SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

Similar documents
Sunshine Coast Airport Master Plan September 2007

DEPARTMENT OF CIVIL AVIATION

30 th January Local Government s critical role in driving the tourism economy. January 2016 de Waal

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

Cooperative Development of Operational Safety & Continuing Airworthiness Programme. 25th COSCAP SA STEERING COMMITTEE MEETING

MemerHandbook.

E190 REPLACEMENT & FLEET UPDATE JULY 11, 2018

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

AIRPORT MODERNISATION IN INDIA By K Roy Paul Secretary, Ministry of Civil Aviation, India and Chairman, Air-India Limited

Tulsa Airports Improvement Trust Strategic Plan Update

ASIAN DEVELOPMENT BANK

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

AFI AVIATION SECURITY MEETING. Dakar, Senegal, 28 May 2014 AN AFRICAN PLAN FOR ENHANCING AVIATION SECURITY AND FACILITATION. (Presented by Uganda)

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

Birmingham Airport 2033

The Government s Aviation Strategy Transport for the North (TfN) response

FLIGHT PATH FOR THE FUTURE OF MOBILITY

Basic Policies on Operation of National Airports Utilizing Skills of the Private Sector

(Quito, Ecuador 17 October 2016)

GHANA S ACTION PLAN ON CO 2 EMISSIONS REDUCTION ACTIVITIES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Queensland Tourism Aviation Blueprint to 2016

EXPERIENCE IN THE LIBERALIZATION OF AIR TRANSPORT IN THE MEMBER STATES OF THE WEST AFRICAN ECONOMIC AND MONETARY UNION (WAEMU)

ICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC

CHAPTER 1 EXECUTIVE SUMMARY

AERODROME LICENCE APPLICATION PROCESS

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

REPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire

Sri Lanka's Experience with ICAO TCB Projects

54 th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS. Ulaanbaatar, Mongolia August 2017

Terms of Reference: Introduction

SECTOR ASSESSMENT (SUMMARY): TRANSPORT Sector Performance, Problems, and Opportunities

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

JUNE 2016 GLOBAL SUMMARY

AVIATION. MichiganReportCard.com 5

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

ASHGABAT, TURKMENISTAN

ENVIRONMENT ACTION PLAN

A Master Plan is one of the most important documents that can be prepared by an Airport.

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

REPORT 2014/065 INTERNAL AUDIT DIVISION. Audit of air operations in the United. Nations Assistance Mission in Afghanistan

Regulating aviation in emerging markets

IAA Submission on the Commission for Aviation Regulation s Draft 2014 Determination of Maximum Level of Charges at Dublin Airport

sdrftsdfsdfsdfsdw Comment on the draft WA State Aviation Strategy

Ex-Ante Evaluation (for Japanese ODA Loan)

DAA Response to Commission Notice CN2/2008

FACILITATION PANEL (FALP)

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION. Developing an EU civil aviation policy towards Brazil

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA

2 Aviation Demand Forecast

DBSA Perspectives on African Aviation: A High-Level Overview

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

Queenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes

Policies for Certification, operation and maintenance of UAS Andres Eduardo Parra Catama Air Safety Inspector Civil Aviation Authority of Colombia

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011

OVERVIEW OF ICAO S ACTIVITIES IN AIR TRANSPORT

Framework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African States ( )

ICAO Technical Cooperation Progress and Future Potential Program on Environmental Sustainable Air Transportation in Indonesia

Memorandum of Understanding with ACT Government

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Airmen s Academic Examination

easyjet response to the European Commission consultation on the aviation package for improving the competitiveness of the EU aviation sector

Making travel easier and more affordable. easyjet s views on how aviation policy can improve the passenger experience and reduce costs

Testimony. of the. National Association of Mutual Insurance Companies. to the. United States House of Representatives

RNP AR APCH Approvals: An Operator s Perspective

PO Box 257 PO Box 257 PARRAMATTA NSW 2124 PARRAMATTA NSW 2124

COMMISSION IMPLEMENTING REGULATION (EU)

Stimulating Airports is Stimulating the Economy

AIR TRAVEL AND ITS POTENTIAL FOR DEVELOPMENT OF THE SAARC REGION

Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation

SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN

2 THE MASTER PLAN 23

Finance and Implementation

TERMINAL DEVELOPMENT PLAN

Safety Enhancement SE 226 Cargo Hazardous Material Fires Enhanced Protection of Occupants and Aircraft

THIRTEENTH AIR NAVIGATION CONFERENCE

PERTH AND KINROSS COUNCIL. Enterprise and Infrastructure Committee 4 November 2009

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

A view on the organisation of Military Oversight over foreign companies

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

2014 SUSTAINABILITY REPORT 1,850 DFW FLIGHTS A DAY ENVIRONMENTAL STEWARDSHIP DOMESTIC DESTINATIONS 62M INTERNATIONAL DESTINATIONS PASSENGERS

TWELFTH AIR NAVIGATION CONFERENCE

The private financing of airport infrastructure expansions

Safety Enhancement SE ASA Design Virtual Day-VMC Displays

10TH ANNUAL WOLFE RESEARCH GLOBAL TRANSPORTATION CONFERENCE MAY 23, 2017

Session III: Closing the gap Placing tourism within the wider urban agenda

10/2017. General Aviation Job Creation Government Choices. AMROBA inc

Consumer Council for Northern Ireland response to Department for Transport Developing a sustainable framework for UK aviation: Scoping document

Benefits of NEXTT. Nick Careen SVP, APCS. Will Squires Project Manager, Atkins. Anne Carnall Program Manager, NEXTT

Q: How many flights arrived and departed in 2017? A: In 2017 the airport saw 39,300 air transport movements.

Chapter 1 EXECUTIVE SUMMARY

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry

Air Operator Certification

CONTACT: Investor Relations Corporate Communications

A THIRD RUNWAY AT HONG KONG INTERNATIONAL AIRPORT IS CRUCIAL TO HONG KONG S ECONOMIC FUTURE

Press Release March 1, Refer to: Anna Salgado

2012 Performance Framework AFI

Summary Report by Activity Area for COSCAP- SA

Transcription:

Air Transport Connectivity Enhancement Project (RRP BHU 44239-013) SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Landlocked Bhutan faces unique development challenges and opportunities. High external and domestic transport costs, and lack or limited accessibility have constrained the country s economic and social development. Vital infrastructure, particularly the road network, is costly to build and maintain. The country s small population of about 700,000, 2 the mountainous terrain, and formidable weather conditions make the goal of achieving economies of scale in service delivery difficult. 2. Paro International Airport (PIA), until recently the country s only operating airport and the only airport with international access, is located near Thimphu, the capital city, in the western region. The lack of domestic air connectivity means that other regions in the center, south, and east have limited access to regional and global markets. The tourism industry, for instance, a substantial economic contributor, is much better developed in the west. To redress this imbalance in accessibility, the Government of Bhutan has started developing three suitably spaced domestic airports upgrading the existing airfield at Yonphula in the east, and constructing new airfields at Bumthang in the center and Gelephu in the south. Domestic flights started operating at Bumthang and Yonphula in December 2011, and are expected to start at Gelephu during 2012. This will expand the reach and travel flexibility for international tourists, and help improve access to remote areas of the country. 3. Due to difficult terrain and weather conditions, air navigation and airport development and operation in the country present unique challenges. PIA is located in a deep valley (Paro valley) about 65 kilometers by road from Thimphu. The surrounding hills rise as high as 4,800 meters, high winds at certain times of the year restrict aircraft operations to early in the day, and difficult and hazardous approaches into PIA must be operated entirely visually under visual flight rules. Aircraft operations at PIA are limited during the windy months to half-day operations, and sometimes restricted to periods of 4 6 hours. This seriously limits PIA capacity and the number of passengers who can fly in and out of the country at those times of the year. The three domestic airports have similar challenges and, due to limited initial government expenditure, current facilities are basic and only for initial air operation and passenger accommodation. Safety, security, and capacity must be strengthened to prepare for the anticipated increase in aircraft movements and passenger volume. Airports in Bhutan Location Service Altitude (meters) Runway Length (meters) Runway Width (meters) Flight Rule Bumthang Domestic 2,580 1,200 30 Visual only Gelephu Domestic 221 1,500 30 Visual only Paro International 2,225 2,265 30 Visual only Yonphula Domestic 2,560 1,300 30 Visual only Source: Department of Civil Aviation, Bhutan 1 This summary is based on the draft final report for TA 7633-BHU Air Transport Connectivity Enhancement Project available upon request. Asian Development Bank. 2010. Technical Assistance to the Kingdom of Bhutan for Air Transport Connectivity Enhancement Project. Manila (TA 7633-BHU, $600,000, approved on 5 November). 2 Asian Development Bank. 2011. Basic Statistics 2011. Manila.

2 4. Drukair is currently the only international airline serving Bhutan, with all operations presently occurring through PIA. Established in 1981, Drukair has a very good safety record and has, at times, operated with multiple aircraft types in the difficult Paro operating environment. The current fleet represents the largest type of aircraft that the airline has operated, comprising two Airbus 319s and an ATR-42-500. 3 Drukair currently provides service to and from eight cities in four countries: Bangladesh (Dhaka), India (Bagdogra, Delhi, Gaya, Guwahati, and Kolkata), Nepal (Kathmandu), and Thailand (Bangkok). Of these, Bangkok is the largest market, providing 38.5% of the airline s total passengers in 2010. The government has selected Drukair and a new Bhutan-based airline company, Tashi Air, to provide scheduled flights for the recently introduced domestic service. 5. Overall, air transport activity in Bhutan is set to increase substantially as a result of the government s continued effort to brand and market the tourist attractions in the country and the new initiative under way to introduce domestic air links. In 2010, the air passenger volume at PIA reached about 127,181 passengers per annum (ppa), tripling from about 33,890 in 2000. Based on the updated air traffic forecast, if unconstrained by capacity, 4 total air passenger traffic could grow to about 491,200 ppa by 2020, of which approximately 12% (59,900 passengers) would be carried on the new domestic services. By 2030, total passenger traffic is forecast to increase on an unconstrained capacity basis to 915,100 ppa, 5 of which domestic passengers would account for 17.4% (159,600). 6. The Department of Civil Aviation (DCA), under the Ministry of Information and Communications, is responsible for administration of civil aviation and all matters concerning regulation and operation of the country s airports and airfields. While DCA has performed well, several critical areas have inadequacies, particularly institutional, legal, and regulatory frameworks, as well as DCA s role and capacity. DCA, since established in January 1986, has been responsible for providing regulatory and operating functions. This dual role, where DCA regulates its own operations, creates potential conflict of interest. In the interest of aviation safety and in keeping with best international practice, the regulatory and operating functions performed by DCA need to be separated more clearly. DCA is substantively understaffed in several areas, particularly regulation and inspection, and is unable to provide total and effective regulatory oversight of airworthiness, flight operations, and aerodromes regulation because of staff shortages, lack of qualified staff in several of the required areas of inspection, and inadequate training and skills upgrading. The Civil Aviation Act 2000, a revision of the first Civil Aviation Act enacted in 1990 and reenacted on 14 July 2000, serves as the enabling legislation for administration of civil aviation in Bhutan. The act is outdated as an instrument for regulating and administering civil aviation in several areas, and the Bhutan air navigation regulations have areas of inconsistency. The regulations are intended to interpret and apply the provisions of the act. They require reconciliation. 3 Due to the difficult maneuvering environment of the approaches into PIA, any aircraft larger than an Airbus 319 or equivalent would not have the maneuverability safety margins. 4 The unconstrained scenario assumes the PAI runway will maintain current peak hour capacity of 4 aircraft movements per hour, and the tourist infrastructure will be able to accommodate an increasing number of tourists. 5 The unconstrained scenario assumes PAI improvements will increase peak hour capacity from the 4 aircraft movements per hour currently to 5 by 2022, and to 6 by 2027.

3 2. Government s Sector Strategy 7. In following with the country s vision statement, 6 the government s Tenth Five-Year Plan (2008 2013) highlights development objectives for transport and communications. It focuses on enhancing connectivity to facilitate greater coverage of basic social services, including health and education in isolated regions, and improving transport efficiency reducing travel time and cost to boost domestic trade and cross-border transport. This will stimulate private sector development and generate employment opportunities for the poor. 8. During 2002 2004, the government developed a civil aviation master plan 7 to define, emphasize, and document the need for a well-developed air transport system in Bhutan, including domestic air services connecting urban and rural centers, and international services to connect Bhutan to other parts of the world. At that time, this was considered paramount in view of the inherent limitations of road transport given the mountainous terrain throughout the country. While the public road system in Bhutan has significantly improved since that time, the limitations of road transport in the mountainous terrain remain relevant to this day. Subsequently, during 2006 2008, the Bhutan Aviation Sector Capacity Development Project helped DCA implement a number of civil aviation master plan recommendations. It included a package to evaluate the potential of different sites for domestic airports in Bhutan. The prevailing government view at the time was that three sites should be developed for domestic operations, in addition to the existing international airport at Paro. This was seen as an attempt to spread the revenue expected from the development of domestic and international tourism roughly equally within Bhutan. Accordingly, the government selected three suitably spaced domestic airports in Bumthang, Gelephu, and Yonphula. 8 9. The government plans to enhance the safety and security of air infrastructure and systems required to support aviation activity in the country to help continue the record of safety. The plan includes (i) consolidating security operations at airports, and establishing an effective emergency and disaster management system, (ii) developing search and rescue capabilities, (iii) managing Bhutanese airspace, and (iv) establishing a flight information region through required infrastructure and facilities. In view of the anticipated increase in aircraft movements and passenger volume, the government s goal is to continue the staged development of PIA and, under the Asian Development Bank (ADB) grant financing, undertake additional improvements at the three domestic airports to strengthen safety and security, and enhance capacity. 10. The country has made progress in privatizing and corporatizing public sector enterprises. The offer to consider proposals from private airlines for domestic air service, and then the awarding to Tashi Air, a private company, the right to share and compete for the provision of domestic and international airline service with the national carrier, Drukair, is an example of efforts to stimulate progress through the private sector. In the future, the operations functions currently performed by DCA could be handed off to a commercial entity, incorporated as a government-owned company, free to function on a commercial basis. 6 Government of Bhutan. 1999. Bhutan 2020: A Vision of Peace, Prosperity and Happiness. Thimphu. 7 Financed by the Swedish International Development Cooperation Agency under the project: Bhutan Master Plan Study of the Civil Aviation. 8 Airport Development Programme Master Plans for Yonphula and Bumthang carried out under the Bhutan Aviation Sector Capacity Development Project (2006 2008) financed by Swedish International Development Cooperation Agency, and the Gelephu Site Feasibility Study (2008) financed by the government.

4 3. ADB Sector Experience and Assistance Program 11. ADB s first assistance for air transport in Bhutan will start in 2012 with implementation of capacity development technical assistance targeted at strengthening regulatory and operational performance by improving institutional, legal, and regulatory frameworks, as well as upgrading DCA s technical capacity. 9 Activities planned include (i) prepare updates for the Civil Aviation Act 2000 and applicable Bhutan air navigation regulations to reflect current needs; (ii) formulate a framework for restructuring DCA and draft necessary legislation to enable effective separation of the regulatory and operating functions, and provide the necessary autonomy; and (iii) provide technical training in the critical areas of regulatory oversight and airport operations. ADB s overall objective is to ensure optimum sector performance given the anticipated traffic growth and the commencement of domestic airport operations. 9 ADB. 2011. Technical Assistance to the Kingdom of Bhutan for Strengthening Air Transport Regulatory and Operational Performance. Manila. (TA 7945-BHU, $300,000, approved on 5 December).

5 Problem Tree for Transport, and Information and Communication Technology - Air Transport Bhutan s economic growth is constrained by limited access to regional and global markets. Air transport connectivity is Air transport regulatory and operational performance is Air transport infrastructure is inadequate in terms of safety, security, and capacity. Civil aviation regulations are outdated, and regulatory and operational functions are not clearly separated. DCA s capacity for regulatory oversight and airport operations is Airport facilities (airfield and terminal facilities) are not adequate, and the level of service is low. Airport communication and navigation equipment is DCA = Department of Civil Aviation. Source: Asian Development Bank.

6 Sector Results Framework (Transport, and Information and Communication Technology - Air Transport, 2012 2013) Country Sector Outcome Country Sector Outputs ADB Sector Operations Outcomes with ADB Contributions Indicators with Targets and Baselines Outputs with ADB Contribution Indicators with Incremental Targets Planned and Ongoing ADB Interventions Main Outputs Expected from ADB Contributions Improved transport connectivity Improved air transport Planned key activity areas Planned key activity areas Number of air passengers per year increases to 230,000 international and 20,000 domestic (2005 baseline for international 70,000 and for domestic nil) Number of operating domestic airports increased to four (2005 baseline: nil) Domestic airports (85% of funds) Air transport policies, reforms, and capacity strengthening (15%) Pipeline projects with estimated amounts Air Transport Connectivity Enhancement Project, 2012 ($6.92 million) Ongoing projects with approved amounts Technical Assistance for Air Transport Connectivity Enhancement Project ($0.6 million) Domestic airports improved Institutional capacity improved Pipeline projects One or more domestic airports improved Ongoing projects Preparing for improvements of one or more domestic airports Civil Aviation Act and regulations improved ADB = Asian Development Bank. Source: Asian Development Bank. Technical Assistance for Strengthening Air Transport Regulatory and Operational Performance, 2011 ($0.3 million)