National Model Railroad Association

Similar documents
DRAFT 05 2/18/09. West Bound Mainline (Mandatory)---North Rail: Blue West Bound Mainline (Mandatory)---South Rail: Black

I Have A Problem Text and Photos by Rich Mahaney, EID Superintendent

BEEN THERE...DONE THAT!

HOME LAYOUTS LAYOUT TOUR DESCRIPTIONS UPDATED 5/26/17. MIKE BENNETTE O Scale. JIM BARTA HO Scale. Nine Mile Falls, WA.

YORKSHIRE AREA GROUP OF THE N GAUGE SOCIETY

Volume 67, Issue 2 2 nd Quarter April May June. The Official Newsletter of the Mid-Continent Region of the NMRA

THE FLIMSY. From the Editor. In This Issue. From the Editor. March meeting. Show and Tell. Buffer Stop. The last say...

Joe Baldwin aka Joe Daddy

O Scale Track FAQs. Download our popular layout planning software FREE! See pages 9-10 or visit our web site for more details.

Google Map:

NPS Form a OMB No (8-86) Expires

N Scale Track Facts. Download our popular layout planning software FREE! See pages 9-10 or visit our web site for more details.

>> Follow the Soo Line

This Month's Program...

IRELAND SAFETY REGULATION DIVISION IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel Fax AFTN EIDWYOYX

Organizing for T-Trak

Virtual Tour. Almost Hidden Treasures.

FoamboardLayout Construction

Read & Download (PDF Kindle) 101 More Track Plans For Model Railroaders

Division Points. Nov 18th Meeting. Dave Salamon. Show and Tell: Structures & Dioramas Clinics/Presentations:

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018

Division 3 Website:

The Journal Division 5, NCR, NMRA Andy Keeney, Superintendent Clerk and Editor: Mark Cowles All Photos are by the editor unless otherwise credited

A Mikado leads a freight across the High Bridge at Tacoma, Colo. A desire to model in a larger scale and to build a railroad featuring

OPS General Rules for Operations Manuals

AIRWORTHINESS ADVISORY CIRCULAR

National Register of Historic Places Multiple Property Documentation Form

GUERNSEY ADVISORY CIRCULARS. (GACs) EXTENDED DIVERSION TIME OPERATIONS GAC 121/135-3

MOUNTAIN SUBDIVISION LAYOUT TOURS

NATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance

SPRING MEET REPORT TEXT & PHOTOS BY JOE BUX. The O-Trolley bunch and the modular layout they displayed and operated at the Spring Meet.

Vasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority

N o v e m b e r 2 1,

Division Points. November 14th Meeting

Switchman s Timetable. HO Division. Aug. 16, HO Division Rev 2.2. AMRS HO Division Signals. Arizona Model Railroading Society

Clinkers Official Newsletter of the New Jersey Division, Mid-Eastern Region, National Model Railroad Association

Navigating your way through the process. Presented by: Mike Mertens DAR ODA MRA Administrator Manager of Regulatory Compliance Duncan Aviation

15. Mashamou Valley & Western Bob Davis 120 Freedley Rd Pomfret, Ct Tel #

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

Modular Model Railroading

Northern Colorado Model Railroaders. August 2001 Volume XXII Number 8. Denver, Greeley & Tahoe

Part 63 CAA Consolidation 22 June 2006 Flight Engineer Licences and Ratings

Kings Dominion Coaster Mania Building Contest 2017

SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012

An advisory circular may also include technical information that is relevant to the standards or requirements.

RAILROAD PARK AGREEMENT

7 Instructor Certificates

Part 149. Aviation Recreation Organisations - Certification. CAA Consolidation. 1 February 2016

Upcoming Division Events. Calendar of Events. Website News: The new redesigned Division website is now active. Check out the new look at:

Network Safeworking Rules and Procedures

FederationofMalysia EDICTOFGOVERNMENT±

April Coming on the heels of last month s. NMRA Awards Featured At March Meeting. Volume 5, Number 4

Student Pilot Certificate Procedures and Sport Pilot Endorsements

Logging. This Month's Program...

Menlo Park Fire District Training Division. Unmanned Aerial System Pilot

HISTORY OF THE DELMARVA MODEL RAILROAD CLUB

CIVIL AVIATION REGULATIONS PART III AVIATION TRAINING ORGANISATION

FIJI AERONAUTICAL INFORMATION CIRCULAR

Captions/Proof Sheets for 97 Alberta Coal Branch & related images to accompany Kodak PhotoCD and slides; A C Lynn Zelmer, photographer

MANASSAS REGIONAL AIRPORT

Advisory Circular AC19-1. Test Pilot Approvals 03 July Revision 0

MODEL CONTEST PHOTOBOOK

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

The Midland, Rockies and Western Bob Wirthlin, MMR Photos by the author. The Midland, Rockies & Western (MR&W) was started by my Dad when

SATURDAY, APRIL 7, A.M. - 5 P.M.

The Journal Division 5, NCR, NMRA Andy Keeney, Superintendent Clerk and Editor: Mark Cowles All Photos are by the editor unless otherwise credited

SECTION TRAINING HELO. Date: 01/08/16 Page: 1 of Table of Contents Training, Helicopter

March 2002 In This Issue

SCALE RAILS of Southwest Florida

NORTHERN NEVADA RAILWAY, Nevada

Volume 24 Number 3 September to November 2017 Edition

Mike Buehner s N Scale Grand River Railroad

Lawrence Model Railroad Club Newsletter June 2015

GUERNSEY AVIATION REQUIREMENTS. (GARs) CERTIFICATION OF AIRCRAFT PART 21

TRAINING BULLETIN ROPE 4 March 8, 2007 PERSONAL SAFETY SYSTEM (PSS)

Newsletter of the Yorkshire Area Group of the N Gauge Society. November For All N Gauge Enthusiasts Whatever their modelling interest.

Contest. millersburg ferry, photo by norbert fry, New cumberland. Super Summer. Scavenger Hunt OFFICIAL entry form

standard gauge This is a story about change. into an On3 space

TORONTO TRANSIT COMMISSION REPORT NO.

LANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006

IRELAND SAFETY REGULATION DIVISION

Control Line Special Events

AOPA may require to see this completed syllabus before issuing the Flying Companion s Course Certificate.

Technical Standard Order

Comparison on the Ways of Airworthiness Management of Civil Aircraft Design Organization

DETROIT, TOLEDO, AND IRONTON RAILROAD PHOTOGRAPHS SUBSERIES, Accession 548

From the Editor... Next Few Meetings. Division Seven Roles. Next Meeting. The Extra. Division Seven Newsleer. Volume 2, Issue 4 13 April 2013

HO, HO, HO, SAID OUR OPEN HOUSE VISITOR

Aircraft Maintenance Personnel Licensing

FEBRUARY Chicago s Garfield-

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

Division 3 Website:

RESCUE SUPPORT SYSTEMS TRIPOD CONVERSION KIT PN

October 2007 ISSUE AND RENEWAL OF AIRCRAFT MAINTENANCE ENGINEER S LICENSE

TEAM AMERICA ROCKETRY CHALLENGE 2014 EVENT RULES

TRAINING COURSE INFORMATION CE-500 Initial Type Rating & CE-500 Single Pilot Exemption Initial

Daylight Division Summer Meet Set for August 23 at Goleta Depot By Bruce Morden

PROCEDURES FOR THE QUALIFICATION OF AN STD/FSTD UNDER THE CATCH-UP PROCESS

Transcription:

National Model Railroad Association Home :: Achievement Program :: Engineer - Civil Achievement Program Model Railroad Engineer - Civil The requirements for Model Railroad Engineer - Civil may look long and complicated, but they really are not. The reason that they are so long is to offer you more options for meeting the requirements. Remember - don't read more into the requirements than is there. To qualify for the Model Railroad Engineer - Civil certificate: 1. Prepare one original scale drawing of a model railroad track plan, identifying overall size, scale, track elevations, curve radii, and turnout sizes. Before you start drawing your layout plan, look at requirements B & C to see what features you are going to want to incorporate in your track plan. Remember: you do not need to build everything on this plan, just the minimum required part of it. The plan should be neat and legible, but it does not have to be in ink. You should also consider the requirements for Model Railroad Engineer - Electrical, and Chief Dispatcher when planning your layout - it is much easier to include the requirements in the planning stage than to go back and add them later. This plan must include: A. Adequate terminal facilities for handling freight and/or passenger cars This will vary, depending on the nature of your layout. Keep in mind that a railroad needs to have a reason to exist, other than to provide modelers and railfans something to look at! There needs to be someone that will pay for it to haul something from one place to another, be it lumber, coal, fruit, passengers, etc. (and usually more than one thing). Your plan and your layout should reflect this. Remember, you don't necessarily have to build these facilities, just include them in your plan. This is to show that you know what the design of a logical terminal facility would look like. B. Adequate terminal facilities for storage and service of motive power This doesn't mean you need a turntable with a twenty stall roundhouse. For a small operation, a simple engine house with a fueling track may be sufficient. It should be consistent with the theme of the rest of your plan. Again, remember that you don't necessarily have to build these facilities, just show that you know how to plan one. 1 of 5 2/13/12 2:58 PM

C. A minimum of one mainline passing siding D. Four switching locations, not counting yards, interchanges, wyes, and reversing loops These would typically be spurs for setting out or picking up cars. Again, each one should have a purpose. E. Provision for turning motive power (except for switchbacks, trolley lines, etc.) A turntable, wye, or reverse loop, which actually changes the way that the motive power faces. Not just a loop of track that sends it back through the scene in a different direction on another track. F. Provision for simultaneous operation of at least two mainline trains in either direction. Remember, you don't have to actually build this, just show it on the plan. 2. Construct and demonstrate, the satisfactory operation of a completed section of the model railroad and track work described in #1. Containing at least 25 linear feet in Z, N, or TT scale, or 50 linear feet in HO or S scale, or seventy five linear feet in O scale, or 100 linear feet in G or #1 scale, or other scales in proportional relationship to HO scale, with appropriate ballast, drainage facilities, and roadbed profile, which may contain spurs, yards, etc. Notice that last part - 50 feet of track, not 50 feet of main line - all operational track counts. While there is some element of scenery (appearance) to the track work and ballasting, the greatest number of points come from Construction and Conformity. In other words, what you need to show is that you know how to build track following prototype practice. The track work must have examples of six of the following features: Passing Siding Spur A crossover is a diagonal track connecting two parallel tracks. Reversing Loop Wye Simple Ladder A ladder should have a minimum of 3 tracks Compound Ladder Turntable Transfer Table Super Elevation 2 of 5 2/13/12 2:58 PM

Banking the track and roadbed on a curve. Simple Overhead Wire - A single overhead wire (such as on a trolley system) Compound Overhead Wire (catenary) One wire which carries the power, with another wire above to support it (such as on high-speed electrical lines) Scale Track A track with a scale for weighing cars. Cog Railway Track Coal Dump Track Could also be for dumping something besides coal Ash Pit Service Pit Track Grade Elevation This is a lot simpler than it sounds: it's any change in the slope of the track, like at the top or bottom of a hill. It's to show that you can make the transition smoothly between grades. Other 3. Construct for Merit Judging, scratch built scale models of any three of the following, and demonstrate their satisfactory operation: Turnout point or stub Double Single Slip Switch Double Slip Switch Crossing Gauntlet Track Gauntlet Turnout Dual Gauge Turnout Gauge Separation Turnout Narrow gauge splitting off from dual gauge. Double Junction Turnout One set of parallel tracks diverges from another. 3 of 5 2/13/12 2:58 PM

Three-Way Turnout Spring Switch Operating Switch in Overhead Wire Other Commercial frogs are not permitted to be used in any of these items. These models may be built and demonstrated as part of the layout or separately. Remember that these items do not need to be part of your layout - they don't even need to be the same scale or gauge. They don 't even need to be part of a layout at all. You can build them on separate pieces of wood. They just have to be big enough and with enough track on either side to "...demonstrate their satisfactory operation. " This means that a unit of motive power must be able to travel through them (along all the possible routes) under its own power. It is NOT sufficient to push or pull a car through by hand. 4. You must win a Merit Award (at least 87.5 points) with the items in section 3 above. Notice that you only have to win a Merit Award with the items in section 3 - the trackwork items in section 2 don 't have to be judged at all, except to demonstrate that they work. They must be available for examination by the judges, however. 5. You must submit a Statement of Qualification (SOQ - available from the Regional AP Manager) which includes the following: A. Attachment to the SOQ showing the track plan required in Section 1 above. The attachment should include: Identification of all scratch built features All commercial components used Materials used in building the model (This is just a list of what was used - you don 't have to try and figure out how much) B. C. Description of the track work features, methods of construction and identification of commercial components used in Section 3. Verification of the Merit Awards (Photocopies of the certificates or signed judging forms.) D. Witness Certification showing that each of the above models meets all applicable NMRA standards. Further Information Contact National Achievement Program General Manager, Paul Richardson, MMR achiev@hq.nmra.org, or your Region or Division Achievement Program Manager for more information. 4 of 5 2/13/12 2:58 PM

Also refer to the article "Achievement Program Skills and Service Awards", NMRA Bulletin, September 1992. Forms available for this category: SOQ Form: (PDF) Record and Validation form: (PDF) Judging Form: (PDF) Copyright (c) 1995-2012 National Model Railroad Association. All Rights Reserved. Last Updated: Tuesday July 01, 2008 National Model Railroad Association, Inc. 4121 Cromwell Rd., Chattanooga, TN 37421 Phone: (423) 892-2846 - Fax: (423) 899-4869 Email Contact List 5 of 5 2/13/12 2:58 PM

ACHIEVEMENT PROGRAM MODEL RAILROAD ENGINEER CIVIL STATEMENT OF QUALIFICATIONS FORM May 2006 page 1 of 2 Member's Name: NMRA #: Exp: Street: City: State/Prov: ZIP/PC: Country: NMRA Region: Date Submitted: E-Mail: Phone: To qualify for this certificate you must: 1. One original scale drawing of a model railroad track plan identifying: Overall Size Scale Track Elevations Curve Radii Facilities Turnout Sizes Terminal Motive Power Storage Mainline Passing Siding Four Switching Locations Turning of Motive Power Two Mainline Train Operation 2. Construct and demonstrate the satisfactory operation of a completed section of the model railroad and track work described in Section 1. The section must contain at least 25 linear feet of track in Z, N, or TT scale, 50 in HO or S, 75 in O or 100 in G or #1, with appropriate ballast, drainage facilities and roadbed profile, and may contain spurs, yards, etc. Track work shall have examples of at least 6 of the following features: Passing siding Spur Reversing Loop Wye Simple Ladder Compound Ladder 2. : Turntable Transfer Table Super Elevation Simple Overhead Wire Compound Overhead Wire Scale Track Cog Railway Track Coal Dump Track Ash Pit Service Pit Track Grade Elevation Other 3. Construct for Merit Award Judging scratch built models of any three of the following. Turnout (Point or Stub) Double Single Slip Switch Double Slip Switch Crossing Gauntlet Track Gauntlet Turnout Dual Gauge Turnout Gauge Separation Turnout Double Junction Turnout Three-Way Turnout Spring Switch or Operating Switch in overhead wire

ACHIEVEMENT PROGRAM MODEL RAILROAD ENGINEER CIVIL STATEMENT OF QUALIFICATIONS FORM May 2006 page 2 of 2 JUDGE S NAME SIGNATURE NMRA # Member s Statement and Agreement: I certify that I have completed all of the requirements for this Certificate of Achievement as listed above and that I will agree to assist other members in this subject whenever possible, whether or not they are participants in the Achievement Program. NAME: SIGNATURE: Date: Certification of Regional Achievement Program Chair As the NMRA Regional Achievement Program Chair of the, I certify that I have examined this SOQ and, having compared it to the stated requirements for this certificate, I am satisfied that the stated requirements have been met. NAME: SIGNATURE: Date: Region Cert #: Approval by AP National Executive Vice-Chair NAME: SIGNATURE: Date:

ACHIEVEMENT PROGRAM MODEL RAILROAD ENGINEER CIVIL RECORD AND VALIDATION FORM May 2006 PLEASE ATTACH THIS FORM TO A COMPLETED STATEMENT OF QUALIFICATIONS (SOQ) FORM. Member's Name: Date Submitted: NMRA #: Region: It is hereby certified that the Civil options described below, built or installed, on one or more model railroads by the above named NMRA member, have been personally examined by two or more judges appointed by the Region or Division AP Chair; that the items are either scratchbuilt or super-detailed or are commercial items properly installed, have been adjusted to be operational and meet all applicable NMRA Standards. 1. One original scale drawing of a model railroad track plan identifying: Overall Size Scale Track Elevations Curve Radii Facilities Turnout Sizes Terminal Motive Power Storage Mainline Passing Siding Four Switching Locations Turning of Motive Power Two Mainline Train Operation 2. Construct and demonstrate the satisfactory operation of a completed section of the model railroad and trackwork described in Section 1. The section must contain at least 25 linear feet of track in Z, N, or TT scale, 50 in HO or S, 75 in O or 100 in G or #1, with appropriate ballast, drainage facilities and roadbed profile, and may contain spurs, yards, etc. Trackwork shall have examples of at least SIX of the following features: Passing siding Spur Reversing Loop Wye Simple Ladder Compound Ladder Turntable Transfer Table Super Elevation Simple Overhead Wire Compound Overhead Wire Scale Track Cog Railway Track Coal Dump Track Ash Pit Service Pit Track Grade Elevation Other 3. Construct for Merit Award Judging scratchbuilt models of any three of the following. Turnout (Point or Stub) Crossing Gauntlet Track Double Gauntlet Turnout Single Slip Switch Dual Gauge Turnout Double Slip Switch Gauge Separation Turnout Double Junction Turnout Three-Way Turnout Spring Switch or Operating Switch in overhead wire JUDGE'S NAME SIGNATURE NMRA # REGIONAL AP CHAIR: REGION: DATE:

ACHIEVEMENT PROGRAM MODEL RAILROAD ENGINEER CIVIL JUDGING FORM May 2006 PLEASE ATTACH THIS FORM TO A COMPLETED STATEMENT OF QUALIFICATIONS (SOQ) FORM. Member's Name: Date Submitted: NMRA #: Region: It is hereby certified that the three scratchbuilt models of railroad track work built by the above named NMRA member, have been personally examined by two or more judges appointed by the Region AP Chair. That all track work operated satisfactorily, meets all applicable NMRA Standards, and that each of the three scratchbuilt items of track work has earned a minimum score of 87.5 points and has been awarded a Merit Award. MERIT AWARD SCORING SCHEDULE CONSTRUCTION DESCRIPTION POINTS SCORE CONSTRUCTION Workmanship: The difficulty or complexity of what the modeler 0-40 has attempted and how well the model was constructed. DETAIL Quality and Amount. How much detail has the modeler added 0-20 or incorporated and how complex was the detailing job? CONFORMITY Prototype Practice. How well has the modeler reproduced the 0-30 prototype? FINISH & LETTERING Appearance. The complexity, accuracy, or completeness of 0-10 finish and lettering and the quality and skill of its application. SCRATCHBUILDING How much did the modeler build from scratch and how difficult was the scratchbuilding. Commercial frogs not allowed but commercial individual rail (not Flex-track), ties and spikes are. 0-25 Total JUDGE'S NAME SIGNATURE NMRA # REGIONAL AP CHAIR: REGION: DATE: