Capital Markets Day 10 January 2013

Similar documents
Pareto s annual Oil & Offshore Conference: Presentation of Kværner ASA Jan Arve Haugan, President & CEO

Nordic Energy Summit, Oslo Jan Arve Haugan, President & CEO

Aker companies investor day, London Jan Arve Haugan, President & CEO Eiliv Gjesdal, CFO

Capital Markets Day 10 January 2013

Capital Markets Day 10 January 2013

Growth and strategic development. 3 January 2019

Contents CONCRETE SUBSTRUCTURES ONSHORE FACILITIES STEEL JACKET SUBSTRUCTURES STRUCTURES

INTSOK 12 th Annual Russian-Norwegian Oil & Gas Conference

Kvaerner s yard at Stord. 19 March 2018 Steinar Røgenes, EVP EPCI

2nd quarter 2005: Status and outlook

Summary. Kvaerner s Investigation Report. Fatal accident at Stord, Norway 7 March / 5

3rd Quarter 2004: Status and outlook

Aker ASA and Aker Drilling ASA

4th quarter results February 2012

Annual General Meeting

1st quarter 2005: Status and outlook

Conference Philip Adkins (CEO) Cristijn Sarvaas (CFO) September 2008

Attitude is everything since 1841

Second Quarter 2016 Presentation

Win-win-win: LANXESS sells stake in Rubber Good for LANXESS, good for ARLANXEO, good for Saudi Aramco

December Prosafe orders harsh environment semisubmersible

Succeeding with Entry into Service MRO Europe: Engineering & Maintenance

Aker Kværner ASA 4th quarter and preliminary annual results 2007

Aker Status and outlook January - June 2008

4 Rights and duties in connection with the conduct of petroleum activities

LEPN license map Producing fields

Saudi Aramco and LANXESS to form a global synthetic rubber powerhouse

Saudi Aramco and LANXESS to form a global synthetic rubber powerhouse. Matthias Zachert, CEO Michael Pontzen, CFO

E BOUGHTON ROAD

Licensing rounds and awards

CONSIGNMENT FOR SALE AGREEMENT FOR THE 2015 HEDLAND ART AWARDS

2Q 2013 presentation Oslo, 11 July 2013

Maintaining a success

Maintenance Cost Estimation Method of an Aircraft Manufacturer

GATWICK AIRPORT LIMITED

More mobility for the world. Services for the Airbus A320. Family business NEW

CAMO. Continuing Airworthiness Management & Maintenance Management Service

DOF ASA 1Q Presentation

Maintaining the dream

Flying in a new dimension

Kinross acquires mining rights to land adjacent Fort Knox mine, adds more than 2 million ounces to mineral resource estimates

Interim Business Report 2017

Operating lease of 50 new MC aircraft. Annual General Meeting of Shareholders Moscow 25 June 2018

Parques Reunidos Expands to Australia with the Acquisition of Wet n Wild Sydney July 2018

information memorandum Business and Technology Precinct Westlink Green Darra

Half Year F1 Results. November 4, 2015

CapitaMalls Asia Limited Asia s Leading Mall Developer, Owner and Manager Singapore China Malaysia Japan India

JAL Group Q1 Account Settlement for FY2006

More mobility for the world. Subline for division or product. Overline 12pt

Meeting the Management 2017 Structurally improving the financial profile. Michael Pontzen, CFO

Asia Pacific Regional Aviation Safety Team

Ship Scrapping - Market Pressures. IMSF Oslo Foteini Kanellopoulou, Senior Analyst 23 May 2012

What s happening in the arctic 2017?

Inmarsat GADSS Solutions Global Aeronautical Distress and Safety System

ATLAS HOUSE THE MALL BROMLEY

Q3 FY18 Business Highlights

Oil and Gas Capabilities

Our local knowledge teamed with our global expertise provides our customer base with the complete heavylift and transportation solution across

(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY

VIEWPOINT JANUARY Japan Hotel Market Outlook

For personal use only

INFLIGHT INTERNET ANYWHERE

Wintershall K10-B Decommissioning Case Study. Sven Vandamme, Scaldis Salvage & Marine Contractors

AUSIMM - Technical Meeting & AGM

AerCap Holdings N.V. April 11, 2015

City of Kingston Report to Council Report Number

Minara Resources Limitedit Sydney February Peter Johnston

PLEASE READ CAREFULLY BEFORE USING THE Qantas Cash App

Presentation on Results for the 1st Quarter FY Idemitsu Kosan Co.,Ltd. August 14, 2017

LAGUNA ISLES DEVELOPMENT

HY 2016 Results February 2016

Cebu Air, Inc. 2Q2014 Results of Operation

Tradition and innovation

Wärtsilä Scrubber Retrofit

Global Commercial Aircraft MRO Market (Maintenance, Repair & Overhaul ):

BAA (SP) Limited Results for six months ended 30 June July 2011

Cebu Air, Inc. 4 th Quarter and Full Year 2017 Results of Operations. cebupacificair.com

WORLD LARGEST VISITS SINGAPORE

Financial Position (consolidated)

Presentation on Results for the 3rd Quarter FY Idemitsu Kosan Co.,Ltd. February 2, 2016

PIKE INDUSTRIAL PARK. 423 Hopewell Road Waverly, Ohio INDUSTRIAL SPACE AVAILABLE. ONNO STEGER Director of Real Estate

Jason Marine, provider of integrated solutions of marine communication, navigation and automation systems, launches IPO

Citigroup Investor Conference October 2010

BASELINE GROUP (PERSONNEL) PTY LTD

Icelandair Group A Brief Introduction. Magnús Þorlákur Lúðvíksson, Business Development March 2017

Airbus. Tom Enders Airbus. 15 & 16 December 2011

Investor Presentation Q2 2011

MANASSAS REGIONAL AIRPORT

THAI AIRWAYS INTERNATIONAL PCL

POLICIES & PROCEDURES

Second Quarter 2004 Teleconference

BD 1 PROJECT. A TWO-YEAR MARATHON JOURNEY Page 6 PTSC M&C- No SU TU TRANG PROJECT TOP 500 LARGEST VIETNAM ENTERPRISES

Presentation on Results for the 3rd Quarter FY Idemitsu Kosan Co.,Ltd. February 14, 2019

Wizz Air aims to increase market share with F17 capacity growth of 20% Q3 passenger growth of 20%, Load Factor of 88% (+2.3ppt)

Double Win for Liberty Industrial at World Demolition Awards

Global Business Jet Market: Industry Analysis & Outlook ( )

Leica CE/ Leica CN. Knife holder

MARITIME. Protect Your Assets. Lay-up seminar MOU - CEFOR. Dec. 2016, Oslo, Ungraded SAFER, SMARTER, GREENER

ENVIRONMENT ACTION PLAN

Benefiting from Aker Arctic Expertise recent Vard Marine projects

Transcription:

Capital Markets Day 10 January 2013 Time Topic Speaker 09.00 Introduction Jan Arve Haugan, President & CEO 09.20 Concept / Front End, Engineering and Procurement Janne H. Rasten, EVP Project Support Tony Allen, EVP International 09.55 Construction Sverre Myklebust, EVP Jackets Tony Allen, EVP International Jim Miller, EVP E&C Americas 10.35 Q&A part I 10.45 Break 11.00 Completion and Decommissioning Lars Eide, EVP North Sea 11.15 Arctic opportunities Bjørn Gundersen, EVP Concrete Solutions 11.35 Financial update Eiliv Gjesdal, CFO 11.55 Summary and Q&A part II Lunch

Copyright and disclaimer Copyright Copyright of all published material including photographs, drawings and images in this document remains vested in Kvaerner and third party contributors as appropriate. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior permission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction. Disclaimer This Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to differ. These statements and this Presentation are based on current expectations, estimates and projections about global economic conditions, the economic conditions of the regions and industries that are major markets for Kværner ASA and Kværner ASA s (including subsidiaries and affiliates) lines of business. These expectations, estimates and projections are generally identifiable by statements containing words such as expects, believes, estimates or similar expressions. Important factors that could cause actual results to differ materially from those expectations include, among others, economic and market conditions in the geographic areas and industries that are or will be major markets for Kvaerner s businesses, oil prices, market acceptance of new products and services, changes in governmental regulations, interest rates, fluctuations in currency exchange rates and such other factors as may be discussed from time to time in the Presentation. Although Kværner ASA believes that its expectations and the Presentation are based upon reasonable assumptions, it can give no assurance that those expectations will be achieved or that the actual results will be as set out in the Presentation. Kværner ASA is making no representation or warranty, expressed or implied, as to the accuracy, reliability or completeness of the Presentation, and neither Kværner ASA nor any of its directors, officers or employees will have any liability to you or any other persons resulting from your use. 2

Completion and Decommissioning Lars Eide, EVP North Sea Capital Markets Day 10 January 2013

Completion Installation and hook-up Commissioning and start-up Offshore installation & hook-up Onshore installation & hook-up Commissioning Pre start-up Start-up Gjøa Offshore hook-up Kollsnes Onshore hook-up Aker Spitsbergen & Barents Commissioning & sea-trials TCM Commissioning and start-up 4

Kvaerner has been pursuing the installation and hook-up market for decades Examples of installation and hook-up projects Statfjord A Oseberg A Gullfaks C Draugen Snorre A Troll A Njord A Oseberg Sør Eldfisk 2/7 E Valhall IP Kristin Gjøa 5

Kvaerner is now preparing the installation and hook-up activities for Edvard Grieg and Eldfisk Edvard Grieg offshore hook-up Commissioning assistance Contract value of NOK 500 million Edvard Grieg Jacket Edvard Grieg topside and jacket Saipem S-7000 heavy lift 6

Onshore installation and hook-up Kvaerner has been offering installation and hook up services to several onshore facilities through history Currently the Nyhamna EPCm project is being executed Trenger bilde i høytere kvalitet Strategy to pursue these jobs jointly with partners Nyhamna Installation is an integrated part of our EPC delivery and would not be pursued on a stand alone basis Kollsnes 7

Kvaerner has experience-based commissioning capabilities including tools and procedures Full commissioning scope Provided key personnel Eldfisk 2/7 E Valhall IP Snorre B Njord A Oseberg Øst Navion Munin Visund Aasgard A Oseberg Sør Aasgard B Aker Spitsbergen Aker Barents TCM Mongstad Kristin Fram Vest Kårstø KEP 2005 Grane Topside Grane Drilling Snøhvit LNG Gjøa Kollsnes KOP EPC Kvaerner can take responsibility for the full commissioning scope or provide key personnel to projects, also projects where Kvaerner has not had the EPC 17.06.2011 8 Kvaerner 2011

Decommissioning TOGI being lifted onto quayside at Eldøyane, Stord Troll Oil and Gas Injection (TOGI) decommissioning project 9

Kvaerner present in the low risk segments of the decommissioning market Offshore preparations Offshore removal and transport Onshore deconstruction and disposal Kvaerner s involvement Hazardous material studies and assistance work possible vehicle for early positioning for onshore disposal Total supplier of inshore and onshore deconstruction and disposal 10

Onshore deconstruction and disposal operations performed at Eldøyane site Stord fabrication yard Eldøyane disposal site Kvaerner has a specialised decommissioning team and nearly 20 years track record The Eldøyane disposal site is developed to accommodate deconstruction and disposal activities. All work is performed with care for personnel and environment Typically more than 98% of the materials are reused or recycled 11

Different approaches to the NCS and UKCS markets NCS: Targeting all structures Northern UKCS: Targeting larger structures installed at water depths >60 m 12