TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1

Similar documents
BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

ADDENDUM NO. TWO AB

Kansas Department of Transportation DISTRICT TE / TA-T043(301) Project(s): Min: Max:

Shallow IC of 5

Report to Council. Report: COR Date: 25 Jul 2016


ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

Tenders. Manitoba Infrastructure

Hospital Link Project Project Update September 2015

Riverside County Transportation Department Summary of Bids

TOWN OF OSOYOOS DIVIDEND RIDGE AND SPARTAN DRIVE/FUJI COURT STREET LIGHT INSTALLATION

Recommendation: THAT the Council of the Township of Centre Wellington award the following two tenders:

DATA BOOK IV : COST ESTIMATE

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB

Mainelli Wagner & Associates, Inc.

Off-Site Solutions. CPM Headwalls. Concrete for Life

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

The lowering of the existing watermain was added to the Catenary B Contract through a change

Application for Permit to Develop in a Floodplain Area

Mainelli Wagner & Associates, Inc.

City of Sarnia MEDIA RELEASE. Release of Four Reports from May 29, 2017 Agenda

Common Ground Drainage Channel Diversion. Design Report

Community Park Capital Project. February 6, 2017

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

Pond Decant Kit KIT INCLUDES

GARFIELD BRIDGE. Building A Bridge to No-Where

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)

MEMORANDUM VILLAGE OF NORTHBROOK

IP3 IP4 LP7 IP5 IP6 IP2 IP1. Phase 1

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

ADDENDUM 2 APPENDIX D STANDARD DRAWINGS

14.1.a. Attachment: Engineering Standards Manual Draft (2016 : Approval of the Engineering Standards Manual) Packet Pg. 216

Township of Centre Wellington Special Council Agenda Wednesday, July 12, :00 pm Council Chamber, 1 MacDonald Square, Elora Page

Third Parties/Crossing

Universal 10 x 27 Canopy

EAGLE RIVER UNION AIRPORT HANGAR CONSTRUCTION GUIDELINES Approved 1/29/2008

DRAFT. Dorabelle Campground Rehabilitation

TXT :250 1:500 Plan and Profile Drawings. Layer Description

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division

LAKE MOUNTAIN PRELIMINARY

APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS

PROJECT UPDATES February 1, 2018

CAMBRIDGESHIRE ROAD WORKS & EVENTS INFORMATION: SOUTH CAMBS

Second Street Improvements Project Project Update Archive

PROJECT UPDATES: March 15, th Street Water Tower Painting Project:

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

Members of the Administrative Staff Committee. Award of Tender T Trans Canada Trail Extension

July 5, Re: Contract ID Plan, & Proposal July 11, 2017 Letting. The Contractor is hereby advised of modifications to the bid documents.

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

REPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

Public Meeting Information Report Development Approval and Planning Policy Department

9' - 0" Locker Bay 237 SF. Elementary Reception 741 SF. Receptionist 82 SF. Work room 105 SF. In School Suspension 89 SF. Conference room 349 SF

Project Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon

Denver International Airport CONCOURSE B WEST GSE PAVEMENT REHABILITATION - PHASE I

APPENDIX F. Structural Design Report

Pallet Feet & Fittings SQUARE

VISTA AZUL- APPROVED 20 LOT TENTATIVE MAP

CONSTRUCTION COMMITTEE MEETING AGENDA

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

Building Permit Application

COATING AND STRUCTURAL CONCRETE COATING (ANTI-GRAFFITI) 1'-3" FINISHED GRADE 1'-3" 3" VENEER ALLOWANCE LEDGER W/ MECHANICAL ANCHOR BOLT

NORMACLAMP TORRO ASSEMBLY FIXTURE NORMACLAMP COBRA PNEUMATIC PLIERS NORMACLAMP FBS PNEUMATIC PLIERS TYPE S NORMACLAMP FBS PNEUMATIC PLIERS TYPE W

Part 8 Street lighting DISTRIBUTION CONSTRUCTION STANDARDS HANDBOOK

FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 CHECKLIST

MATERIALS AND PROCUREMENT DEPARTMENT 1900 YONGE STREET PAGE 1 OF 1 TORONTO, ONTARIO M4S 1Z2

Front Carport Design Standards, Requirements & Application

Photographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:

Project Management, Environmental Assessment, Stormwater Management. Hydrologic Modelling. Natural Heritage. Fluvial Geomorphology

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Tenders. Manitoba Infrastructure

Action Recommendation: Budget Impact:

The Owners of Strata Plan BCS3635 Council Meeting Agenda Jan 24, 2017

DEVELOPMENT PLAN REVIEW PROCESS and APPLICANT GUIDELINES

,271

Long water shutdown scheduled for Tuesday, September 18

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014

Dublin Airport Update Presented by Pat Molloy

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

DOWNPIPE AND FITTINGS. Including Clips, Brackets and Droppers

Required. When application not signed by owner Permit Fee V As per Fee By-law

Installation Instructions Traditional Awnings in a box Classic Awnings in a Box

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

MINUTES OF THE SEPTEMBER 26, 2018, MONTHLY MEETING OF THE BAYLES LAKE HOMEOWNERS ASSOCIATION

Garden Party 13ft X 13ft 12ft 9in Wide x 12ft 9in Deep x 6ft3in Side Height / 10ft4in Center Height

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

City of Redding Airports

City of Grand Island

Poly Shelters. Instruction Manual. Sunblocker Shade House 10' Wide x 30' Long SKU #1030SPC. Note: Photo may be of a different but similar model

CAUTION - NOTICE TO CONTRACTOR

PUMICE TRADE PRICE LIST 2013 UPDATED RANGE INCLUDING THE NEW CE APPROVED MAGNUM FIRECHEST. Part of the MONIER GROUP. April 2013

Construction Staging Adelaide Street West

DWV AND STORMWATER SYSTEMS. Fittings / Pipes

CITY OF PEMBROKE 2004 BUDGET. July 6, 2004

Abandoned Mine Sites Policy

Transcription:

TENDER NO. T-2170-2018 ADDENDUM NO. 1 SCHEDULE OF QUANTITIES AND PRICES REPLACE A revised copy of the Schedule of Quantities and Prices with changes bolded in red has been posted online (pdf attached). DRAWINGS: REMOVE Drawing No. 22475 Version No. 4 Mar 2018 Issued for Tender REPLACE Drawing No. 22475 Version No. 5 Apr 2018 - Re-issued for Tender; Storm Details Added A revised copy of the drawing set - IFT Westdale Sanitary Sewer Upgrade T-2170-2018- rev2.pdf is posted online, including the drawing replacement above. NOTE: Please acknowledge receipt of this Addendum No. 1 by returning a signed copy of this document to City of Nanaimo, Construction Department email constructioninfo@nanaimo.ca or fax 250-756-5336. Signature Company Name Date NOTE: Submit signed copy of this Addendum No. 1 with your tender submission and/or. Signature Company Name Date Date: 2018-APR-4

Section 2 General Conditions 2.1 Location of Works - Project Layout (Article 7) (not to exceed 5% of the total contract price) 1 lump sum Total Section 2 Section 3 General Requirements 3.1 Existing Structures and Utility Works (Section 3.70) a) Locate Existing Structures 3 ea b) Support Existing BC Hydro Pole 1 ea c) Support Existing TELUS/Hydro Ducts 1 ea 3.2 Control of Public Traffic (Section 3.73) 1 lump sum 3.3 Removal of Existing Pipe (Section 3.74) a) 150mm PVC 125 m b) 200mm AC 5 m c) 300mm Concrete (Addendum No. 1) 10 15 m 3.4 Removal of Existing Structures (Section 3.75) a) Manholes (Addendum No. 1) 1 2 ea b) Manholes (> 2m deep) (Addendum No. 1) 6 4 ea c) Sandbag Headwall (Addendum No. 1) 5 4 ea 3.5 Abandon Existing Manhole (Section 3.77) 2 ea Total Section 3 Section 4 Trench Excavation, Bedding and Backfill 4.1 Imported Granular Fill (Section 4.73) 4350 tonne 4.2 Surface Restoration (Section 4.76) UNTRAVELLED a) Seeding w/topsoil (100mm Depth) 450 m 2 b) Bark Mulch 4 m 2 c) Ditch Re-grading 20 m 2 TRAVELLED d) Clean Crushed Gravel (100mm thick, 19mm minus) 50 m 2 e) Driveway Chips (50mm thick) 25 m 2 f) 50mm Asphalt & 100mm Base 515 m 2 g) Asphalt Curb (CS-12) 75mm 1.5 m h) Concrete Curb & Gutter (CS-1) 115 m i) Asphalt Driveway, 50mm thick c/w 100mm base 10 m 2 j) Concrete Driveway, 150mm thick c/w 100mm base 6 m 2 TEMPORARY k) Cold Mix (50mm thick) 300 m 2 l) RAP (50mm thick) 215 m 2 Total Section 4 Page 1 of 4

Section 5 Water Distribution System 5.1 Watermain Pipe (Section 5.70) a) 200mm PVC DR-18 1 LS Total Section 5 Section 6 Sanitary Sewer System 6.1 Piping (Section 6.70) PIPING a) 200mm dia. PVC DR 35 115 m b) 250mm dia. PVC DR 35 121 m c) 300mm dia. PVC DR 35 11 m CAPS & PLUGS d) 100mm dia. (Addendum No. 1) 1 2 ea e) 200mm dia. (Addendum No. 1) 1 5 4 ea f) 300mm dia. (Addendum No. 1) 1 13 12 ea REDUCERS g) 100mm dia. x 150mm dia. VC/PVC Eccentric Reducer 1 ea 6.2 Service Junctions (Section 6.71) a) 100mm dia. (Addendum No. 1) 9 8 ea 6.3 Connections to Existing Piping and Appurtenances (Section 6.72) a) 100mm dia. 10 ea c) 200mm dia. 5 ea d) Tie-in to Existing Manhole 1 ea 6.4 Precast Manhole Sections (Section 6.73) a) 1050mm dia. 17 vm 6.5 Concrete Bases, Frames, and Covers (Section 6.74) a) 1050mm dia. 7 ea 6.6 Drop Structures (Section 6.75) 2.7 vm 6.7 Sewer Service Connection Piping (Section 6.79) a) 100mm PVC DR 28 60 m b) 150mm PVC DR 28 41 m 6.8 Service Connection Inspection Assembly (Section 6.80) a) 100mm dia. (Addendum No. 1) 14 10 ea Total Section 6 Page 2 of 4

Section 7 Stormwater Management 7.1 Piping, Fittings and Services (Section 7.70) a) 200mm dia. PVC DR 35 3 m b) 375mm dia. PVC DR 35 18 m 7.2 Service Junctions (Section 7.71) 7.3 Connections to Existing Piping and Appurtenances (Section 7.72) b) 200mm dia. 1 ea c) 375mm dia. Addendum No. 1 4 ea 7.4 Service Connection Piping (Section 7.80) a) 100mm dia. Addendum No. 1 5 m 7.5 Service Connection Inspection Assembly (Section 7.82 7.6 Catchbasins SW-1 (Section 7.74) Addendum No. 1 1 ea Total Section 7 Page 3 of 4

SUMMARY SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 SECTION 7 SUBTOTAL GST TOTAL CONTRACT: NAME OF COMPANY: SIGNATURE OF SIGNING OFFICER: DATE: Page 4 of 4