ENABLING PROJECTS TOWN PLANNERS RESIDENTIAL AND MIXED USE SCHEMES

Similar documents
Pre-application submission for Committee: Phase 4 development at West Hendon

Hotel and Hospitality Services. Capita Real Estate

FREEHOLD FOR SALE Residential Development Opportunity. Manor and Tindal Sites, Bierton Road, Aylesbury, HP20 1HU

317a & 400 Hoe Street, Walthamstow, E17 9AA

Reference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date:

DEVELOPMENT MANAGEMENT COMMITTEE. 23 August 2011

Meteor Building, St Mary's Row, Moseley, Birmingham, B13 9EG

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B

Welcome WINSTON GROUP. Welcome to our public exhibition on the Winston Group s proposals to redevelop 110 Walm Lane, Willesden Green.

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

Coomb House, 7 St. John s Road, Isleworth, London, TW7 6NH

FREEHOLD FOR SALE Prime Residential Development Opportunity

The decision on whether to take enforcement action falls outside the scope of delegated powers.

A summary report on what the community told us

All reports. 1. Governance Service receive draft report Name of GSO DPR

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

SKYLINER. Prime Residential Development Site PRS or Private Sale Potential. OCEAN DRIVE, EDINBURGH EH6 6JH

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Submission to. Queenstown Lakes District Council. on the

Adoption and Maintenance of Sustainable Drainage Systems in South Cambridgeshire. Council Policy. Published by South Cambridgeshire District Council

Swallow House, 10 Swallow Street, Birmingham, B1 1BD

Methwold Parish Council Planning Committee meeting Thursday 10 th December pm Fenton Room St George s Hall Methwold.

Supporting information to an application for preapplication 3 rd February 2017

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

West London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London

Bridge School, Longmoor Campus, Coppice View Road, Sutton Coldfield, Birmingham, B73 6UE

Conservation Area Consent for demolition of existing building

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY

Aberdeen Exhibition and Conference Centre

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

MERIDIAN DELTA LTD BRIEFING DOCUMENT

ENVIRONMENT ACTION PLAN

CEDAR HOUSE Spa Road, Gloucester, GL1 1XL SOUTH WEST OFFICE INVESTMENT WITH ASSET MANAGEMENT OPPORTUNITIES

BEST & FINAL OFFERS INVITED BY FRIDAY 10th JUNE 2016

West of England. Priority Places Requiring Public Investment

Where did London s jobs go? Paul Convery LEPU October 11 th 2005

Ms P Goldfinger Date: 18 September 2017 Head of Programme The Architecture Centre Our Ref: M15/

Llandudno Junction. Regeneration Proposals for the Future. December 2009

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary

Welcome to public consultation for the redevelopment of the existing leisure centre site.

Local Development Scheme

ST JOHN S WOOD LONDON

A21 TONBRIDGE TO PEMBURY DUALLING. Outline Statement of Case

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

FOR SALE Residential Development Site with Planning Permission 0.51 Acres (0.21 Hectares) FORBOURN MOTORS

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

Homelessness in London. Simon Cribbens Senior Policy Officer

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:

HOTEL/LEISURE/COMPLEMENTARY RETAIL OPPORTUNITY

MINUTES OF THE MEETING OF THE TRANSPORT COMMITTEE HELD ON FRIDAY, 21 APRIL 2017 AT COMMITTEE ROOM A, WELLINGTON HOUSE, WELLINGTON STREET, LEEDS

Fellow of the Royal Institution of Charted Surveyors (FRICS) since Member of the Royal Institution of Charted Surveyors (MRICS) since 1986

FOR SALE - ICONIC GRADE II LISTED COUNTRY HOUSE IN A SOUGHT AFTER PART OF LEEDS SUITABLE FOR A VARIETY OF USES (SUBJECT TO PLANNING CONSENT)

IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation.

Our services include: Applications & Appeals. Heritage. Economics & Regeneration. Urban Design. Community Engagement. GIS & Spatial Analytics

Woodthorpe Village Community Group

PERTH AND KINROSS COUNCIL. 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS

ROCHESTER RIVERSIDE. City of learning, culture, tourism and enterprise.

Available end of February, unit suitable for industrial and warehouse uses. Regret no motor trade or leisure uses.

SOUTH HAYLING BEACH MANAGEMENT PLAN Executive Head Of Planning & Built Environment

GATTONSIDE HOUSE GATTONSIDE MELROSE ROXBURGHSHIRE PRIME DEVELOPMENT OPPORTUNITY

CAA stakeholder engagement Draft airspace modernisation strategy

Amlets Lane Cranleigh Surrey

Hotels. Delivering rooms in prime locations

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW

COUNCIL OF THE CITY OF RIPON MINUTES OF A PLANNING COMMITTEE MEETING

Draft Western District Plan

Scala House, 36 Holloway Circus, Queensway, Birmingham, B1 1EQ

A NEW COMMUNITY OF 3,000 HOMES IN WELLINGBOROUGH, NORTHAMPTONSHIRE

Peter Lovegrove Curriculum Vitae. Managing Director. 3/12 Sankey Street Highgate Hill QLD 4101

BURNASTON PARISH COUNCIL MINUTES OF THE ORDINARY PARISH COUNCIL MEETING HELD ON THURSDAY 15 th MARCH 2018 IN THE VILLAGE HALL, BURNASTON AT 7.

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council

The Edinburgh 12. Monthly Bulletin May City of Edinburgh Council. Steve McGavin Head of Business Partnerships

Rangitīkei District Council

ON BEHALF OF CENTRAL BEDFORDSHIRE COUNCIL DEVELOPMENT OPPORTUNITY DOWNING VIEW, 1-3 LORING ROAD, DUNSTABLE LU6 1DZ

Liston House, Marlow SL7

Greater London Vacant Office For Sale With Potential For Conversion To Residential

CAIRNGORMS NATIONAL PARK AUTHORITY

ENTER EXCEPTIONAL RESIDENTIAL DEVELOPMENT OPPORTUNITY

WROCKWARDINE PARISH COUNCIL. Minutes of the Parish Council Meeting held on Wednesday 11 th January 2017 at Admaston House at 7.30 p.m.

WELCOME SE16 PRINT WORKS MEET THE TEAM AND SITE TOUR

TRANSPORT AND WORKS ACT Proof of Evidence. Andrew Wright Planning and Design Manager Taylor Wimpey East Anglia

Draft Planning Controls Planning Scheme Amendment GC81

Permitted Development Rights

EXCLUSIVE NEW LUXURY TOWNHOUSES ON SYDNEY HARBOUR S FORESHORE

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment

Welcome to our exhibition

Land adjacent to:, 34 Oving Road, Whitchurch, Aylesbury, Buckinghamshire, HP22 4JF 1,400,000

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report

Development Site Two substantial dwellings Redcoats, Hitchin, Hertfordshire

Welcome to this public consultation on plans to redevelop part of Bath City Football Club s home ground Twerton Park

North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange,

Transcription:

ENABLING PROJECTS TOWN PLANNERS RESIDENTIAL AND MIXED USE S 2004-2017 www.enablinguk.com

2 ENABLING PROJECTS RESIDENTIAL AND MIXED USE S - 2004-2017 SITE SYDNEY AVENUE, ENFIELD Conversion to 3 flats ENFIELD Negotiation for revised scheme. 2017 The scheme hit problems and was delayed by well over a year before we came in and kick started negotiations. A successful outcome to a stalled project. MIDDLEFIELD, CAMDEN Erection of a house CAMDEN Sustainability work, 2016 Preparing statement for Lifetime Homes and BREAMM suitability statement TUDOR WAY Flat conservation ENFIELD Planning negotiations - 2016 Planning and viability negotiations NEASDEN LANE Hotel redevelopment scheme BRENT Planning submission and managing project. Jan 2016 onwards Our role in this project was crucial in designing the scheme and getting over major hurdles. The site is complex with a whole range of issues. We undertook a SEQUENTIAL SITES TEST and paved the way for an outline planning application. Advice on planning submission content and all negotiations were involved. This type of scheme positioning helped get the project positioned for success and is very much part of our proactive approach.

BLURTON ROAD, HACKNEY New building with green walls and modern design containing 3 dwellings HACKNEY GRANTED JANUARY 2015 We were involved from the very start with the project managers, making design suggestions and also proposing a green wall to make it acceptable. A highly modern design was agreed and taken forward into pre-application discussions, after which it was lodged and successfully negotiated. The scheme benefits were very successfully presented. ACTON STREET, CAMDEN Change of use from light industrial to live/work CAMDEN NEGOTIATED, FEB 2015 This scheme was negotiated so that the normal 2 year marketing period was reduced to only 6 months. This meant less of a rental void for the client. CUMBERLAND ROAD, E5 Construction of building with 6 dwellings NEWHAM NEGOTIATED FEB- MARCH 2015 The scheme went through extensive pre-app discussions and was then lodged and successfully negotiated. It was a landmark scheme in the area. HARLESDEN HIGH STREET, NW10 Change from offices to 6 flats BRENT JANUARY 2014 A permitted development proposal involving the prior notice process, from offices to 6 dwellings. We successfully made the submission and negotiations.

BARN RISE, WEMBLEY 9 NEW DWELLINGS BRENT SUCCESSFUL 2014-2015 This site was found through north London agency contacts and followed through from feasibility stage to getting planning permission for a flatted scheme in a conservation area. SUTTON ROAD, SEAFORD 7 NEW DWELLINGS LEWES SUCCESSFUL, 2014-2015 We took this site through from feasibility stages, to lodging the planning application and successfully negotiating it. SITES IN KENT & SURREY SITE FINDING VARIOUS S NEW SITES FOUND, 2014-2015 Acting in partnership with a developer builder, we operated targeted site finding program over south-east England, successfully brining in some new housing projects. WELLINGTON ROAD, ENFIELD CONVERSION OF CARE HOME INTO 8 FLATS ENFIELD GRANTED, 2015. PLANNING OBTAINED FOR AN 8 FLAT involving long negotiations and a submission, followed by more negotiations, including sorting out the affordable housing contribution.

CHELVERTON ROAD CONSTRUCTION OF HOUSE WANDSWORTH GRANTED, 2011 PLANNING STATEMENT: We can work with agents to juts do the planning statement. This helped make the overall submission much more robust. LAND IN THE PADDOCKS, BROADBRIDGE HEATH, NR HORSHAM CONSTRUCTION OF A 3 BEDROOM HOUSE HORSHAM GRANTED DEC 2007, RENEWAL OF PP IN 2011 THE OBTAINING OF FOR A SINGE HOUSE was one of the most complex schemes we have undertaken, as it involved the removal of covenants and drain re-routing, as well as planning complexities. We not only managed the planning process but also all the legal aspects of the scheme, right through to the site sale in 2009. This was one of our most effective enabling projects to date!!! SITES IN SOLENT ROAD HAVANT & WESTHAM BUSINESS PARK, EASTBOURNE CHANGE OF USE FROM B1 TO RENAL HEALTH CLINIC HAVANT & EASTBOURNE S GRANTED, BOTH IN 2008 EXTENSIVE TARGETED SITE FINDING PROGRAMME FOLLOWING ON TO A SERIES OF CLINIC APPROVALS: From 2008 through to 2009 we worked for a renal services operator who was seeking to gain UK market share by opening new clinics. We were very successful for them, finding site and turning difficult planning situations into much needed planning permissions. We operated an integrated site finding and planning model for them. LAND IN WARNEFORD RISE, GOLCAR, HUDDERSFIELD ERECTION OF 4 BEDROOM HOUSE WITH PARKING KIRKLEES METROPOLITAN PLANNING GRANTED DECEMBER 2006 HOUSING ON TIGHT CUL-DE-SAC SITE: The scheme for one house was on a tight site at the end of a cul-de-sac. We oversaw the design of a sensitive fill scheme, involving a single house with varying levels. The situation removed four garages on site and added significant value.

SITE IN BAMPTON ROAD, LUTON, BEDFORDSHIRE ERECTION OF 2 BUNGALOWS LUTON BOROUGH PLANNING GRANTED OCTOBER 2004, SITE SOLD TO DEVELOPER IN MAY 2005 HOUSING GENERATED FROM A NIL SITUATION Through 2004 ENABLING PROJECTS focused on a number of towns with its TARGETED SITE FINDING PROGRAM. The Bampton Road site in Luton was one project that came from this, involving two sets of pensioners wishing to stay in their homes at the front of the site, adding value by developing the land to the rear. This would also make their retained gardens smaller and more manageable. The Council s planners initially responded negatively to the double bungalow scheme, stating that no development would be possible on this site. We were thus forced to make our own judgement on whether to proceed and decided to do so, on the basis that a high quality scheme that complied with the Council s policies and standards could be achieved. After the architects had altered the scheme to meet with our design brief, the scheme was lodged with a comprehensive planning statement. In the end, the planners were persuaded with our watertight case in favour of redevelopment. After going twice to Planning Committee, planning permission was granted. The site sale strategy focused on achieving an exclusive sale with a local builder, which achieved a good site value. We remain proud of this scheme, in which we forged good relations with the landowners and took all the burdens of the development process off their shoulders.

SITE IN LOXLEY NEW ROAD, MALIN BRIDGE, SHEFFIELD 10 X 2 BEDROOM FLATS WITH CAR FREE ELEMENT SHEFFIELD CITY GRANTED SUBJECT TO SECTION 106 AGREEMENT IN DECEMBER 2004; SITE SOLD TO A DEVELOPER IN 2006 A HIGH DENSITY HOUSING ACHIEVED ON COMPLEX SITE In May 2004 we were approached by the owner of a house in Sheffield with very large side garden. He had put in his own planning application for 5 houses but was told by the planners that this was not acceptable. We re-assessed the situation and designed a scheme that took account of the very complex site constraints. The existing site was raised 6 metres above street level - we turned this into an advantage by proposing a scheme that achieved an extra floor by partially excavating the site. This resulted in a high density scheme on three floors containing 10 x 2 bedroom flats. On a small site, this achieved a very high end realisation of about 1 million. The scheme was submitted with a comprehensive planning statement, noise survey (for traffic noise) and local parking survey. The planners were impressed with the quality of the case and recommended to planning committee that permission be granted. After our presentation to Committee the scheme was granted consent and a planning obligation negotiated for local open space contributions. SITE IN DALSTON TOWN CENTRE, HACKNEY, EAST LONDON MIXED USE COMPRISING RETAIL, OFFICES & COMMUNITY USE HACKNEY CONCEPT FORMULATED IN RELATION TO MAJOR TOWN CENTRE BASED REGENERATION PROJECT, ONGOING INTO 2007 CONCEPT DEVELOPMENT FOR MAJOR COMMUNITY PROJECT In April 2006 ENABLING PROJECTS undertook initial work on a major regeneration scheme, assisting a community based organisation in assessing local needs, aspirations and priorities for a vibrant, town centre based, mixed use scheme. We developed a MATRIX which described the scheme in detail and presented these to 4 focus groups. This initial public consultation was highly successful, with the MATRIX being refined into a scheme that was presented to the local authority. ENABLING PROJECTS were at the creative interface of progressing the project.

SITE IN VALE ROYAL, NEAR KINGS CROSS, LONDON N7 REDEVELOPMENT OF FACTORY SITE TO CREATE COMMERCIAL BUILDING WITH 4,900 SQ.M. OF OFFICE SPACE, WITH CAFÉ, GYM, CONFERENCE FACILITIES AND STAFF FLAT. ISLINGTON LONDON BOROUGH PLANNING GRANTED IN JANUARY 2005; SITE MARKETED & SOLD IN 2006 A HIGH INTENSITY MIXED USE Involving an in situ business that manufactured pasta, we proposed that the site be redeveloped with a high intensity mixed use scheme, comprising office space with large and small units, café, gym, conference facilities and staff flat, to 6 storeys. The scheme was facing a possible refusal, after the planners insisted on a mono-use B1 scheme, which would have limited its viability and been less attractive to investors/developers. The planners also insisted that the existing use was B2, which would have brought more restrictive policies into play. The scheme was assertively negotiated, with aspects included into the project such as putting the gym into the basement, reducing the car parking area by having car lifts, putting more B1 space into the ground floor and integrating the café into a modern, glazed atrium space. The scheme was successfully presented to the planning committee in January 2005. Permission was granted and the scheme, from being close to a refusal, quickly changed into an added value situation. LAND IN LYNN ROAD, NEAR SWAFFHAM IN NORFOLK ERECTION OF A BUNGALOW WITH LINKED OFFICE SPACE BRECKLAND DISTRICT GRANTED SUBJECT TO SECTION 106 AGREEMENT IN DECEMBER 2004; SITE SOLD IN 2006 OBTAINED FOR A HOUSE WITH LINKED OFFICE AREA - The site, just outside Swaffham in Norfolk, consisted of 2.7 acres of land with an existing bungalow and dilapidated workshops. The Council were resistant to any form of development. After extensive pre-application negotiations we formatted a case whereby the possible intensive activity that would be granted if the workshops were brought back into use (with associated highway safety problems) were swapped for a large sized bungalow with office space attached. This live-work scheme represented a much lower level of activity than the possible full B1 use, therefore having less of an impact on the countryside. Thus, a very valuable consent being obtained.

CONTACT DETAILS Enabling Projects Limited 020 8381 4311 interface@enablinguk.com www.enablinguk.com Office address available on request by e-mail We are based in London UK OUR MAIN WORKING AREAS IS GREATER LONDON