v FAA (2012). General Aviation Airports: A National Asset.