William Clay Ford ready for launch [DC]

Similar documents
Who is the Oldest Grand Lady of the Great Lakes?

William G. Mather being launched at River Rouge [DC]

Edgewater docked at Ford s Rouge Plant for the first time 1931 [DC] Orion at Zug Island on the old Rouge River c1952 [DC]

Adam E. Cornelius on the Detroit River [PW]

Red Lilly (all details are about)

Bulk Singapore (all details are about)

Port dues and charges Free port of Ventspils

NOMADIC. Tender to TITANIC. Synopsis

PRESS RELEASE WRECK REMOVAL OPERATION OF M/V GOODFAITH, ANDROS ISL. GREECE

N. S. Savannah History and Decommissioning Status

Great Lakes/ Great Ships. Language Arts/Social Studies

We can offer following LPG Tanker, about 1,663 DWT, built 1985;

McDougall s. Dream. By Ric Mixter

FPMC INMARSAT number (Bridge), (Cabin) 1.16 Ship's address

thirty-eight crewmen were lost. Mr. Anthony A. Raven was president of the American Bureau of Shipping from 1898 to Robert M.

Sunken Barge ARTHUR J & Tug MADISON Case Study. LCDR Chico Knight, DBA, M.S.

The History of the tug Cruden Bay

Serving the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service

Exploration Updates. Spring Issue 1

HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH

Ohio Freight Conference Great Lakes Commercial Navigation

352ft RORO Passenger/Car Ferry Listing ID: 4156

AOM Elena (all details are about)

In this presentation you will find about: Who we are Our Activities & Services Some of our Customers Our Certificates Contact us

Corroded pipe causing oil spill

SOLD - 404mt dwt Cargo Vessel Listing ID:

Archive Fact Sheet: Guinness Ships

Marine Transportation Safety Investigation Report M17P0406

Case Study 9 MSC CARLA Complete Hull Failure in a Lengthened Container Vessel

Lecture 11. Container Ships

ENGINEERING AND TECHNICAL CHALLENGES IN LNG CONVERSIONS. 1 Wärtsilä

The History of the tug Cannis

Number 162. Underwater bow thruster replacement in harsh conditions Fast underwater hull repairs save time and money for ship owners..

ASL Marine Holdings Ltd.

68' (20.80m) CANTIERE NAUTICO VZ

56m Multipurpose Vessel / Icebreaker Listing ID:

The Last Years of Sun Ship

S.S. EDMUND FITZGERALD

HERMAN EIJKELENBOOM. Suite K 5 th Floor East Hope Plaza 1777 Century Avenue Pudong Shanghai, P.R. China

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

Validity: indefinitely

BRAMBLE. 180' (54.86m) ZENITH DREDGE CO.

OCIMF Report Template OVID OVPQ

Coastal vessels The number of insurance accidents and accident rate fluctuation 8.0%

NINTH ORDINARY MEETING OF THE OSC 9/8/3 RAC/REMPEITC-Caribe STEERING COMMITTEE 31 May 2018

86' (26.21m) Cantiere delle Marche

The 3 platforms are called Tchatamba-A (MOPU), Tchatamba South and the Tchatamba West and the FSO is called MADIELA and is owned by MODEC.

HARBOR INFRASTRUCTURE INVENTORIES Duluth-Superior Harbor, Minnesota/Wisconsin

m.v.vendome IMO , O.N

MARITIME AND PORT AUTHORITY OF SINGAPORE SHIPPING CIRCULAR NO. 3 OF 2014

2- Pilotage Cost Tonnage. 1- Pilotage Cost Tonnage. Currency

Extensive doubler plate repair in Ivory Coast allows bulker to sail after collision


Vessel s name: MV TANAIS DREAM

Cantiere delle Marche Darwin Expedition Yacht STELLA DEL NORD. DEL NORD Yacht. Denison Yacht Sales

Cowanshannock getting final paint scheme Ashtabula [DC]

HUDSON LEADER. Classification society: American Bureau of Shipping. Recognized Organization: American Bureau of Shipping

ATLANTIC / ARNGAST Collision in the DW route east of Langeland, Denmark, 4 August 2005

102' (31.09m) Cantiere delle Marche

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

Class Entry for Existing Ships

Alexandria Port, Egypt

the foss seattle shipyard helping you succeed in a competitive market

TALVESADAM Port rules

MV ANSCHÜTZ FOR SALE

Globus Maritime Limited Trading Update and Financial Highlights for the Three Months and Nine Months Ended September 30, 2007.

TARIFF OF HARBOUR DUES

TITANIC a Human Performance Case Study

Casualty Incident Report

CSL WORLDWIDE. 11 Conversation with Gerry Carter. 10 A Typical Day at Chengxi Shipyard. 2 Message from Rod Jones

Lake Elizabeth at Boston 03/19/1920 [HCGL]

NO PHOTOS. Resolute just after launch Ashtabula 1916 [RR] Resolute on the East coast [HCGL]

The History of the tug Polmear

TARIFF PORT: RIO HAINA

INCIDENTS INVOLVING THE IOPC FUNDS 1992 FUND

112ft 1983 Benetti Custom Lloyds M.Y.

AZ MARINE OFFSHORE SERVICES PTE LTD. Safety Rules & Regulations for Compliance by the Ship s Crew

ANSWER to the Exercise of Completion of Summary

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

748 Ramirez Avenue Phone: Florida 32159

(1) The keywords from the statements are marked yellow. (2) The paragraphs that you should do close reading are: PARAGRAPHS D, G, H, I, J, K

Directions Governing Ship Mooring Operations of Taichung Port

00- Was One Person Responsible for the Titanic Disaster- Preview of Tim

DOCKING AND ROUTING PLAN

Marine Protection Rules Part 141 Ship Design, Construction, Equipment and Operation Noxious Liquid Substances in Bulk

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

Summary Report. Contact with Wharf General Villa. 5 March 2006

TRINIDAD OFFSHORE CALLING INSTRUCTIONS

Barge and Tug Fleet. Construction of the BC

SMIT INTERNATIONALE (GABON) S.A. Part 2 Left : The 1975 build Makokou seen here departing from Port Gentil.

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Shipping Industry. Advances in the 19th Century INTRODUCTION

SHIPBUILDING INDUSTRY

Marine Exchange of Alaska Port of Juneau Navigation Study

Her Story: Flag: Rig: Homeport: Sparred Length: Length Overall: Draft: Beam: Rig Height: Sail Area: Displacement: Crew:

Lennusadam Marina (Seaplane Harbour) Marina Rules

Suez Canal Transit. Characteristics of the current canal lengths

REPORT INTO THE FIRE AND SUBSEQUENT GROUNDING OF THE MV "PATRIARCH" ON 1ST SEPTEMBER, 2004

TECHNICAL & TACTICAL INFORMATION

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Transcription:

300 HULL NUMBER William Clay Ford ready for launch [DC] Lake Bulk Freighter built at the River Rouge yard in 1953 as a) WILLIAM CLAY FORD (1) (US.266029). Her keel was laid April 7, 1952 and launched on May 5, 1953 for the Ford Motor Co., Dearborn, MI. Dimensions: 647 loa, 629 3 lbp x 70 x 36 ; 11,590 GRT, 8590 NRT, 22,800 dwt. Powered by a 7,700 shp double reduction geared cross-compound steam turbine built in 1953 by Westinghouse Electric Co., Philadelphia, PA, and two oil-fired water tube boilers. This ship was the last of the Pittsburgh or AAA class, similar to the ANDERSON, RESERVE, CALLAWAY and CLARKE, built (at a cost of $5.3 million) on the Great Lakes. The WILLIAM CLAY loaded her first cargo of iron ore at Superior, WI on August 6, 1953 to be delivered to her home port at the Ford Rouge Plant south of Detroit, MI. A 800 hp Liaaen bow thruster, built by the Avondale Shipyard in New Orleans, LA, was installed during the summer of 1963 by the Fraser-Nelson Shipbuilding & Dry Dock Co., Superior, WI. During the winter of 1965-66, her boiler controls were automated at Detroit. Between the 1967-68 seasons the Ford fleet stacks were changed from buff colored with a black band to Ford blue with the elliptical Ford logo. A self-contained sanitary system was installed on board over the winter of 1970-71 at the Ford Rouge slip. The work was accomplished by both Ford and Nicholson Terminal & Dock personnel. This was done in compliance with the Michigan Pollution Act of 1970, which became effective January 1, 1971, prohibiting the discharge of untreated sewage into the Great Lakes. A pump-out station was installed at the Rouge to service the Ford boats. The night the EDMUND FITZGERALD disappeared on November 10, 1975 during a gale-force storm the crew of the WILLIAM CLAY FORD did an extraordinary act. Because of the bravery and valor demonstrated that night by Captain Don Erickson and his crew, they were presented with many accolades including a plaque bestowed upon them by the Great Lakes Maritime Institute recognizing her role in the search for the EDMUND FITZGERALD. It read On the night of November 10-11, 1975, these men voluntarily left a safe harbor to face the dangers of gale force winds and vicious seas, in the blackness of a storm which had already claimed as a victim the steamer EDMUND FITZGERALD, to search for possible survivors of that disaster, exemplifying the finest traditions of the maritime profession.

The WILLIAM CLAY s hull was lengthened 120 feet in 1979 by Fraser Shipyards at Superior, WI, the ninth stretching done at Fraser. New dimensions: 767 loa, 749 3 lbp x 70 x 36 ; 14,630 GRT, 11,629 NRT. A stern thruster was also installed at this time. This lengthening, which increased her mid-summer carrying capacity from 21,000 to 26,500 tons, was completed in May, 1979 and she returned to service on June 2, 1979. Her ownership was transferred to the Rouge Steel Corp., Dearborn in 1984. The WILLIAM CLAY FORD (1) loaded her last cargo at Duluth, MN. December 11, 1984. She passed by Detroit and into the Rouge Basin on her final trip and laid up December 14th. In 1985 she was renamed b) US.266029 her US official number. This became necessary due to the purchase of two Cleveland-Cliffs boats, the WALTER A. STERLING which became the WILLIAM CLAY FORD (2) and the EDWARD B. GREENE, which became the BENSON FORD (3). The US.266029 departed her lay-up berth at the Rouge slip on August 20, 1986 in tow of Gaelic tugs and taken to Detroit Marine Terminals on the Rouge River, where her pilothouse was removed to be displayed at the Dossin Great Lakes Museum on Detroit s Belle Isle. The hull was moved to Nicholson s River Rouge dock on August 27th. Then she was towed from there November 6, 1986 by tugs TUSKER and GLENADA to Port Maitland, ON for scrapping there by A. Newman & Co. in 1987. On April 3, 1991 the pilothouse was moved by barge, towed by Gaelic tug s CAROLYN HOEY, and placed on a specially built foundation at the Dossin Museum for display facing the Detroit River as a fully equipped pilothouse. William Clay Ford being launched [DC]

William Clay Ford at shipyard being fitted out [SMMC] William Clay Ford with tan stack on the St. Marys River [PW] William Clay Ford with blue stack entering Cleveland 11/1977 [SM]

William Clay Ford in Rouge Steel colors off Port Huron 11/03/1984 [JM] William Clay Ford pilothouse on the Rouge River being moved to Dossin Museum 04/03/1991 [SM] William Clay Ford pilothouse at Dossin 05/11/1991 [SM]

301 HULL NUMBER Edmund Fitzgerald is ready for launch [SM] Lake Bulk Freighter built at the River Rouge yard in 1958 as a) EDMUND FITZGERALD (US.277437). Hull 301 s keel was laid on August 8, 1957 and launched June 7, 1958 for the Northwestern Mutual Life Insurance Co., Milwaukee, WI and bareboat chartered to Columbia Transportation Co. (Oglebay Norton & Co.), Cleveland, OH. Dimensions: 729 loa-711 lbp-75-39 ; 13,632 GRT, 8713 NRT, 26,600 dwt. Powered by a 7500 shp Westinghouse Electric cross-compound steam turbine and two coal-fired water tube boilers. Sea trials occurred on September 13th, and she was commissioned on September 22nd. The FITZGERALD arrived at Silver Bay, MN September 24, 1958 on her maiden voyage where she loaded 20,000 gross tons of taconite pellets for Toledo, OH. She was the largest bulker on the Great Lakes at the time she entered service. A Bird-Johnson diesel powered bow thruster was installed in 1969. The FITZ collided with the Canadian steamer HOCHELAGA at the mouth of the Detroit River, May 1, 1970, suffering slight damage at hatches 18 and 19. During the 1971-72 winter lay up at Duluth, MN, she was converted from coal to oil-fired boilers which were automated at that time, and the fuel tanks were installed in the space that was occupied by the coal bunkers. Also a fire fighting system and a sewage holding tank were installed at that time. Minor cracking at the keelson to shell connection was repaired by installing additional stiffening on the keelson in 1970 and additional welding was required in 1973-74. The EDMUND FITZGERALD foundered on Lake Superior during a severe storm November 10, 1975 at approximately 7:10 pm about 17 miles north-northwest of Whitefish Point, MI in Canadian waters. The FITZGERALD was running downbound loaded with 26,116 tons of taconite ore pellets from Superior, WI for Zug Island in River Rouge. During the height of the storm, winds reached 55 knots (though gusts to 75 knots were recorded) from the north-northwest and quartering 25 foot waves careened over her deck decreasing her normal 12 feet of freeboard to nothing. Tons of water would have submerged her spar deck especially as water would have piled up behind her forward deckhouse and challenged her buoyancy, exasperated by the 15 sheer strake that trapped water. Her sinking was so quick that no radio message was given though she had been in frequent visual and radio contact with the trailing steamer ARTHUR M. ANDERSON, which had gotten as close as 10 miles from the doomed vessel. The FITZGERALD disappeared from sight in a furious snow squall and then from radar. Captain McSorley of the FITZ had indicated he was having difficulty and

Edmund Fitzgerald just entering launch way slip [PW] was taking on water. She was listing to port and had two of three ballast pumps working. She had lost both of her radars, damage was noted to ballast tank vent pipes and he was overheard on the radio saying, don t allow nobody (sic) on deck. McSorley has stated it was the worst storm he had ever seen. All 29 officers and crew, including a Great Lakes Maritime Academy cadet, went down with the ship, which lies broken in two large sections in 530 feet of water. Surveyed by the US Coast Guard in May, 1976 using the US Navy CURV III system (an unmanned, deep-diving vehicle controlled from the surface), the wreckage consisted of an upright bow section, approximately 276 feet long, an inverted stern section, about 253 feet long, and a debris field comprised of the missing 200-foot midship section. Both sections lie within 170 feet of each other. The EDMUND FITZGERALD was removed from documentation January, 1976. The National Transportation Safety Board unanimously voted on March 23, 1978 to reject the US Coast Guard s official report supporting the theory of faulty hatches. Later the NTSB revised its verdict and reached a majority vote to agree that the sinking was caused by taking on water through one or more hatch covers damaged by the impact of heavy seas over her deck (The No. 1 hatch cover was entirely inside the No. 1 hatch and showed indications of buckling from external loading.). This is contrary to the Lake Carriers Association s contention that her foundering was caused by flooding through bottom and ballast tank damage resulting from bottoming on the Six Fathom Shoal between Caribou and Michipicoten Islands. The US Coast Guard, report on August 2, 1977 cited faulty hatch covers, lack of water tight cargo hold bulkheads and damage caused from an undetermined source. Edmund Fitzgerald stretches launch restraining cables to maximum [PW]

Edmund Fitzgerald at the fit out dock [DC] Edmund Fitzgerald at Toledo s C&O Dock 10/08/1963 [GLMI] Edmund Fitzgerald on the St. Clair River 1974 [SM]

302 HULL NUMBER Herbert C. Jackson on launch day [DC] Lake Bulk Freighter built at the River Rouge yard in 1959 as a) HERBERT C. JACKSON (US.278780). Hull 302 s keel was laid on June 25, 1958 and launched February 20, 1959 for the Interlake Steamship Co., Cleveland, OH (Pickands Mather, Mgr.). Dimensions: 689 loa-670 lbp-75-37 6 ; 12,752 GRT, 8026 NRT. Powered by a 6,600 shp General Electric cross-compound steam turbine and two coal-fired Combustion Engineering water tube boilers. Commissioned on May 14, 1959. Ownership was transferred to Pickands Mather & Co. and a bow thruster was installed in 1966. The JACKSON was converted to a self-unloader and oil-fired boilers at Defoe Shipbuilding Co., Bay City, MI in 1975. The JACKSON had her bow thruster replaced in October, 1988 with the 1000 hp unit removed from idle fleetmate, John Sherwin at Fraser Shipyard, Superior, WI. In keeping with other vessels, she had a 1000 hp stern thruster installed over the winter of 1997-98 by Fraser. With great pomp and ceremony, the JACKSON became the last boat to dock at the Port Washington Power Plant on June 26, 2004. She was opened for tours the next day on June 27 before the power plant s coal-fired boilers were taken out of service and converted to natural gas for generating electricity. It also marked the conclusion of Port Washington as a commercial port when the JACKSON cleared the breakwall at 1815 later that day. The harbor is now utilized almost exclusively by recreational boaters. Herbert C. Jackson after launch [BH]

Herbert C. Jackson as a straight decker [PW] Herbert C. Jackson as a self-unloader on the St. Clair River 07/27/1991 [SM]

303 HULL NUMBER Arthur B. Homer ready for launch [BH] Lake Bulk Freighter built at the River Rouge yard in 1960 as a) ARTHUR B. HOMER (US.280946). Keel laid March 18, 1959. Launched November 7, 1959 for the Bethlehem Steel Corp., Cleveland, OH. Dimensions: 730 loa-711 lbp-75-39 ; 13,390 GRT, 8442 NRT, 26,850 dwt. Powered by an 8,000 shp cross-compound steam turbine and two Combustion Engineering oil-fired water tube boilers. Hull #303 was the last ship launched and built by the River Rouge yard. The HOMER entered service April 20, 1960 on her maiden voyage. Her boilers were automated during the winter of 1968-69. The HOMER, loaded with ore, was in a head-on collision, October 5, 1972, with the empty Greek salty NAVISHIPPER at Buoy 83 in the Detroit River s Fighting Island Channel. NAVISHIPPER reportedly had no licensed pilot aboard at the time, a violation of Maritime law. There were no injuries, but the HOMER suffered extensive bow damage up to and including part of her pilothouse. The HOMER was repaired at the American Ship Building Co., Lorain, OH and on April 10, 1973 she departed the shipyard with a new pilothouse. The HOMER was lengthened 96 feet to 826 loa-807 lbp at Fraser Shipyards, Superior, WI over the winter of 1975-76 and a bow thruster was installed at this time. New tonnage; 15,200 GRT, 10,225 NRT, 33,100 dwt. On April 23, 1980 her bow thruster failed while maneuvering through ice at Taconite Harbor, MN, resulting in a grounding, which damaged her bow and one ballast tank. She was dry docked at Superior for repairs. On October 4, 1980 the ARTHUR B. HOMER was laid up for the last time at Erie, PA. She was towed to Port Colborne, ON, December 9, 1986, and was scrapped there by Port Colborne Marine Terminals, Ltd the following year. Arthur B. Homer launched [DC]

Arthur B. Homer builder s plate [PL] Arthur B. Homer on the St. Marys River [PW]

Arthur B. Homer after collision with NAVISHIPPER on the lower Detroit River 10/05/1972 [GR] Arthur B. Homer on the St. Clair River c1980 [PW] Arthur B. Homer laid up at Erie 08/01/1985 [SM]