Kosovo Transmission System Development Achievements and Challenges

Similar documents
DECISION. 2. All other provisions of the Network Code and Measurement Code will remain effective.

Reforms in Kosovo s power System

NEWSLETTER. N e w s l e t t e r N o. 1 0 Ye a r V I I I,

The Electric Power System

KOSOVO INVESTMENT OPPORTUNITIES

The Electric Power System

NEWSLETTER. no. 13 Year X, 2017

Conservation of Biodiversity and sustainable land use management in Municipality of Dragash

Short Project Summary Cebren & Galiste Hydropower Project Republic of Macedonia

Publisher: Kosovo Agency of Statistics (KAS) Date of publication: March 2013 : Kosovo Agency of Statistics Reproduction is authorised, if the source

The Importance of the geographical position of Kosovo in increasing the Trade, Transit and International Transport in the Balkans

Strategic priorities for professional sports infrastructure in Kosova / [presentation given May 16, 2011]

JSPA Initiative FROM AN IDEA TO THE REALITY. THE DANUBE REGION TRANSPORT DAYS Ljubljana, 21 st and 22 nd October 2014

Second project management meeting for reducing cash transactions in Kosovo. January, 2011

ANNUAL REPORT OF INDUSTRIAL DEVELOPMENT IN KOSOVO FOR 2013

The role of Serbia in the security of supply in Europe

Republika e Kosovës Republika Kosova-Republic of Kosovo Qeveria - Vlada - Government New Kosovo Project

Policy PL Date Issued February 10, 2014

Press Release Athens, 2 June 2014

OPEN SEASON Phase 2 Rules. Project on the development and expansion of Bulgartransgaz EAD gas transmission system (GTS)

Energy Community Regulatory Board Status review of transmission tariffs and treatment of cross - border transmission flows and recommendations By

STANDARDS OF THE REPUBLIC OF KOSOVO, STANDARDS AGENCY AND THEIR IMPORTANCE IN IMPROVING THE QUALITY

Pumped storage hydroelectric power plants: Issues and applications BIH Case Study

Wind Energy in South-east Europe: Seminar III: WIND ENERGY PROJECT DEVELOPMENT. Mostar,

Abruzzo Airport. Commercial Policy Development Routes

Chapter 1: Kosovo and its Population

Population Census Data and their Impact on Public Policies

MI/11/01/211, initiated by the contracting authority/ministry of Infrastructure, on the has issued the following:

DEVELOPMENT. Challenges and Opportunities. 9/5/2008 eapic 2008 Nairobi 1

Making Better Cities Together

Smart Networks Smart Islands. Nikos Chatziargyriou Chairman and CEO

Kosovo Feasibility Study. EUs Chance to Anchor Kosovo

1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS. 2. SECTOR Energy

IOM KOSOVO NEWSLETTER QUARTERLY EDITION JANUARY MARCH 2018

ACTIVITIES 2011 MINISTRY OF ECONOMIC DEVELOPMENT. Ministria e Zhvillimit Ekonomik Ministarstvo Ekonomskog Razvoja Ministry of Economic Development

Thesis/Dissertation Collections

Interconnections of Greek islands The Regulatory Approach

Republika e Kosovës Republika Kosova-Republic of Kosovo Qeveria - Vlada - Government

Mid-year Financial Report

Large Disturbances During 2014 in Power System of Serbia

REPUBLIC OF KOSOVO Ministry of Trade and Industry. reasons IN KOSOVO

Disaster relief emergency fund (DREF) Kosovo: Extreme winter conditions / Snowstorm

Southern African Power Pool Report to SADC

PUBLIC OPINION IN KOSOVO BASELINE SURVEY RESULTS NOVEMBER, 2010

Decision Strategic Plan Commission Paper 5/ th May 2017

Trading in the Southern African Power Pool and possible coupling with the East African Power Pool

Planning Resilient Transmission Networks in Chile

1 st US - Kosovo Trade Forum New York, New York

Gas competition in SEE: New regional infrastructure - a factor for growth

Kosovo Export/Import Roadmap

Infrastructure for Rebuilding and Developing Countries Workshop. Kosovo s Small Education and Water Infrastructure Program

ACI EUROPE POSITION PAPER. Airport Slot Allocation

Notification to Suppliers

German Financial Cooperation: Support for the management of the extended Drin River Basin

Public Seminar 30 October 2018, Lisbon. Water sector in B&H

MATL Reference. MATL Path 83 Transfer Capability with Seasonal SOL Effects. Document. 1. Purpose

Recommendations on Consultation and Transparency

Ref: New Tariff for the Water and sewerage Company Inc. (WASCO) Page 1 of 9

Synergy and Interconnection

M A T L Reference. MATL Path 83 Transfer Capability with Seasonal SOL Affects. Document. 1. Purpose

Transboundary Water Management in Republic of Macedonia

Smart Networks Smart Islands. Nikos Chatziargyrio u Chairman and CEO

FOREIGN TRADE OF KOSOVO AND IMPACT OF FISCAL POLICY

EUROCONTROL / Central Route Charges Office. The significance of Economic Regulation with regard to air navigation services charges

REPUBLIC OF CROATIA MINISTRY OF MARITIME AFFAIRS, TRANSPORT AND INFRASTRUCTURE AGENCY FOR INLAND WATERWAYS

Community Liaison Group. 20 May 2015

Country report: Kosovo

THE DANUBE WATER PROGRAM PHILIP WELLER, IAWD DANUBE STRATEGY PA 4,, 2015

Project Purpose: Project History and Status:

THE REPUBLIC OF SERBIA MINISTRY OF ENVIRONMENTAL PROTECTION DEVELOPMENT OF THE ECOLOGICAL NETWORK IN SERBIA

Update on the Thameslink programme

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Project of E-763 Motorway Construction, Section: Belgrade Ostružnica - Požega Boljare/ Border of Montenegro

Conference: FOOD CHAIN IN THE DIGITAL SINGLE MARKET Organised jointly with the Slovak Presidency of the Council

Ministry of Communications and Transport

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

Opinion 2. Ensuring the future of Kosovo in the European Union through Serbia s Chapter 35 Negotiations!

Yugoslav Republic of Macedonia.

The ITGI Project Gas Corridor through Turkey, Greece and Italy

THE CARICOM REGIONAL IMPLEMENTATION PLAN

GATWICK AIRPORT JOINS VINCI AIRPORTS December 2018

PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation

The Southern African Power Pool. Meeting growing power demands through Southern African regional integration

7. Education Degree: Institution: Darmstadt University of Technology, Darmstadt, Germany Degree Date: Degree : Dr.-Ing.

PORT MORESBY POWER PROJECT - UPDATE PNG Mining & Petroleum Investment Conference. 4 th December 2018

COMMISSION IMPLEMENTING REGULATION (EU)

DEPA s contribution to the development of a competitive gas market in Southeast Europe

Albania Energy Country Profile. Presented By: Mr. Koli Bele General Secretary of Ministry of Energy and Industry August 25, 2014

EFFORTS FOR CREATING THE COMMUNITY OF SERBIAN MUNICIPALITIES ARE A VIOLATION OF CONSTITUTIONAL AND LEGAL ORDER OF KOSOVO ABSTRACT

Hugo Klingenberg Senior Manager Network Development ElectraNet Adelaide, South Australia Lodged via

JP TRANSNAFTA PETROLEUM PRODUCTS PIPELINE SYSTEM THROUGH SERBIA. October 2017

New EU Guidelines on State Aid to airports and airlines. ERA Perspective

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *

Invest in. KAÇANIK.$þ$1,..$d$1,..$ÿ$1,. MUNICIPALITY

WHAT IS WoW? A program that builds. Flexible work arrangements. Work from home and obtain earnings above national average

Future Network Requirements

NEWS RELEASE 8 NOVEMBER Gladstone LNG Project Arrow-AGL Joint Venture Acquires Enertrade s Gas and Pipeline Business

Criteria for a Successful Shore Power Project

Security of Natural Gas Supply in BiH

ANGLIAN WATER GREEN BOND

Transcription:

Kosovo Transmission System Development Achievements and Challenges

Content KOSTT Role in the Power System of Kosovo KOSTT main infrastructure, system data and capacities Objectives of Transmission infrastructure investments Main Transmission Investment Projects implemented 2007-2017 5 Year investment development Plan 2018-2023 Integration of 450 MW TPP Kosova e Re and RES into the Transmission system Technical operational affair related to Albanian- Kosovar Market Coupling Technical benefits from joint operation of Kosovo and Albanian Power Systems Connection agreement KOSTT-ENTSOE

KOSTT Role in the Power System of Kosovo KOSTT J.S.C is a public company, the shareholder of which is the Republic of Kosovo, through the Ministry of Economic Development The Transmission System Operator manages operation, maintenance and development the electricity transmission system in the HV levels of network 400kV, 220kV and 110kV. KOSTT performs: Real Time Operation Observability of neighboring transmission grids Short (Day Ahead),Medium and Long term Planning\Analysis Provide Transmission service under regulated tariff Provide non-discriminatory open access to the grid Enhance reliability and balancing the system Planning, development and maintenance of network responsibility Transmission delivery service Facilitate and operate the Market

Kosovo Transmission system interconnected with regional network 450MW 450MW 200MW 4

KOSTT main infrastructure and system data (actual) ME Ribarevina Peja 1 Peja 2 HC Kelkos Sistemi Transmetues i Republikës së Kosovës 2017 Deçani Burimi Klina N.Pazar PEJA 3 HC Ujmani Vallaqi Skenderaj Trepça Vushtrri 1 2 KOS B DRENAS 1 TC B A Palaj Feronikeli KS Lipjan 5 3 2 1 4 Podujeva RS Krushevc PRISHTINA Nish 2 Berivojce Legjenda Linja 400 kv Linja 220 kv Linja 110 kv HC TC NS 400/220 kv NS 400/110 kv NS 220/110 kv NS 220/35/10 kv NS 110/35/10 kv NS 110/35 kv NS 110/10 kv Transmission lines HV Lines in KOSTT Line length km 400 kv 279.7 220 kv 231.8 110 kv 841.8 Total line length =1353.4 km Power Transformers and SS Autotransformers Transformers 3750 MVA 2080 MVA Main HV Substations 6 Load Substations 28 Gjilan 5 Bujanovc Fierza Tirana 2 1 Gjakova 2 Rahoveci Theranda Ferizaj 1 FERIZAJ 2 Peak demand last three years Viti Y-2015 Y-2016 Y-2017 3 2 1 PRIZREN 1129 MW 1160 MW 1161 MW AL MK Sharr Shkupi 5 Electricity demand Y-2015 Y-2016 Y-2017 5663 GWh 5426 GWh 5781 GWh 2017 Increase tendency

Transmission vertical and horizontal network capacities (actual) Internal network (vertical) capacities Y-2017 For N security criterion the network capacity is 1700 MW For N-1 security criterion the network capacity is 1160 MW Security margin is C(N) Peak= 1700-1161= 539 MW Interconnection capacities Y-2017 MW 1800 1600 1400 1200 1000 800 600 400 200 0 1550 1700 1072 1129 1161 930 2008 2015 2017 Security margin N- Capacity Peak Interconnection lines Voltage NTC of KOSTT Kosovo-Serbia SS Kosova B- SS Nis 2 NS Podujeva NS Krushevc Kosovo - Macedonia NS Ferizaj 2- NS Shkupi 5 Kosovo - Montenegro NS Peja 3 NS Ribarevina Kosovo Albania NS Kosova B NS Tirana 2 NS Prizreni 2 NS Fierza 400 kv 220 kv 400 kv 400 kv 400 kv 220 kv 600 MW 400 MW 400 MW 600 MW 1500 MW Simultaneous export capacities 1400 MW Simultaneous import capacities High ratio : Capacity/Peak= 1.29 System Adequacy =

Objectives of Transmission infrastructure investments Enable security and quality of supply as far as transmission capacity concerned Reduction of power losses Reduction of Energy not Supplied Fully complaint with GRID CODE and ENTSO-E requirements Support for connection of 450 MW new TPP Kosova e Re Support for Renewable Energy Integration in Transmission System Support for economic development of the country Support for market development and regional integrations of KOSTT Ensure stable transit flows through KOSTT network for regional power systems needs

Main Transmission Investment Projects implemented 2007-2017 Reinforcement category: - 2 400/110 kv substations, - Interconnection line 400kV Kosovo Albania together with LFC project - 12 new 110 kv lines and re-conductor (increase of capacities) - 5 autotransformers and 21 power transformers Load support category - 7 110/35/10 kv Substations Refurbishment Category - 90% of existing Substations are renewed ( modern equipment's) System Support Category - New SCADA/EMS system - Modern telecommunication infrastructure - New measurement systems at interconnection and with other connected parties - 100% new relay protection systems 56 projects 2-2007 2-2008 6-2009 6-2010 4-2011 8-2012 4-2013 2-2014 1-2015 11-2016 10-2017 Total investments 236 M 8

5 Year investment development Plan 2018-2023 Transmission projects: - New 110 kv Lines and reinforcements of the lines - 6 New 110/10(20) kv substations for load support ( Regions: Mitrovica, Drenasi, Prishtina, Fushë Kosova, Malisheva, Dragashi) - Refurbishment of 4 Substations 110/35/10 kv - 4 new Power Transformers 40MVA - Upgrade of Telecommunication systems, SCADA/EMS, Metering Systems and Relay Protection Systems - Upgrade of Market IT support Systems - Support for regional activities CAO, APEX, RSCI, ENTSO_E, SECI etc. Total planned investments 2018-2023 60 M

Integration of 450 MW TPP Kosova e Re in Transmission system Considering Strong interconnections of Kosovo Transmission Network and large investments in last decade, the Transmission network is able to accommodate 450 MW New TPP in the Kosovo Power System. The existing capacities and the system performance will ensure stable and secure operation of 450 MW TPP. Kosovo transmission network has sufficient security margin also for the N-1 security criterion, and the security margin will increase after putting on load the 400 kv interconnection line with Albania. Several was perform about dynamics and transient analyses of transmission network. The studies/analyses shown that unit of 450 MW will remain stable during any disturbances in the network. The 450MW failure will not increase risk of widespread grid failure. Common market with Albania and Implementation of Energy Strategy 2017-2026 program which includes construction of 200 MW flexible unit will ensure system power reserves to maintain the system balance in real time.

ME Fierza Ribarevina Tirana 2 AL Peja 1 Peja 2 HC Kelkos Deçani 1 Gjakova Integration of RES in the transmission system Sistemi Transmetues i Republikës së Kosovës 2023 2 Kukes Burimi Klina N.Pazar PEJA 3 HC Ujmani WP Zatriqi Rahoveci 2 1 3 PRIZREN Dragashi Vallaqi Trepça Theranda Vushtrri 1 2 Podujeva Skenderaj KOS B 5 PRISHTINA DRENAS 1 A 3 TC B+Re Palaj D 2 Feronikeli F.Kosova 1 7 4 Drenasi 2 KS Ilirida Malisheva WP Budakova WP Selac Lipjan Ferizaj 1 HC Lepenci MK RS Krushevc FERIZAJ 2 Sharr Nish 2 WP Koznica Gjilan 5 Viti Shkupi 5 Berivojce Legjenda Linja 400 kv Linja 220 kv Linja 110 kv HC TC WP Kitka NS 400/220 kv NS 400/110 kv NS 220/110 kv NS 220/35/10 kv NS 110/35/10 kv NS 110/35 kv NS 110/10 kv Bujanovc RES application for connection in KOSTT: WP KITKA, 32.5 MW (under construction/2018 in operation) WP SELACI 105 MW (in process/ Connection agreement) WP Koznica 34.5 MW (in process/ Connection agreement) WP Budakova 46 MW in process/connection offer) WP Zatriqi 64.8 MW in process/connection offer WP Kamenica 1 and 2, 76.8 MW(In process/connection offer) HPP Lepenci 10 MW/ under construction) SOLAR PARK 9 MW Bejta Commerce (process/connection offer)

Integration of RES in the transmission system Support factors for RES Integration Reliable and secured transmission network Priority in dispatching KOSTT manages RES Found through Market Operator Feeding Tariffs (for 150 MW wind, 240MW HPP, 14 MW Biomass, 10 MW Solar - 12 years) Market integration with Albania and next step integration in regional market Constrains factors for RES Integration: Lack of power reserves, Inflexible TPP units and age and technical condition of existing TPP no energy storage facilities or flexible units such a pump storage units Connection application up to the date: - Wind = 360 MW, - Solar= 9 MW, - HPP=10 MW 12

Technical operational affair related to Albanian- Kosovar Market Coupling Prishtine 2018

Market Opening- Law obligation (2016) Deregulation of Wholesale market Retail market deregulation in phases Generators to offer their capacities in open market to all market participants MO will manage RES found and will pay RES generators Market based purchase of Grid Loses Organization of Day Ahead market Based on law obligation ERO issued Guidelines for market opening staring from 1 st of April 2017 14

Balancing mechanism (BM) Operates as a contract between TSO and Trading Parties for delivery of power (not energy) Payment is for energy delivered with that power. From 1 st October 2016-31 st May 2017 was implemented as dry run with no financial impact. From 1 st June 2017 BM is in real operation There are lack of national balancing reserves Procedures for cross border procurement of services are developed. 15

RES Energy Found From 1 st Jun 2017 KOSTT MO manages RES energy Found RES Generator Sells to MO their production regulated incentive price (feed-in tariff) MO Sells to Suppliers proportionally to their demand with referent market price. MO charges Supplier to cover price difference RES tariff RES generator are charged for 25% of imbalances for both direction (being long or short) RES generator nominates their production at D-1. they have the right to re nominate every three hours in advance 16

Grid Losses From 1 st April 2017 Transmission and distribution Grid losses are purchased at deregulated price in the open market Part of grid losses are purchased from KEK generation with contracted Price KOSTT signed with cross border traders who are operating in Kosovo market the framework contract for purchasing grid losses From 1 st September 2017 KOSTT is organizing auction on D-1 for purchasing part of losses not covered by KEK generation 17

Establishment Common Market KS-AL As first step common Power exchange with Albania KOSTT will be shareholder of ALPX Expected to joint on 2019 Adaptation of regulation and Market design and market is needed Stepwise volume of energy will be traded through ALPX Business plan and decision are in process recently for approval 18

Common Electricity Market Common market of Kosovo and Albania in line with EU target model objective of Energy community a single bidding zone in all markets timeframes interconnections KS-AL will be considered as internal lines No capacity booking or scheduling requirement would be coupled with other zones on the day ahead and intraday markets cross-border capacities with other zones would be allocated in line with the Forward Network Code The generation mix would allow generators to optimize their generation portfolio will link a hydro-based system of Albania with a lignite-based system of Kosovo 19

Critical milestones of Market Coupling Legislation Outline changes to national laws covering establishment of a regulatory committee and recognition of licenses issued by either ERO or ERE Implementation of national law changes Regulators and licensing Establishment of the Common Market Regulatory Committee Development of the SO and MO licenses Development of Price Control framework for SO and MO Establishment of Market Rules Modification Committee Development of procedure for allocation of congestion costs Transmission and communication infrastructure Operating of new 400 kv interconnection line Kosovo Albania List of needed internal network reinforcements, especially in Albania 20

Critical milestones of Market Coupling Market model Development of high level market design for Common Market Development of market rules for Common Market Establishment of communication and billing procedures between the SO and the MO for operation of a balancing mechanism and for charging for ancillary services and other commercial payments Establishment of procedures for trading participant registration (plus registration of service providers such as distribution network operators) Establishment of Metering Administration Agents in Kosovo and Albania Establish procedures for registration of customer transfers between supplier licensees System operation Commissioning of new fiber optic data link and data exchange protocols Setting up common dispatching center and eventual regional network control centers Adoption of common system operation responsibilities, including power system control, maintenance, construction and development Transition from two separate systems operation and control to common, single system operation and control mechanism 21

Technical benefits from joint operation of Kosovo and Albanian Power Systems Power System optimisation ( utilisation of base power from TPP and flexible power from HPP) Reduction of system power reserves and their costs Improvements of generation and system adequacy Improvements of security of supply Support for RES integration in Power System Better utilisation of new interconnection 400 kv and 110 kv ( Connection to SS Kuksi)

Impact of Joint operation Kosovo and Albania (CB KS+AL) on system power reserves The integration of Kosovo-Albania market enables proportional reduction of regulatory reserves for both systems. If two systems are integrated, i.e. if two CA( Control Areas) create a Control Block, then the needs for tertiary reserve remains the largest unit in the block. Replacement reserve or so called tertiary reserve will be reduced proportionally for each CA in relation with largest unit operating I CB

Connection agreement KOSTT-ENTSOE KOSTT signed CA with ENTSO-E in good faith being aware that condition on Elektrosever licensing is beyond KOSTT s mandate For one year this condition has blocked KOSTT to start operation as control area/block Non implementation of CA/CB disables KOSTT to: Fulfil commitments of WB6 MoU by Kosovo for regional market integration & balancing Utilize 400kV line and LFC project Joint establishment of PX Kosovo Albania Receiving services from SEE CAO and RSC Market signals for investment 24

Revenue from Congestion management /Capacity allocation collected by EMS from KOSTT interconnectors Revenue from Congestion management /Capacity allocation collected by EMS for KOSTT interconnectors 450MW 450MW 200MW 450MW Year 2008 1.212 2009 4.184 2010 3.873 2011 2.883 2012 5.892 2013 6.708 2014 9.813 2015 4.473 2016 2.759 2017 (Jan-Sept) 9.70 Total 50.285 Revenue( mil ) (AL-MN-MK) New 400 kv line with regional importance out of operation since June 2016 25

Thank You! Transmission System and Market Operator KOSTT J.S.C Iljaz Kodra St. n.n 10 000 Prishtina, Kosovo Ph: +381(0) 38 501 601 5 Fax:+381(0)38 500 201 email: info@kostt.com Web: www.kostt.com