Rochester Genesee Regional Transportation Authority

Similar documents
New System. New Routes. New Way. May 20, 2014

PLEASE READ Proposal for Sustainable Service

(This page intentionally left blank.)

Chapel Hill Transit: Short Range Transit Plan. Preferred Alternative DRAFT

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

Presentation Outline

METROPOLITAN EVANSVILLE TRANSIT SYSTEM Part I: Comprehensive Operations Analysis Overview July 9 th, 2015 Public Information Meeting

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

COMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer)

TORONTO TRANSIT COMMISSION REPORT NO.

Service Change Plan Cowichan Valley Regional Transit System July 2018 Expansion. Prepared by

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

North Shore Coordination Plan. Steering Committee Meeting #5 November 28, 2017

DEMOGRAPHICS AND EXISTING SERVICE

Title VI Service Equity Analysis

SAN LUIS OBISPO TRANSIT + SAN LUIS OBISPO RTA JOINT SHORT RANGE TRANSIT PLANS: SERVICE STRATEGIES. Presented by: Gordon Shaw, PE, AICP; Principal

Ozaukee County Transit Development Plan

Draft SamTrans Service Plan Public Outreach Presentation

Public Meeting. December 19 th, 2018

Central Oregon Intergovernmental Council

Existing Services, Ridership, and Standards Report. June 2018

METROBUS SERVICE GUIDELINES

#1. Why is the City doing this project?

GCTD Technical Advisory Committee (TAC) 10:00 a.m. - Wednesday, July 18, 2018 Gold Coast Transit District - Board Room.

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

LODI CITY COUNCIL Carnegie Forum 305 West Pine Street, Lodi

Prior to reviewing the various performances of Red Apple Transit, it is important to point out some key terminology, including:

Study Overview and Context

Annual Route Report Operating Data. Prepared for: Board of Directors. Final 4/26/2018

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

Corridor Analysis. Corridor Objectives and Strategies Express Local Limited Stop Overlay on Local Service 1 Deadhead

HOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING

Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL HKS I Urban Design Studio

Service Recommendation Plan. June 2018

Improving Transit Service to Major Music Festivals

Demand-Responsive Transportation in the TCQSM

Riders Advisory Council Rail Subcommittee April 9, 2008

Chapter 3. Burke & Company

Public Transit Services on NH 120 Claremont - Lebanon

Bristol Virginia Transit

Restoration of Historic Streetcar Services in Downtown Los Angeles

October 12th 2015 DRAFT Service Implementation Plan

Metrobus Service Evaluations

RACINE COUNTY PUBLIC TRANSIT PLAN:

Accessibility at Autograph exhibitions and events

Berkshire Flyer Working Group. February 13, 2018

Kitsap Transit Board Workshop January 16, 2018

Lessons Learned from Rebuilding the Muni Subway Schedule Leslie Bienenfeld

LA Metro Rapid - Considerations in Identifying BRT Corridors. Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California

Approval of August 2019 Service Changes

Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives

MERRIMACK VALLEY REGIONAL TRANSIT AUTHORITY (MVRTA) PERFORMANCE MEASURES: FIXED ROUTE

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

// Atlanta Streetcar System Plan

DRAFT Fare Increase Proposal Spokane Transit Authority. Public Outreach April June 2016

CITY OF BILLINGS MET PLUS. A Guide for Riders, Operators, Agencies.. Contact Numbers. Passenger Handbook

New free City connector bus service

Plaza Park, Village Park, and Community Clubhouse

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.

I-95/395 HOV/Bus/HOT Lanes Project Overview

CHERRIOTS 2018 SERVICE PLAN 1

This report recommends routing changes resulting from the Junction Area Study.

Title VI Service Equity Analysis

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

Service Summary. Winter Service Change Highlights WINTER 2019 CHANGES TRIP LEVEL DETAIL. Victoria Regional Transit Commission

Montgomery Area Paratransit Guide

Creating Sustainable Communities Through Public Transportation

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

September 2019 Service Revisions

Community Feedback and Survey Participation Topic: ACCESS Paratransit Services

Att. A, AI 46, 11/9/17

COLTS Complementary ADA Paratransit Service. Special Efforts Accessibility Transportation Service (SEATS) SEATS Trip Tips (570)

COLT RECOMMENDED BUSINESS PLAN

ROUTE 110. St. Albans Downtown Shuttle ROUTE OVERVIEW

2017 Annual Service Plan

Fixed-Route Operational and Financial Review

Resort Municipality Initiative Annual Report 2015

January 14, Orange County Transportation Authority Attn: M2 NCCP/HCP 550 South Main Street P.O. Box Orange, CA

DC Circulator Service Changes. Implementation Plan for June 24, 2018

1. Call to Order/Introductions

284,557 inhabitants + 23% 60,000 vehicles during peak periods Growing need in terms of moving people public transit Saturation of the road network

PROPOSED FOR IMPLEMENTATION

THE ECONOMIC IMPACTS OF AIRPORTS

Paratransit Bus Services Guide

Intercity Transit Short / Long Range Plan Short-Term Recommendations Transit Authority Meeting

Recommendation on bus/rail bus/rail experiments #78 Montrose Bus Six University of Chicago bus routes Six Westside/W est estside/w Suburban

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Imagine the result. Bus Rapid Transit Feasibility Study. Laredo Urban Transportation Study. August 31 st, 2011

Pinellas Suncoast Transit Authority Community Bus Plan

Introduction DRAFT March 9, 2017

EXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION

Valley Metro Construction Projects Update. Transportation Coordinator (TC) Webinar December 12, 2018

The Atlanta Streetcar: Laying the Tracks for a Better Future

September 2011 Service Reductions

DRAFT PLAN & DRAFT EIR

TORONTO TRANSIT COMMISSION REPORT NO.

DRAFT Appendix A Appendix B. Planning Process & Public Participation

SCTA TRANSPORTATION DEVELOPMENT PLAN UPDATE DRAFT RECOMMENDATIONS

Kenosha County Transit Development Plan:

Bus Corridor Service Options

Transcription:

Rochester Genesee Regional Transportation Authority Public Hearing RTS Routes 10 & 15 April 3, 2012 Presenter: Dan Kenyon Transportation Planner

Commenting at the Public Hearing Individuals wishing to speak at the public hearing must register. Individuals will be called in the order they are registered. Comments are limited to 3 minutes to assure that all have the opportunity to comment; additional written comments can be submitted following the hearing. Questions and comments will be responded to in writing. Comments and responses will be posted on the RGRTA website. All verbal and written comments will be included in the public record.

Exciting Changes First major route structure change in 30+ years Platform for future growth New service adjustment strategy

Route 10 & 15 Project Purpose & Goals Enhance customer experience by increasing reliability Increase customer connections to desired destinations Address consistent increased ridership for Route 10 Reduce customers being passed up due to full buses Improve RTS On Time Performance Evaluate Route 15 due to geographical overlap with Route 10 (North of Ridge Road). Identify specific low ridership areas on Route 15

Route 10 Service Challenges Constant increase in overall ridership Boardings in February 2011 = 116,000 customers Boardings in February 2012 = 131,000 customers Increase in customer pass ups Decrease in On-Time Performance City of Rochester Street Improvement Program on Dewey Avenue Opening of New Walmart Supercenter at Northgate Plaza

Improvement & Evaluation Process Reviewed ridership data Bus operator feedback Customer survey & community outreach Current & previous route structure and service area Field work Land use review Impact Analysis Rochester City School District Lift Line (Paratransit Service)

Route 10 & 15 Customer Outreach On bus surveys conducted by RTS Customer Service Representative Customers responded favorably to having consistent service to the New Walmart at Northgate Plaza Customers expressed a desire to be connected to retail destinations at Mt. Read Blvd. & Maiden Lane Ted B. A valued Route 10 Customer

Overall Route 10 Project Overview - Maps Project Area: North of West Ridge Road Town of Greece Route 10 - Current Route 10 - Current & Proposed Route 15 - Current Route 15 - Current & Proposed Night & Weekend Route Segments

Note: Current Route 10 operates North of Ridge Rd. during mid-day & evening. Also runs on weekends.

Frequency Route 10 ROUTE TIME PERIOD CURRENT PROPOSED 10 North of Ridge 10 South of Ridge 5:00 am 9:00 am None 40 minutes 15 minutes 15 minutes 10 North of Ridge 10 South of Ridge 9:00 am 3:00 pm 60 minutes 40 minutes 25 minutes 20 minutes 10 North of Ridge 10 South of Ridge 3:00 pm 6:00 pm None 40 minutes 10 minutes 10 minutes 10 Night 67 minutes 67 minutes

Note: Current Route 15 operates North of Ridge Rd. in AM & PM rush hours only on 2 segments. Does not run on weekends.

Frequency Route 15 ROUTE TIME PERIOD CURRENT PROPOSED 15 5:00 am 9:00 am 40-50 minutes 60 minutes 15 9 am 3:00 pm None 120 minutes 15 3:00 pm 6:00 pm 30 minutes 60 minutes 15 Night None None

Night and Weekend Service No Frequency Changes English Rd. - Affinity Pattern Dewey - Latta Loop Pattern

There will be NO Lift Line Impact Insert map of Route 15 single trip that accomplishes this goal

Moving Forward RGRTA Board of Commissioners will review all comments at May 2012 meeting. Pending board approval, proposed route structures will be changed June 25, 2012. Customers will be notified of new route structures, if approved.

Thank You We appreciate your attendance, input and continued interest in the services provided by the Rochester Genesee Regional Transportation Authority

Written Comments Mail: RTS Routes 10 & 15 Public Hearing c/o RGRTA 1372 East Main Street Rochester, NY 14609 Email: rts.customerservice@rgrta.com Subject: Routes 10 & 15 Public Hearing Comments must be received by April 10, 2012