Sub: Publishing details s / award web site. Ref: Corporate Office letter No.V/R/CO/Policy/G-10 dated 09.10.2006 DETAILS OF CONTRACTS/AWARD OF TENDERS OF VALUE MORE THAN 50 LAKHS DURING THE MONTH OF APRIL 2014 No. Item / Nature Mode Publicati ) Last parties Award/ or Ctract (Rs.) supplies/. 83/OT/WBPDCL- KTPS/OHE- P.Way/2014 dtd 17.01.2014 Laying & linking railway track 1/17/2014 Single Bid 26,962,783 4 mths from the April'14 - - related to electrificati. start 07/02/2014 2 firms 1) Natial cstructi & trading company,po Raghunathpur,Dist:Purulia (WB),Pin:723133 2) K&K Minerals Pvt Ltd Kanksa Road,PO Panagarh Bazar,Dist Burdwan,WB:713148 Ne Yes RITES/RPO- KOL/WBPDCL- KTPS/OHE- P.Way/2014/1948 dtd 3.4.2014 Natial Cstructi & trading company P.O RAGHUNATHPU R,Dist:Purulia(W B),Pin:723133 90/OT/R/NTPC- BgTPP/P-Way/PkgvI/2014 dtd 27.01.2014 Laying & linking Rly Track including supply track ballast & p- way fittings in cnecti with project management & cstructi coal & lime transportati for Bgaiga Thermal power stati(3x250mw) at salakati,dist:kokrajhar(btad) assam 1/27/2014 T TB:3.3.2014 14.03.2014 2 firms M/s Ratan Kumar Das,9A,Broad Street,Kolkata-700019 Jhajharia Yes Nirman Pvt Ltd Jhajharia Mansi,Jagmal Block Bilaspur (C.G) 495001 RITES/RPO- KOL/NTPC-Bg- TPP/P-Way/PKG- VI/2014/1964 dtd 4.4.2014 M/s Ratan Kumar Das,9A,Broad Street,Kolkata- 700019 234,210,262 15 mths from the 15th day after the issue LoA or from the first day handling over the site,whichever is April'14 - -
Sub: Publishing details s / award web site. DETAILS OF CONTRACTS/AWARD OF TENDERS OF VALUE MORE THAN 50 LAKHS DURING THE MONTH OF MAY 2014 No. Item / Nature Mode Publicati ) Last parties Award/ or Ctract (Rs.) supplies/. General Electrical s including 2/11/2014 T TB: 6 firms (i) Shyam Takniki Udyog, i) Shankar Yes RITES/RPO- Shyam Takniki - - 11KV HT Cable laying,substati 12.03.2014 (ii) Bajaj Electricals Ltd., Electric Works, KOL/NTPC- Udyog,Post Box for electrificati loco shed etc in (iii) C & S Electric Ltd., ii)karanveer BARH/Genl- No 31,Bhuli cnecti with cstructi 22.04.2014 (iv) Jadob Electric Co., Singh Yadav Elect/Stage-I & Road,Dhanbadrailway siding for Barh-STPP(Stage Enterprises Pvt. II/PKG-II/2014/2696 826001 I & II) at Barh,Dist Patna,Bihar Ltd., dtd 13.5.2014 94/OT/NTPC- Barh/Ct Electrical/StageI & II/Pkg-II/2014 dtd 11.02.2014 41,866,585 9 mths from the issue LoA or from the first day handling over the site,whichever is 103/OT/R/NTPC- BgTPP/Civil/Pkg- II/2014 dtd 03.03.2014 Earth in formati & cstructi bridges for Bgaiga Thermal Power Project Rly siding at Salakati,Kokrajhar,Assam 3/3/2014 T TB: 27.03.2014 29.04.2014 2 firms (i) Jhajharia Nirman Pvt. Ltd. (ii) M/s. Ratan Kuimar Das(R.K.D.Infrastructure Pvt Ltd) Ne Yes RITES/RPO- KOL/NTPC-Bg- TPP/Civil/Pkg- II/2014/2950 dtd 26.5.2014 M/s R.K.D.Infrastruct ure Pvt Ltd,9A,Broad Street,Kol- 700019 238,411,245 15 mths from the 15th day after the issue LoA June'14 111/LT/Hospital/Archi Group-A/2014 dtd Providing csultancy services for speciality hospitals at rampurhat,domkol & mal,west bengal 3/31/2014 4/7/2014 3 firms i) M/s Haven Csultants ii) M/s Subir Kumar Basu iii) M/s De Atelier A/2014/2487 dtd M/s Haven Csultants Pvt Ltd,14/2,Lake East,6th Road,Santoshpur, Kol-700075 0.52% actual project project cost:150 crores) 15 mths from the issue Work order 112/LT/Hospital/Archi (Group-B)/2014 dtd Providing csultancy services for speciality hospitals atbishnupur,raghunathpur,west bengal 3/31/2014 4/7/2014 3 firms i) M/s Haven Csultants ii) M/s Escape,Kol-700029 iii) M/s De Atelier,Kol- 700031 B/2014/2489 dtd M/s De 0.52% Atelier,27C,Tanup actual project ukur Road,Dhakuria,K project cost:150 ol-700031 crores) 15 mths from the issue Work order 113/LT/Hospital/Archi (Group-O)/2014 dtd Providing csultancy services for speciality hospitals at m.r Bangur & Diamd harbour,west bengal 3/31/2014 4/7/2014 3 firms i) M/s Haven Csultants ii) M/s De Atelier,Kol- 700031 iii) M/s Aakriti,Kol-700042 C/2014/2488 dtd M/s Haven Csultants Pvt Ltd,14/2,Lake East,6th Road,Santoshpur, Kol-700075 0.495% actual project project cost:150 crores) 15 mths from the issue Work order
Sub: Publishing details s / award web site. DETAILS OF CONTRACTS/AWARD OF TENDERS OF VALUE MORE THAN 50 LAKHS DURING THE MONTH OF JUNE 2014 No. Item / Nature Mode Publicati ) Last parties Award/ or Ctract (Rs.) supplies/. NIL
Sub: Publishing details s / award web site. DETAILS OF CONTRACTS/AWARD OF TENDERS OF VALUE MORE THAN 50 LAKHS DURING THE MONTH OF JULY 2014 No. Item / Nature Mode Publicati ) Last RITES LTD parties Award/ or Ctract (Rs.) supplies/. 50/OT/DVC- Earth in formati,cstructi 10/10/2013 T TB: 6 Firms (1) Premco Rail Engineers (1) ARSS Yes LOA No RITES/RPO- Allied 311,234,550 18 mths from Aug'14 - At present MTPS/Civil/Ph- Bridges,blanketing and allied s 06.11.2013, Infrastructure Kol/DVC- Infrastructures & the start is I/Pkg(I)2013 d etc. in cnecti with Cstructi (2)Allied Infrastructures & Projects Ltd., MTPS/Civil/Ph-I/Pkg- projects pvt Ltd,P- stuck up 10.10.2013. double line existing single rail track between Raniganj and waiting bay line MTPS at Mejia,Dist Bankura,W.B 13.06.2014 Projects Pvt. Ltd., (3) ROYAL CMATPL (JV), (4) Bridge and Ro Co. (India) Ltd (2) Hindustan Steels Cstructi 1/Vol-IV/2014/4114 dtd 21.7.2014 16,Bentick Street,3rd Floor,AC Mansi,Kol- 700001 due to local villagers agitati 91/OT/DVC- RTPS/Civil & P- Way/Pkg-IV/2014 dtd 31.01.2014 06/OT/R/WBPDCL- KTPS/OHE-Track Hopper/2014 dtd 2.5.2014 Ne Yes RITES/RPO- BCPL Railway KOL/DVC-RTPS/Civil Infrastructure & P-Way/PKG- IV/2014/4119 dtd 21.7.2014 Ltd,13B,Bidhan Sarani,Chandra Plaza,4th Floor,Kolkata- 700006 13/OT/R/WBPDCL- SgTPP/Phase- II/P&C/PKG-III/2014 dtd 2 18/LT/RCF BGB/Balance Anciliary Bldg/2014 dtd 8.7.2014 Earth in formati including blanketing,cstructi major & minor bridges,p-way linking s including supply P.Way fittings & track ballast in cnecti with cstructi railway infrastructure to serve Raghunathpur Thermal Power Stati (RTPS) DVC at Design,drawing,supply,erecti,testing & commissiing electrificati track hopper line,engine escape line,pre-tippler line within plant area Kolaghat thermal power stati at Mecheda,dist: Purba medinipur(wb) Manufacture,supply and delivery switches & crossings including lead rails and fittings as per RDSO drawing & specificati in cnecti with cstructi Railway infrastructure to serve Sg-TPP(Phase-II) inside the plant at Manigram,Dist:Murshidabad,W.B Balance for cstructi anciliary buildings like gas godown cum tools store,bogie store,canteen building,painting existing boundary wall,paver block and internal electrificati s in cnecti with Bogie manufacturing factory at Budge Budge at RCF at West Bengal 1/31/2014 T 5/2/2014 T 5/21/2014 Single Bid 7/8/2014 TB: 27.2.2014 13.6.2014 TB:22.05.20 14 18.06.20 14 3 Firms i) Bridge and Ro Co. (India) Ltd., ii) M/s Triveni Engic Pvt.Ltd 2 Firms (1) Bright Power Projects (India) Pvt. Ltd., (2) BCPL Railway Infrastructure, 6/5/2014 2 Firms (1) R.V. Rail Products (P) Ltd. (2) Rahee Track Technologies Private 7/21/2014 6 Firms a) R.K.D. Infrastructure Pvt. Ltd., 9A, Broad Street, Kolkata 700 019. b) Modern Cstructi Co., 11/1B, New Road, Alipore, Kolkata 700 027. c) Super Cstructi Co., 48, Iswar Ganguly Street, Kolkata 700 026. i) ARSS Infrastructure Projects Ltd., Yes RITES/RPO- Triveni Engics KOL/DVC-RTPS/Civil Pvt Ltd,3/s,HS & P-Way/PKG- Tower,L- IV/2014/3740 dtd Road,Bistupur,Ja 3.7.2014 mshedpur- 831001 Ne Yes RITES/RPO- KOL/WBPDCL- SgTPP/Phase- II/P&C/PKG- III/2014/4379 dtd 31.7.2014 KOL/RCF BGB/Balance Anciliary Bldg/2014/4369 dtd 31.07.2014 Rahee Track Technologies Pvt Ltd,NH-6,P.O- Argori,Jangalpur,H owrah-711302 Modern Cstructi Co,11/1B,New Road,2nd Floor,Alipore,Kol- 700027 458,857,133 18 mths from the start 69,700,771 14 mths from the start 10,525,528 3 mths allowed for executi the from the issue LoA 9,242,499 05 mths from the 15th day after the issue LoA or from 1st day handling over the Aug'14 - -
Sub: Publishing details s / award web site. DETAILS OF CONTRACTS/AWARD OF TENDERS OF VALUE MORE THAN 50 LAKHS DURING THE MONTH OF AUGUST 2014 No. Item / Nature Mode Publicati ) Last parties Award/ or Ctract (Rs.) supplies/. supply,erecti,testing & 7/18/2014 Single Bid 8/1/2014 4 Firms (i) K. Chakraborty (i) Yes LOA No RITES/RPO- Fire Remedy Sept'14 - Ctractor commissiing Hydrant type Fire (ii) Allen Richards & Co. Thermosystems Kol/RCF-BGB/Fire s,n-1,2nd Mobilised protecti system,pumping system,fire (P) Ltd. Pvt. Ltd Fighting/2014/4892 Floor,South at site detecti,alarm for factory shed and (iii) Fire Remedy s dtd 25.08.2014 Exensi Partall buildings Bogie Manufacturing I,New delhi-110049 Factory at Budge Budge,West Bengal 24/OT/RW&IE/RCF- BB/CIVIL/FFI/2014 dtd 18.7.2014 7,318,922 4 mths from the issue LoA or from 1st day handling over the 28/LT/RCF- BGB/Cycle Stand Gate/2014 dtd 25.7.2014 Balance for Cstructi cycle stand,time fice,main gate,rpf booth,truck parking bay etc including internal electrificati in cnecti with Bogie manufacturing factory at Budge Budge RCF at West Bengal 7/25/2014 8/4/2014 3 Firms i) R.K.D. Infrastructure Pvt. Ltd., ii) Modern Cstructi Co., iii) Super Cstructi Co., Ne Yes LOA No RITES/RPO- Kol/RCF-BGB/Cycle Stand Gate/2014/4891 dtd 25.08.2014 Super Cstructi Co. 48,Iswar Ganguly Street Kol-700026 18,004,270.5 4 mths from the issue LoA or from 1st day handling over the Aug'14 - -