Central Land Acquisition (formerly Farmington Hills Acquisition) City of Farmington Hills. City of Farmington Hills

Similar documents
Acquisition in fee simple of approximately one-half acre of property on the shore of Spring Lake to expand the Lakeside Beach Park.

City of Haslett. City of East Lansing. City of East Lansing

Yuba Creek Natural Area Acquisition. Acme Township. Acme Township. TF Acquisition $1,576, Grand Traverse

Chapter eight. Parks and Recreation. Introduction. Crystal Lake Park District

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

THOMAS A. SWIFT METROPARK Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics

Chapter 2: Summary of Existing Open Space System

City of Keller Parks and Facilities Inventory

City of Oak Harbor Parks & Descriptions

J. Recreation Plan of Conservation and Development. The Town of Hebron. Section 2. Preservation of Unique Assets. 1 P a g e

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

BRACEVILLE NATURE PRESERVE Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics

Southwest Quadrant Distinctive Features

Pinellas County Environmental Lands

MONTGOMERY TOWNSHIP OPEN SPACE & PATHWAYS COMMITTEE

Chapter 6. Action Program. Heart of the Lakes Area Recreation Plan

MASTER PLAN EXECUTIVE SUMMARY

Northeast Quadrant Distinctive Features

Lake Myra County Park. Wake County, North Carolina Community Forum #2 June 12, 2008

Silver Lake Park An Environmental Jewel for the Citizens of Prince William County

3.0 EXISTING PARK & RECREATION SPACE

Rating: 5.0 (scale of 1-10)

NORTH HEMPSTEAD BEACH PARK MASTER PLAN

Schoolcraft Township is located in northeast Houghton County. A portion of the township borders Keweenaw County and Lake Superior.

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

4.19 Parks, Recreation, and Conservation Lands

Understanding user expectations And planning for long term sustainability 1

CHAPTER 4 EXISTING PARKS AND RECREATION FACILITIES INVENTORY

Corabelle Park. Inventory. Future Development

TOWN OF LAKESHORE PARKS

Chapter 9 Recreation

National Recreation Trail Update Form

Segment 2: La Crescent to Miller s Corner

All Groups. Conserve/

Fun Facts. How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21

4.0 FACILITIES INVENTORY

Hampton Township. Community Description

Wilds. Headwaters. Lakes. Oxbows. Falls

Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming

Table B-1: P&RS Park and Facility Inventory by Classification 1 Outdoor Recreation Amenities Park Structures

PARKS & BEACHES PROJECTS

Stony Creek Master Plan Public Meeting #2. May 21, 2016

OAKLAND TOWNSHIP PARKS AND RECREATION MILLAGE RENEWAL AUGUST 2, 2016 BALLOT PROPOSAL QUESTIONS & ANSWERS PULL-OUT SECTION (APRIL 21, 2016)

Blue River Trail Master Plan JSA to Town Hall June 2004

IOWA ORNITHOLOGISTS' UNION - Birding Sites in Dallas County

Capital Prioritization

National Recreation Trail Application for Designation

C h a r t e r Township of Milford Recreation Master Plan

Classifications, Inventory and Level of Service

WEST FARMINGTON NATURE PRESERVE Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics

Frederickson LUAC. Community Plan Update. Parks & Recreation. September 25, 2017

FEASIBILITY CRITERIA

CHAPTER 5. Chapter 5 Recreation Element

Conservation Area Management Statement

Camping (Primitive) Camping (RV) Electrical Potable Water Grill Established Fire Pit Picnic Table

M E S T I Z O C U R T I S P A R K

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Greater Minnesota Regional Parks and Trails Commission Designation Application

APPENDIX E: SUMMARY OF PUBLIC MEETING QUESTIONNAIRE RESULTS

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

CRANE LAKE TRAILS NETWORK AND SPACES

City of Chelan Shoreline Public Access Plan

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS

CITY COUNCIL MARCH 15, 2016 CEDAR LAKE AND LAKE OLATHE PARKS MASTER PLAN. Lake Olathe and Cedar Lake Parks Olathe, Kansas OLATHE PARKS AND RECREATION

VOLUME II APPENDIX F DETAILED PHYSICAL DESCRIPTION OF PROJECT RESERVOIRS AND LANDS

Municipal Park Descriptions: 1. Bear Hollow Park 4100 Bear Hollow Park Court, Murrysville, PA acres

This Passport: Revised October 20, 2017, EAM # Discovering the Trails of Webster, NY

2030 Comprehensive Plan A Policy Guide to 2030

County of Peterborough Active Transportation Master Plan

Parks & Recreation Areas Program

NEW MEADOWS PARK PROPOSED MASTER PLAN

NORTH OF BROADWAY SECTION CONTENTS: COTTAGE PARK FARVIEW PARK GLEN GALE PARK IRVING TRIANGLE JORDAN PARK NEWTON PARK PERKINS HILL PARK

Columbus Township Board

Community Recreation Plan City of Rockford

Walking is great exercise for the entire family. Take part in area walks that earn money for various causes:

6.5 DURANGO EXCELS AT PARK CONNECTIVITY

NAVAJO COMMUNITY PLAN

Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through

Langton Lake Park Implementation Planning Session One 6 June Attendees signed in

Lake Waconia Regional Park 6. Lake Waconia Regional Park

MINUTES FILED WITH TOWN CLERK

BIRDING Lake Fayetteville

LANDING S PARK CONCEPTUAL PLAN HAMILTON ANDERSON JANUARY City of Novi, Michigan. The Park at 13 Mile and Old Novi Road

The Recreational Trail along Cushing Park road has been a successful addition to the city

Trail Etiquette. Hours of Operation. Trail Accessibility

2009 RIVER TOWN OF THE YEAR AWARD APPLICATION Supplemental Material Images

Classes Other locations & Parks

7. Plan Implementation

F. Forest Recreation Management

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Port Gamble Shoreline Area Conceptual Trail Proposal

North Shore Lacamas Lake

DEPARTMENT OF PARKS & RECREATION

Projects Awarded GOCO Funding in El Paso County

PAVILION RESERVATIONS

ADA Compliance Projects Summary Sheet

Recreation and Resource Inventories

Dungeness Recreation Area County Park Master Plan

Transcription:

Central Land (formerly ) TF89-100 $661,200.00 To acquire approximately 44 acres of land ajacent to I-96. 1989 Karner Farm Expansion Project TF00-056 $352,594.00 in fee simple of 14.6 acres for habitat protection and nature education. The parcel is adjacent to an existing 17-acre park. 2000 Rails-to-Trails TF00-312 $1,608,786.00 in fee simple of approximately 3 miles of Canadian National (Grand Trunk ern) railroad right-of-way for conversion to non-motorized pathway. Pathway is part of the Clinton River trailway and will link to the Paint Creek/Polly Ann Trail. 2000 Sylvan Lake Rail to Trail Sylvan Lake Sylvan Lake TF01-046 $162,000.00 in fee simple of 6.6 acres of CN Railroad property for a non-motorized pathway. Part of the Clinton River Trailway, this trail will directly connect to 's trail. 2001 Clinton River Trail TF01-068 $1,900,000.00 of about 4.5 miles (54 acres) of abandoned CN Railroad property, with a section of the rightof-way running along the Clinton River, for eventual development of Hill's section of the regional Clinton River Trail system. 2001

Clinton River Trail Pontiac Pontiac TF01-115 $412,160.00 of 1.7 miles (10.7 acres) of railroad right-of-way through the Pontiac to provide a segment of the nonmotorized Clinton River Trail network. 2001 Lost Lake Park TF02-013 $1,762,800.00 in fee simple of approximately 32 acres, including an entire lake, geological formation, wetland areas and structure for 2002 nature center, to be used for passive recreation and environmental education. Berberian Property TF02-148 $1,753,500.00 in fee simple of 16 acres of natural property on the Rouge River to provide fishing access, protect wetland habitat, and complete the trail and wildlife corridor of Valley Woods Nature Preserve. 2002 Dodge Park #5 Commerce Commerce TF03-130 $250,000.00 Acquire in fee simple the 64-acre Dodge Park #5 to use as a public park. 2003 Highland Property Highland TF05-032 $1,440,000.00 in fee simple of 260 acres encompassing wetlands, forests, and other natural features to create the Highland Oaks Park. 2005

Elizabeth Lake Woods Park Expansion Waterford Waterford TF05-097 $87,000.00 in fee simple of 25 acres within the watershed of the Clinton River to protect mature oak forest and fragile wetlands. 2005 Stony Creek Corridor Park TF05-102 $893,700.00 in fee simple of 60.56 acres of forested land with 2,000 linear feet of frontage on the west 2005 branch of Stony Creek for passive recreation and to provide a regional trail link. Village Wood Lake/Orchard Novi Novi TF05-165 $846,400.00 in fee simple of 51 acres containing 5,200 feet of frontage on the Middle Rouge River, Village Wood Lake, and wetlands. 2005 Upper Bushman Lake Independenc e TF06-199 $1,900,000.00 of the 188-acre Upper Bushman Lake property, including a 31-acre lake, wetland, forested lowlands, and open meadows. 2006 Novi Core Habitat Reserve Property Novi Novi TF07-017 $281,300.00 of 16.2 acres of wooded wetland adjacent to Singh Trail Parkland. 2007

Huron- Indian Springs Clinton Metropark Land Metropolitan Authority Springfield TF07-028 $1,426,000.00 of 287 acres adjacent to Indian Springs Metropark, containing the 38-acre Schmitt Lake, for fishing, boating, hiking, wildlife viewing, and nature interpretation. 2007 Addison Oaks Property Addison TF07-031 $616,000.00 of 100 acres adjacent to Addison Oaks Park for passive recreation. 2007 Michigan Air- Line Railway TF08-142 $1,452,500.00 of approximately 17 acres, or 2.5 miles of railway corridor, that connects to the existing trail at Arrowhead Road. 2008 Lake George Nature Park Addison Addison TF09-033 $428,000.00 of rights in land for an 82-acre property to allow public access to the natural and water resources of a passive recreation nature park. A conservation easement on most of the property is held by the Department of Environmental Quality. 2009 Sheldon-Mead Greenspace TF09-165 $510,000.00 of 39 acres of property along Sheldon and Mead Roads for greenspace preservation and to 2009 secure sensitive wetlands, woodlands, and greenway connectivity.

Leonard Mill Park Village of Leonard Village of Leonard TF10-051 $22,500.00 of.28 acres of property that is adjacent to the Polly Ann Trail. 2010 Morton-Roy Court Park Huntington Woods Huntington TF1031 $130,000.00 To acquire 1.217 acre of land for park land. The land will be developed as an athletic field for soccer, youth baseball and a play structure. 1985 Carpenter Lake Park Acquistion TF1038 $516,788.00 To acquire 42 acres of open space in an urban area with frontage on a small lake. 1985 Groveland Oaks (formerly Simpson Lake Thread Creek) Groveland TF1048 $344,900.00 To acquire 191.15 acres of land providing access to Simpson Lake and Thread Creek in Groveland Oaks Park. 1985 Shiawassee Basin Preserve Springfield Springfield TF1077 $527,000.00 To purchase approximately 394.92 acres of land which is a hilly, wooded, knob and basin 1985 topography. This land contains half of a 1.5 mile shoreline on a 31 acre lake.

CW2 Airline Trailway Commerce, Walled Lake and Wixom Commerce Trailway Management Council TF11-123 $3,755,400.00 of approximately 32.91 acres of railway corridor and the Walled Lake Train Depot. 2011 Bald Mountain Recreation Area DNR - Parks and Recreation Division Orion TF287 $5,000,000.00 of 2.230 acres known as the Chrysler property. (some of this land was transferred to and is now Orion Oaks Park) 1979 Ulbrich Tract TF396 $620,000.00 of 187 acres. Now known as Pine Trace Golf Course. 1980 Milford Lakes DNR - Parks and Recreation Division Milford TF460 $1,300,000.00 Acquire 300 acres of a 663 acre site ucrrently being mined for sand and gravel. Site inclues a 70-acre spring fed lake. 1981 Simonds Woods Natural Area Madison Heights Madison Heights TF492 $460,000.00 of 35.4 acres. 1981

Paint Creek Trail Paint Creek Trailways Commission TF493 $200,000.00 of 119 acres including 11 miles of abandoned railroad ROW. 1981 Independence Oaks Independenc e TF57 $165,000.00 To acquire land for Independence Oaks. Reauthorized in Act 201 of 1983 TF 603. 1979 Independence Oaks Independenc e TF603 $387,000.00 To acquire and manage floodplain land along the headwaters of the Clinton River as a connecting greenbelt between an existing Park (Independence Oaks) and Park. (Originally approved in P.A. 19 of 1980, reauthorized in 1983.) 1982 Horseshoe Lake SGA DNR - Wildlife Division Oxford TF684 $500,000.00 To acquire over 600 acres of vacant rolling farmland with lowland 1983 hardwoods and swamp. Spicer Property TF701 $1,200,000.00 To purchase a 212 acre tract in the city limits of with frontage on the Upper River Rouge. 1983

Pines of Scripter Park Oxford Oxford TF705 $60,000.00 To acquire two parcel totaling 5.7 acres to expand the existing Oxford 1983 Village Park. St. Mary's Land Hazel Park TF722 $90,000.00 To acquire 10 acres in Hazel Park, which is the largest single piece of undeveloped land in this highly urbanized city. 1983 Clifton Heights Land TF770 $282,000.00 To acquire 67.7 acres of undeveloped land adjacent to 186 acres of land acquired in 1981 and is near the headwater of the Rogue River. 1984 Meyer Leib Property TF86-191 $108,000.00 To acquire approximately 10 acres of lightly wooded land in the. 1986 of Railroad R.O.W. TF86-230 $108,000.00 To acquire an approximate 29 acres strip of abandoned Grand Trunk ern Railroad right-ofway. The strip is 50 feet in width and over four miles in length. 1986

Bay Court Camp Independenc e Independenc e TF86-312 $375,000.00 of 49 acres of land for a township park. 1986 Southend Park TF87-233 $150,000.00 To acquire approximately 14 acres for recreation purposes in a rapidly expanding area of the state. 1987 of Woods (Howard Brothers/Gliebe rman Woods) TF87-269 $500,000.00 To acquire approximately 179 acres of wooded land which is bisected by the Rouge River. 1987 Mill Race Park Extension Commerce Commerce TF878 $17,000.00 To acquire 4 acres and nearly 1600 feet of frontage on the Huron River adjacent to the 's Mill Race Park. 1984 Maple Park Expansion Wixom TF88-007 $150,000.00 To acquire approximately 29 acres of a wooded site with wetlands and a 5-acre pond. 1988

Walter Findley Property Waterford Waterford TF88-037 $281,250.00 To acquire approximately 285 acres with 8,800 feet of frontage on 1988 two sides of the Clinton River. Highland Community Park Highland Highland TF88-068 $164,250.00 To acquire approximately 89 acres with 1,000 feet of frontage on Murray Lake. 1988 Novi Nature Area Novi TF88-078 $166,350.00 To acquire approximately 100 acres of a natural area in adjacent to the city's park on South Lake Road. 1988 of Woods -Phase II (Howard Brothers/Gliebe rman Woods) TF88-172 $500,000.00 To acquire a total of 179 acres in phase 2 of wooded land which is bisected by the Rouge River. 1988 Duns Scotus TF88-174 $500,000.00 To acquire 22 acres of wooded property for use as a passive park. 1988

Addison Oaks TF89-002 $307,500.00 To acquire approximately 139 acres adjacent to Addison Oaks for expansion of recreational opportunities and open space. 1989 Lyon Oaks Rookery Lyon TF89-003 $1,000,000.00 To acquire approximately 768 acres comprised of open meadows, woodlands and wetlands with a rookery in the center of the 1989 wetlands for the Great Blue Heron and to preserve the recreational and natural educational opportunities. Maple Park Expansion Wixom Wixom TF89-189 $150,000.00 To accquire 25 acres of heavily wooded and wetland area adjacent to Maple Park. 1989 Nature Preserve (Howard Brothers/Gliebe rman Woods) - Phase III TF89-235 $500,000.00 To acquire 179 acres of wooded land containing wetlands and wildlife bisected by the Rouge River to be used for passive recreation with trails for hiking and cross-country skiing. 1989 Section 24 Wetlands TF89-237 $218,800.00 To acquire approximately 13 acres of land as natural open space area. 1989

Carpenter Lake TF90-847 $300,000.00 of 30 acres of natural woodlands, rolling terrain with 650 feet of frontage on Carpenter Lake, an impoundment of the Rouge River. 1990 Rose Property Rose TF91-024 $542,500.00 Acquire approximately 610 acres of property consisting of a variety of terrain, vegetation, and several small bodies of water for future park and recreation uses. 1991 Lyon Rookery Lyon TF91-026 $837,500.00 of 272.16 acres of land, adjacent to one of Michigan's largest Great Blue Heron rookeries, 1991 for the preservation of natural resources and future recreation opportunities. Section 36 Lake Commerce Commerce TF91-045 $375,000.00 Acquire a 7-acre parcel adjacent to property being donated to for park purposes. Intended use is for passive recreation. 1991 Cranbrook Nature Preserve - Phase I Orchard Lake Orchard Lake Village TF91-140 $1,000,000.00 of the 50-acre Cranbrook Nature Sanctuary from Cranbrook Educational Community for the purposes of preserving woodlands, wetlands, wildlife habitat, and lake frontage in their natural state. 1991

Elizabeth Lake Woods Waterford Waterford TF91-263 $74,300.00 Acquire a 60-acre addition to Waterford 's natural area park to protect old growth oak forest, wetlands, 1/3 mile of the Clinton River and freshwater mussel habitat. would provide a buffer to the existing park and allow expansion of t 1991 Sod Farm - Phase I TF91-297 $1,000,000.00 of vacant 93.80 acres of land in the southern section of city for future development of recreational facilities. 1991 Evergreen Woods Park TF91-833 $950,000.00 Acquire 35 acres of land adjacent to 45 acres of City-owned nature preserve. The expanded park would provide additional open space and natural reas for passive recretion use. 1991 Cranbrook Nature Preserve - Phase II Orchard Lake of 50 acres of the Cranbrook Nature Sanctuary for Orchard Lake TF92-006 the purposes of preserving $1,000,000.00 woodlands, wetlands, wildlife Village habitat and lake frontage in their natural state. All acreage acquired reported in TF91-140 1992 Sod Farm Phase II TF92-049 $1,000,000.00 of vacant 93.80 acres of land at Eight Mile Road and Metroview for future development of recreational facilities. Acreage acquired recorded in TF91-297. 1992

Oxford Park Oxford Oxford TF92-163 $155,400.00 Acquire 75 acres of land located 1-1/2 miles west of M-24 on Pontiac Road to be developed as a new park site. 1992 Drake Road Park TF92-204 $1,250,000.00 Acquire 51.65 acres of land for development of a sports facility consisting of ball diamonds, soccer fields, tennis courts, basketball courts, restrooms and pavilion for people of all ages with an emphasis on youth. 1992 Parkdale Woods TF92-817 $375,000.00 Acquire 125 acres of property bisected by the Clinton River and Stoney Creek, adjacent to the Bloomer Unit of -Utica Recreation Area. 1992 Watkins Lake DNR - Parks and Recreation Division Waterford TF92-841 $375,000.00 Acquire 1.3 acres, located on the corner of M-59 and Claudia in Waterford, with 400 feet frontage on Watkins Lake for a boating access site. 1992 Lyon Oaks Park Addition Wixom TF93-037 $630,000.00 of 188 acres of wetlands contiguous to Lyon Oaks Park and an existing heron 1993 nesting area, for the preservation of natural resources and future recreation opportunities.

Clinton River Auburn Auburn TF93-117 $525,000.00 Acquire 27.03 acres which will provide 1,724 lineal feet of Clinton River frontage and enough open space for passive outdoor, scenic, recreation activity. 1993 Various State Park amd Recreation Areas DNR - Parks and Recreation Division TF93-430 $1,000,000.00 Acquire inholdings within various State Park and Recreation Areas statewide. 1993 Polly Ann Trail DNR - Forest Resources Division TF93-439 $600,000.00 Acquire 33-mile inactive railroad corridor for development as public trailway. 1993 Waterford Oaks Waterford TF94-014 $172,500.00 of approximately 18 acres of land adjacent to Waterford Oaks Park for the purpose of providing additional recreational open space. 1994 Nature Center Expansion Schools TF94-039 $264,000.00 of 4.58 acres to expand E. L. Johnson Nature Center. 1994

Park TF95-217 of 2 parcels totaling 121- acre acres for dual use as township $1,107,000.00 park and pedestrian link between the Paint Creek Trail and Bald Mountain State Recreation Area. 1995 Lyon Oaks Lyon TF96-026 $174,000.00 of approximately 13.8 acres of an existing farmstead, including residence, existing barn and out building for a demonstration farm and environmental education facility. 1996 Civic Center Park Expansion Auburn Auburn TF96-078 $1,108,700.00 of 9.09 acres for expansion of the Civic Center Park to extend the existing trail network. 1996 Watershed Park Addison Addison TF96-215 $840,000.00 of 252 acres in Northern with frontage on 4 small inland lakes and a pond for passive and active recreation use. The site also includes the headwaters of five rivers, wetlands and a prairie fen area. 1996 Suarez Woods Madison Park Expansion Heights Madison Heights TF97-032 $78,000.00 Acquisiton of 1.51 acres to provide grassland study area and additional 1997 parking for existing nature center.

Watershed Park (Fore Addison Lakes Park) Oakwood Road Land Oxford Maceday Lake Waterford Waterfront Park Highland Park Highland Addison Oxford Waterford Highland TF97-136 of 252 acres providing inland lakes access and associated recreational opportunities in $1,260,000.00 nothern, preserving important wetlands and watercourse headwaters of three rivers. 1997 Acquire in fee simple terms 300 acres which includes natural wetlands, springs, inland lakes and TF98-013 a river. Plans for the site include $825,000.00 hunting, fishing, trails, boardwalks, 1998 a sporting firearms training facility, picnic areas, non-mototized boating and cano Acquire in fee simple terms a 3- acre wetland parcel to be developed as a waterfowl and TF98-121 wildlife sanctuary and a 4-acre $405,000.00 upland parcel for the 's 1998 only waterfront park. plans include a swimming beach, picnic area, playground, fishing Acquire in fee simple terms a 40- acre site, with wetlands and deep water marsh area, for development TF98-135 of a multiple-use community park. $425,000.00 1998 The proposed park plans include a natural area, ball fields, picnic facilities, trails, archery range and a winter spo Southeastern Land TF98-273 $351,000.00 in fee simple terms of 15.38 acres of land in the City's southeast section to be developed as a neighborhood park, including playscapes, picnic areas, trails and parking. 1998

Upper Bushman Lake Independenc e TF99-041 $2,000,000.00 Acquire in fee simple an estimated 189 acres, which includes a 13- acre lake and surrounding wetlands, wooded and open uplands to be used for a natural area and an addition to Independence Oaks Park. 1999 Park TF99-128 $2,010,101.00 in fee simple of about 90 acres for use as a Park for active and passive recreation and pedestrian link between the Paint Creek Trail and Bald Mountain Recreation Area. 1999 Carpenter Lake TF99-272 $544,000.00 in fee simple of about 30 acres on Carpenter Lake, an impoundment of the Rouge River, for resource protection and passive outdoor recreation. 1999 Total $63,054,679.00 New City Park Auburn Auburn TF00-092 $235,000.00 of entrance drive, parking lot, trail, picnic area, pedestrian bridge, picnic shelter, playground, restrooms, lighting and landscaping in undeveloped City park on the Clinton River. 2000 Pontiac Lake Recreation Area Shooting Range Upgrade DNR - Parks and Recreation Division White Lake TF00-251 $250,000.00 Construction of accessible walkways and concession/storage/restroom building, as well as redevelopment of a paved, lighted parking area. 2000

Bear Creek Park TF00-311 $313,302.00 of Bear Creek Park to provide nature interpretation and observation via trails, boardwalks, observation decks and interpretive signage, as well as a picnic pavilion, playground and parking lot. 2000 Independence Oaks Youth Camp Independenc e TF01-022 $163,200.00 Construction of a youth camp, with shelters, restroom/shower building, six tent platforms, trail, and fishing deck on the Clinton River. 2001 Clinton River Trail TF02-043 $175,000.00 Develop a 2.5-mile hard surface trail, including bridge decking and railing. Portions will abut the Clinton River and pass through natural areas designated by the Michigan Natural Features Inventory. 2002 Paint Creek Trail Enhancements Paint Creek Trailways Commission TF02-125 $58,900.00 Project will develop trail-side improvements, including two picnic area sites with seating, water and a 2002 restroom at one of the picnic sites and an observation deck. Visitors Center at E.L. Johnson Schools Nature Center TF03-092 $475,000.00 Construct a 5,000 square foot visitors center overlooking scenic wetland and wildlife areas. 2003

Organizational Youth Campground - Connector Trail Independenc e TF04-003 $219,000.00 of a hard-surface looped trail within the headwaters area of the Clinton River within Independence Oaks Park, connecting the Organizational Youth Campground to existing trails. 2004 Carpenter Lake Park and Lake Restoration TF04-112 $500,000.00 of a new public fishery and park site, including restoration of 6-acre Carpenter Lake, wetlands enhancement, barrier-free trail, fishing dock, and parking. 2004 Carpenter Lake Nature Interpretive Center TF06-064 $500,000.00 of a community nature and environmental 2006 education center at Carpenter Lake Park. Milford to Kensington Metropark Trail Milford Milford TF06-074 $400,000.00 of approximately 2.9- mile non-motorized trail through Kensington Metropark to Milford Dam. 2006 Hubbell Pond Park Non- Motorized Trail Village of Milford Village of Milford TF06-079 $297,000.00 of a one mile, 10-foot wide paved trail from Milford Dam north through Hubbell Pond Park. 2006

Marshbank Park Improvement Project TF07-013 $500,000.00 Improvements to Marshbank Park, including restrooms, playgrounds, picnic areas, trails, lakeside boardwalk, and fishing pier. 2007 Addison Oaks Trail Connector Addison TF07-030 $228,800.00 of a 1.7 mile gravel path and boardwalk at Addison Oaks Park. 2007 Marsh View Park TF07-057 $293,300.00 of Marsh View Park to provide active and passive recreation via trails, wetland observation deck, interpretive signage, archery range, sports fields, and basketball court. 2007 Proud Lake Electrical System Upgrades DNR - Parks and Recreation Division Commerce TF07-129 $500,000.00 Upgrades to the electrical system at Proud Lake Recreation Area. 2007 Kensington Metropark- Milford Trail Connector Huron- Clinton Metropolitan Authority Milford TF08-033 $315,000.00 This project will include development of 1.2 miles of paved trail from Kensington Metropark loop trail to Milford-Kensington Trail. 2008

Clinton River Trail Pedestrian Pontiac Bridge Pontiac TF08-040 $485,000.00 to include pedestrian bridge structure, approach, and ramps to provide a safe crossing for the Clinton River Trail at Telegraph Road. 2008 Bald Mountain Shooting Range DNR - Office of Communicati Orion ons, Recruitment and Retention TF08-124 $500,000.00 will include accessible sporting clays course, clay target and equipment storage building, renovate current trap and skeet range and club house to barrier-free condition. 2008 State Park Infrastructure Repairs DNR - Parks and Recreation Division TF08-130 $350,000.00 will include replacement of obsolete well houses in three southeast Michigan 2008 recreaiton areas: Proud Lake, Pontiac Lake, and Highland Recreation Areas. Bloomer Park White Lake White Lake TF09-103 $350,000.00 to include parking facilities, fishing platform and observation deck overlooking Grass Lake, boardwalk, and trails. 2009 Dodge #4 State Park-Water System Replacement DNR - Parks and Recreation Division Waterford Waterford TF09-143 $400,000.00 to include replacement of antiquated water system at Dodge #4 State Park. 2009

Trail TF10-038 $500,000.00 to include 2.5 mile, 10' wide aggregate path, road crossings, benches, interpretive 2010 signage and native seeding along Trail, which is part of the Michigan Airline Trail system. Landings Park Trailhead/Wate rfront Lost Lake Nature Park Novi Novi TF10-043 to include construction of a trailhead for the existing and future non-motorized $437,500.00 regional pathway system within the 2010 11-acre Landings Parkand create accessible waterfront park with 835 feet of naturalized shoreline. to include renovation of existing residence for nature center use, fishing dock, nonmotorized boating, nature TF10-069 $154,900.00 2010 observation/education, accessibility improvements to parking lot, pedestrian routes, interpretive signage, and storm water buffers. Natural Areas Accessibility Improvements Various TF10-098 $308,000.00 of universally accessible site amenities at Highland Oaks, Lyon Oaks, Red Oaks and Rose Oaks parks. 2010 Goldengate Park Playground Equipment Lathrup Village Lathrup Village TF11-012 $50,000.00 to include replacement of playground equipment at Goldengate Park. 2011

Kensington Metropark Nature Center Pond Overlook Huron- Clinton Metropolitan Authority Milford TF11-018 $94,000.00 to include pond overlook, replace seawall sheetpile, walks and railing, group seating 2011 area, interpretive signage, viewing scopes and accessibility for pond dipping programs. Camp Dearborn Non- Motorized Trail Dearborn Milford TF11-053 $268,900.00 to include a new bridge across Huron River with a fishing platform/canoe launch. 2011 Paint Creek Trail/Polly Ann Trail S. Connector Dev TF11-107 $300,000.00 to include paved trail, boardwalks, pedestrian bridges, interpretive/directional signage and fishing access. 2011 Mack Rowe Memorial Park (formerly Detroyal Park) Royal Oak Royal Oak TF86-152 $22,000.00 to include restrooms, first aid station, bleachers, tennis court, patio, and basketball courts. 1986 Lyon Community Park/I-96 Lyon Lyon TF86-182 $150,000.00 In this project 33.4 acres of former landfill will be developed into a township recreation facility. The initial phase of development calls for two ballfields and one soccer field, parking areas, enterance drives, landscaping, grading, and fencing. 1986

Heritage Park TF87-234 $195,000.00 To develop three picnic areas, hardsurfaced trail system, parking area, 1987 and an outdoor amphitheatre. Heritage Park TF88-254 $300,000.00 To construct a nature interpretive facility with visual and sensory displays for the disabled, outdoor arboretum with sensorty exploration features, and a barrier free boardwalk on a 211-acre site. 1988 Orion Oaks Beach Orion TF89-004 $195,000.00 Developoment of a multi-purpose beacj faco;out pm :ale Soxtee om Propm Pals {arl/ The beach/pavilion project includes 1989 devlopoment of a swimming beach, shelter, fishing docks, paths, and landscaping. Shiawassee Basin Preserve Springfield Springfield TF90-050 $129,000.00 Construction of 2 softball fields, one soccer field, picnic area, trails, access road and 2 parking lots at Long Lake. 1990 Avondale Park (formerly "Consumer's" Parkland) TF90-256 $200,000.00 Develop 1 ballfield, playground, 2 tennis courts, landscaping, 2 basketball courts, fencing, and parking. 1990

Ganshaw Park Boardwalk Village of Holly Village of Holly TF90-387 $177,300.00 to include construction of a six foot wide boardwalk with four fishing platforms that would meander along the Bevins Lake shoreline. 1990 Valley Woods Trail TF90-393 $120,000.00 Construction of trails, benches, fishing/viewing station, pedestrian bridge, stream bank stabilizaiton and landscaping on the Rouge River. 1990 Community Park Lyon Lyon TF91-043 $375,000.00 Construct ballfields, tennis courts, restroom/concession/press box facility, purchase of bleachers and goals, pave road and parking, install utilities and landscaping. 1991 Beaudette Park Boat Launch Pontiac Pontiac TF91-159 $69,200.00 Develop a boat launch facility, foot path, parking and landscaping. 1991 Section 36 Lake Commerce Commerce TF91-196 $332,900.00 of wetland habitat, parking, trails and picnic area. 1991

Bay Court Park Beachfront Independenc e Independenc e TF92-101 $308,400.00 Construction of a restroom/bathhouse building, an outdoor deck and meeting area, and the complete renovation of the Greens Lake beach. 1992 Fisk Hawk Woods Nature Center Auburn Auburn TF94-035 $43,600.00 of one-half mile of limestone walking/jogging trails, with raised boardwalks on Galloway sream, a tributary of the Clinton River. 1994 Fish Hatchery Park Waterford Waterford TF94-181 $141,000.00 Construction of entrance roads, parking lots, restroom facility, fishing and boating docks, and picnic areas on the Clinton River. 1994 Independence Oaks Restroom Independenc e TF95-052 $24,500.00 Renovation of an existing restroom facility to better accommodate handicapped visitors at the Independence Oaks boat house. 1995 Hawk Woods Nature Center Auburn Auburn TF95-090 $90,000.00 Construct a combination building (bathrooms, pavilions, showers), gazebo, and utility extensions. 1995

Holly Nature Center Holly Holly TF96-036 $180,950.00 of a nature center and the access road and parking in a township park to provide environmental education programming to the general public. 1996 Park #3 Oxford Oxford TF97-044 $93,930.00 Develop 1.3 miles of a nature trail system with paved and woodchip pathways, and boardwalks through 1997 a 56-acre natural area with extensive wetlands and frontage on Powell Lake. Mercer Beach Walled Lake Walled Lake TF97-089 $97,170.00 Improve public access to beach and lakefront in downtown Walled Lake by constructing a stone retaining wall, boardwalk, concrete sidewalk, play structure, site furnishings, fencing, foot shower, restroom enclosures and landscaping. 1997 Hawthorne Park Renovation Pontiac Pontiac TF97-232 $168,750.00 Renovate a boat launch and pave a parking lot at Hawthorne Park with lakefront access. 1997 Orin McPherson/Sc out Park Hazel Park Hazel Park TF98-078 $38,826.00 Construction of a lighted, barrierfree picnic/events pavilion at Orion McPherson/Scout Park to be used by the residents of Hazel Park and surrounding communities. The project will include accessible parking, barrier-free paths to connect park facilities 1998

Wixom Habitat Huron Valley Trail Construction Wixom ern Trailway Management Council Wixom TF98-079 Construction of a 1,318 linear feet boardwalk, 13,000 linear feet walking trails, viewing platform, landscaped entrance, 26-space $198,500.00 parking lot, and signage within Wixom Habitat, a 292 acre dedicated natural area with two small lakes and significat wetlands of approximately 10.7 1998 miles of 12' wide paved trail, including 6.9 miles on the TF98-096 Lakelands Trail 3.8 miles of $490,000.00 connecting trails, linking four 1998 municipalities to Kensington Metropark, Island Lake State Recreation Area, other recreation New Interpretive Center Troy Troy TF98-157 $466,000.00 Construction of a new nature interpretive center to include improved and expanded teaching, exhibit, lecture, library and office spaces. 1998 Total $14,228,828.00 Total $77,283,507.00