TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects. 13 August

Similar documents
Operation Phakisa as a driver for economic growth B2B Networking Forum 15 August 2016

Click to edit Master title style

Walvis Bay and its role as a logistics hub for the SADC region. Christian Faure Executive: Marketing and Strategic Business Development

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY

B2B JOINT PLAN FOR AN OIL & GAS SERVICE COMPLEX IN THE PORT OF SALDANHA BAY, SOUTH AFRICA 11 th February 2015

Port of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010

Innovation based development of Klaipeda Port technologies

Port of Los Angeles CIP Shaun Shahrestani Chief Harbor Engineer Director of Construction September 27, 2018

TRANSNET PORT TERMINALS - Increasing efficiency and integration of activities in Africa

SOUTH AFRICAN REVENUE SERVICE SUID AFRIKAANSE INKOMSTEDIENS

NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May

New vessels this season include LE LYRIAL, which was built only last year for Compagnie du Ponant. The vessel will call at Durban and Cape Town.

California Los Angeles County Chapter PORT OF LOS ANGELES. January 16, 2018

DOWNLOAD OR READ : TRANSNET PORT TERMINALS TRANSNET SOC LTD REGISTRATION PDF EBOOK EPUB MOBI

PRESENTATION ON CAIRNS SHIPPING DEVELOPMENT PROJECT

SAN HYDROGRAPHIC OFFICE NATIONAL REPORT to the 14 TH SOUTHERN AFRICA AND ISLANDS HYDROGRAPHIC COMMISSION CONFERENCE (SAIHC) 6-8 September 2017

GRINDROD LIMITED AUDITED RESULTS AND DIVIDEND ANNOUNCEMENT for the year ended 31 December 2016

Discover a proven way! PORT of KLAIPEDA. Klaipeda Port Extensive Business Opportunities Artūras Drungilas. Marketing and Corporate Affairs Director

ADVICE ON MOZAMBIQUE PORTS. P&I ASSOCIATES (PTY) LTD

MEDIA RELEASE. 2017/18 Cruise Season Underway at SA Ports

VERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED Technical note HHP DKA OYBE

Master Plan of Costa Rica Atlantic Coast Limon - Moin. November, 2008 Costa Rica

SERVICE QUALITY IMPROVEMENT AT THE CONTAINER TERMINAL OF THE PORT OF CASABLANCA. 12 th ASEAN PORT & SHIPPING &12 June, Jakarta, Indonesia

SCHEDULE TO THE RULES PLACES OF ENTRY, WAREHOUSING PLACES, PLACES FOR PARTICULAR AND LIMITED PURPOSES, ETC

Richards Bay Port Festival Hailed a Success

PORT OF TOWNSVILLE NORTHERN AUSTRALIA S TRANSPORT LINK TO THE WORLD TOWNSVILLE PORT EXPANSION PROJECT MAGNETIC ISLAND KNOWLEDGE FORUM 29 APRIL 2017

Alexandria Port, Egypt

LNG the future fuel in ferry and cruise ship ports?!

SAMOA PORTS AUTHORITY

Strategic Location DJIBOUTI

Port Everglades: Making The Last Mile Count. AAPA Annual Convention November 3, 2015

Transport. fact. Agencies. Transnet Limited

MIAMI INTERNATIONAL REAL ESTATE CONGRESS ERIC OLAFSON MANAGER TRADE DEVELOPMENT

American Institute of Marine Underwriters

SHIPBUILDING INDUSTRY CORPORATION (SBIC) VIETNAM MARITIME INDUSTRY (Presentation at ASEF 9 th Forum)

Capability Statement. Connecting global markets

Port Everglades Master/Vision Plan Update

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

Bigger, Deeper, Wider

Port Everglades Overview

The Panama Canal Update: Some Implications for Western Hemisphere Trade

Erhama bin Jaber Al Jalahma Shipyard

Panama Canal Stakeholder Working Group Meeting

Capability Statement Connecting global markets

Mr. Jeff Keever Deputy Executive Director Virginia Port Authority May 2, 2012

Port Everglades Master/Vision Plan Update

PORT DEVELOPMENT STRATEGIES & SUCCESS STORIES. PORTMIAMI AN EVOLVING GATEWAY Juan M. Kuryla, PPM PortMiami Director and CEO

Polish Ports in 2017 February 2018

Waterway Access and the Atlantic Intracoastal Waterway in Florida

Philadelphia Regional Port Authority. Channel Deepening Briefing to the Delaware Valley Goods Movement Task Force Our Port Our Legacy

Green Award Tariffs

SALDANHA BAY PORT INFORMATION

Madagascar. Ports description

Unlocking Panama? Some thoughts on the impact of the Canal expansion on liner and bulk sea trade

Jhan Schmitz. Executive Sponsor Panama Canal Expansion Program

Golden Ocean Group Limited Q results March 1, 2007

Delivering the Goods: Ports in the South

Navigation and operation 20. port procedures manual 22. communication 22. port security 23. Services

Capability Statement. Connecting global markets

HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH

BHP Billiton Iron Ore. Asset Development Projects

January 2018 Air Traffic Activity Summary

The History & Management of the Atlantic Intracoastal Waterway in Florida

3 Pilbara ports provide gateways

CIVIL AVIATION AUTHORITY

Table of Contents. CMA CGM Mozambique Profile

HUTCHISON PORTS STOCKHOLM

HARBOR INFRASTRUCTURE INVENTORIES Buffalo Harbor, New York

Oil and Gas Capabilities

COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project

Efficiency that delivers GENERAL PRESENTATION UCSD FRONTERA FRIDAY APRIL 1 ST. 2016

COSCO CORPORATION. (SINGAPORE) LTD FY2003 Full Year Results. Presentation

port of brisbane Information Guide

PERFORMANCE MEASUREMENT: THE CASE OF DURRES PORT ABSTRACT

State of South Africa s Maritime Industry Transport Portfolio Committee. 08 May 2012 Commander Tsietsi Mokhele Chief Executive Officer

Presentation to Analysts. 20 August

Auto Port Operational Strategy. Roy A. Schleicher Senior Director Trade Development & Global Marketing

MAPUTO PORT DEVELOPMENT COMPANY

Vagelis Chatzigiannis, GMS. 3rd February, 2016 International Seminar: Towards Sustainable Ship Recycling 1

Final Results 31 December 2013

MoorMaster, automated mooring for ports automation

CAIRNS A STRATEGIC PORT

Post tsunami Recovery of Port and Harbor areas in Japan from the 2011 Great East Japan Earthquake Tsunami

The Port of New York & New Jersey A Leading Indicator of Globalization Transportation Research Forum Plenary Session March 23, 2006

Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda

UK Port Infrastructure Project Pipeline Analysis Report

Aid to Local Ports FY19 Requests

ECONOMIC CONSEQUENCES OF PIRACY AND ARMED ROBBERY ON SHIPPING

U.S. Army Corps of Engineers Wilmington District

PORT WARATAH COAL SERVICES

Statistics of Air, Water, and Land Transport Statistics of Air, Water, and Land. Transport Released Date: August 2015

Port Everglades 2014 Master/Vision Plan Update

Oil and Gas Capabilities

PortMiami Director and CEO Juan M. Kuryla PUBLIC-PRIVATE PARTNERSHIPS (P3)

New Orleans Municipal Yacht Harbor

NAFTA Next Chicago, Illinois April 23 rd, 2014

AAPA Smart Ports. Business Intelligence. March 7 th, 2018 Oakland, CA. Nicholas van den Heiligenberg Business Development Manager

Yorkshire s Offshore, Renewable Energy and Operations and Maintenance Centre. 7 th October 2014

Oil and Gas Capabilities

Transcription:

TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects 13 August 2014 1

THE TNPA WORLD OF PORT INFRASTRUCTURE

Complete Pixman Images 2010 Dredging International - Pallieter

Overview of Presentation TNPA s 7 year Capital Program starting 2014/15. Projects already Sanctioned Projects being planned in 7 year capital program 4 TNPA Infrastructure Projects

8 x Commercial South African Ports Johannesburg Port Nolloth SOUTH AFRICA Durban Richards Bay Saldanha East London Cape Town Courtesy Google earth Mossel Bay Ngqura (Coega) Port Elizabeth 2,798 km of Coastline

The 8 x Existing Ports + DDOP WESTERN PORTS Saldanha Bay Cape Town Mossel Bay CENTRAL PORTS Port Elizabeth Ngqura East London EASTERN PORTS Durban New Durban dig-out Port Richards Bay

TNPA 7 year Capital Program Starting 14/15 per PORT PORT Rand billions % Cape Town 1.26 2.9 Durban 14.31 32.9 Dredging Services 0.89 2.1 East London 1.70 3.9 Head Quarters 4.23 9.7 Lighthouses 0.42 1.0 Mossel Bay 0.06 0.1 Ngqura 12.85 29.5 Port Elizabeth 0.82 1.9 Richards Bay 2.83 6.5 Saldanha 4.14 9.5 7 TOTAL TNPA 43.51 100

TNPA 7 year Capital Program Starting 14/15 per YEAR Year Financial year Rand billions % 1 2014/15 2.37 5.4 2 2015/16 6.01 13.8 3 2016/17 8.58 19.7 4 2017/18 9.93 22.8 5 2018/19 5.50 12.6 6 2019/20 5.74 13.2 7 2020/21 5.38 12.4 TOTAL 43.51 100 8 TRANSNET AUDITED RESULTS 2014

Major Projects Sanctioned # Project FFC million Start Completion 1 Durban Sand Hopper Station 188.95 3 July 2012 22 Jan 2016 2 Durban Maydon Wharf Rehabilitation 1,456.40 1 May 2014 1 Dec 2016 Durban HV electrical Upgrade 103.02 11 July 2013 1 Aug 2014 3 Richards Bay Truck Staging 126.73 27 Jan 2014 13 June 2015 Richards Bay Power supply to Harbour West upgrade 40.00 25 March 2014 10 March 2015 4 East London Foreshore 191.25 1 April 2014 10 March 2016 5 Port Elizabeth Slipways x 2 229.00 1 Oct 2014 26 Oct 2016 6 7 Ngqura Administration Building & Small Craft Basin Ngqura Berth A100 & Tank Farm landside services 8 Ngqura Manganese Included in overall port sanction Started 28 July 2016 2,487.68 1 April 2015 4 July 2018 Busy with detail design 27 July 2018 9 Cape Town Fire Fighting 89.15 16 Apr 2014 16 Apr 2016 10 Saldanha General Maintenance Quay (GMQ) 200.83 30 Oct 2014 31 March 2016 9

New Sand Hopper Berth & Pump Station

New Sand Hopper Berth & Pump Station Scope: Construction of New Sand Hopper and Pump Station at A Berth to replace the original hopper station that was demolished during Entrance Channel Widening Purpose: To reinstate the natural migration of sand along the coast by supplying sand to the city beaches. Prevent the entrance channel from silting up

Durban New Sand Hopper Berth & Pump Station

13 Sand Hopper progress as at July 2014

Maydon Wharf rehabilitation of berths 1 to 4 and 13 to 14 Scope Replace old steel sheet pile berths 1-4, and 12-14, with new deep water berths. Purpose: Provide infrastructure to sustain existing port operations and cater for growth in cargo volumes. Risks: Berths at risk of failure, if not reconstructed. Berth capacity constraint during construction. Mitigations: Implement Berth Monitoring Surveys. Fast track reconstruction program. Berth 12 is being reconstructed to create additional capacity for when the remainder of the sheet pile berths are reconstructed. 14

Maydon Wharf - Berth Reconstruction Steel Sheet Pile Walls (Current Project)

16 Maydon Wharf berth 1 start of construction

17 Completed Maydon Wharf berth 12

Projects being planned in 7 year capital program 1. Durban Berth Deepening 2. Durban Pier 1 Phase 2 3. Durban Dig Out Port (DDOP) including land acquisition 4. RB Land Acquisition 5. Ngqura Liquid Berth A100 and Landside services 6. Ngqura General Cargo Berth B101 7. Saldanha Iron Ore Quay 8. Saldanha Oil & Gas Repair Quay 9. Saldanha Mosgas Quay extension 18

Berth Deepening Durban Deepen Container Terminal berths from -12.8m CD (Port) to -17.0m CD (Port) Extend length of existing quay wall from 915 m to 1190 m to accommodate 3 x 350 m long vessels Ensure the larger container vessels with a draft of 14.5 m can be accommodated Vessel size 9,200 TEU or (14,000 TEU light) 4.0 million m3 of dredging 1.0 million m3 reclamation 19

Project Motivation 1,000 TEU Vessel and 4 ton Wharf Crane 6,000 TEU Vessel and 80 ton STS crane (12,000 TEU already calling light)

North Quay - berths 203 to 205 Existing Sandbank 21

Caisson Deepening Solution

Existing dredged limits Proposed dredged limit Proposed quay wall extension

Pier 1 Phase 2 (Salisbury Island) Container Terminal Durban Reclaim 12 hectares to create a Container Terminal of 1.8 million TEU per annum Design vessel size 9,200 TEU to 14,000 TEU light Draft of 14.5 m Water depth required = 16.5 m 1,180 m of productive quay length 1.0 million m 3 of dredging 2.8 million m 3 reclamation

Salisbury Island New Terminal boundary Existing Navy boundary Proposed Navy Boundary

2.8 million m3 of reclamation

Durban Dig Out Port Example of the typical terminal layouts from CONCEPT stage

Aerial View Old DIA Site

Artist s Impression of Durban Dig Out Port

Port of Ngqura: Proposed New Liquid Bulk Berth & General Cargo Berth Purpose is to construct New Liquid bulk berth A100 with capacity of 4 Mtpa New General Cargo berth B101 with capacity of 1 Mtpa Design vessel sizes 100 000 DWT carriers Water Depth required = 18 m Dredging volume = 1.2 million m 3 of dredging

Port of Ngqura Aerial View of Proposed Developments New Admin Building Small Craft Basin B101 Cargo Berth Basin dredging A100 Tanker berth

A100 Tanker berth B101 General Cargo berth Future development up the river

Saldanha Proposed Developments Proposed Mosgas Quay Extension Aerial picture of Port General Maintenance Quay Proposed Oil & Gas Repair Berth Proposed Iron Ore Berth

Saldanha Proposed Quay Walls Proposed Iron Ore Berth Proposed Oil & Gas Repair Berth General Maintenance Quay

The End Session # 1 A brief overview of The TNPA World of Port Infrastructure The End

Thank you