TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects 13 August 2014 1
THE TNPA WORLD OF PORT INFRASTRUCTURE
Complete Pixman Images 2010 Dredging International - Pallieter
Overview of Presentation TNPA s 7 year Capital Program starting 2014/15. Projects already Sanctioned Projects being planned in 7 year capital program 4 TNPA Infrastructure Projects
8 x Commercial South African Ports Johannesburg Port Nolloth SOUTH AFRICA Durban Richards Bay Saldanha East London Cape Town Courtesy Google earth Mossel Bay Ngqura (Coega) Port Elizabeth 2,798 km of Coastline
The 8 x Existing Ports + DDOP WESTERN PORTS Saldanha Bay Cape Town Mossel Bay CENTRAL PORTS Port Elizabeth Ngqura East London EASTERN PORTS Durban New Durban dig-out Port Richards Bay
TNPA 7 year Capital Program Starting 14/15 per PORT PORT Rand billions % Cape Town 1.26 2.9 Durban 14.31 32.9 Dredging Services 0.89 2.1 East London 1.70 3.9 Head Quarters 4.23 9.7 Lighthouses 0.42 1.0 Mossel Bay 0.06 0.1 Ngqura 12.85 29.5 Port Elizabeth 0.82 1.9 Richards Bay 2.83 6.5 Saldanha 4.14 9.5 7 TOTAL TNPA 43.51 100
TNPA 7 year Capital Program Starting 14/15 per YEAR Year Financial year Rand billions % 1 2014/15 2.37 5.4 2 2015/16 6.01 13.8 3 2016/17 8.58 19.7 4 2017/18 9.93 22.8 5 2018/19 5.50 12.6 6 2019/20 5.74 13.2 7 2020/21 5.38 12.4 TOTAL 43.51 100 8 TRANSNET AUDITED RESULTS 2014
Major Projects Sanctioned # Project FFC million Start Completion 1 Durban Sand Hopper Station 188.95 3 July 2012 22 Jan 2016 2 Durban Maydon Wharf Rehabilitation 1,456.40 1 May 2014 1 Dec 2016 Durban HV electrical Upgrade 103.02 11 July 2013 1 Aug 2014 3 Richards Bay Truck Staging 126.73 27 Jan 2014 13 June 2015 Richards Bay Power supply to Harbour West upgrade 40.00 25 March 2014 10 March 2015 4 East London Foreshore 191.25 1 April 2014 10 March 2016 5 Port Elizabeth Slipways x 2 229.00 1 Oct 2014 26 Oct 2016 6 7 Ngqura Administration Building & Small Craft Basin Ngqura Berth A100 & Tank Farm landside services 8 Ngqura Manganese Included in overall port sanction Started 28 July 2016 2,487.68 1 April 2015 4 July 2018 Busy with detail design 27 July 2018 9 Cape Town Fire Fighting 89.15 16 Apr 2014 16 Apr 2016 10 Saldanha General Maintenance Quay (GMQ) 200.83 30 Oct 2014 31 March 2016 9
New Sand Hopper Berth & Pump Station
New Sand Hopper Berth & Pump Station Scope: Construction of New Sand Hopper and Pump Station at A Berth to replace the original hopper station that was demolished during Entrance Channel Widening Purpose: To reinstate the natural migration of sand along the coast by supplying sand to the city beaches. Prevent the entrance channel from silting up
Durban New Sand Hopper Berth & Pump Station
13 Sand Hopper progress as at July 2014
Maydon Wharf rehabilitation of berths 1 to 4 and 13 to 14 Scope Replace old steel sheet pile berths 1-4, and 12-14, with new deep water berths. Purpose: Provide infrastructure to sustain existing port operations and cater for growth in cargo volumes. Risks: Berths at risk of failure, if not reconstructed. Berth capacity constraint during construction. Mitigations: Implement Berth Monitoring Surveys. Fast track reconstruction program. Berth 12 is being reconstructed to create additional capacity for when the remainder of the sheet pile berths are reconstructed. 14
Maydon Wharf - Berth Reconstruction Steel Sheet Pile Walls (Current Project)
16 Maydon Wharf berth 1 start of construction
17 Completed Maydon Wharf berth 12
Projects being planned in 7 year capital program 1. Durban Berth Deepening 2. Durban Pier 1 Phase 2 3. Durban Dig Out Port (DDOP) including land acquisition 4. RB Land Acquisition 5. Ngqura Liquid Berth A100 and Landside services 6. Ngqura General Cargo Berth B101 7. Saldanha Iron Ore Quay 8. Saldanha Oil & Gas Repair Quay 9. Saldanha Mosgas Quay extension 18
Berth Deepening Durban Deepen Container Terminal berths from -12.8m CD (Port) to -17.0m CD (Port) Extend length of existing quay wall from 915 m to 1190 m to accommodate 3 x 350 m long vessels Ensure the larger container vessels with a draft of 14.5 m can be accommodated Vessel size 9,200 TEU or (14,000 TEU light) 4.0 million m3 of dredging 1.0 million m3 reclamation 19
Project Motivation 1,000 TEU Vessel and 4 ton Wharf Crane 6,000 TEU Vessel and 80 ton STS crane (12,000 TEU already calling light)
North Quay - berths 203 to 205 Existing Sandbank 21
Caisson Deepening Solution
Existing dredged limits Proposed dredged limit Proposed quay wall extension
Pier 1 Phase 2 (Salisbury Island) Container Terminal Durban Reclaim 12 hectares to create a Container Terminal of 1.8 million TEU per annum Design vessel size 9,200 TEU to 14,000 TEU light Draft of 14.5 m Water depth required = 16.5 m 1,180 m of productive quay length 1.0 million m 3 of dredging 2.8 million m 3 reclamation
Salisbury Island New Terminal boundary Existing Navy boundary Proposed Navy Boundary
2.8 million m3 of reclamation
Durban Dig Out Port Example of the typical terminal layouts from CONCEPT stage
Aerial View Old DIA Site
Artist s Impression of Durban Dig Out Port
Port of Ngqura: Proposed New Liquid Bulk Berth & General Cargo Berth Purpose is to construct New Liquid bulk berth A100 with capacity of 4 Mtpa New General Cargo berth B101 with capacity of 1 Mtpa Design vessel sizes 100 000 DWT carriers Water Depth required = 18 m Dredging volume = 1.2 million m 3 of dredging
Port of Ngqura Aerial View of Proposed Developments New Admin Building Small Craft Basin B101 Cargo Berth Basin dredging A100 Tanker berth
A100 Tanker berth B101 General Cargo berth Future development up the river
Saldanha Proposed Developments Proposed Mosgas Quay Extension Aerial picture of Port General Maintenance Quay Proposed Oil & Gas Repair Berth Proposed Iron Ore Berth
Saldanha Proposed Quay Walls Proposed Iron Ore Berth Proposed Oil & Gas Repair Berth General Maintenance Quay
The End Session # 1 A brief overview of The TNPA World of Port Infrastructure The End