Chapter 5 Airport Development Alternatives Introduction CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-1
Evaluation Process No-Action Alternative CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-2
Preliminary Development Alternatives Airside Development Options CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-3
RUNWAY CONFIGURATION AUTOMATED WEATHER OBSERVATION SYSTEM (AWOS) CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-4
Airside Option 1 RUNWAY PROTECTION ZONE (RPZ) AND ROAD EVALUATION Airside Option 2 CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-5
RUNWAY PROTECTION ZONE (RPZ) AND ROAD EVALUATION Airside Option 3 CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-6
RUNWAY PROTECTION ZONE (RPZ) AND ROAD EVALUATION TABLE 5-1: COMPARISON OF RUNWAY LENGTHS Option 1 Option 2 Option 3 CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-7
albany municipal airport airport master plan airside option 1 fig. 5-1
albany municipal airport airport master plan airside option 2 fig. 5-2
albany municipal airport airport master plan airside option 3 fig. 5-3
Landside Development Options LANDSIDE OPTION 1 CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-11
Landside Option 2 MAIN APRON RECONFIGURATION CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-12
TERMINAL AREA LANDSIDE CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-13
Landside Option 3 MAIN APRON RECONFIGURATION TERMINAL AREA LANDSIDE CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-14
SOUTHWEST DEVELOPMENT AREA NORTHEAST DEVELOPMENT AREA CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-15
LEGEND STRIPING TO BE REMOVED FUTURE STRIPING FUTURE FENCING AIRFIELD PAVEMENT TO BE REMOVED FUTURE AIRFIELD PAVEMENT FUTURE VEHICLE PARKING FUTURE BUILDING DEVELOPMENT RESERVE FUTURE ROAD LEASE AREA BUILDINGS AND FACILITIES 1 FBO 2 HANGAR (SMALL CONVENTIONAL) 3 HANGAR (T-HANGAR) 4 HANGAR (LARGE/MED. CONVENTIONAL) 5 ELECTRONIC BUILDINGS 6 FUTURE AIRPORT APRON 7 FUTURE HANGAR 8 FUTURE BUSINESS AVIATION FACILITIES 9 FUTURE VEHICLE PARKING 10 FUEL STORAGE 11 AVIATION RELATED LEASE 12 FUTURE FBO HANGAR AIRPORT ROAD INTERSTATE 5 BUSINESS RELATED AVIATION/FBO AREA SOUTH AVIATION RESERVE AREA 8 9 7 7 9 8 12 1 AIRPORT ACCESS ROAD 4 5 9 4 8 4 2 BRL (E) 6 AC TIEDOWN 6 FBO APRON 7 7 7 3 3 3 3 7 7 6 10 6 FBO DEVELOPMENT RESERVE 13 ROTATING BEACON BRL (E) RUNWAY 16-34 TAXIWAY RESERVE 11 FUTURE AIRPORT RELATED LEASE A/C APRON RESERVE T-HANGARS, CONVENTIONAL HANGARS COMMERCIAL HANGARS 11 AIRCRAFT APRON RESERVE (FBO & TIEDOWN) PRICE ROAD AVIATION RELATED LEASE AREAS albany municipal airport airport master plan landside option 1 fig. 5-4 FIGURE 5-4 LANDSIDE DEVELOPMENT OPTION 1
AIRPORT ACCESS ROAD ACCESS ROAD VEHICLE PARKING BRL (F) BRL (F) BRL (F) AIRCRAFT PARKING RESERVE 50' H BRL (F) APL (F) APL (F) APL (F) APL (F) SOUTHWEST LANDSIDE TERMINAL AREA LANDSIDE AIRPORT ACCESS ROAD BRL (F) (E) H BRL (F) (E) (F) RUNWAY 16-34 LEGEND RECONFIGURED TIEDOWNS (EAST & WEST 293' BRL (24') POSITIONS) 293' BRL (24') MULTI-ENGINE DRIVE THROUGH PARKING COMMERCIAL HANGARS T-HANGARS; CONVENTIONAL HANGARS AIRCRAFT PARKING RESERVE HELICOPTER PARKING POSITION RECONFIGURED APRON TAXILANE (FUELING AREA) FUEL STORAGE RESERVE STRIPING TO BE REMOVED FUTURE STRIPING FUTURE FENCING FUTURE AIRFIELD PAVEMENT FUTURE VEHICLE PARKING FUTURE BUILDING DEVELOPMENT RESERVE FUTURE ROAD LEASE AREA albany municipal airport airport master plan landside option 2 fig. 5-5 FIGURE 5-5 LANDSIDE DEVELOPMENT OPTION 2
ACCESS ROAD AIRPORT ACCESS ROAD H VEHICLE PARKING AIRCRAFT PARKING RESERVE 250' BRL (17.8') 250' BRL (17.8') 250' BRL (17.8') 50' SOUTHWEST LANDSIDE TERMINAL AREA LANDSIDE AIRPORT ACCESS ROAD H 250' BRL (17.8') 250' BRL (17.8') RUNWAY 16-34 LEGEND STRIPING TO BE REMOVED FUTURE STRIPING FUTURE FENCING AIRFIELD PAVEMENT TO BE REMOVED FUTURE AIRFIELD PAVEMENT FUTURE VEHICLE PARKING FUTURE BUILDING DEVELOPMENT RESERVE FUTURE ROAD LEASE AREA RECONFIGURED TIEDOWNS (EAST FACING POSITIONS) COMMERCIAL HANGARS T-HANGARS, EXECUTIVE HANGARS MULTI-ENGINE DRIVE THROUGH PARKING albany municipal airport airport master plan landside option 3 fig. 5-6 FIGURE 5-6 LANDSIDE DEVELOPMENT OPTION 3 RECONFIGURED FUELING STATION FUEL STORAGE RESERVE RELOCATED AC HOLD AREA AIRCRAFT PARKING RESERVE HELICOPTER PARKING POSITION