REAL ESTATE PLAN ADOLFO SUÁREZ MADRID-BARAJAS AIRPORT
Adolfo Suárez Madrid-Barajas Airport A landmark airport
53.4 million Passengers +5.9% 387 thousand Operations +2.5%
Gateway to Latin America 27 destinations 283 frequencies per week 25% market share Europe - Latin America
In an unbeatable situation to be the main hub between Asia and Latin America
25% seats Between Latam and Asia + 77.1% Asia Airport connectivity compared to 2016 611,000 Latin Americans living in Madrid
Leader in air cargo transport 470 thousand MT Cargo +13.1% 92 companies Air cargo centre
Committed to sustainability, innovation and the environment
Madrid, a cosmopolitan city and the economic capital of southern Europe
5 th city in Europe in attracting property investment 211,000 million It accounts for 19% of Spain s GDP 9.3% GDP The airport s share in the Region of Madrid
Strategic location CLOSE 15 km M-12 SCALE 3,532 ha 2/3 of the M-30 s area Within growth trends
Airport integrated in and connected with Madrid Superb connectivity Main roads M-12
Airport integrated in and connected with Madrid Superb connectivity Main roads Underground M-12
Airport integrated in and connected with Madrid Superb connectivity Main roads Underground Regional Rail Network M-12
Airport integrated in and connected with Madrid Superb connectivity Main roads Underground M-12 Regional rail network High-speed train M-12
Next to the main economic activity corridors Economic dynamism M-12
Next to the main economic activity corridors Economic dynamism Business corridor Economic activities M-12
Next to the main economic activity corridors Economic dynamism Business corridor Economic activities Logistics corridor M-12 Logistics activities
Unique metropolitan development opportunity for Madrid
Gateway to connectivity and the global economy
Based on three development areas
Logistics centre Passenger service Global business hub Sustainability and Innovation as design criteria
ADDITIONAL USES M-50 A-1 Overview of the land LOGISTICS HUB LEISURE AND RETAIL CENTRE 920 ha Marketable land 562 ha Gross developed land 2.7 million m² Gross floor area 140 ha Green areas 2,997 million Investment M-12 AIRPORT CITY AERONAUTICAL ACTIVITIES LOGISTICS HUB A-2
Proposed uses Between Runways North Terminal T4 Between Runways South Terminals T123 Air Cargo Centre
Proposed uses Between Runways North Terminal T4 Between Runways South Terminals T123 Air Cargo Centre AERONAUTICAL ACTIVITIES
Proposed uses Between Runways North Terminal T4 Between Runways South Terminals T123 Air Cargo Centre AERONAUTICAL ACTIVITIES LOGISTICS HUB
Proposed uses Between Runways North Terminal T4 Between Runways South Terminals T123 Air Freight Centre AERONAUTICAL ACTIVITIES LOGISTICS HUB AIRPORT CITY
Proposed uses Between Runways North Terminal T4 Between Runways South Terminals T123 Air Cargo Centre AERONAUTICAL ACTIVITIES LOGISTICS HUB AIRPORT CITY LEISURE AND RETAIL CENTRE
Proposed uses Between Runways North Terminal T4 Between Runways South Terminals T123 Air Cargo Centre AERONAUTICAL ACTIVITIES LOGISTICS HUB AIRPORT CITY LEISURE AND RETAIL CENTRE ADDITIONAL USES
Terminal T4 Terminals T123 Air Cargo Centre Between Runways North Aeronautical activities Between Runways South 5 hangars already in operation 6 ha plots / 52,000 m 2 GFA 9 ha New net plots developed 74,000 m² Gross floor area 99 million INVESTMENT
Aeronautical activities Making sure the airport remains a leading aircraft maintenance centre
Terminal T4 Terminals T123 Air Cargo Centre Between Runways North Logistics hub Between Runways South 257 ha Net plots 1,486,000 m 2 GFA Gross floor area 426,500 m² Green areas 1,096 million Investment
Logistics hub Development of the largest logistics hub in Spain with direct access to the main communication routes
Terminal T4 Terminals T123 Air Cargo Centre Between Runways North Airport City Between Runways South 62 ha Net plots 652,000 m 2 GFA Gross floor area 380,000 m² Green areas 965 million Investment
Airport City Turning the airport into the main global hub for business development
Airport City Innovative and sustainable urban design
Airport City
Terminal T4 Terminals T123 Air Cargo Centre Between Runways North Leisure and retail centre Between Runways South 57 ha Net plots 341,000 m²gfa Gross floor area 298,000 m² Green areas 681 million Investment
Leisure and retail centre A leisure and services range that will be a hotspot for Madrid and its airport
0 8 years Stage 1 Launch 953 million Initial investment 557,000 m² Initial gross floor area Upgrading current entrances
0 8 years 16 years Stage 1 Launch Stage 2 Development 953 million Initial investment 1,692 million Cumulative investment 557,000 m² Initial gross floor area 1,478,000 m² Cumulative gross floor area Upgrading current entrances Enabling additional development
0 8 years 16 years 40 years Stage 1 Launch Stage 2 Development Stage 3 Consolidation 953 million Initial investment 1,692 million Cumulative investment 2,997 million Cumulative investment 557,000 m² Initial gross floor area 1,478,000 m² Cumulative gross floor area 2,680,000 m² Cumulative gross floor area Upgrading current entrances Enabling additional development Upgrading and improving the land
Sustainable and innovative design
2017 2018 Real Estate Plan Strategy 2018 Setting up the management structure Plans, designs and tenders 2019 Start of works 2020 First properties
562 ha New land developed Integrated and sustainable 2,680,000 m 2 Total gross floor area 2,997 million Total investment 244 ha Land available for additional uses Economic development opportunity Environmentally responsible Leading and innovative range of uses Contribution to the community With the ability to continue growing