Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time of awarded ge above costing more Ibelow April NIL NIL NIL NIL NIL NIL NIL NIL May 1 Construction of Roadbed, Major and Minor 162.33Cr. 186.12 Cr. 14.65% = MIs Larsen Toubro, ECC Division 3rd 24 months + Bridges and Track Linking (Excluding Supply floor Transmission line Railway, 6months ( Defect of Rails, Thick Web switches and Line PSC Electrification Business Unit, Mount liability period) Sleeper), S & T and OHE & General Poonamali Road, Manapakkam, Chennai- Electrical work in connection with 3rd line 600089 between Panskura- Kharagpur (45 Km) on Kharagpur Division of South Eastern Railway in West bengal State, India. June NIL NIL NIL NIL NIL NIL NIL NIL July NIL NIL NIL NIL NIL NIL NIL NIL August NIL NIL NIL NIL NIL NIL NIL NIL September NIL NIL NIL NIL NIL NIL NIL NIL October NIL NIL NIL NIL NIL NIL NIL NIL November NIL NIL NIL NIL NIL NIL NIL NIL December NIL NIL NIL NIL NIL NIL NIL NIL January'10 1 Design, Supply, Erection, Testing & 8.16 Cr. 7.94Cr. 5.63% RVNUKOUEUPSI/OT/09/01N M/s.PSC Engineers Pvt. Ltd. 18 months + 180 Commissioning Of 132/27 Kv, 2 X 30142 (below) 01-11/2241 Dt.28-01-2010 IT Building(3rd Floor),Benfish,31, days (Defect MVA, Traction-Sub-Station, with an G.N.Block, Sector -V, Salt Lake City, liability period) additional bay and replacement of one Kolkata 700091. existing 13/20MVA capacity, modification of 132KV incomming and out going 25KV Power Supply, TSS feeding post, with other associated works at Balichak Sub-Station, along with modification of opposite gantry in connection with 3rd line between Panskura- Kharagpur under Kharagpur Division Of South Eastern Railway in the State of West IRpnn~1. February'10 NIL NIL NIL NIL NIL NIL NIL NIL March'10 NIL NIL NIL NIL NIL NIL NIL NIL Aoril'10 NIL NIL NIL NIL NIL NIL NIL NIL ~
I Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time of awarded ge above costing more /below May'10 1 Construction of Road bed, Major and Minor 56.93 Cr. 65.47 Cr. 14.99% No. RVNUKOU2009/PST- MIs Premco Rail Engineers Limited, 18 months + Bridges and Track Linking (Excluding Supply (Above) MOU/Tender (Part-I)/3204 dt. B-304, City Centre Block-DC, Sector - I, 6months ( Defect of Rails, Thick Web Switches and Line PSC 05.05.2010 Salt Lake City, Kolkata - 700064. liability period) Sleeper), S&T and OHE & General Electrical work in connection with construction of 3rd line between Posoita - Manoharpur (11.6Km) on Chakradharpur Division of South Eastern Railway in Jharkhand State, India" June'10 1 Construction of Road bed, Major and Minor 56.49 Cr. 56.96Cr. 0.826% No. RVNUKOU2010/RGA- MIs KEC International Ltd. 18 months + 180 Bridges and Track Linking (Excluding Supply (Above) TMZlRoadbed/KEC/3423 MIs Asia Communication & Electronics days (Defect of Rails, Thick Web Switches and Line PSC 0129.06.2010 Sdn. Bhd. & MIs Unique Builders (JV) liability period) Sleeper), S&T and OHE & General Electrical O/c KEC International Limited,1 st Floor, work in connection with construction of 3rd Building No.9A, DLF Cyber line between Rajgoda - Tamluk Doubling City, Phase - III, (13.5 Km) Phase -II of Panskura - Haldia Gurgaon - 122002. Haryana (India) Doubling in Kharagpur Division of South Eastern Railway in West Bengal State, India July 1 Construction of structural Shed with Gantry, 87.54 Cr. 84.21 Cr. 3.80% No. RVNUKOU2010IDLCI MIs SIMPLEX INFRASTRUCTURES 12 months from Administrative and othr Buildings along with (Below) SIMPLEx/3608 dt. 26.07.2010 LIMITED. Simplex House, 27, the date of issue ancillary works (Civil, tele Communication, Shakespear Sarani, Kolkata - 700017. of LOA. Illumination and electrification) in connection,with setting up of Diesel Loco Component factory for manufacturing and sub assembling of EMD Locos, etc. of DAnkuni of Eastern Railway in the State of West Benaal INDIA. Auaust NIL NIL NIL NIL NIL NIL NIL NIL September 2 Construction of new line between Dankuni- 147.48 Cr. 89.70 Cr. 3.76% No. RVNUKOUDKAE - F. MIs totem Infrastructure Limited - MIs 30 month + 6 furfura Sharif via Jangaloara (20 km) in (Below) Sharif New LinelTotem - Premco Rail Engineers Limited (JV) Howrah Division of Eastern Railway in the Premco/4404 dt. 20.09.2010 6, Totem House, Dwarkapuri Colony, state of West Bengal, INDIA. Punjagutta, Hyderabad - 500082. Design, Supply, Erection, Testing & 9.105 Cr. 8.65 Cr. 4.997% RVNUKOUGOL-MOUITSSNol M/s.G.E.T. Power Pvt. Ltd. 18 months + 180 Commissioning Of 132/27 Kv, 2 X 30142 (below) II 0124.09.2010 153, Developed Plot, Electrical and days (Defect MVA, Traction-Sub-Station, Feeding Post Electronic Industrial Estate, Perungudi, liability period) with othre associate works at Goelkera - Chennai - 600096. Psoita section under Chakradharpur Division of South Eastern Railway in the State of Jharkhand. October NIL NIL NIL NIL NIL NIL NIL NIL November NIL NIL NIL NIL NIL NIL NIL NIL \ ~ot '
Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time of awarded ge above costing more Ibelow December 2 Package - I : "Construction of viaduct 206.30 Cr. 181.14Cr. 12.19% No. RVNUKOUMETRO/JOKA- Simplex Infrastructure Limited 30 month from the including related works for 4.748 km length Below BBD BAGITENDER/2/BEC File Simplex House, 27, Shakespear Sarani, date of issue of excluding station areas from CH (-)1250 to Vol-1/PACKAGE-1 dt, Kolkata - 700017. LOA. CH 4128.00 between Joka to Behala 28.12.2010 Chowrasta including depot approach at Joka, in Joka-BBD BAG corridor of Kolkata Metro Railwav Line." Package - II : "Construction of viaduct 206.50 Cr. 184.72 Cr. 10.54% No. RVNUKOUMETRO/JOKAincluding related works for 4.762 km length Below BBD BAGITENDER/2/BEC File excluding station areas from CH 4128.00 to Vol-1/PACKAGE-11 dt, CH 9700.00 between Behala Chowrasta to 28.12.2010. Mominpur in Joka-BBD BAG corridor of Kolkata Metro Railway Line." Januarv'11 NIL NIL NIL NIL NIL NIL NIL NIL February'11 2 Execution of Desing & Construction of PSC 223 Cr. 199.87 Cr. 10.37% No. RVNUKOUNOA-BARA- MIs CCCL - SAM India (JV) 30 month + 6 viaduct, Embankment and stations including (Below) DAKS/METROITENDER/(R)/1 Khivraj Complex, #2, 8th Floor, E&M works in connection with extension of dt04.02.2011 480, Anna Salai, Nandanam, Metro Railway line Naopara (excluding) - Chennai - 600035. Baranagar - Dakshineswar of Kolkata Metro. \ Construction of Roadbed, Major and Minor 171.02 Cr. 113.54 Cr. 6.59% No. RVNUKOUTMZ- MIs JMC - GPT - Vijaywargi - Bright 24 month + 6 Bridges, Track Linking (Excluding Supply of above BYSNJMC-GPT-Vijaywargi- Power, A- Rails and Line PSC Sleepers), S & T and Bright Power/161 dt. 104, Shapath - 4, Opp. Karnavati Club, OHE & General Electrical work in connection 25.02.2011 S.G. Road, Ahmedabad - 380-051 with Doubling between Tamluk (Junction Cabin) - Basulya Sutahata (24.4 Km) in Kharagpur Division of South Eastern Railway in State of West Bengal, India. March'11 2 Carrying out Detailed Design consultancy & 7.62Cr. 7.16 Cr. 6.04% No. RVNUKOUROB- MIs Consulting Engineering Services 30 months + 6 Construction Supervision for the proposed 4- (Below) BWN/DDC & CS/5502 dt. India Pvt Ltd. CES Centre, lane Cable stayed road over bridge over 02.03.2011 OM - 3 & 4, Sector - V, Saltlake City, Barddhaman yard in lieu of existing 2-lane Kolkata - 700091. ROB Bridge No.-231 of Eastern Railway in the State of West Bengal, India. Project Management Consultancy for 2.96Cr. 2.74Cr. 8% (below) No. RVNUKOUGOL- M/s SNC-LAVALIN Infrastructure Pvt Ltd. 34 months Construction of Road bed, Major and Minor MOU/PMC/Price Bid/Pt 1115780 (Formerly MIs Span Consultants Pvt Ltd.) Bridges, Track Linking, Tunnel, S&T and dt, 31.03.2011 Mindmill Corporate Tower, 4th & 5th OHE, TSS & General Electrical works in Floors, Plot No. 24A, connection with construction of 3rd line Sector 16A, Film City, between Goelkera - Manoharpur (27.50 Km) Noida (UP) - 201301 on Chakradharpur Division of South Eastern Railwav in Jharkhand State lndia" April'11 NIL NIL NIL NIL NIL NIL NIL NIL Mav'11 NIL NIL NIL NIL NIL NIL.. NIL NIL
Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time of awarded ge above costing more Ibelow June'11 1 Project Management Consultancy for 1.19 Cr. 1.41 Cr. 18.48% NO. RVNUKOUDKAE- MIs S. N. Bhobe & Associates Pvt. Ltd. 30 months + 6 Construction of Road bed, Major and Minor Above F.Sharif/PMC/2010/1 dt. Unit No. - 10, Banking Complex No - II, Bridges, Track Linking (Excluding supply of 01.06.2011 Plot NO.9 & 10, Sector -19A, Vashi, Navi Rails and PSC Sleepers) S&T and OHE & Mumbai - 400705, India General Electrical works in connection with new line between Dankuni - Furfura Sharif (20 km) on Howrah Division of Eastern Railway in the State of West Benaal India" July'11 1 Construction of sheds, Structures, Porta 86Cr. 98Cr. 14% No. MIs Premco - Vardhman (JV) Axis 15 months + 6 Blocks, Water Supply Arrangement, (Above) RVNUKOUDMU/HLZl2/913 dt. Multi Complex, CF-9,3rd Sewerage, Drainage, Roads, Track, S&T, 2007.2011 Floor, Rajarhat New Power Supply Arrangement, General Town, Kolkata - 700156 Electrical Works and Supply, Erection & Commissioning 0 fmachinery & Plant in connection with setting up of DMU Factory of South Eastern Railwavin Haldia West Auaust'11 NIL NIL NIL NIL NIL NIL NIL NIL September'11 1 Construction of Road bed, Major and Minor 103 Cr. 135.27Cr. 30.8% NO. RVNUKOUGOL-PST 3rd MIs. Unity- Triveni - BCPL (JV), 24 months + 6 Bridges, Tunnel and Track Linking (Above) Iine/UTBJV 11517 dt. 1252, Pushpanjali Apartments, (Excluding Supply of Rails, Thick Web 12.09.2011 Old Prabhadevi Road, Switches and Line PSC Sleeper) and OHE & Prabhadevi, General Electrical work in connection with Mumbai - 400025. construction of 3rd line between Goelkera - Posoita (15.9 Km) on Chakradharpur Division of South Eastern Railway in the IState of Jharkhand. India October'11 240.56 Cr. 233.6 Cr. 2.89% RVNUKOUMETRO(ANV1 )/113 MIs. Afcons Infrastructure Ltd. Afcons 30 months +12 PACKAGE-ANV1: "CONSTRUCTION OF (below) 8 dated 21.10.2011 House, VIADUCT INCLUDING RELATED WORKS 16, Shah Industrial Estate, FOR 5.75 KM LENGTH EXCLUDING Veera Desai Road, Post Box No.11978, STATION AREAS FROM CH. -247.00 TO Azad Nagar, P.O. Andheri (W), CH. 6400.00 BETWEEN KAVI SUBHASH Mumbai - 400053 (NEW GARIA) TO VIP Bazar, IN Ph. - 022-6719-1000 NEWGARIA-AIRPORT CORRIDOR OF Fax - 022-2673-0047 KOLKATA METRO RAILWAY LINE". 220.47 Cr. 224.97 Cr. PACKAGE- ANV2: "CONSTRUCTION OF 2.05% RVNUKOUMETRO(ANV2)/113 MIs. Gammon India Limited, Gammon 30 months +12 (above) VIADUCT INCLUDING RELATED WORKS 9 dated 21.10.2011 House, FOR 5.27 KM LENGTH EXCLUDING Veer Savarkar Marg, STATION AREAS FROM CH. 6400.00 TO Prabha Devi, CH. 12570.00 BETWEEN VIP BAZAR TO Mumbai - 400 025, NICCO PARK, IN NEWGARIA-AIRPORT Phone: 91226114000 CORRIDOR OF KOLKATA METRO FAX : 022-2430-0221 RAILWAY LINE". \ ~ ~ 1 _
1 ---------- I Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time of awarded ge above costing more Ibelow 215.89 Cr. 212.54 Cr. RVNUKOUMETRO(ANV3)/114 MIs. Afcons Infrastructure Ltd. Afcons 30 months +12 PACKAGE- ANV3: "CONSTRUCTION OF o dated 21.10.2011 House, VIADUCT INCLUDING RELATED WORKS 16, Shah Industrial Estate, FOR 5.16 KM LENGTH EXCLUDING Veera Desai Road, Post Box No.11978, STATION AREAS FROM CH. 12570.00 TO Azad Nagar, P.O. Andheri (W), CH. 18630.00 BETWEEN NICCO PARK TO Mumbai - 400053 CBD-1, IN NEWGARIA-AIRPORT Ph. - 022-6719-1000 CORRIDOR OF KOLKATA METRO Fax - 022-2673-0047 RAILWAY LINE". 4 PACKAGE- ANV4: "CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 5.40 KM LENGTH EXCLUDING STATION AREAS FROM CH. 18630.00 TO CH. 25102.00 BETWEEN CBD-1 TO RABINDRA TIRTHA, IN NEWGARIA- AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINE". 225.84 Cr. 199.1 Cr. 11.84 RVNUKOUMETRO(ANV4)/114 MIs. Larsen & Toubro Limited. TCTC 30 months +12 (below) 1 dated 21.10.2011 Building, Mount Poonamallee Road, Manapakkam,Chennai-600089 November'11 NIL NIL NIL NIL NIL NIL NIL NIL December'11 NIL NIL NIL NIL NIL NIL NIL NIL Januarv'12 NIL NIL NIL NIL NIL NIL NIL NIL February'12 Construction of 4-Lane Cable Stayed Road 105.61 Cr. 110.88 Cr. 4.99% RVNUKOUROB-BWN/GPT- MIs GPT-RANHILL (JV), 25 months + 6 Over Bridge over Barddhaman Yard in lieu of Above RANHILU1/3012 dt. "Jeewansaatya" DD-6, existing 2-Lane ROB Bridge No.213 of 20.02.2012 Sector-I, Salt Lake City, Eastern Railway in the State of West Bengal, Kolkata - 700064. India. March'12 NIL NIL NIL NIL NIL NIL NIL NIL April'12 JMS-1:- Construction of Joka, Thakurpukur, 167.76 Cr. 200.91 Cr. 19.76% RVNUKOUJOKA- Simplex Infrastructure Limited 24 months +12 Sakher Bazar and Behala Chowrasta Above MAJERHAT/JMS1/096 Simplex House, 27, Shakespear Sarani, Stations including all related works Dt.14.04.2012 Kolkata - 700017. (architectuire, electrical & Mechanical (E&M), HVAC, Fire detection and Fire suppression system and public health engineering works) in Joka-BBD Bag corridor of Kolkata Metro Railway Line. 2 JMS-2:- Construction of Behala Bazar, 138.65 Cr. 162.66Cr 17.31% RVNUKOUJOKA- Gammon India Limited 24 months +12 Taratala and Majerhat Stations including all Above MAJERHAT/JMS2/097 Gammon House, Veer Savarkar Marg., related works (architectuire, electrical & Dt.14.04.2012 Prabha Devi. Mechanical (E&M), HVAC, Fire detection Mumbai-400 025. and Fire suppression system and public health engineering works} in Joka-BBD Bag corridor of Kolkata Metro Railway Line. \ 1\ - \ y
Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time of awarded ge above costing more Ibelow May'12 Design and construction of power supply & 43.44 Cr. 42.09 Cr. 3.12% RVNUKOUEUNEW-METRO Isolux Ingenieria, SA 24 months +6 distribution, traction electrififcation, 750 VDC (below) LlNE(NOA - DAKE Section)Nol 12th floor, Building No - 10, Tower - C, third rail and SCADA system for a total II dt. 22.05.2012 DLF Cyber City Sector - 25, Phase - II 1 length of 4.465 km (approx) from Noapara Gurgaon - 122002, Hariyana. (ex) - Baranagar - Dakshineswar station in connection with the extension of existing Metro corridor kolkata. June'12 NIL NIL NIL NIL NIL NIL NIL NIL ~~ I 1 _
Rail Vikas Nigam Limited Kolkata Details of tenders/contracts awarded upto September'2012 Month No. of tender awarded costing more Name of the Work & Location Estimated Tendered Percenta ge above /below LOA No. Agency Name Time of April NIL NIL NIL NIL NIL NIL NIL NIL May 1 Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails, Thick Web switches and Line PSC Sleeper), S & T and OHE & General Electrical work in connection with 3rd line between Panskura- Kharagpur (45 Km) on Kharagpur Division of South Eastern Railway in West bengal State, India. 162.33Cr. 186.12 Cr. 14.65% = M/s Larsen Toubro, ECC Division 3rd floor Transmission line Railway, Electrification Business Unit, Mount Poonamali Road, Manapakkam, Chennai- 600089 24 months + 6months ( Defect liability period ) June NIL NIL NIL NIL NIL NIL NIL NIL July NIL NIL NIL NIL NIL NIL NIL NIL August NIL NIL NIL NIL NIL NIL NIL NIL September NIL NIL NIL NIL NIL NIL NIL NIL October NIL NIL NIL NIL NIL NIL NIL NIL November NIL NIL NIL NIL NIL NIL NIL NIL December NIL NIL NIL NIL NIL NIL NIL NIL January'10 1 Design, Supply, Erection, Testing & Commissioning Of 132/27 Kv, 2 X 30/42 MVA, Traction-Sub-Station, with an additional bay and replacement of one existing 13/20MVA capacity, modification of 132KV incomming and out going 25KV Power Supply, TSS feeding post, with other associated works at Balichak Sub-Station, along with modification of opposite gantry in connection with 3rd line between Panskura- Kharagpur under Kharagpur Division Of South Eastern Railway in the State of West Bengal. 8.16 Cr. 7.94 Cr. 5.63% (below) RVNL/KOL/EL/PSI/OT/09/01/V ol-11/2241 Dt.28-01-2010 M/s.PSC Engineers Pvt. Ltd. IT Building(3rd Floor),Benfish,31, G.N.Block, Sector -V, Salt Lake City, Kolkata 700091. 18 months + 180 days (Defect liability period) February'10 NIL NIL NIL NIL NIL NIL NIL NIL March'10 NIL NIL NIL NIL NIL NIL NIL NIL April'10 NIL NIL NIL NIL NIL NIL NIL NIL
Month No. of tender awarded costing more Name of the Work & Location May'10 1 Construction of Road bed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails, Thick Web Switches and Line PSC Sleeper), S&T and OHE & General Electrical work in connection with construction of 3rd line between Posoita - Manoharpur (11.6Km) on Chakradharpur Division of South Eastern Railway in Jharkhand State, India Estimated Tendered Percenta ge above /below 56.93 Cr. 65.47 Cr. 14.99% (Above) LOA No. Agency Name Time of No. RVNL/KOL/2009/PST- MOU/Tender (Part-I)/3204 dt. 05.05.2010 M/s Premco Rail Engineers Limited, B-304, City Centre Block-DC, Sector - I, Salt Lake City, Kolkata - 700064. 18 months + 6months ( Defect liability period ) June'10 1 Construction of Road bed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails, Thick Web Switches and Line PSC Sleeper), S&T and OHE & General Electrical work in connection with construction of 3rd line between Rajgoda - Tamluk Doubling (13.5 Km) Phase II of Panskura Haldia Doubling in Kharagpur Division of South Eastern Railway in West Bengal State, India 56.49 Cr. 56.96Cr. 0.826% (Above) No. RVNL/KOL/2010/RGA- TMZ/Roadbed/KEC/3423 Dt.29.06.2010 M/s KEC International Ltd. M/s Asia Communication & Electronics Sdn. Bhd. & M/s Unique Builders (JV) O/c KEC International Limited,1st Floor, Building No.9A, DLF Cyber City, Phase - III, Gurgaon - 122002. Haryana (India) 18 months + 180 days (Defect liability period) July 1 Construction of structural Shed with Gantry, Administrative and othr Buildings along with ancillary works (Civil, tele Communication, Illumination and electrification) in connection with setting up of Diesel Loco Component factory for manufacturing and sub assembling of EMD Locos, etc. of DAnkuni of Eastern Railway in the State of West Bengal, INDIA. 87.54 Cr. 84.21 Cr. 3.80% (Below) No. RVNL/KOL/2010/DLC/ M/s SIMPLEX INFRASTRUCTURES SIMPLEX/3608 dt. 26.07.2010 LIMITED. Simplex House, 27, Shakespear Sarani, Kolkata - 700017. 12 months from the date of issue of LOA. August NIL NIL NIL NIL NIL NIL NIL NIL September 2 Construction of new line between Dankunifurfura Sharif via Jangaloara (20 km) in Howrah Division of Eastern Railway in the state of West Bengal, INDIA. 147.48 Cr. 89.70 Cr. 3.76% (Below) No. RVNL/KOL/DKAE - F. Sharif New Line/Totem - Premco/4404 dt. 20.09.2010 M/s totem Infrastructure Limited - M/s Premco Rail Engineers Limited (JV) 6, Totem House, Dwarkapuri Colony, Punjagutta, Hyderabad - 500082. 30 month + 6 Design, Supply, Erection, Testing & Commissioning Of 132/27 Kv, 2 X 30/42 MVA, Traction-Sub-Station, Feeding Post with othre associate works at Goelkera - Psoita section under Chakradharpur Division of South Eastern Railway in the State of Jharkhand. 9.105 Cr. 8.65 Cr. 4.997% (below) RVNL/KOL/GOL-MOU/TSS/Vol- M/s.G.E.T. Power Pvt. Ltd. II Dt.24.09.2010 153, Developed Plot, Electrical and Electronic Industrial Estate, Perungudi, Chennai - 600096. 18 months + 180 days (Defect liability period) October NIL NIL NIL NIL NIL NIL NIL NIL November NIL NIL NIL NIL NIL NIL NIL NIL
Month No. of tender awarded costing more Name of the Work & Location Estimated Tendered Percenta ge above /below LOA No. Agency Name Time of December 2 Package - I : "Construction of viaduct including related works for 4.748 km length excluding station areas from CH (-)1250 to CH 4128.00 between Joka to Behala 206.30 Cr. 181.14Cr. 12.19% Below No. RVNL/KOL/METRO/JOKA- BBD BAG/TENDER/2/BEC File Vol-1/PACKAGE-I dt. 28.12.2010. Simplex Infrastructure Limited Simplex House, 27, Shakespear Sarani, Kolkata - 700017. 30 month from the date of issue of LOA. Chowrasta including depot approach at Joka, in Joka-BBD BAG corridor of Kolkata Metro Railway Line." Package - II : "Construction of viaduct including related works for 4.762 km length excluding station areas from CH 4128.00 to CH 9700.00 between Behala Chowrasta to 206.50 Cr. 184.72 Cr. 10.54% Below No. RVNL/KOL/METRO/JOKA- BBD BAG/TENDER/2/BEC File Vol-1/PACKAGE-II dt. 28.12.2010. Mominpur in Joka-BBD BAG corridor of Kolkata Metro Railway Line." January'11 NIL NIL NIL NIL NIL NIL NIL NIL February'11 2 Execution of Desing & Construction of PSC 223 Cr. 199.87 Cr. 10.37% No. RVNL/KOL/NOA-BARA- M/s CCCL - SAM India (JV) 30 month + 6 viaduct, Embankment and stations including E&M works in connection with extension of Metro Railway line Naopara (excluding) - Baranagar - Dakshineswar of Kolkata Metro. (Below) DAKS/METRO/TENDER/(R)/1 dt.04.02.2011 Khivraj Complex, #2, 8th Floor, 480, Anna Salai, Nandanam, Chennai - 600035. Construction of Roadbed, Major and Minor Bridges, Track Linking (Excluding Supply of Rails and Line PSC Sleepers), S & T and OHE & General Electrical work in connection with Doubling between Tamluk (Junction Cabin) - Basulya Sutahata (24.4 Km) in Kharagpur Division of South Eastern Railway in State of West Bengal, India. 171.02 Cr. 113.54 Cr. 6.59% above No. RVNL/KOL/TMZ- BYSA/JMC-GPT-Vijaywargi- Bright Power/161 dt. 25.02.2011 M/s JMC - GPT - Vijaywargi - Bright Power, A - 104, Shapath - 4, Opp. Karnavati Club, S.G. Road, Ahmedabad - 380-051 24 month + 6 March'11 2 Carrying out Detailed Design consultancy & Construction Supervision for the proposed 4- lane Cable stayed road over bridge over Barddhaman yard in lieu of existing 2-lane ROB Bridge No.-231 of Eastern Railway in the State of West Bengal, India. 7.62 Cr. 7.16 Cr. 6.04% (Below) No. RVNL/KOL/ROB- BWN/DDC & CS/5502 dt. 02.03.2011 M/s Consulting Engineering Services India Pvt. Ltd. CES Centre, DM - 3 & 4, Sector - V, Saltlake City, Kolkata - 700091. 30 months + 6 Project Management Consultancy for Construction of Road bed, Major and Minor Bridges, Track Linking, Tunnel, S&T and OHE, TSS & General Electrical works in connection with construction of 3rd line between Goelkera - Manoharpur (27.50 Km) on Chakradharpur Division of South Eastern Railway in Jharkhand State, India 2.96 Cr. 2.74 Cr. 8% (below) No. RVNL/KOL/GOL- MOU/PMC/Price Bid/Pt.II/5780 dt. 31.03.2011 M/s SNC-LAVALIN Infrastructure Pvt. Ltd. (Formerly M/s Span Consultants Pvt. Ltd.) Mindmill Corporate Tower, 4th & 5th Floors, Plot No. 24A, Sector 16A, Film City, Noida (UP) - 201301 April'11 NIL NIL NIL NIL NIL NIL NIL NIL May'11 NIL NIL NIL NIL NIL NIL NIL NIL 34 months
Month No. of tender awarded costing more Name of the Work & Location June'11 1 Project Management Consultancy for Construction of Road bed, Major and Minor Bridges, Track Linking (Excluding supply of Rails and PSC Sleepers) S&T and OHE & General Electrical works in connection with new line between Dankuni - Furfura Sharif (20 km) on Howrah Division of Eastern Railway in the State of West Bengal, India Estimated Tendered Percenta ge above /below 1.19 Cr. 1.41 Cr. 18.48% Above July'11 1 Construction of sheds, Structures, Porta Blocks, Water Supply Arrangement, Sewerage, Drainage, Roads, Track, S&T, Power Supply Arrangement, General Electrical Works and Supply, Erection & Commissioning o fmachinery & Plant in connection with setting up of DMU Factory of South Eastern Railwayin Haldia, West 86 Cr. 98 Cr. 14% (Above) LOA No. Agency Name Time of NO. RVNL/KOL/DKAE- F.Sharif/PMC/2010/1 dt. 01.06.2011 M/s S. N. Bhobe & Associates Pvt. Ltd. Unit No. - 10, Banking Complex No - II, Plot No. 9 & 10, Sector -19A, Vashi, Navi Mumbai - 400705, India No. M/s Premco - Vardhman (JV) RVNL/KOL/DMU/HLZ/2/913 dt. Multi Complex, 20.07.2011 9,3rd Floor, Rajarhat New Town, Kolkata - 700156 Axis CF- 30 months + 6 15 months + 6 August'11 NIL NIL NIL NIL NIL NIL NIL NIL September'11 1 Construction of Road bed, Major and Minor 103 Cr. 135.27Cr. 30.8% NO. RVNL/KOL/GOL-PST 3rd M/s. Unity Triveni - BCPL (JV), Bridges, Tunnel and Track Linking (Excluding Supply of Rails, Thick Web Switches and Line PSC Sleeper) and OHE & General Electrical work in connection with construction of 3rd line between Goelkera - Posoita (15.9 Km) on Chakradharpur Division of South Eastern Railway in the State of Jharkhand, India. (Above) line/utbjv/1517 dt. 12.09.2011 1252, Pushpanjali Apartments, Old Prabhadevi Road, Prabhadevi, Mumbai 400025. October'11 PACKAGE-ANV1: CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 5.75 KM LENGTH EXCLUDING STATION AREAS FROM CH. -247.00 TO CH. 6400.00 BETWEEN KAVI SUBHASH (NEW GARIA) TO VIP Bazar, IN NEWGARIA-AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINE. 240.56 Cr. 233.6 Cr. 2.89% (below) RVNL/KOL/METRO(ANV1)/113 8 dated 21.10.2011 M/s. Afcons Infrastructure Ltd. Afcons House, 16, Shah Industrial Estate, Veera Desai Road, Post Box No.11978, Azad Nagar, P.O. Andheri (W), Mumbai 400053 Ph. 022-6719-1000 Fax 022-2673-0047 24 months + 6 30 months +12 PACKAGE- ANV2: CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 5.27 KM LENGTH EXCLUDING STATION AREAS FROM CH. 6400.00 TO CH. 12570.00 BETWEEN VIP BAZAR TO NICCO PARK, IN NEWGARIA-AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINE. 220.47 Cr. 224.97 Cr. 2.05% (above) RVNL/KOL/METRO(ANV2)/113 9 dated 21.10.2011 M/s. Gammon India Limited, Gammon House, Veer Savarkar Marg, Prabha Devi, Mumbai 400 025, Phone : 91226114000 FAX : 022-2430-0221 30 months +12
Month No. of tender awarded costing more Name of the Work & Location PACKAGE- ANV3: CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 5.16 KM LENGTH EXCLUDING STATION AREAS FROM CH. 12570.00 TO CH. 18630.00 BETWEEN NICCO PARK TO CBD-1, IN NEWGARIA-AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINE. Estimated Tendered Percenta ge above /below 215.89 Cr. 212.54 Cr. RVNL/KOL/METRO(ANV3)/114 0 dated 21.10.2011 LOA No. Agency Name Time of M/s. Afcons Infrastructure Ltd. Afcons House, 16, Shah Industrial Estate, Veera Desai Road, Post Box No.11978, Azad Nagar, P.O. Andheri (W), Mumbai 400053 Ph. 022-6719-1000 Fax 022-2673-0047 30 months +12 PACKAGE- ANV4: CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 5.40 KM LENGTH EXCLUDING STATION AREAS FROM CH. 18630.00 TO CH. 25102.00 BETWEEN CBD-1 TO RABINDRA TIRTHA, IN NEWGARIA- AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINE. 225.84 Cr. 199.1 Cr. 11.84 (below) RVNL/KOL/METRO(ANV4)/114 1 dated 21.10.2011 M/s. Larsen & Toubro Limited. TCTC Building, Mount Poonamallee Road, Manapakkam, Chennai - 600089 30 months +12 4 November'11 NIL NIL NIL NIL NIL NIL NIL NIL December'11 NIL NIL NIL NIL NIL NIL NIL NIL January'12 NIL NIL NIL NIL NIL NIL NIL NIL February'12 Construction of 4-Lane Cable Stayed Road Over Bridge over Barddhaman Yard in lieu of existing 2-Lane ROB Bridge No.213 of Eastern Railway in the State of West Bengal, India. 105.61 Cr. 110.88 Cr. 4.99% Above RVNL/KOL/ROB-BWN/GPT- RANHILL/1/3012 dt. 20.02.2012 M/s GPT-RANHILL (JV), "Jeewansaatya" DD-6, Sector-I, Salt Lake City, Kolkata - 700064. 25 months + 6 March'12 NIL NIL NIL NIL NIL NIL NIL NIL April'12 JMS-1:- Construction of Joka, Thakurpukur, Sakher Bazar and Behala Chowrasta Stations including all related works (architectuire, electrical & Mechanical (E&M), HVAC, Fire detection and Fire suppression system and public health engineering works) in Joka-BBD Bag corridor of Kolkata Metro Railway Line. 167.76 Cr. 200.91 Cr. 19.76% Above RVNL/KOL/JOKA- MAJERHAT/JMS1/096 Dt.14.04.2012 Simplex Infrastructure Limited Simplex House, 27, Shakespear Sarani, Kolkata - 700017. 2 JMS-2:- Construction of Behala Bazar, Taratala and Majerhat Stations including all related works (architectuire, electrical & Mechanical (E&M), HVAC, Fire detection and Fire suppression system and public health engineering works) in Joka-BBD Bag corridor of Kolkata Metro Railway Line. 138.65 Cr. 162.66Cr 17.31% Above RVNL/KOL/JOKA- MAJERHAT/JMS2/097 Dt.14.04.2012 Gammon India Limited Gammon House, Veer Savarkar Marg., Prabha Devi. Mumbai-400 025. 24 months +12 24 months +12
May'12 Month No. of tender awarded costing more 1 Name of the Work & Location Design and construction of power supply & distribution, traction electrififcation, 750 VDC third rail and SCADA system for a total length of 4.465 km (approx) from Noapara (ex) - Baranagar - Dakshineswar station in connection with the extension of existing Metro corridor kolkata. Estimated Tendered Percenta ge above /below 43.44 Cr. 42.09 Cr. 3.12% (below) LOA No. Agency Name Time of RVNL/KOL/EL/NEW-METRO Isolux Ingenieria, SA LINE(NOA - DAKE Section)/Vol-12th floor, Building No - 10, Tower - C, II dt. 22.05.2012 DLF Cyber City Sector - 25, Phase - II Gurgaon - 122002, Hariyana. 24 months +6 June'12 NIL NIL NIL NIL NIL NIL NIL NIL July'12 NIL NIL NIL NIL NIL NIL NIL NIL August'12 NIL NIL NIL NIL NIL NIL NIL NIL September'12 NIL NIL NIL NIL NIL NIL NIL NIL
BID AWARD DETAILS w.e.f. March 2012 and onwards for Projects under CPM/M Kolkata Sl. No. Tender No. Date of Opening Description of Work Contract No. & date Contractor's Name Quantity (for supply contract) Estimated (for Engg./Elect/S&T/Mech.) Rate (for supply contact) Tender (for Engg./Elect/S&T/Mech.) Scheduled Date 1 RVNL/KOL/JOKA- MAJERHAT/JMS1/096 Dated 14.04.2012 19.02.2012 JMS-1:- Construction of Joka, Thakurpukur, Sakher Bazar and Behala Chowrasta Stations including all related works (architectuire, electrical & Mechanical (E&M), HVAC, Fire detection and Fire suppression system and public health engineering works) in Joka-BBD Bag corridor of Kolkata Metro Railway Line. Notification of Award No. RVNL/KOL/JOKA- MAJERHAT/JMS1/096 Dt.14.04.2012 M/s. Simplex Infrastructure Limited Simplex House, 27, Shakespear Sarani, Kolkata - 700017. - INR 200.91 Cr. Apr-14 2 RVNL/KOL/JOKA- MAJERHAT/JMS2/097 Dated 14.04.2012 19.02.2012 JMS-2:- Construction of Behala Bazar, Taratala and Majerhat Stations including all related works (architectuire, electrical & Mechanical (E&M), HVAC, Fire detection and Fire suppression system and public health engineering works) in Joka-BBD Bag corridor of Kolkata Metro Railway Line. Notification of Award No. RVNL/KOL/JOKA- MAJERHAT/JMS2/097 Dt.14.04.2012 M/s. Gammon India Limited Gammon House, Veer Savarkar Marg., Prabha Devi. Mumbai-400 025. - INR 162.66 Cr. Apr-14 3 RVNL/KOL/CLW/DKAE/ 1 Date : 28.05.2012 18.07.2012 Construction of sheds, structures, water supply arrangement, sewerage, drainage, roads, track, S&T, power supply arrangement, general electrical & OHE works and supply, erection & commissioning of machinery & plant in connection with setting up of Electric Locomotives Factory at Dankuni, West Bengal, India. Notification of Award No. RVNL/KOL/CLW/DKAE/1/18 76 Dated 02.10.2012 M/s Simplex Infrastructures Ltd. Simplex House 27,Shakespear Sarani, Kolkata 700017 - INR 146.44 Cr. Apr-14
BID AWARD DETAILS w.e.f. May 2013 and onwards Sl. No. Tender No. Date of Opening Description of Work Contract No. & date Contractor's Name Quantity (for supply contract) Estimated (for Engg./Elect/S&T/Mech.) Rate (for supply contact) Tender (for Engg./Elect/S&T/Mech.) Scheduled Date 1 RVNL/KOLKATA/CLW/P MC/1 Date : 11.03.2013 09.04.2013 Project Management Consultancy Services for Construction of sheds, structures, water supply arrangement, M/s Data Technosys sewerage, drainage, roads, track, S&T, (Engineers) Pvt. Ltd. Notification of Award No. power supply arrangement, general TF II, RVNL/KOLKATA/CLW/950 electrical & OHE works and supply, Asha Apartment I, 19, Dated 02.08.2013 erection & commissioning of machinery Ram Mohan Rai Marg, & plant in connection with setting up of Lucknow 226001 Electric Locomotives Factory at Dankuni, West Bengal, India. INR 1.77 Cr. INR 1.60 Cr. 18 months (including 6 months DLP)