Chapter 5 Airport Development Alternatives

Similar documents
Chapter 4 Airport Facility Requirements

Addendum - Airport Development Alternatives (Chapter 6)

Grants Pass Airport Master Plan & Airport Layout Plan Update

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

General Aviation Master Plan Update

Master Plan Update Technical Advisory Committee Meeting

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 5: Landside Facility Requirements and Development Concepts

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Table of Contents. Overview Objectives Key Issues Process...1-3

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

Lake Tahoe Airport Master Plan

Chapter 2: Existing Facilities

Merritt Island Airport

From concept through completion, CGA is your AVIATION engineering firm!

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Chapter 4 Development Alternatives

What is an Airport Master Plan?

Current Airport Roles

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Birmingham Airport 2033

Beginning balance available for Priority I Projects: $1,737,029

Collier County Airport Authority. Joint Automated Capital Improvement Program

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

Current and Forecast Demand

STUDY WORK GROUP MEETING No. 3. November 29, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

5. Facility Requirements

Punta Gorda Airport Master Plan Update

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

Appendix B PLANNING ADVISORY COMMITTEE - MEETING SUMMARIES

PUBLIC MEETING 2. Airport Master Plan Update. March 2019

Financial Plan/Capital Improvements - DRAFT 6-1

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan

Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES

ArcadiaMunicipalAirportislocatedonthesoutheast sideofarcadia,southofstateroute70,westofstate Route31,andisaccessiblefrom AirportRoad.

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

AIRPORT MASTER PLAN UPDATE

Chapter 4 Airport Facility Requirements

PREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Technical Advisory Committee Meeting February 29, 2016

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES

Bremerton National Airport Airport Master Plan Project Update February 12, 2013

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan

Chapter 8.0 Implementation Plan

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Request for Scoping Comments Regarding Environmental Issues of Concern

Meeting Notes Public Open House

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

Airport Master Plan Update


Demand. Typical Building Area Functions and Facilities Commonly Found at General Aviation Airports:

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

MASTER PLAN CONCEPT 1 DRAFT

Master Plan Update Community Advisory Committee Kick-off Meeting

CHAPTER 1 INTRODUCTION AND BACKGROUND

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

PORT OF PORTLAND. Chapter Six AIRPORT PLANS

BELFAST MUNICIPAL AIRPORT OVERVIEW

CHAPTER 1: INTRODUCTION

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

MOST aircraft need a runway for landing and takeout.

ACTION TRANSMITTAL

3.9 AIRPORT SUPPORT FACILITIES

Chapter 9 - AIRPORT SYSTEM DESIGN

PORT OF PORTLAND. Chapter Five AIRPORT DEVELOPMENT ALTERNATIVES

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

AIRPORT COMPLIANCE th Texas Aviation Conference. 3/29/2018 Date. Footer Text

DRAFT MASTER PLAN UPDATE

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

CHAPTER 3 AIRPORT FACILITY REQUIREMENTS

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

Master Plan Update. Palm Beach County Park Airport. Master Plan Update. Ricondo & Associates, Inc.

MONTROSE REGIONAL AIRPORT

OREGON AVIATION PLAN AIRPORT SUMMARY CORVALLIS MUNICIPAL AIRPORT

CHAPTER 1 EXECUTIVE SUMMARY

KEN JERNSTEDT AIRFIELD AIRPORT MASTER PLAN 2009 UPDATE PORT OF HOOD RIVER HOOD RIVER, OREGON

Chapter 9 Airport Financial Plan

Eugene Airport Master Plan Update Executive Summary

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

THE PURPOSE OF THIS BUSINESS PLAN FOR Lee s Summit Municipal Airport is to assess potential

CHAPTER 5 - FACILITY REQUIREMENTS

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS

Technical Advisory Committee Briefing #3

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Transcription:

Chapter 5 Airport Development Alternatives Introduction CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-1

Evaluation Process No-Action Alternative CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-2

Preliminary Development Alternatives Airside Development Options CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-3

RUNWAY CONFIGURATION AUTOMATED WEATHER OBSERVATION SYSTEM (AWOS) CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-4

Airside Option 1 RUNWAY PROTECTION ZONE (RPZ) AND ROAD EVALUATION Airside Option 2 CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-5

RUNWAY PROTECTION ZONE (RPZ) AND ROAD EVALUATION Airside Option 3 CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-6

RUNWAY PROTECTION ZONE (RPZ) AND ROAD EVALUATION TABLE 5-1: COMPARISON OF RUNWAY LENGTHS Option 1 Option 2 Option 3 CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-7

albany municipal airport airport master plan airside option 1 fig. 5-1

albany municipal airport airport master plan airside option 2 fig. 5-2

albany municipal airport airport master plan airside option 3 fig. 5-3

Landside Development Options LANDSIDE OPTION 1 CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-11

Landside Option 2 MAIN APRON RECONFIGURATION CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-12

TERMINAL AREA LANDSIDE CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-13

Landside Option 3 MAIN APRON RECONFIGURATION TERMINAL AREA LANDSIDE CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-14

SOUTHWEST DEVELOPMENT AREA NORTHEAST DEVELOPMENT AREA CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-15

LEGEND STRIPING TO BE REMOVED FUTURE STRIPING FUTURE FENCING AIRFIELD PAVEMENT TO BE REMOVED FUTURE AIRFIELD PAVEMENT FUTURE VEHICLE PARKING FUTURE BUILDING DEVELOPMENT RESERVE FUTURE ROAD LEASE AREA BUILDINGS AND FACILITIES 1 FBO 2 HANGAR (SMALL CONVENTIONAL) 3 HANGAR (T-HANGAR) 4 HANGAR (LARGE/MED. CONVENTIONAL) 5 ELECTRONIC BUILDINGS 6 FUTURE AIRPORT APRON 7 FUTURE HANGAR 8 FUTURE BUSINESS AVIATION FACILITIES 9 FUTURE VEHICLE PARKING 10 FUEL STORAGE 11 AVIATION RELATED LEASE 12 FUTURE FBO HANGAR AIRPORT ROAD INTERSTATE 5 BUSINESS RELATED AVIATION/FBO AREA SOUTH AVIATION RESERVE AREA 8 9 7 7 9 8 12 1 AIRPORT ACCESS ROAD 4 5 9 4 8 4 2 BRL (E) 6 AC TIEDOWN 6 FBO APRON 7 7 7 3 3 3 3 7 7 6 10 6 FBO DEVELOPMENT RESERVE 13 ROTATING BEACON BRL (E) RUNWAY 16-34 TAXIWAY RESERVE 11 FUTURE AIRPORT RELATED LEASE A/C APRON RESERVE T-HANGARS, CONVENTIONAL HANGARS COMMERCIAL HANGARS 11 AIRCRAFT APRON RESERVE (FBO & TIEDOWN) PRICE ROAD AVIATION RELATED LEASE AREAS albany municipal airport airport master plan landside option 1 fig. 5-4 FIGURE 5-4 LANDSIDE DEVELOPMENT OPTION 1

AIRPORT ACCESS ROAD ACCESS ROAD VEHICLE PARKING BRL (F) BRL (F) BRL (F) AIRCRAFT PARKING RESERVE 50' H BRL (F) APL (F) APL (F) APL (F) APL (F) SOUTHWEST LANDSIDE TERMINAL AREA LANDSIDE AIRPORT ACCESS ROAD BRL (F) (E) H BRL (F) (E) (F) RUNWAY 16-34 LEGEND RECONFIGURED TIEDOWNS (EAST & WEST 293' BRL (24') POSITIONS) 293' BRL (24') MULTI-ENGINE DRIVE THROUGH PARKING COMMERCIAL HANGARS T-HANGARS; CONVENTIONAL HANGARS AIRCRAFT PARKING RESERVE HELICOPTER PARKING POSITION RECONFIGURED APRON TAXILANE (FUELING AREA) FUEL STORAGE RESERVE STRIPING TO BE REMOVED FUTURE STRIPING FUTURE FENCING FUTURE AIRFIELD PAVEMENT FUTURE VEHICLE PARKING FUTURE BUILDING DEVELOPMENT RESERVE FUTURE ROAD LEASE AREA albany municipal airport airport master plan landside option 2 fig. 5-5 FIGURE 5-5 LANDSIDE DEVELOPMENT OPTION 2

ACCESS ROAD AIRPORT ACCESS ROAD H VEHICLE PARKING AIRCRAFT PARKING RESERVE 250' BRL (17.8') 250' BRL (17.8') 250' BRL (17.8') 50' SOUTHWEST LANDSIDE TERMINAL AREA LANDSIDE AIRPORT ACCESS ROAD H 250' BRL (17.8') 250' BRL (17.8') RUNWAY 16-34 LEGEND STRIPING TO BE REMOVED FUTURE STRIPING FUTURE FENCING AIRFIELD PAVEMENT TO BE REMOVED FUTURE AIRFIELD PAVEMENT FUTURE VEHICLE PARKING FUTURE BUILDING DEVELOPMENT RESERVE FUTURE ROAD LEASE AREA RECONFIGURED TIEDOWNS (EAST FACING POSITIONS) COMMERCIAL HANGARS T-HANGARS, EXECUTIVE HANGARS MULTI-ENGINE DRIVE THROUGH PARKING albany municipal airport airport master plan landside option 3 fig. 5-6 FIGURE 5-6 LANDSIDE DEVELOPMENT OPTION 3 RECONFIGURED FUELING STATION FUEL STORAGE RESERVE RELOCATED AC HOLD AREA AIRCRAFT PARKING RESERVE HELICOPTER PARKING POSITION