Performance Based Navigation Implementation in Thailand

Similar documents
(RN R A N V A V & & RN R P N

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

GEN 3.2 AERONAUTICAL CHARTS

GEN 3.4 COMMUNICATION SERVICES

RUNWAY SAFETY ISSUES and MITIGATION OPTIONS

AD 1.3 INDEX TO AERODROMES AND HELIPORTS INTL INTL INTL INTL INTL INTL INTL

REPORT ON PROGRESS AND ACCOMPLISHMENTS OF THE ICAO APAC FLIGHT PROCEDURE PROGRAMME (FPP) IN 2012

ICAO Asia-Pacific Flight Procedure Programme

Airports of Thailand Public Company Limited

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

APAC PBN UPDATE Slide 1 of xx

Performance Based Navigation (PBN) Implementation Plan. The Gambia

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

ENR 1.6 RADAR SERVICES AND PROCEDURES

AEROTHAI ATSEP Training ATSEP Workshop 2017

Investor Relations Department

RNP AR APCH Approvals: An Operator s Perspective

Aeronautical Radio of Thailand Ltd. Annual Report We get. ready

THAI AIRWAYS INTERNATIONAL Pcl. Fiscal Year 2007

Implementation of PBN in Armenian airspace

DEPARTMENT OF CIVIL AVIATION


IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Overview of ICAO APAC FPP

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

PBN and Procedure Design training

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

Monthly Weather Summary in Thailand September 2015

Honeywell.com PBN Concepts Krakow, Poland

CASE STUDY YUWADEE SUWANMANEE THAI METEOROLOGICAL DEPARTMENT (TMD) THAILAND INTERNATIONAL WORKSHOP ON THE ASSESSMENT OF SOCIO-ECONOMIC BENEFITS OF

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

The Coral Executive Lounge

Monthly Weather Summary in Thailand October 2016 The monsoon trough mostly lay across upper Thailand coupled with southwest monsoon prevailed over

Flight Procedure Design and Cartography

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

STRENGTHENING SAFETY MANAGEMENT SYSTEM OF AGRICULTURAL PRODUCTS

Thailand ATFM Operations at Sub- Regional Level

PBN Implementation Plan Tonga

SDM WORKSHOP ON PBN (19/10/2017)

Air Navigation Bureau ICAO Headquarters, Montreal

Monthly Weather Summary in Thailand January 2019

Navigation at the. Federal Aviation Administration Crossroads

Performance Based Navigation (PBN) Update on ICAO APAC Regional Sub-Office, APAC Flight Procedure Programme, and COSCAP Supports

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

Monthly Weather Summary in Thailand September 2016

Slot Coordination Thailand (Thailand)

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

Note : Rainfall, temperatures and natural disasters were updated up to November 14, 2015

PBN Implementation inside Italian Airspace Status update Summer 2013

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

Monthly Weather Summary in Thailand November 2016 The moderate to rather active high pressure area from China periodically extended its ridge to

Investor Relations Center, Tel: (662) , Fax (662)

Airports of Thailand Plc.

Monthly Weather Summary in Thailand August 2018

Bandos Island Resort, Maldives, 3-5 June 2015

Monthly Weather Summary in Thailand May 2016

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

Asia Pacific Initiative to Reduce Emission. Brian Bagstad Senior ATO Representative, FAA

Status of PBN implementation in France

PBN/TF/7 DRAFT Appendix D to the Report D-1

The Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap

Performance Based Navigation Implementation Plan SINGAPORE. December Published by Civil Aviation Authority of Singapore

34 th Airline/ATS Safety Forum

Review of the designation of Class C controlled airspace in the Mount Cook area - Consultation November 2013

French DSNA approach to CNS rationalization & evolution

RNP AR and Air Traffic Management

COSCAP CAAM COOPERATION

Performance Based Navigation Implementation of Procedures

Pick & Mix: Thailand VISA: TAKE THE WORRY OUT OF TRAVEL ADVERTISING FEATURE. Table of Contents

PBN Implementation in the UK

Information Paper 2 SUMMARY

European Aviation Safety Agency

Learning Objectives. By the end of this presentation you should understand:

UK Implementation of PBN

PBN Implementation Plan - Fiji Version 1 19 January 2010

SOUTH AFRICA. Performance Based Navigation (PBN) Roadmap

Draft PBN Implementation Plan Papua New Guinea

Airplane Navigation Capabilities

Investor Relations Center, Tel: (662) , Fax (662)

RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement

Russian Federation ATM modernization program

DSNA NAVIGATION STRATEGY

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration

F r o m B O B C AT t o C r o s s - B o r d e r AT F M

EASA RNP (AR) Workshop The Landscape Working Together

Performance Based Navigation Operational End-State 2023

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

NEW CALEDONIA PBN PLAN

55 TH CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS

ATNS. Performance Based Navigation Roadmap SOUTH AFRICA

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

NATA 2018 AGM & CONFERENCE

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

ICAO Regional Seminar on Performance - Based Navigation (PBN) Nairobi, Developments and Benefits. 4 December 2008.

International Civil Aviation Organization FIT-ASIA CRA ARRANGEMENTS, PROBLEM REPORTS, AND PERFORMANCE DATA ANALYSIS REPORTING

Transcription:

Performance Based Navigation Implementation in Thailand Present by AEROTHAI 1

Thailand WG on PBN&GNSS Since May 2007, Thailand National Working Group on PBN & GNSS Implementation consists of representatives from: - DCA Thailand - Airlines - Thai Pilots Association - Airports of Thailand - Aeronautical Radio of Thailand 2

Area 1: Policy & Implementation Planning - Conduct feasibility, e.g. why should we implement PBN and GNSS? How much would it cost? - Define roadmap, e.g. where and when should we implement? - Address regulatory issues, e.g. what regulations/legislations are needed? Area 2: Establishments of Standards and Requirements - Identify/Establish standards, e.g. how should we implement? What actions are needed to be done? Who are responsible for doing what? Area 3: Communication with Stakeholders - Notify stakeholders, e.g. let other people know what we have planned and accomplished. - Gather feedback, e.g. what do other stakeholders think? How can we improve what we have done? 3

Thailand PBN Roadmap 2005 2010 2015 2020 En-route Basic RNAV RNAV 5 Possible RNP 2 or RNAV 2 Terminal RNAV (GNSS ) SID/STAR at Int l Airports RNAV 10/RNP 4 for Some Oceanic Routes RNAV 1 SID/STAR at Int l Airports RNAV 1 to RNP 1 transition at some TMAs RNAV 1 SID/STAR at Domestic Airports RNAV 1 to RNP 1 transition at some TMAs Approach RNP 1 SID/STAR at Non-Radar Airports RNP APCH (with Baro-VNAV) at Domestic and Int l Airports RNP AR APCH and/or GBAS at selected airports 4

PBN TMA Implementation 5

Thailand PBN Plan Terminal Areas Progress Phuket Operation since January 2009 Hat Yai Operation since December 2009 Samui Operation since May 2010 Chiang Mai Design Completed and Successfully Flight Validated Krabi Design Completed Suvarnabhumi 2010-2012 Don Mueang 2010-2012 Lumpang Being Designed Udornthani Being Designed Chiang Rai Being Designed Khon Kaen Being Designed

Procedures for Phuket 09 Yellow Current VOR Track Green - PBN Track 7

8

Safety and Efficiency Improvements with PBN Phuket (VTSP) Conventional PBN Runway 27 1.4-degree ILS offset Straight-in approach Runway 09 6-degree VOR offset Straight-in approach OCA at 850 feet OCA at 750 feet Samui (VTSM) Conventional PBN Runway 17 Straight-in yet through unstable weather area Straight-in approach, yet able to side-step to avoid the unstable weather area Hat Yai (VTSS) Conventional PBN Runway 08 Unavailable due to Straight-in approach mountainous ti terrain Chiang Mai (VTCC) Conventional PBN Runway 18 VOR circling approach with high Runway aligned approach circling OCA/H 9

Thailand PBN Plan Target Year Terminal Area 2012 VTSF - Nakhon si Thammarat 2012 VTSB - Surat thani 2012 VTBO - Trat 2012 VTSC - Narathiwat 2013 VTPO Sukhothai 2013 VTPP Phitsanulok 2013 VTSR - Ranong 2013 VTUU - Ubon Ratchathani h 2013 VTCH - Mae Hong Sorn

PBN En-route Implementation 11

PBN En-route M502 connecting Suvarnabhumi with South Asia Expect RNAV-5 Navigation Specification M752 connecting Suvarnabhumi with Australia Expect RNAV-5 Navigation Specification 12

PBN En-route Route Number of Flight (Month) Reduce Fuel Burn (Month) Reduce Carbon Emission (Month) Suvarnabhumi Male 24 Flights ~1,488 Kg ~5,208 Kg Fuel Saving from M502: Data from Bangkok Airways 13

PBN En-route On-Going Initiatives : PBN Domestic En-route Domestic Enroute : 2.2 mil kg of fuel save / year estimated Bangkok Phuket Bangkok Samui Hat Yai Bangkok Chiang Mai Bangkok Udon Thani Bangkok Ubon Ratchathani Implementation On-going 14

PBN En-route: International On-going Initiatives : PBN International Routes via ICAO Bay of Bengal ICAO BOB Reduced Separation Minima South China Sea ICAO South China Sea Route Review Task Force 15

AEROTHAI in International PBN Community 16

An Active Member of International PBN Community Thailand as an active member of international PBN community Active Participating State for ICAO Asia-Pacific Flight Procedure Program Member of ICAO FPP Steering Committee First country to be selected for ICAO PBN Go-team Visit in 2010 Host of ICAO Instrument Flight Procedure Panel Meeting in 2010 Member of ICAO Navigation System Panel Rapportuer of ICAO Asia-Pacific PBN Task Force Co-Chair of APEC GNSS Implementation Team Designated ICAO PBN Airspace Concept Instructor Honorary Member, US National Executive Committee for Space-Based Positioning, Navigation, and Timing 17

Success Overseas PBN training for Nepal, Bhutan, Myanmar, Mongolia and Cambodia PBN & GNSS training for ATC, engineer, flight inspection pilots to Mongolia PBN and GNSS flight validation services for 16 PBN Procedures for CAA Chinese Taipei PBN route design for Bhutan GNSS interference validation for Nepal 18