GBAS ICAO Provisions. Presented by Sylvie GRAND-PERRET EUROCONTROL Navigation Unit

Similar documents
AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

AERODROME OPERATING MINIMA

Final Approach Operations Symposium

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

All-Weather Operations Training Programme

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Challenges in Complex Procedure Design Validation

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Consideration will be given to other methods of compliance which may be presented to the Authority.

INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERONAUTICAL CHARTS ANNEX 4 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding

Título ponencia: Introduction to the PBN concept

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

EUROPEAN GUIDANCE MATERIAL ON AERODROME OPERATIONS UNDER LIMITED VISIBILITY CONDITIONS

EUROPEAN GUIDANCE MATERIAL ON ALL WEATHER OPERATIONS AT AERODROMES

ADVISORY CIRCULAR AC-AD-005

Lecture Minimum safe flight altitude

Overview ICAO Standards and Recommended Practices for Aerodrome Mapping Data reported to AIM

USE OF RADAR IN THE APPROACH CONTROL SERVICE

Learning Objectives. By the end of this presentation you should understand:

European Aviation Safety Agency

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

Open Questions & Collecting Lessons Learned

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

AMENDMENT No. 14 TO THE PROCEDURES FOR AIR NAVIGATION SERVICES AIRCRAFT OPERATIONS. (Doc 8168) VOLUME I FLIGHT PROCEDURES FIFTH EDITION

AD 2. AERODROMES VAKS AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

Flight inspection service of LGS Radionavigation Aids in 2017

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

Electronic Terrain and Obstacle Data

SUBPART C Operator certification and supervision

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

AN INTRODUCTION TO PANS-AERODROMES (Doc 9981)

EFFECTIVE 0901Z 29 MARCH 2018 TO 0901Z 24 MAY 2018 AIP CANADA (ICAO) Part 3 Aerodromes (AD)

Chapter 6. Nonradar. Section 1. General DISTANCE

LOW VISIBILITY OPERATION

AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION

IFR SEPARATION WITHOUT RADAR

The aim of any instrument approach is to allow the aircraft to safely descend to a low altitude in order to become visual.

3. The proposed amendments to Annexes 4, 11, 15 and the PANS-OPS, Volumes I and II are in Attachments B through F, respectively.

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

Manual of Radiotelephony

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs.

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

Appendix A COMMUNICATION BEST PRACTICES

Update of ICAO DOC 8071 Volume 1

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

IRELAND SAFETY REGULATION DIVISION

Regulations & Obligations

AREA NAVIGATION RNAV- MANAGEMENT

2007 Instrument Procedures Handbook; Chapter 5 Approach

Approach Specifications

EXPLANATION OF TPP TERMS AND SYMBOLS

ICAO EUR PERFORMANCE BASED NAVIGATION TASK FORCE & EUROCONTROL RAiSG MEETING (ICAO EUR PBN TF & EUROCONTROL RAiSG)

AD 2. AERODROMES VOAT AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

SECURITY OVERSIGHT AGENCY June 2017 ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

AD 2. AERODROMES VEBI AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

AIP AD SEYCHELLES 03 APR 14

FLIGHT OPERATIONS PANEL (FLTOPSP)

AIM WG: Contributing to ATM Success. Roland Baumann Head Planning & Development AIM skyguide

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy


Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments

AIR NAVIGATION ORDER

FLIGHT OPERATIONS PANEL

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

CHAPTER 5 SEPARATION METHODS AND MINIMA

Change History. Table of Contents. Contents of Figures. Content of Tables

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS. Agenda Item: B.5.12 IFATCA 09 WP No. 94

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace

REPUBLIC OF CROATIA. LDDU - DUBROVNIK/Čilipi Airport - Temporary suspension of RNAV (GNSS) RWY12 and trial of PBN instrument flight procedures

Appendix A REQUEST FOR AUTHORIZATION FORM

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

SKUKUZA OPERATIONAL BRIEFING

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

Safety and Airspace Regulation Group

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE. Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13)

It is essential that planning take full account of air safety and efficiency of operations.

Organización de Aviación Civil Internacional. Международная организация гражданской авиации. Ref.: AN 13/2.5-13/85 13 December 2013

Quality Assurance Manual for Flight Procedure Design

23 July To: IFATCA Member Associations. Dear colleagues

Aerodrome Obstacle Survey Information Checks

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING

Aerodrome Obstacle Surfaces The new concept

2018 Annex Amendments

SRC POSITION PAPER. Edition March 2011 Released Issue

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

Contents. Subpart A General 91.1 Purpose... 7

Honeywell.com PBN Concepts Krakow, Poland

PBN and Procedure Design training

Work Programme of ICAO Panels and Study Groups

Validation & Implementation Considerations Module 14 Activities 11 to 17

CONTROLLED AIRSPACE CONTAINMENT POLICY

ATC PROCEDURES WORKING GROUP. Transition Level

Transcription:

GBAS ICAO Provisions Presented by Sylvie GRAND-PERRET EUROCONTROL Navigation Unit ICAO EUR GBAS Implementation Workshop Paris 18th March 2010

Applicable ICAO provisions ICAO Global provisions ANNEX 10 PANS ATM ANNEX 6 ANNEX 4 ANNEX 15 PANS OPS ANNEX 14 ANNEX 11 AWO Manual ICAO EUR DOC EUR DOC 011 EUR DOC 013 EUR DOC 015

ANNEX 10 GBAS CAT I SARPs update completed Remaining issue: Positioning service Existing provision does not sufficiently separate approach and positioning services GS-based integrity mechanism difficult to ensure at edge of coverage (unobservable iono errors) above 23NM Operation for which positioning service is used is not known by the ground system => no predefined performance and error size limit for GS to protect Review ongoing at NSP

PANS ATM Parallel Operations Normal operating zone (NOZ). Airspace of defined dimensions extending to either side of an ILS localizer course and/or MLS final approach track. Only the inner half of the normal operating zone is taken into account in independent parallel approaches. 6.7.3.2.1 Independent parallel approaches b) instrument landing system (ILS) and/or microwave landing system (MLS) approaches are being conducted on both runways; 6.7.3.4.1 Dependent parallel approaches may be conducted to parallel runways provided: d) ILS and/or MLS approaches are being conducted on both runways; 6.7.3.5 REQUIREMENTS AND PROCEDURES FOR SEGREGATED PARALLEL OPERATIONS 6.7.3.5.3 a) ILS and/or MLS precision approach; 8.9 USE OF ATS SURVEILLANCE SYSTEMS IN THE APPROACH CONTROL SERVICE (just ILS)

PANS ATM Phraseology (1/2) Philosophy : GBAS for system status GLS for approach type 12.3.1.11 OPERATIONAL STATUS OF VISUAL AND NON-VISUAL AIDS c) GBAS/SBAS/MLS/ILS CATEGORY (category) (serviceability state) 12.3.3.2 APPROACH INSTRUCTIONS CLEARED (type of approach GLS??) APPROACH [RUNWAY(number)]; 12.4.2.2 VECTORING FOR ILS AND OTHER PILOT-INTERPRETED AIDS e) REPORT ESTABLISHED ON [ILS] LOCALIZER (or ON GBAS/SBAS/MLS APPROACH COURSE); 12.4.2.3 MANOEUVRE DURING INDEPENDENT AND DEPENDENT PARALLEL APPROACHES b) YOU HAVE CROSSED THE LOCALIZER (or GBAS/SBAS/MLS FINAL APPROACH COURSE). TURN LEFT (or RIGHT) IMMEDIATELYAND RETURN TO THE LOCALIZER (or GBAS/SBAS/MLS FINAL APPROACH COURSE); c) ILS (or MLS) RUNWAY (number) LEFT (or RIGHT) LOCALIZER (or MLS) FREQUENCY IS (frequency);

PANS ATM Phraseology (2/2) & Flight Plan 12.3.1.13 GNSS SERVICE STATUS b) BASIC GNSS (or SBAS, or GBAS) UNAVAILABLE FOR (specify operation) [FROM (time) TO (time) (or UNTIL FURTHER NOTICE)]; *d) GBAS (or SBAS) UNAVAILABLE. Denotes pilot transmission. Flight Plan Item 10 or 18 do not refer to GBAS Need to be updated

ANNEX 6 No mention of GBAS: Flight data recorder requirement (Part II): Vertical deviation*: ILS glide path, MLS elevation, GNSS approach path Horizontal deviation*: ILS localizer, MLS azimuth, GNSS approach path Primary navigation system reference*: GNSS, INS, VOR/DME, MLS, Loran C, ILS No specific approval for GBAS or CAT I

ANNEX 4 (1/4) Precision approach procedure. An instrument approach procedure utilizing azimuth and glide path information provided by ILS or PAR. 6.5.3 Recommendation. The ILS reference datum height should be shown to the nearest half metre or foot. 11.10.8.6 For precision approach procedures and approach procedures with vertical guidance, the reference datum height to the nearest half metre or foot and the glide path/elevation/vertical path angle to the nearest one-tenth of a degree shall be shown. 11.10.8.7 When a final approach fix is specified at the final approach point for ILS, a clear indication shall be given whether it applies to the ILS, the associated ILS localizer only procedure, or both. In the case of MLS, a clear indication shall be given when an FAF has been specified at the final approach point.

ANNEX 4 (2/4) 13.6.1 This chart shall show: c) elevations and geoid undulations, to the nearest half-metre or foot, of the precision approach runway threshold, the geometric centre of the touchdown and lift-off area, and at the highest elevation of the touchdown zone of a precision approach runway Table 2. Elevation/altitude/height Runway or FATO threshold, precision approaches : 0.5 m or 1 ft; 1 10-8 / critical Threshold crossing height, precision approaches : 0.5 m or 1 ft 1 10-8 / critical Table 3. Gradients and angles Precision approach glide path/elevation angle : 0.1 degree 1 10-8 / critical

ANNEX 4 (3/4) Applicable to GBAS but no reference to GBAS: 11.10.4 Radio communication facilities and navigation aids 11.10.4.1 Radio navigation aids required for the procedures together with their frequencies, identifications and track-defining characteristics, if any, shall be shown. In the case of a procedure in which more than one station is located on the final approach track, the facility to be used for track guidance for final approach shall be clearly identified. In addition, consideration shall be given to the elimination from the approach chart of those facilities that are not used by the procedure. 11.10.4.2 The initial approach fix (IAF), the intermediate approach fix (IF), the final approach fix (FAF) (or final approach point (FAP) for an ILS approach procedure), the missed approach point (MAPt), where established, and other essential fixes or points comprising the procedure shall be shown and identified. 11.10.4.3 Recommendation. The final approach fix (or final approach point for an ILS approach procedure) should be identified with its geographical coordinates in degrees, minutes and seconds. 11.10.4.4 Radio navigation aids that might be used in diversionary procedures together with their track-defining characteristics, if any, shall be shown or indicated on the chart. 11.10.4.5 Radio communication frequencies, including call signs, that are required for the execution of the procedures shall be shown. 11.10.4.6 When required by the procedures, the distance to the aerodrome from each radio navigation aid concerned with the final approach shall be shown to the nearest kilometre or nautical mile. When no track-defining aid indicates the bearing of the aerodrome, the bearing shall also be shown to the nearest degree.

Item 108 : only ILS ANNEX 4 (4/4) Radio Navigation aids Table 5: Bearing (No GBAS) ILS localizer alignment: 1 degree 1 10-5 / essential MLS zero azimuth alignment : 1 degree 1 10-5 / essential

ANNEX 15 Amend Annex 15, Appendix 1, Section AD 2.19, as follows: 3) frequency(ies) and channel(s), as appropriate. 6) elevation of the transmitting antenna of DME to the nearest 30 m (100 ft) and of DME/P to the nearest 3 m (10 ft); elevation of the GBAS ground station reference point (Annex 10, App B, 3.6.4.3) to the nearest 1 m or 1 ft (Annex 4, 2.18.2), 7) service volume radius (Dmax Annex 10, Volume, App B, 3.6.4.3) of GBAS ground station to the nearest kilometre or nautical mile, and 8) remarks Note: The complete set of GBAS FAS Data Block information is not to be promulgated on the chart. The process to transfer the FAS data block information to industry still needs to be standardized. FAS data block information is to be uploaded by the ground station or a simulator.

PANS OPS (1/4) 6.1.5.4 - Note 1. While specific GBAS distributions for the existing CRM are being developed, use should be made of the current ILS CRM. (verification of decorrelation to be done for CAT II/III) 6.1.7 GBAS with glide path inoperative The GBAS with glide path inoperative is a non-precision approach procedure. The principles of Chapter 3, Non precision approach procedures apply. To be deleted Point already highlighted Parallel operations: A single GBAS is capable of serving both runways, however, a separate safety study needs to be carried out when it is intended to use GBAS for both runways.

PANS OPS (2/4) 6.8.1 General The instrument approach chart for a GBAS approach procedure shall be identified by the title GLS Rwy XX. If more than one GBAS approach is published for the same runway, the Duplicate Procedure Title convention shall be applied, with the approach having the lowest minima being identified as GLS Z Rwy XX. 6.4 QUALITY REQUIREMENTS Note 2. The 1 x 10-8 data integrity requirement can be met by conducting a flight evaluation after the FAS data block has been defined, provided the flight evaluation system verifies the CRC and determines that the approach path is acceptable.

PANS OPS (3/4) 6.8.7 Minimum Procedure Information (1/2) 1. Reference Path Identifier (RPI). The RPI, as defined in Part III, Section 2, Chapter 6, Appendix A, paragraph 3.h., is to be promulgated with the procedure information. This is required for charting and for database encoding. 2. Local Horizontal Reference Datum. The position and MSL altitude of the threshold shall be published, as well as the horizontal position of the Flight Path Alignment Point (FPAP, see Annex 10, Volume I, App B, 3.6.4.5.1) with precision as requested in Annex 4 section 2.18. Note: The LTP/FTP positions broadcast by the ground station are not necessarily located at the threshold and need not be promulgated with the procedure information. 3. GBAS Approach Channel Number. The channel number assigned to the GBAS Approach, as defined in Annex 10, Volume I, Appendix B, section 3.6.5.7 and Attachment D, paragraph 7.7, is to be promulgated with the procedure information. This is required for charting and for database encoding. 4. Other GBAS approach information: Other GBAS approach information to be promulgated is: runway number, runway letter, glide path angle, indication if autoland is not supported on this approach and coordinates of the waypoint used for altitude crosscheck (outer marker equivalent), if used. This is required for database encoding and charting.

PANS OPS (4/4) 6.8.7 Minimum Procedure Information (1/2) 5. GBAS Ground Station Information. The following information about the GBAS Ground Station is to be promulgated in the aerodrome section of the AIP.: The GBAS station identifier (ref Annex 10, Volume I, App B, 3.6.3.4.1), latitude, longitude, MSL altitude and undulation of the GBAS reference point (with precision as requested in Annex 4 section 2.18), service volume radius (Dmax), constellations supported (GPS/GLONASS), type of polarization (horizontal/elliptical), services supported (approach, DCPS, GRAS). Note: The position of the GBAS reference point shall also be provided in the appropriate navigation aid section of the AIP. Note: Refer to Annex 10, Volume I, App B, 3.6.4.3 for definitions of the GBAS reference point and Dmax). 6. The channel number for DCPS should be promulgated on RNAV charts, not GLS precision approach charts. 7. Waypoint Information. All waypoints required for RNAV transition and capture of the procedure as well as RNAV missed approach procedure are to be promulgated with their identifier and latitude/longitude to the correct resolution, as defined in Annex 15, Table A7-1. See also Document 8168, Volume II, Part III, Section 5, Chapter 1.

ANNEX 14 No direct mention of GBAS operations so far need to verify where GBAS needs to be included notably verify all ILS/MLS occurrences) However additionally to minimize loss of runway throughput during LVP (so GBAS CAT II/III): OFZ scope, Runway strip and Runway vacating sign need to be reviewed. This review needs to be performed in conjunction with PANS ATM («Runway vacated») & Doc 9137

ANNEX 11 (CAT II/III issue) 3.8 Control of persons and vehicles at aerodromes a) persons and vehicles operating on the manoeuvring area of an aerodrome shall be restricted to the essential minimum, and particular regard shall be given to the requirements to protect the ILS/MLS sensitive area(s) when Category II or Category III precision instrument operations are in progress; c) when mixed ILS and MLS Category II or Category III precision instrument operations are taking place to the same runway continuously, the more restrictive ILS or MLS critical and sensitive areas shall be protected. 4.3.4.3 Voice-ATIS broadcasts shall not be transmitted on the voice channel of an ILS. Do we need addition on GBAS naming convention?

AWO Manual (1/2) Update not yet approved GLS. An instrument approach operation that is based on GBAS. (need harmonisation with PANS OPS amendment which includes also S-CAT I) 3.2.14 Alternate visual aid requirements for RNP based procedures, and for GLS may be applicable. This is because both RNP and GLS procedures may be established to runways where it is impractical to install or maintain traditional visual aids in the approach zone, or where the RNP paths may not necessarily follow a long straight-in final segment. 4.2.3 The following are examples of minimum equipment combinations acceptable for Category I operations by air-carrier aeroplanes using ILS, MLS or GLS for either manual or automatic approaches: Equipment type/specification ILS, MLS or GLS receiver (GBAS?) Display of deviation data based on the ILS, MLS or GLS service (GBAS service?) 5.2.11 The ILS, MLS and GLS ground equipment 5.2.14 GLS TBD

AWO manual (2/2) Update not yet approved 5.7.5 Flight crews must be able to make full use of ground and airborne equipment intended for use during Category II and III operations. They must, therefore, be instructed in how to obtain maximum benefit from redundancy provided in the airborne equipment and to fully understand the limitations of the total system, including both ground and airborne elements. The ground instruction should cover at least: a) the characteristics, capabilities and limitations of the navaids involved (e.g. ILS, GLS) including the effect on aeroplane systems performance of interference to the ILS signal caused by other landing, departing, or overflying aeroplanes, and the effect of the infringement of ILS critical and sensitive areas by aeroplanes or vehicles in the manoeuvring area;

EUR Doc 011 Frequency coordination Existing text requires to coordinate GBAS frequency and used slots in 500NM radius SARPS maintenance changes agreed for Amendment 86 also require to coordinate: RPDS and RSDS (unique approach identifier) RPI s used (approach name) GBAS ID (typically set to the airport ID) Doc011 change after SARPS publication

EUR DOC 013 GBAS will be added AWOG 15 action

EUR DOC 015 EANPG COG 45: Revisit Doc 015 in relation to GBAS

Any Additions or Questions???

Table 3.2 Holding distance ANNEX 14 This table ensures holding aircraft do not penetrate the OFZ Type of runway Aerodrome Code Number 1 2 3 4 Non-Instrument 30 m 40 m 75 m 75 m Non-Precision Approach 40 m 40 m 75 m 75 m Precision Approach Category I 60 m b 60 m b 90 m a, b 90 m a,b,c Precision Approach Categories II and III - - 90 m a, b 90 m a,b,c Take-Off Runway 30 m 40 m 75 m 75 m Aircraft vacating runway not considered here

ANNEX 14 - runway strip: a defined area including the runway and stop way, if provided, intended: a) to reduce the risk of damage to aircraft running off a runway; and b) to protect aircraft flying over it during take-off or landing operations.

Annex 14 section 3.3.7 defines the rules to apply for fixed object and mobile object on the runway strip as follows: 3.3.7 No fixed object, other than visual aids required for air navigation purposes and satisfying the relevant frangibility requirement in Chapter 5, shall be permitted on a runway strip: within 77.5 m of the runway centre line of a precision approach runway category I, II or III where the code number is 4 and the code letter is F; or within 60 m of the runway centre line of a precision approach runway category I, II or III where the code number is 3 or 4; or within 45 m of the runway centre line of a precision approach runway category I where the code number is 1 or 2. No mobile object shall be permitted on this part of the runway strip during the use of the runway for landing or take-off.

ICAO Doc 9137 Part 6 Control of obstacles The OFZ shall be kept free from fixed objects, and from transient objects such as aircraft and vehicles when the runway is being used for category II or III ILS approaches. When an OFZ is established for a precision approach runway category I, it shall be clear of such objects when the runway is used for category I ILS approaches.