Cadia Valley. Peter Smith Executive General Manager Australian Operations

Similar documents
Exploration. General Manager Minerals Development

Newcrest Mining Limited

Wafi Golpu. Craig Jones Executive General Manager Australian Operations and Projects. 7 October 2014

NEWCREST LOOKING TO THE FUTURE

Lihir Operations PNG Mining and Petroleum Conference 24 November Peter Aitsi Country Manager, PNG

Annual Mineral Resources and Ore Reserves Statement - 31 December 2016

2011 Annual General Meeting. Greg Robinson Managing Director & CEO

NEWCREST Newcrest to acquire potential Tier 1 orebody in Canada Sandeep Biswas Managing Director and Chief Executive Officer

Annual Mineral Resources and Ore Reserves Statement - 31 December 2017

Market Release 11 March 2019

Credit Suisse Asia Investor Conference March 2013, Hong Kong. Greg Robinson Managing Director and Chief Executive Officer

HARMONY GOLD AND NEWCREST FORM PAPUA NEW GUINEA GOLD JOINT VENTURE

Quarterly Report. Greg Robinson Managing g Director & CEO

For personal use only

For personal use only

December 2017 Quarterly Report

For personal use only

Lihir Operations. 14 th PNG Mining and Petroleum Investment Conference. 5 December 2016

Kinross acquires mining rights to land adjacent Fort Knox mine, adds more than 2 million ounces to mineral resource estimates

Lorena Gold Project Malachite AGM 29 November 2017

Quarterly Results. Greg Robinson CEO & Managing g Director

Kinross Gold Corporation Merrill Lynch Global Metals, Mining & Steel Conference May 13 15, 2008

Morgan Stanley Asia Pacific Summit November Ian Smith MD & CEO

BMO Capital Markets Global Metals & Mining Conference Feb 2012, Florida USA

Bank of America Merrill Lynch Global Metals & Mining Conference May 2015, Barcelona, Spain

For personal use only

Mungana Signs Agreement with Newcrest to unlock Porphyry Gold-Copper Potential at Chillagoe

Candelaria and Ojos del Salado Chile

For personal use only

Quarterly Report Newcrest Mining Limited For the three months ending 30 June 2007 (These figures are unaudited)

South America Copper Site Visit Non-ferrous overview

Focus Begins Accelerated Development of the Mount into New Stand Alone Mining Operation

For personal use only

Market Release Newcrest Mining Limited 10 February 2012

Newcrest Mining Limited. March 2007 North American Roadshow Ian Smith, MD & CEO

MARCH 2018 QUARTERLY ACTIVITIES REPORT

Half Year Results Newcrest Mining 15 February 2016

BHP Billiton: A Strategy of Diversification

Quarterly Activities Report Period Ended 31 March 2018

PROJECTS & TECHNICAL SERVICES

Mining Address. Ian Smith MD & CEO Newcrest Mining Limited

Kinross Nevada tour highlights growth potential at Bald Mountain and Round Mountain

OZ MINERALS AUSTRALIA & EUROPE ROADSHOW. May 2011

For personal use only

Kalgoorlie, WA - August Colin Moorhead

For personal use only OZ MINERALS AUSTRALIAN COPPER CONFERENCE. TERRY BURGESS - Managing Director & CEO March

Ramelius Resources Limited ASX:RMS

Cadia East PC2 recorded its highest quarterly ore production, and PC1 recommenced ore production

Recent Exploration of the Olympic Dam

HANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND Drill Results Include 8.0% ZnEQ and 10.

Quarterly Report Newcrest Mining Limited For the three months ending 31 March 2013 (These figures are unaudited)

For personal use only

Ramelius Resources Limited ASX:RMS

For personal use only

Angas Zinc Mine From Prediction to Production

Quarterly Activities Report Period Ended 31 December 2017

Newcrest Lihir Gold. Brett Fletcher Executive General Manager PNG & Indonesia

Innovative, Long Term Copper Producer in Chile

For personal use only

AUSIMM - Technical Meeting & AGM

Kinross Production Continues on Plan

Kidman agrees to acquire 1Moz Mt Holland gold field in WA

Australian Mines increases Marymia ground holding

On The Road To Silver Mining In Mexico

For personal use only

Alberto Calderon Group Executive and Chief Executive Aluminium, Nickel and Corporate Development

Tax Contribution Report 2017

QUARTERLY REPORT 1 JULY 2017 to 30 SEPTEMBER 2017

On The Road To Silver & Gold Mining In Mexico

Australian Securities Exchange Notice

For personal use only

QUARTERLY ACTIVITIES REPORT

Australian Site Tour Mt Keith Operation. Jaco Harwig General Manager

Half Year Results FY18

OZ MINERALS CONTINUED INVESTMENT IN SOUTH AUSTRALIA. TERRY BURGESS - Managing Director & CEO SAREIC - 02 May 2011

Investor Presentation July 2013

NEWS RELEASE Orca Gold Receives Ministerial Approval for the Acquisition of the Kinross Côte d Ivoire Property Portfolio

Market Announcement ASX:NTL, NZX:NTL For Immediate Release

Genius Properties / Cerro de Pasco Resources Merger Opportunity. June 2018

For personal use only

FOUR EAGLES JV FORMALISED SEISMIC AND DRILLING PROGRAMME COMMENCES

Gold Mining an Industry in Transition. Melbourne Mining Club 7 June Ian Smith Managing Director and CEO Newcrest Mining Limited NEWCREST 1

Lihir record milling throughput rate of 14.5mtpa (annualised) delivering record quarterly gold production

OMNR. ^ååì~ä=déåéê~ä=jééíáåö. OT=klsbj_bo=OMNR=== ^puw=cjp===

SEPTEMBER 2018 QUARTERLY ACTIVITIES REPORT

CATALYST SECURES $1.5 MILLION PLACEMENT WITH ST BARBARA LIMITED

For personal use only

OZ MINERALS US ROADSHOW

KEY POINTS. Significant Resource increase at the Tier-1 mines:

GROWTH DELIVERING DISCIPLINED. The Kinross Difference. Increased Margins, Cash Flow & Leverage to Gold Price. Kinross Gold Corporation January 2008

For personal use only

First Thunderbox gold now anticipated in June Quarter 2016

Northern Territory. Ark wishes to extend the strike and further define the size of the Golden Honcho deposit, with the

OZ MINERALS UK ROADSHOW OCTOBER

ORO VERDE LIMITED (ASX: OVL)

Company Announcements Office

THE NEW HIGH- GRADE AUSTRALIAN GOLD DISCOVERY

Australian Resource Reviews Gold 2016

Quarterly Report Newcrest Mining Limited For the three months ending 31 March 2012 (These figures are unaudited)

Inca de Oro Copper-Gold Project and Carmen deposit sale process

Transcription:

Cadia Valley Peter Smith Executive General Manager Australian Operations

Disclaimer Forward Looking Statement These materials include forward looking statements. Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as may, will, expect, intend, plan, estimate, anticipate, continue, and guidance, or other similar words and may include, without limitation statements regarding plans, strategies and objectives of management, anticipated production or construction commencement dates and expected costs or production outputs.. Forward looking statements inherently involve known and unknown risks, uncertainties and other factors that may cause the company s actual results, performance and achievements to differ materially from any future results, performance or achievements. Relevant factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary licences and permits and diminishing quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the company operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and litigation. Forward looking statements are based on the company and its management s good faith assumptions relating to the financial, market, regulatory and other relevant environments that will exist and affect the company s business and operations in the future. The company does not give any assurance that the assumptions on which forward looking statements are based will prove to be correct, or that the company s business or operations will not be affected in any material manner by these or other factors not foreseen or foreseeable by the company or management or beyond the company s control. Although the company attempts and has attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in forward looking statements, there may be other factors that could cause actual results, performance, achievements or events not to be anticipated, estimated or intended, and many events are beyond the reasonable control of the company. Accordingly, readers are cautioned not to place undue reliance on forward looking statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, in providing this information the company does not undertake any obligation to publicly update or revise any of the forward looking statements or to advise of any change in events, conditions or circumstances on which any such statement is based. Ore Reserves and Mineral Resources Reporting Requirements As an Australian company with securities listed on the Australian Securities Exchange ( ASX ), Newcrest is subject to Australian disclosure requirements and standards, including the requirements of the Corporations Act and the ASX. Investors should note that it is a requirement of the ASX listing rules that the reporting of ore reserves and mineral resources in Australia comply with the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code ) and that Newcrest s ore reserve and mineral resource estimates comply with the JORC Code. As a company listed on the Toronto Stock Exchange ( TSX ), Newcrest is subject to certain Canadian disclosure requirements and standards, including the requirements of National Instrument 43-101 - Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators ( NI 43-101 ). In accordance with NI 43-101, Newcrest reports its ore reserves and mineral estimates in compliance with the JORC Code, along with a reconciliation for any material differences between the JORC Code and the applicable definitions adopted by the Canadian Institute of Mining, Metallurgy and Petroleum (CIM Definition Standards). There are no material differences between the definitions of Measured, Indicated and Inferred Mineral Resources, and Proven and Probable Reserves, under the CIM Definition Standards and the equivalent or corresponding definitions in the JORC Code. Exploration Target The potential quantity and grade related to any Exploration Targets referred to in this presentation is conceptual in nature as there has been insufficient exploration to define a Mineral Resource. It is uncertain if further exploration will result in the determination of a Mineral Resource. Refer to Newcrest s detailed exploration summary on our website at www.newcrest.com.au and on www.sedar.com. 2

Long life, low cost, organic growth FY13 production guidance 400 to 500koz gold 53 to 58kt copper 5 year outlook 700 to 800koz gold a year 80 to 90kt copper a year >30 year reserve life Cadia East ramp up CVO, Australia CVO Gold Moz Copper Mt Resource 1 43.2 7.97 Reserve 1 26.6 4.27 1 Refer Newcrest Annual Statement of Mineral Resources & Ore Reserves as at December 31, 2011. 2 Annual gold production range: gold bar designates up to low end of range, blue signifies high end of range Gold production 2 473koz 400 to 500koz 700 to 800koz FY12 FY13 FY17 3

First quartile gold producer Cadia East capital targeting high returns ~$1.3bn expansion over 5 year plan period ~$100m development spend per year thereafter Cadia East to deliver: Mining costs $5 to 6/tonne Unit cash costs post credits ~$200/oz 2 Cadia Valley Cash cost post credits Production cost post credits FY12 A$423 per ounce A$663 per ounce EBIT margin 40% Return on net assets 13% (27% excluding CE WIP) Unit cash cost per ounce 1 1,500 1,000 USD$/oz Cadia 500 0 0.0% 25.0% 50.0% 75.0% 100.0% -500-1,000 Current cash cost Target cash cost Percentile 1 Source: GFMS, accessed 25 September 2012 2 Assumes US$2.50/lb and AUD:USD 0.85 4

Cadia Valley: long life, low cost, organic growth FY13 Production 400 to 500koz transition year Cadia East commercial production - rate steps-up Process stockpiles, RWD at 8mtpa Plants commissioned 5 years Increase production to 700 to 800koz gold plus 80 to 90kt copper 100% Cadia East ore Optimise cave performance Drive cash costs lower and stabilise capital Studies to drive 30 to 35mtpa processing 15 years Production sustained for 30+ years Broader province exploration options Near mine supplementary ore supply Seamless mining and processing factory Future mine Highly automated, high technology, low cost long life 5

Cadia Valley Province in central NSW Australia Cadia Valley Cowal 4.5 Moz Au # Northparkes 4.1 Moz Au # 2.3 Mt Cu Marsden Marsden Project 1 Peak Hill 1 Moz Au historical production # Parkes 43 Copper Hill Mine 1.6 Moz Au, 640 kt Cu # Orange Cadia Valley Operations Bathurst Cowra McPhillamys 3 Moz Au, 60 kt Cu # Mineralised Corridor Ridgeway 3.4 Moz Au CADIA PLANT Big Cadia 0.55 Moz Au Cadia Extended 0.93 Moz Au Cadia Hill 5.4 Moz Au Cadia East 33 Moz Au Gooleys Willow Park Tenement Legend Newcrest ML Newcrest EL EL - Active EL Application nn 2011 Gold Resource (Moz Au) Newcrest interest basis 50 km Tenement Legend Newcrest ML Newcrest EL EL - Active EL Application Target areas 50 km # externally reported figures Refer Newcrest Mineral Resource & Ore Reserve Explanatory Notes issued 15 August 2011 6

Cadia Valley - Australia Newcrest Owned Land Operational Area Mining Lease CVO land position is secure 7

CVO site well established footprint 8

18700 Mega litres of site storage 2 years without refill Southern Tails Northern Tails Upper Rodds Creek Dam CVO well set up for water supplies 9

Environmental impact monitoring and management includes: Noise: operational & traffic Blasting and vibration Air quality, soil and water Meteorological monitoring Rehabilitation & biodiversity Aboriginal and historical heritage Open community relations practised Employee awareness Inductions and participation Open days, site tours, newsletters 24 hour community hotline Regular consultation forums 10

Plan view Ridgeway Mine Grid 1000 m Ridgeway Big Cadia Cadia Extended Cadia Extended Cadia Hill Big Cadia Pit outline Long projection (looking mine grid north) 1000 m F F Stage 4 Cadia Hill F F Cadia Valley Sydney Cadia East Cadia East Resource RESOURCE Resource Reserve 43.2 Moz Au 8 Mt Cu 26.6 Moz Au 4.3 Mt Cu 2011 CADIA EAST RESOURCE (1) 2.3 Bt @ 0.44 g/t Au & 0.28 % Cu 33.1 Moz Au 6.6 Mt Cu 2011 RIDGEWAY RESOURCE (1) 150 Mt @ 0.71 g/t Au & 0.37 % Cu 3.3 Moz Au 0.54 Mt Cu 2011 CVO OTHER RESOURCE (1) 560 Mt @ 0.38 g/t Au & 0.15 % Cu 6.8 Moz Au 0.84 Mt Cu 2011 CADIA EAST RESERVE (1) 1.2 Bt @ 0.58 g/t Au & 0.31 % Cu 22.2 Moz Au 3.7 Mt Cu 2011 RIDGEWAY RESERVE (1) 93 Mt @ 0.82 g/t Au & 0.36 % Cu 2.5 Moz Au 0.35 Mt Cu 2011 CVO OTHER RESERVE (1) 130 Mt @ 0.51 g/t Au & 0.20 % Cu 2.0 Moz Au 0.25 Mt Cu (1) Newcrest Annual Statement of Mineral Resources & Ore Reserves as at December 31, 2011. 11

CVO operations are in a transition phase from open pit to all underground Cadia Hill open cut: care and maintenance on 30th June 2012 Ridgeway underground mine: Newcrest s first Block Cave mine, hitting targets Cadia East Project on schedule for commercial production in December quarter Ore processing facility: fully commissioned 12

CVO future production dominated by Cadia East (CE) Transition phase: from open cut (CH) and underground to all underground RWD (RW) operating at 8mtpa, pushing to 9mtpa Cadia East ramping to 26mtpa capability Tonnes Processed (Mt) 30 25 20 15 10 5 800 700 600 500 400 300 200 100 koz 0 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 FY2017 0 CE Mill Tonnes RW Mill Tonnes CH Mill Tonnes CH Stockpile Mill Feed Gold Produced mid point estimate koz 13

RWD learning & perfecting how to block cave RWD is a single level block cave mine - Feasibility design of 5.6mtpa - Now operating at 8mtpa - Static panel layout reserves of 100mt - Material handling system max capability of 9-10mtpa Demonstrated technical capability to build and operate deep block cave mine in CVO conditions Managed secondary break out of critical path Remote / automated bogging tested Demonstrated electric loaders can compete Introduce link to SAOC All learnings lead to CE SLC Lift 1 Lift 2 14

Cadia East: the largest underground mine in Australia Panel Cave mine - Depth: 1200m 1500m 1.2bn tonnes ore in total 26mtpa production capacity ~$5 to $6/tonne mining costs 5 year capital: $1.3bn Intense preconditioning of cave Mine infrastructure capability Crushers Belts Processing Operating systems tuned at RWD Cadia Hill Open Pit 825 m PC1 S2 1,225m 1,475m 400m PC1 S1 600m PC2 S1 PC2 S2 700m 15

Production has commenced Cave propagating well Main crusher on track PC2 on track Infrastructure commissioned Future state design complete SAOC imbedded 16

FY13 cave layout: currently 27 drawbells fired and 28 ready (drilled) Note: 2 drawpoints for each drawbell 17

Undercut moving to plan: grey = fired, blue = drilled 18

PC1 S1 PC2 S1 FY13 Cave development over the next 3 years: FY13 19

PC1 S1 PC2 S1 Cave development over the next 3 years: FY14 20

PC1 S1 PC2 S1 Cave development over the next 3 years: FY15 21

Unlike RWD CE is a dynamic multi panel multi level layout We are now here To compare: this is the size of RWD Cadia East future sequencing - Macro Blocks (LOM Au Grade) 22

Feasibility Feasibility Optimised Panel cave 2 extraction level layout optimised 23

Panel cave 1 phase 2 crusher chamber progressing to plan 24

Isometric View (looking towards West) The cave has started to propagate very well 4670 PC1 Undercut 4650 PC1 Extraction 25

Cave Back Open Monitoring Holes Recorded Seismicity 11th 24th September 2012 PC1 Cave Shape 4670 PC1 Undercut Level Top of Undercut Drilling Drawbells fired and connected to Undercut 4650 PC1 Extraction Level 26

Cave Back Interpretation September 2012 Caved Stock: 430,000 Tonnes Caved Stock Available: 50,000 Tonnes 9 m average air gap (25 m max) Next 6 UC firings to the North To create caving and filling of gap Isometric View (looking towards West) 4670 PC1 Undercut Expansion Void height (m) 110 100 90 80 70 60 50 40 30 20 Assumes 2 pathways Nomogram 4650 PC1 Extraction 10 0 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 Muckpile Height (m) Red Orange Yellow Green Daily monitoring and reporting tools in place 27

There is potential to drive processing to 35mtpa 1 HIGH CASE 35Mtpa Leverage assets Step upper change limits New technologies Leverage assets upper limits MID CASE 30Mtpa Execute the plan BASE CASE 26Mtpa 1. Subject to regulatory approvals. 28

Emerging Cadia Step Changes Getting higher productivities from what we have Finer Engineered Cave Ore Exploit finer, engineered cave material Ridgeway showing fine material as cave matures Cadia East additionally has intensive preconditioning Low grade segregation before processing Higher productivity from asset Adopt semi-continuous cave production Fine tuning ore transfer system productivities Working with Codelco Field trialling mobile breaker units at Cadia High Productivity Transfer Systems Macro block value sequencing Refining draw column value assessment processes Understanding cave engineered design parameters front ended grade & metal by sequencing value better Macro Block Value Re-sequencing Sustained, low cost 30-35Mtpa Mining Factory 29

Future State Collaboration Hub - Operations Excellence (Tier 3) Excellence (Tier 3) Collaboration Hub - Expert Tune Up (Tier 2) Sites Site Asset Operations Centres (Tier 1) Continuous mines, safe delivery of plan Rapid, quality short interval decision making Drive on-going operational improvement Establish Newcrest ops plans and improvement priorities Shared context in real-time CVO performance will be underpinned by the company's integrated operating philosophy 30

Cadia Valley: long life, low cost, organic growth FY13 Production 400 to 500koz transition year Cadia East commercial production - rate steps-up Process stockpiles, RWD at 8mtpa Plants commissioned 5 years Increase production to 700 to 800koz gold plus 80 to 90kt copper 100% Cadia East ore Optimise cave performance Drive cash costs lower and stabilise capital Studies to drive 30 to 35mtpa processing 15 years Production sustained for 30+ years Broader province exploration options Near mine supplementary ore supply Seamless mining and processing factory Future mine Highly automated, high technology, low cost long life 31

Cadia Valley operations at the dawn of greatness The future is here 32