Deficiencies in the ATS/AIS/SAR fields. (Presented by the Secretariat) Summary

Similar documents
ATM Deficiencies. Algeria AFI/7 Rec.5/21 FIR Algiers Non-implementation. Angola. Benin. Botswana. Burkina Faso. Burundi. Cameroon

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP FOURTEENTH MEETING (APIRG/14)

Table A.LPG1 : TOTAL LPG CONSUMPTION (Best available Estimates)

Africa. Display Transparency 6 on the overhead. Explain to students that Africa is the

A Snapshot of Sanitation and Open Defecation in Africa 2010 Update

The Second Japan-Africa Business Forum TICAD and Business: Feedback from the Yokohama Action Plan to the Nairobi Declaration July 25, 2017

Status of Implementation of the Integrated Aeronautical Information Package. (Presented by the Secretariat) Summary

REPORT ON WHO STAFF IN THE AFRICAN REGION. Information Document CONTENTS

REPORT ON HUMAN RESOURCES IN WHO IN THE AFRICAN REGION. Information Document CONTENTS INTRODUCTION... 1

REPORT ON WHO STAFF IN THE AFRICAN REGION. Information Document CONTENTS

THE MOST AND LEAST CHILD-FRIENDLY GOVERNMENTS IN AFRICA

Fostering healthcare Investments through PPPs. George Uduku Health Systems November 2017

REPORT ON WHO STAFF IN THE AFRICAN REGION. Information Document CONTENTS

Ensuring water and sanitation for all Where are we?

Countries of the World QTR 3

EARTHQUAKE HAZARD ZONES - AFRICA

International Civil Aviation Organization African Flight Procedure Programme

The A Z of African Countries Notebooking Pages with Backline Maps. Preface

THE AFRICAN DEVELOPMENT BANK GROUP. At the centre of Africa s transformation

APC TV White Spaces and Africa. Russell Southwood, CEO, Balancing Act

Southern Africa outpaces North Africa in governance performance

Financing Sustainable Transport in LLDCs in Africa High Level Meeting October Santa Cruz, Bolivia

Millennium Development Goal 1: eradicate extreme poverty and hunger. International poverty line a Share of population below PPP $1.

Regional outlook Sub-Saharan Africa 24/11/2015. Share commodities in good exports. Share commodities in goods imports

TABLE OF CONTENTS COUNTRY FOCUS: ALGERIA

Table of CONTENTS. COUNTRY FOCUS: Equatorial Guinea

Data Limitations. Index Choices

Table of CONTENTS. COUNTRY FOCUS: United Republic of Tanzania

REPORT ON WHO STAFF IN THE AFRICAN REGION. Information Document CONTENTS

Table of CONTENTS. COUNTRY FOCUS: Tunisia

THE AFRICAN DEVELOPMENT BANK GROUP. At the centre of Africa s transformation

TABLE OF CONTENTS COUNTRY FOCUS: BENIN

AFSEC Workshop Johannesburg 27 March 2017

Global IP Infrastructure

JICA s activity in the Northern Economic Corridor. 7 Dec 2015, Nairobi

Supporting Road Infrastructure Development to Connect Africa: Actions to be taken under the TICAD Process and Japan s Initiatives

Energy Poverty in Africa

List of medicines for which protection against trade diversion is granted under. Regulation 953/2003

Structure. Introduction

21st ACI AFRICA REGION ANNUAL ASSEMBLY CONFERENCE AND EXHIBITION

AFRICA EASTERN AFRICA COMORO ISLANDS 1978-PRESENT. BURUNDI 1962-PRESENT Prior to 1962 see Rwanda

ECONOMIC PARTNERSHIP AGREEMENTS. Overview of State of Play

2017 ACCPA Compliance List

FOLLOW UP TO APIRG/17 CONCLUSION 17/86 (AIM)

Table AIM-1. Responsibility for the provision of AIM Services

FOLLOW UP TO APIRG/17 CONCLUSION 17/86 (AIM)

Emerald Group Publishing. The Horizon and Beyond with the African Library Summit

I. F. A. L. P. A. African RVSM. Briefing Leaflet. Air Traffic Services. The Global Voice of Pilots. RVSM Compliance Operations

AGRICULTURE THE BIG PICTURE

Essential guide to modern travel risk management. Level 2 BBBEE Contributor

CLIMATE DIAGNOSTIC BULLETIN FOR AFRICA

Germany s bilateral development cooperation with Sub-Saharan Africa: An Agenda for Reform

2015 CRS ICT4D CONFERENCE INTRODUCING THE BANDWIDTH AGGREGATION BUYING PROGRAM

Structuring national health systems to deliver better services

Framework for Progressive Destination Competitiveness

Case 2:16-cv RGK-JC Document 45 Filed 03/21/16 Page 2 of 3 Page ID #:2363

Ibrahim Index of African Governance SUB-CATEGORY INSIGHTS RULE OF LAW MO IBRAHIM FOUNDATION

CASM (Africa) and the African Mining Partnership. Jon Hobbs - CASM (Global) Chairman Linus Adie - CASM (Africa) Chairman

Accelerating Economic Growth in Africa

We have the know-how to boost crop productivity, trigger profitable enterprises and opportunities, and chart a sustainable livelihood for rural and


The political economy of resource discoveries. Prof. Michael L. Ross UCLA Department of Political Science September 21, 2011

1 What is the African Economic Outlook Project? 2 African Economic Performance: Multifaceted Growth. 3 Africa and Globalization

Entrepreneurial Universities and Private Higher Education Institutions

Bridging the Gap: Benchmarking Utilities in Africa

4-H Is Where You Live

RAF Country/Group Allocation Utilization Report*

How much will the SDGs cost and can developing countries afford them? Chris Hoy, Independent Consultant and PhD Econ. Candidate

FAMILY PLANNING TRENDS IN SUB SAHARAN AFRICA:

Trade Blocs, Development Hotspots and Changing Trade Patterns. Breakbulk Africa, 18 th February 2015

Africa the potential for growth

What is new on the T4A GPS Maps Traveller s Africa 17.10

Cambridge International Examinations Cambridge International Advanced Subsidiary and Advanced Level

THE PROTECTION OF GEOGRAPHICAL INDICATIONS (GIs) IN AFRICA

What is new on the T4A GPS Maps Traveller s Africa 16.10

Air Transport: An Engine to Prosperity

Section 1. The Index

Projected Rural Population % (2030) and Rural Population Growth % pa ( )

Contents. Africa Highlights 4. Destination Africa 13. Getting Started 15. Itineraries 19. History 27. The Culture 33. African Music 43.

The Galileo Galilei Institute for Theoretical Physics (GGI) plans to organize and host small-size advanced workshops in theoretical particle physics

Economic Partnership Agreements (EPA) Lucia BALOGOVA European Commission Directorate-General Trade

Briefing Leaflet. Recommended Procedures in the AFI Region 1. EXCERPT FROM THE IATA IN-FLIGHT BROADCAST PROCEDURE (IFBP): 17ATSBL07 07 July 2017

WORLD PRESS FREEDOM INDEX 2012

PRIORITIZED ROAD CORRIDOR TRANSPORT PROJECTS

Federal Ministry of Transportation. Nigeria Business Investor Forum Briefing on Aviation Sector Reform and Investment Opportunities

Africa Today. Tunis. TUNISIA Tripoli LIBYA. Red Sea MALI VERDE Praia NIGER. Khartoum SENEGAL. Asmara Banjul GAMBIA. DJIBOUTI Ouagadougou.

4 th EAC Aviation Symposium. ICAO Initiatives Improving Aviation Safety and Security In Africa. (Nairobi, Feb 2018) ARPO AFI Plan & RO AVSEC

Trade Facilitation Conference on New Trends in Trade Facilitation. June 16, Dominique Njinkeu

Per Capita Income Guidelines for Operational Purposes

AFRICAN GROWTH MARKETS AND OPPORTUNITIES

Are$African$Governments$Ready$3$For$Global$Post$2015$Sustainable$Development$Goals?$And$The$Evolving$AU$Africa$2063$Development$Agenda?

Members of the Sub-committees of the Committee of Ambassadors

Appendix D2 amendments 27 November 2018:

Programme planning levels for regular resources in 2017 (10 January 2017)

Special Africa-Indian Ocean Regional Air Navigation Meeting (Durban, South Africa 24 to 29 November 2008) FOLLOW-UP ON ATM RECOMMENDATIONS

Parties to the Convention July 2018

Membership in the Security Council by year ( )

Country Visa required Allowed stay

IMPERIAL LOGISTICS AFRICA DISTRIBUTORSHIPS

Poverty eradication means doubling the lowest household incomes globally in just 15 years after they have stagnated for the last years

Transcription:

APIRG/15 WP/12 26/08/05 INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP FIFTEENTH MEETING (APIRG/15) (Nairobi, Kenya, 26 30 September 2005) Agenda Item 5: Deficiencies in the Air Navigation Fields 5.2: List of deficiencies in the air navigation field Deficiencies in the ATS/AIS/SAR fields (Presented by the Secretariat) Summary This paper presents the list of deficiencies in the ATS, AIS and SAR fields as updated by the Eighth Meeting of the ATS/AIS/SAR Sub-Group (Dakar, 10 12 August 2005). It incorporates updates from States in response to a State Letter as well as inputs directly received from States through missions and correspondence. In carrying out the updates, the Sub-Group made recommendations for appropriate remedial and proposed target dates for /elimination. References: ATS/AIS/SAR/SG/7 Report. 1. Introduction 1.1 The Sub-Group recalled the concerns of the Air Navigation Commission (ANC) and the Council related to the impact of air navigation deficiencies on safety. The Sub-Group noted the appreciation by the ANC and the Council of the efforts made by the APIRG as well as those of States to identify, assess and report air navigation deficiencies. 2. Discussion 2.1 The Sub-Group, using the approved methodology, updated the list of deficiencies in the ATS, SAR and AIS/MAP fields as shown in Appendices A, B and C to this paper. 2.2 The Sub-Group noted with appreciation that there was a marked improvement in the elimination of the previous deficiencies. In the ATS field 50% of the deficiencies have been rectified, in the AIS field 75% of the deficiencies have also been rectified. In the SAR field, though there were some improvements, issues relating to SAR Legislation and SAR Agreement continue to be prevalent. These are being addressed under the ICAO/AFCAC SAR Project.

APIRG/15 WP/12-2 - 2.3 In light of the discussions the meeting formulated draft conclusion 8/30 which is reproduced below: Draft Conclusion 8/30: Consideration of specific air navigation planning and problems and the review of air navigation deficiencies in the Region That considering the negative impact of non of the air navigation plan requirements and the persistence of serious cases of deficiencies in several parts of the AFI region; and a) States concerned should take as soon as possible concrete measures to eliminate all deficiencies at Appendix A, B and C to this working paper. b) the matter be regularly followed up by the ICAO regional offices; and c) results be brought to the attention of APIRG. 3. Action required: That APIRG: a) note the list of deficiencies in ATS, AIS and SAR fields appearing in the Appendices A, B and C to this working paper as updated by the Secretariat and the ATS/AIS/SAR Sub-Group. b) update the list as appropriate on the basis of Appendices A, B and C. c) invite ICAO Secretariat to coordinate with the States concerned in order for them to take remedial in a timely manner. d) develop a modified conclusion taking into account the content of the ATS/AIS/SAR/SG/8 draft conclusion 8/30 based on a), b) and c) above.

APIRG/15 WP/12 Appendix A English ATM Deficiencies State Name Requirements Facilities or Date first corrective Algeria Route UR981 Casablanca- Marrakech-BULIS- Gao-Niamey-Lagos. 1995 Aircraft routes date (Route segment implemented in Algeria). Mali-Mauritania- Morocco-Niger- Nigeria Annex 11 Appendix 2 Route UR986 Five-letter name code Tunis-Ghadames-In Amenas-Djanet- Kano-Foumban- Yaoundé-France Ville Route crossings not identified 1995 Aircraft routes 1998 Difficulties for pilots identifying potential traffic conflicts. date. ICAO Regional Office concerned allocate the 5- letter name codes. Algeria Algeria APIRG/13 Conc.13/43 FIR Algiers Non- of 10 minutes longitudinal separation. 31/12/04 U AFI/7 Rec.5/21 FIR Algiers Non- of ATC in the upper airspace. 31/12/04 U Route UA293 (Ibiza) (KIRLA) Tiaret. 1995 Aircraft date. Algeria RNAV UM999 Casablanca- Errachidia-El Golea- Zarzaitine-Sebha- Sarir-New Valley- Luxor-Jeddah. 1995 Aircraft date. Algeria-Egypt- Libya-Morocco- Saudi Arabia.

APIRG/15 WP/12 Appendix A - A2 - State Name Requirements Facilities or Date first corrective Route UG623 (BALEN) Annaba- Tebessa-Ghardaia. 1995 Aircraft dates. Algeria. Angola RNAV UM731 RNAV UM998 Carbonara- OSMAR- Tunis- Jerba-FARES- Dirkou-N'Djamena- Beriberati-Saurimo- Johannesburg Gaborone-Maun- Luena-Kinshasa 1996 Aircraft 1996 Aircraft dates. dates. Angola- Botswana- Central African Republic- Congo(DRC)- Chad-Libya- Niger South Africa-Zambia Angola- Botswana-DR. Congo. AFI/7 Rec.5/21. Provision of ATC 150 NM concept. Non-provision of ATC Service 150 NM of Huambo 1998 Steep descent for arrival and steep climb for departure. Implement as required. Angola 31/12/04 U Benin Botswana AFI/7 Rec.5/21 RNAV UM731 Johannesburg- Saurimo 1990 Aircraft dates. Angola- Botswana-So uth Africa- Zambia Burkina Faso Burundi

- A3 - APIRG/15 WP/12 Appendix A State Name Requirements Facilities or Date first corrective Cameroon Route UA861 Lagos-Garoua 1994 Aircraft dates. Cameroon Cape Verde Central African Republic Chad Comoros Congo LIM AFI Rec.10/38 SSR Provision of effective surveillance. Need for SSR surveillance in extended TMA as expressed in the AFI CNS/ATM Plan. 1998 Traffic density/complexi ty contributing to frequent ATS incidents Implement SSR at Brazzaville Congo 31/12/04 U Côte d'ivoire Dem. Rep. of Congo UM731 Johannesburg- Saurimo-Berberati 1995 Aircraft dates. (Need of VHF coverage before ) Angola- Botswana-Co ngo (DRC) AFI/7 Rec.5/21 FIR Kinshasa Non-provision of ATC service. - - - - 31/12/04 U

APIRG/15 WP/12 Appendix A - A4 - State Name Requirements Facilities or Date first corrective APIRG/13 Conc.13/43 FIR Kinshasa Non- of 10 minute longitudinal separation. - - - - 31/12/04 U Route UA617 Kinshasa-Windhoek 1995 Aircraft date. (Coordination Meeting with Military Authorities ongoing). Congo (DRC) 31/12/04 U RNAV UL612 Goma-El Dhaba(Paleohora) 1995 Aircraft dates. Congo (DRC)- Egypt-Sudan Djibouti Egypt Equatorial Guinea Eritrea Route UB525 Addis Ababa- ALEBA-Luxor 1996 Aircraft dates. Eritrea 1/9/2005 A Ethiopia France (Réunion)

- A5 - APIRG/15 WP/12 Appendix A State Name Requirements Facilities or Date first corrective Gabon Gambia Ghana Guinea Guinea Bissau Kenya AFI/7 Rec.5/1 - Airspace management P2, R10, D20 Prohibited area, restricted area, danger area. 1990 Non-availability of direct routing. Withdraw these areas. Kenya Lesotho Liberia Libya RNAV UM999 Zarzaitine-Sebha- Sarir-New Valley 1994 Aircraft dates. Libya AFI/7 Rec.5/21 Provision of ATC 150 NM concept Non-provision of ATC 150 NM of Tripoli. 1990 Delayed descent for arrival and steep climb for departure. Implement as required. Libya 31/12/04 U

APIRG/15 WP/12 Appendix A - A6 - State Name Requirements Facilities or Date first corrective Route UA748 (Gozo)-Tripoli- Mizda- Cairo-Sharm Sheikh 1994 Aircraft dates. Libya and adjacent States Route UG623 Route UG855 BALEN-Annaba- Tebessa- Ghadames Tripoli-Ghadames- B. Omar Driss 1994 Aircraft 1994 Aircraft dates. dates. Libya Libya Route UG864 Tunis-Tebessa- Ghardaia- Timmimoun 1994 Aircraft dates. Libya AFI/7 Rec.5/1 RNAV UM994 Monastir-Mitiga- Beni- Walid-ORNAT Airspace Management Inadequate airspace management between ATS units leading to frequent traffic incidents in the FIR boundaries between Alger, N'djamena, Tripoli and Niamey not responding to existing route structure flows. 1994 Aircraft 1998 Frequent ATS incidents in the area attributed to airspace management. dates. Need for urgent meeting of the address the problem of airspace management and prevalent ATS incidents in the area. Libya Libya and adjacent States

- A7 - APIRG/15 WP/12 Appendix A State Name Requirements Facilities or Date first corrective AFI/7 Rec.5/1 Route UA411 Jerba-Tripoli-Beni- W alid-benina- GERFA- Mersa Matruh-Cairo P21-R23-Airspace Management Prohibited 1994 Aircraft 1990 Non-availability of direct routing. dates. State concerned to withdraw these areas. Libya Libya area-restricted area Madagascar Malawi Mali Mauritania Mauritius Morocco Route UR981 Casablanca- Marrakech-BULIS. 1995 Aircraft dates. Morocco

APIRG/15 WP/12 Appendix A - A8 - State Name Requirements Facilities or Date first corrective Airspace Management Problems associated with non flight level allocations on ATS 1998 Non-standard flight level allocations contributed to ATS incidents meet and address issues under column 3. Morocco- Portugal 31/12/04 U Mozambique Namibia AFI/7 Rec.5/21 Provision of ATC 150 NM concept Non-provision of ATC service 150 NM Windhoek 1994 Delayed descent for arrival and steep climb for departure. To Implement as required. Namibia 31/12/04 U Niger Nigeria Route UA861 Lagos-Garoua 1995 Aircraft dates. Nigeria RNAV UM998 Ngaoundere- Maiduguri-Djanet 1995 Aircraft - Nigeria Rwanda Sao Tome & Principe

- A9 - APIRG/15 WP/12 Appendix A State Name Requirements Facilities or Date first corrective Senegal Seychelles Sierra Leone Somalia AFI/7 Rec.5/21 AFI/7 Rec.5/21 Provision of ATC 150 NM concept. Non-provision of ATC service 150 NM of Mogadishu. 1994 Delayed descent for arrival and steep climb for departure. Route UG207 Mogadishu-Karachi 1990 Aircraft No due to the present situation date. Somalia 31/12/04 U Somalia South Africa Spain (Canary Is.) Sudan Route UR400 A. Simbel-Kassala 1994 Aircraft Not acceptable now within Khartoum FIR. Sudan 17/02/05 A Route UR995 Merowe-Addis Ababa 1994 Aircraft To be deleted and replaced by UM665. Sudan 17/02/05 A

APIRG/15 WP/12 Appendix A - A10 - State Name Requirements Facilities or Date first corrective RNAV UM665 Addis Ababa- Merowe 1994 Aircraft Not acceptable in Khartoum FIR due to military reasons. Sudan 17/02/05 A RNAV UM220 Lodwar-A.Simbel 1994 Aircraft non dates. Sudan 17/02/05 A RNAV UL612 Goma-El Dhaba 1994 Aircraft non Overlaps UB607 need to review alignment at appropriate forum. Sudan 17/02/05 A Route UB607 Goma-El Obeid- New Valley-El Dabha 1994 Aircraft non dates. Sudan 17/02/05 A Route UB525 Addis Ababa-Luxor 1994 Aircraft non Not acceptable now in Khartoum FIR. Sudan 17/02/05 A Route UA618 Bukavu-Malakal 1994 Aircraft non Not available now in Khartoum FIR. Sudan 17/02/05 A Provision of ATS Area control service not provided to most ATS routes in the upper airspace. 1998 Aircraft non State to expedite process. Sudan 17/02/05 A Swaziland AFI/7 Rec.5/1 P4 - Airspace Management Prohibited area 1990 Non-availability of direct routings. Withdraw this area - P4. Swaziland

- A11 - APIRG/15 WP/12 Appendix A State Name Requirements Facilities or Date first corrective Tanzania UB527 Lubumbashi - Dares-Salaam 2001 Aircraft Tanzania is coordinating with the States for a common date. D. R. Congo - Tanzania Togo Tunisia Uganda Western Sahara Zambia Zimbabwe

APIRG/15 WP/12 Appendix B SAR English Deficiencies State Name Requirements Facilities or Date first corrective Algeria Angola Benin Botswana Burkina Faso Burundi Annexe 12, 3.1.6, 3.1.7 SAR legislation Provide legal framework for the SAR authority 1995 Lack of legal authority could delay SAR Establish SAR legislation Burundi Annex 12, 2.4, Annex 12, 3.2.4: AFI/7 Rec.6/1 and 6/2 SARSAT ELT 406 MHz 1993 Delay to conduct SAR OPS Coordinate with States concerned. Burundi and Adjacent States. Cameroon Cape Verde

APIRG/15 WP/12 - B2 - Appendix B State Name Requirements Facilities or Date first corrective Central African Republic Chad Comoros Congo Annex 12, 3.1.5, AFI/7 Conc.6/3 Annexe 12, 2.4, Annexe 12, 3.2.4, AFI/7 Rec.6/1 and 6/2 SAR Agreements - 1991 Delay to conduct SAR OPS SARSAT ELT 406 MHz 1993 Delay to conduct SAR OPS Annexe 12, 3.1.6, 3.1.7 SAR legislation Provide legal framework for the SAR authority 1995 Lack of legal authority could delay SAR efficiency. Coordinate with States concerned Implement 406 MHz in acft. Provide SPOC to ICAO Establish SAR legislation Comoros and adjacent States Comoros Comoros Côte d'ivoire Dem. Rep. of Congo Djibouti Annex 12, 3.1.5, AFI/7 Conc.6/3 SAR Agreements - 1991 Delay to conduct SAR OPS Coordinate with States concerned Djibouti and adjacent States Annex 12, 2.4, Annex 12, 3.2.4, AFI/7 Rec. 6/1 and 6/2 SARSAT ELT 406 MHz 1993 Delay to conduct SAR OPS I) Provide SPOC to ICAO: ii) Implement 406 MHz acft. Djibouti

- B3 - APIRG/15 WP/12 Appendix B State Name Requirements Facilities or Date first corrective Annex 12, 3.1.6, 3.1.7 SAR legislation Provide legal framework for the SAR authority 1995 Lack of legal authority could delay SAR efficiency. Establish SAR legislation Djibouti Egypt Equatorial Guinea Eritrea Annex 12, 3.1.5, AFI/7 Conc.6/3 SAR Agreements Establish SAR agreements 1995 Delay to conduct SAR OPS Coordination with States concerned Eritrea and adjacent States 1/3/2005 A Annex 12, 3.1.6, 3.1.7 SAR Legislation Provide legal framework for the SAR authority 1995 Lack of legal authority could delay SAR Establish SAR Agreements Eritrea 1/3/2005 A Ethiopia Annex 12, 3.1.5, AFI/7 Conc.6/3. SAR Agreements - 1995 Delay to conduct SAR/OPS Coordinate with States concerned. Ethiopia and adjacent States France (Réunion) Gabon Gambia Ghana

APIRG/15 WP/12 - B4 - Appendix B State Name Requirements Facilities or Date first corrective Guinea Guinea Bissau Kenya Annex 12, 2.4, Annex 12, 3.2.4, AFI/7 Rec. 6/1 and 6/2 SARSAT ELT 406 MHz 1993 Delay to conduct SAR OPS Implement 406 MHz in acft. Kenya Annex 12, 3.1.6, 3.1.7 SAR legislation Provide legal framework for the SAR Authority 1995 Lack of legal authority could delay SAR efficiency. Establish SAR legislation Kenya Annex 12, 3.1.5, AFI/7 Conc.6/3 SAR Agreements - 1996 Delay to conduct SAR OPS Signed with EAC States only. To coordinate with other neighbouring States concerned outside EAC. Kenya and adjacent States Lesotho Liberia Libya Madagascar Malawi

- B5 - APIRG/15 WP/12 Appendix B State Name Requirements Facilities or Date first corrective Mali Mauritania Mauritius Morocco Mozambique Namibia Niger Nigeria Rwanda Sao Tome & Principe Senegal Seychelles

APIRG/15 WP/12 - B6 - Appendix B State Name Requirements Facilities or Date first corrective Sierra Leone Somalia AFI/7 Rec.5/21 Route UG207 Mogadishu-Karachi 1990 Aircraft subjected to fly noneconomical routes States concerned to coordinate common date Somalia South Africa AFI/7 Rec.5/21 Provision of ATC 150 NM concept Non-provision of ATC service 150 NM of Mogadishu 1994 Delayed descent for arrival and steep climb for departure No due to the present situation Somalia 31/12/04 U Spain (Canary Is.) Sudan Swaziland Tanzania Togo Tunisia Uganda

- B7 - APIRG/15 WP/12 Appendix B State Name Requirements Facilities or Date first corrective Western Sahara Zambia Zimbabwe

APIRG/15 WP/12 Appendix C AIS English Deficiencies State Name Requirements Facilities or Date first corrective Algeria Angola Annex 4, 3.2 and 13.2 AFI/7 Rec. 12/31 ICAO Mandatory Charts Non-availability of the ICAO Aerodrome Chart and the ICAO Aerodrome Obstacle Chart - Type A for Huambo and Luanda. 1990 Lack of charts affects safety Publish these Charts for Luanda and Huambo Angola 31/12/04 U Benin Botswana Burkina Faso Burundi Cameroon Annex 4, 3.2 and 13.2 AFI/7 Rec.12/31 and 12/32 AFI/7 ICAO Mandatory Charts Non-availability of the ICAO Aerodrome Chart and the ICAO Aerodrome Obstacle Chart - Type A for Yaoundé. 1990 Lack of charts affects safety Publish these charts for Yaounde Cameroon 31/12/04 U Cape Verde

APIRG/15 WP/12 - C2 - Appendix C State Name Requirements Facilities or Date first corrective Central African Republic Chad Comoros Annex 4, 3.2 and AFI/7 Rec.12/31 ICAO Mandatory Charts Non-availability of the ICAO Aerodrome Obstacle Chart - Type A for Dzaoudzi and Moroni 1990 Lack of this chart affects safety Publish this Chart for Moroni and Dzaoudzi Comoros 31/12/04 U Congo Côte d'ivoire Dem. Rep. of Congo Annex 4, 13.2 and AFI/7, Rec.12/31 ICAO Mandatory Charts Aerodrome Charts outdated 1990 Non-updated charts affects safety Publish new charts. IAC and VAC charts published. Congo (DRC) 31/12/04 U Djibouti Annex 15, 3.3 Integrated AIS package Irregular distribution of AIS package 01/01/98 Non-availability of latest status of information affects safety Distribute regularly Djibouti 31/12/04 U Annex 15, 3.6.4 Coordinates WGS84 Accuracy of coordinates in accordance with Annexes 11 and 14 01/01/98 Delay in introduction of GNSS Implement WGS- 84 coordinates Djibouti 31/12/04 U Egypt

- C3 - APIRG/15 WP/12 Appendix C State Name Requirements Facilities or Date first corrective Equatorial Guinea Eritrea Ethiopia France (Réunion) Gabon Ghana Annex 15, 3.3 Integrated AIS package 01/01/98 Non-availability of latest status of information. Distribute regularly Gambia 31/12/04 U Gambia Guinea Annex 15, 3.3 Integrated AIS package. Irregular distribution of AIS package 01/01/98 Non-availability of latest status of information. Distribute regularly Guinea 31/12/04 U Guinea Bissau Annex 15, 3.6.4 Coordinates WGS-84 Accuracy of coordinates in accordance with Annexes 11 and 14. 01/01/98 Delay in introduction of GNSS Implementation of WGS-84 coordinates Guinea- Bissau 31/12/04 U Kenya Lesotho Annex 15, 4.1 Lack of new AIP format Irregular distribution of AIS package 01/01/96 Non-availability of AIP affects safety Implement and publish new AIP Lesotho 31/12/04 U

APIRG/15 WP/12 - C4 - Appendix C State Name Requirements Facilities or Date first corrective Liberia Situation unknown Robertsfield Libya Madagascar Malawi Mali Mauritania Mauritius Morocco Annex 15, 4.1 New AIP format Irregular distribution of AIS package. 1/1/96 Non-availability of AIP affects safety Implement and publish new AIP Morocco 31/12/04 U Mozambique Annex 15, 4.1 AIP in new format Non-availability of up-todate information 01/01/96 Use of outdated information may affect safety Implement and publish new AIP format. Mozambique 31/12/04 U Namibia Annex 4, 13.2 and AFI/7 Rec.12/31 ICAO Mandatory Charts Non-availability of ICAO Aerodrome Chart for Keetmanshoop and Windhoek/Hosea Kotako. 1979 Lack of these charts affects Publish the required charts Namibia 31/12/04 U Niger Nigeria

- C5 - APIRG/15 WP/12 Appendix C State Name Requirements Facilities or Date first corrective Rwanda Annex 4, 3.2 and 13.2 Rec.12/31 AFI/7. ICAO Mandatory Charts. Non-availability of ICAO Aerodrome Chart and Aerodrome Obstacle Chart - Type A for Kigali. 1979 Lack of these charts affects safety. Publish the two charts for Kigali. Rwanda 31/12/04 U Sao Tome & Principe Annex 15, 5.1 NOTAM Irregular Publication of NOTAM. 1991 Lack of NOTAM affects safety. Publish regularly. Sao Tome (Brazzaville FIR) 31/12/04 U Senegal Seychelles Sierra Leone Annex 15, 5.1 NOTAM Irregular Publication of NOTAM Publication of points. 1991 Lack of NOTAM affects safety Publish regularly Sierra Leone (Roberts FIR) 31/12/04 U Somalia Annex 4, 3.2, 11.2 and 13.2, AFI/7 Rec.12/31 ICAO Aerodrome Chart and the ICAO Aerodrome Obstacle Chart - Type A. Non-availability of ICAO Aerodrome Chart, ICAO Aerodrome Obstacle Chart type A and ICAO Instrument Approach Chart for Hargeisa, Kismayu, Mogadishu. 1990 Lack of these charts affects safety. Publish the three Charts as required Somalia 31/12/04 U Annex 15, 3.6.4 Coordinates WGS84 Accuracy of coordinates to be established in accordance with Annexes 11 and 14. 01/01/98 Delay in introduction of GNSS Implementation of WGS-84 coordinates Somalia 31/12/04 U South Africa Spain (Canary Is.)

APIRG/15 WP/12 - C6 - Appendix C State Name Requirements Facilities or Date first corrective Sudan Annex 4, 13.2 15, 8.1 ICAO Mandatory Charts. Non-availability of ICAO Aerodrome Chart for Khartoum. 1990 Lack of this chart affects safety. Publish the required chart Sudan 31/12/04 U Swaziland Annex 4, para 3.2 and Rec.12/31 AFI/7 Non-availability of ICAO Aerodrome Chart and the ICAO Aerodrome Obstacle Chart - Type A. Non-availability of ICAO Aerodrome Obstacle Chart type A for Matsapha. 1991 Lack of this chart affects safety. Publish the required chart. Swaziland 31/12/04 U Tanzania Togo Tunisia Uganda Western Sahara Zambia Zimbabwe E N D