General Information Applicant Name and Address: Tel./Fax/ Contact Person Name/Tel./Fax/

Similar documents
Signature: Signature:

AMC ICAO DOC 9613 AMC 20-4 ICAO DOC 9613 TGL-10 ICAO DOC 9613 AMC AMC AMC ICAO DOC 70300

All-Weather Operations Training Programme

Operational Evaluation Board Report

Operational Procedures

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

Application for Low Visibility Operation

CIVIL AVIATION REQUIREMENT SECTION 8 AIRCRAFT OPERATIONS SERIES F PART V ISSUE I, 29 TH JULY 2015 EFFECTIVE: 31 ST JULY 2015

Human external cargo draft

GUERNSEY ADVISORY CIRCULARS. (GACs) EXTENDED DIVERSION TIME OPERATIONS GAC 121/135-3

CHAPTER 24 D APPROVAL OF SPECIAL OPERATIONS- PERFORMANCE BASED NAVIGATION OPERATION

SUBPART C Operator certification and supervision

APPLICATION FOR SPECIAL OPERATIONAL APPROVALS

SECURITY OVERSIGHT AGENCY June 2017 ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS

Flight Operations Inspector Manual

Regulation (EU) 965/2012 on air operations. and related EASA Decisions (AMC&GM and CS-FTL.1)

GHANA CIVIL AVIATION AUTHORITY ALL WEATHER OPERATIONS

OPERATIONS APPROVAL - EU-OPS OPERATOR NAME... SCHEDULE - THE SPECIFIED REQUIREMENTS Required Yes/No A/C Type Ops Manual Ref. e.g.

Recurrent Training & Checking Form

HEAD-UP DISPLAY (HUD), EQUIVALENT DISPLAYS AND VISION SYSTEMS

Section I Page 1 Operator/Airframe Details Completion mandatory. Section III Page 2 Signature Block Completion mandatory

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

CIVIL AVIATION AUTHORITY CZECH REPUBLIC

APPLICATION FOR EXTENDED OPERATIONS (ETOPS) OPERATIONAL APPROVAL

2.1 Private Pilot Licence (Aeroplane/Microlight)

Council of the European Union Brussels, 14 October 2016 (OR. en)

CHAPTER 5 AEROPLANE PERFORMANCE OPERATING LIMITATIONS

Mijloace acceptabile de conformitate. Electronic Flight Bag (EFB)

Form 91 Application for Approval of an EFB System

EDTO SARPS FROM ANNEX 6 PART 1

IATA Air Carrier Self Audit Checklist Analysis Questionnaire

FIJI ISLANDS AERONAUTICAL INFORMATION CIRCULAR

RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS

Navigation 101 Chapter 3 RNP-10

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

EU-OPS Operations Manual Checklist/Compliance Schedule

Part 63 CAA Consolidation 22 June 2006 Flight Engineer Licences and Ratings

Index to Paragraph Numbers - OTAR Parts 91, 125, 135, 121 Issue 10-0

IRELAND SAFETY REGULATION DIVISION

REQUIREMENTS FOR EXTENDED- RANGE OPERATIONS WITH TWO ENGINE AIRCRAFT (ETOPS)

IRELAND SAFETY REGULATION DIVISION IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel Fax AFTN EIDWYOYX

OPS General Rules for Operations Manuals

Part 121, Amendment 26. Air Operations Large Aeroplanes. Docket 14/CAR/3

NOISE ABATEMENT PROCEDURES

An advisory circular may also include technical information that is relevant to the rule standards or requirements.

OPERATIONS CIRCULAR 01/2012. Subject: HEAD-UP DISPLAYS (HUD) AND ENHANCED VISION SYSTEMS (EVS)

CIVIL AVIATION PUBLICATION CAP 05 ALL WEATHER OPERATIONS

THE CIVIL AVIATION ACT (No. 21 of 2013 THE CIVIL AVIATION (OPERATION OF AIRCRAFT) (AMENDMENT) REGULATIONS, 2015

NZQA registered unit standard version 2 Page 1 of 9. Demonstrate flying skills for an airline transport pilot licence (aeroplane)

CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs.

APPLICATION FOR LOW. Application received, Date:

RNP AR APCH Approvals: An Operator s Perspective

Report for instrument rating - IR(A) skill test

OFFICE AVIATION. Subject: FLIGHT. ICAO Annex. requires operators to. proficiency. covered in. qualification

REPORT FORM IR(A) INITIAL SKILL TEST. (Use Type or Class Rating forms to revalidate IR(A) or renew expired IR(A)) Type rating: Type rating:

Airmen s Academic Examination

Application for Changes requiring prior Approval. FORM

DEPARTMENT OF CIVIL AVIATION ANNEX 1 REPUBLIC OF MAURITIUS

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

Part 125, Amendment 19. Air Operations Medium Aeroplanes. Docket 14/CAR/3

BUILDING LOCAL RUNWAY EXCURSION ACTION PLAN UNSTABILISED APPROACHES. Lisbon, 4 th Dec 2013

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI.

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

AIRWORTHINESS ADVISORY CIRCULAR

NZQA registered unit standard version 3 Page 1 of 5. Demonstrate type rating competency for an aeroplane not exceeding 5700 kg MCTOW

OPERATIONAL BULLETIN

Consideration will be given to other methods of compliance which may be presented to the Authority.

REPUBLIC OF SOUTH AFRICA

GENERAL ADVISORY CIRCULAR

Section M. Airline Transport Pilot s Licence (Aeroplanes)

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

TEXT OF AMENDMENT 36 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES OPERATION OF AIRCRAFT

COMMISSION REGULATION (EU)

AIRWORTHINESS ADVISORY CIRCULAR

For the purposes of this guidance material the following definitions are used:

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:

Airworthiness Directive

CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA

Official Journal of the European Union L 186/27

Subpart H. 2042/2003

NATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance

UNITED KINGDOM AERONAUTICAL INFORMATION CIRCULAR

Advisory Circular (AC)

RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS

AIRWORTHINESS ADVISORY CIRCULAR

Part 115. Adventure Aviation, Initial Issue - Certification and Operations. CAA Consolidation. 18 May 2018

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

CAR AIR CONTINUING AIRWORTHINESS (GENERAL AVIATION OPERATIONS)

1 JAR-OPS 1 AND 3 SUB-PARTS K AND L COMPLIANCE DOCUMENT

This Section 1 contains the requirements for the approval of Master Minimum Equipment Lists and Minimum Equipment Lists.

Appendix 1(a) to JCAR-FCL 1.055

Airmen s Academic Examination

Aircraft Leasing Manual

GUIDANCE MATERIAL FOR Extended Diversion Time Operations (EDTO/ETOPS) Approved by

CLASS AND TYPE RATING (SP)

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace

the Applicant A P P L I C A N T ' S L I C E N C E N U M B E R : Title First Name Last Name Street Place Postal Country Telephone Fax

LOW VISIBILITY OPERATION

An advisory circular may also include technical information that is relevant to the rule standards or requirements.

Transcription:

Application for steep approach approval Completion of form: Each relevant box should be completed with a tick ( ) or a (X). Form must be completed by referring to a document of applicant's documentation system, add manual reference, chapter and sub-chapter. Please ensure all applicable areas are completed. 1. GENERAL General Information Applicant Name and Address: Tel./Fax/e-mail: Contact Person Name/Tel./Fax/e-mail: Aeroplane Registration Aeroplane Type Designation / Model Designation Aeroplane Serial No. Aeroplane Manufacturer 2. AIRWORTHINESS Eligibility Airworthiness Documents 1. The approval of the steep approach is based on: AFM AFM Supplement Type certification data sheet 2. Maximum approved glideslope angle as per item 2.1: Supplemental other (specify): Type Certificate Minimum Equipment List 3. The applicant should revised parts of Minimum Equipment List to reflect system requirements (e.g. configuration, airbrakes, flaps, TAWS override procedure) appropriate to the intended steep approach operations? Minimum Equipment List revised? YES NO 3. OPERATION Operating Practices and Procedures The applicant must institute steep approach Operating Practices and Procedures. These practices and procedures should cover the following subjects: Operational Control and Supervision (OM-A 2.3) The operator shall establish a control loop to verify, that at least the CMD for an assigned flight, is trained and proficient to conduct the intended steep approach. This verification shall be done in the planning phase in the context of operational control 1. and supervision CAT.POL.A.245(2) CAT.POL.A.345(2) (OM-A 2.3) Any Steep Approach limitations shall be considered in the planning, when operation into an aerodrome with Steep Approach is intended. This feasibility-check shall be done in the context of operational control and Supervision. Steep approach Operating Practices and Procedures are described in (add manual reference, chapter and sub-chapter): PUB Page: 1 of 5

2. 3. 4. General description of Steep Approach CAT.POL.A.245 CAT.POL.A.345 (OM-A 8) General definitions and characteristics shall be described in the Chapter 8. The description shall mention the definition of a steep approach (an approach with a glide slope angle of 4,5 or more is considered a Steep Approach) The required type of vertical path reference and runway guidance used for the steep approach, must be The difference in screen height (less than 50ft but not less than 35ft) and the resulting operational consequences have to be (OM-B 0) Steep Approach with its maximum approach angle shall be mentioned in the list of operations specifications. Limitations (OM-B 1.1) If there is a maximum landing mass, other than the maximum landing mass for normal approach angle, it must be listed. The maximum tailwind allowed for Steep Approach must be The maximum x-wind allowed for Steep Approach must be The maximum approach angle the aeroplane is certified for and the operator is authorised to conduct, must be Required automation and its minimum use heights (EXAMPLE: A/P and A/T might be used down to 200ft AAL etc.). CAT.POL.A.245(2)(iii)(D) CAT.POL.A.345(2)(iii)(D) (OM-B 1.1) All technical limitations must be For example: Powerplant limitations (EXAMPLE: OEI?, FADEC, minimum N1 etc), required navigation equipment, required configuration (EXAMPLE: Flaps, slats, airbrake etc). Aerodrome/runway limitations must be listed (e.g. max slope, max aerodrome elevation, minimum runway width etc). Normal Procedures (OM-B 2) All normal procedures shall be consistently described including flight profile and crew station duty assignments. The procedures and manipulations may vary from normal approach procedures. The OM-B Chapter 2 shall contain the description of these procedures and manipulations. - If the briefing for a steep approach is different to the conventional approach, the differences shall be described in this chapter - Describe if specific tasks have to be completed before the approach (e.g. arming of steep approach mode, verification of serviceability of equipment etc) - The description must include configurations, speeds, callouts, tasks in relation to the flight/approach progress. If the operator decides to implement additional call-outs for steep approach(e.g. speed call- out during short final), it shall be defined in this chapter - The procedures shall also describe techniques used for the attitude change during flare following a Steep Approach - The use of automatics during the approach and maybe PUB Page: 2 of 5

landing, shall be described - If a different speed schedule for the Steep Approach is required, it shall be described, how the crewmember obtains these figures - If the landing configuration for a Steep Approach is different to a normal approach, a detailed description must be available - The missed approach procedure must be described in detail (including configuration, speed, call-out, flight modes etc). Abnormal Procedures (OM-B 3) All abnormal procedures concerning Steep Approach must be described. The description shall contain procedures to be applied in case 5. of failures during Steep Approach (e.g. OEI, configuration failures etc). If not defined as procedures by the manufacturer, the operator can describe additional, more restrictive contingency procedures in this chapter (EXAMPLE:. The manufacturer allows to conduct Steep Approach with FADEC inop. The operator requires to conduct a G/A for a FADEC fault during approach, due to the difficult engine handling during Approach) Performance (OM-B 4) Due to the Steep Approach angle and the reduced screen height, a different speed schedule might be certified by the aeroplane manufacturer. This might result in a different calculation or increment for the landing distance (LD) and consequently for the determination of landing distance required (LDR) The manufacturer provided documents will give information to this topic. The operator must ensure to implement this information in the OM-B Chapter 4. The information shall be presented in a way that the crew members can easily calculate 6. the required performance data for landing. If there is a different calculation method, or if different figures are used, the operator must proof the correct application. Special attention must be given to calculations with electronic applications or calculation programs from external suppliers (e.g. EFB applications) In case of a landing distance (LD) penalty due to overspeed, the crewmember must have an easy-to-use method to determine the resulting penalty (e.g. 7% increase of LD per 2kts speed increment) If for Steep Approach a special landing configuration is used, the configuration change and missed approach configuration may be different than on a normal approach and therefore considered in the approach climb calculation, provided by the manufacturer. Mass and Balance (OM-B 6) If the aeroplane has a landing mass limitation other than the 7. maximum landing mass for normal approaches, it must be considered for the calculation of the load sheet. Special attention to this has to be given, if the load sheet is calculated electronically (e.g. EFB application). Exceedance of a landing mass limitation must be excluded/ indicated. 8. Minimum Equipment List PUB Page: 3 of 5

9. CAT.POL.A.245(2)(iii)(D) CAT.POL.A.345(2)(iii)(D) (OM-B 9) The MEL must be revised with all considerations concerning the required equipment for Steep Approach. If the operator decides to implement additional items required for Steep Approach, they must be listed in the MEL. Aerodrome Instruction and Information CAT.POL.A.245(2) CAT.POL.A.345(2) (OM-C 1) All aerodromes shall be categorised in order to allow flight crew competence qualification. The categorisation gives the operational control and the crewmember concerned the information about the required qualification in order to operate into a specific aerodrome. Aerodromes with special limitations (performance, operating procedures) must be explicitly published in the OM C. Also special considerations, additional information, aerodrome special issues defined by the operator (e.g. tips and hints) shall be published in the OM C. Following items shall be taken into consideration for each aerodrome at which Steep Approach operations are to be conducted: - a suitable glide path reference system comprising at least a visual glide path indicating system shall be available, - the obstacle situation, - the type of glide path reference and runway guidance, - the minimum visual reference to be required at decision height (DH) and MDA, - pilot qualification and special aerodrome familiarisation, - missed approach criteria - weather minima Flight Crew Training and Qualification The applicant is required to establish the following (covering subjects under 3.1 to 3.9): Description in (add manual reference, chapter and subchapter): 10. Flight crew qualification requirements (OM-A 5) 11. Flight Crew Training (OM-D 2.1) Description of initial and recurrent training, checking-and training-syllabi. Steep Approach shall be trained at least for the CMD. This training shall be conducted in a simulator and documented in the personal file. It is the operators responsibility to adhere to the training requirements for every single aerodrome where he intends to operate to. CCAA will only issue an approval for the Steep Approach procedure. The validity period for the route and aerodrome qualification must be observed It is the operators responsibility to observe this period of validity. The initial and recurrent training must be based on the Operator s Procedures laid down in the respective OM B. The training must emphasis on proper distribution of the flight PUB Page: 4 of 5

crew station workload management, duties, responsibilities and appropriate call-outs during Steep Approach, flare, roll-out and GA / missed approach. Special emphasis shall be laid on critical phases such as flare, transition from non-visual to visual conditions and on procedures in deteriorating visibility, the handling of failures as well as detection of / response on pilot s incapacitation. 4. APPLICATION PACKAGE Documentation to be submitted to the CCAA Submitted? Yes No N/A 1. Compliance statement which shows how the criteria of CAT.POL.A.245 and/or CAT.POL.A.345 have been satisfied. (Section 5. Of this application) 2.. Sections of the AFM or AFM Supplements that document steep approach airworthiness approval 4. Flight crew steep approach training programmes and syllabi for initial and recurrent training 5. Operation manual and checklists that include steep approach operating practices and procedures. 6. Minimum Equipment List (MEL) that include items pertinent to steep approach operations 8. Maintenance program or revision thereof that include items pertinent to steep approach equipment 9. Steep approach maintenance practices & procedures (CAME, maintenance program, stand-alone document) 10. Service Bulletin, Supplemental Type Certificate (STC) or Major Modification Approval Documentation, if approval based on documents as detailed in 2.1 above (except if based on approved type design). 5. APPLICANT S STATEMENT The undersigned certifies the above information to be correct and true and that aeroplane system installation, continuing airworthiness of systems, minimum equipment for dispatch, operating procedures and flight crew training comply with applicable requirements of EC 965/2012. Name of Post Holder Maintenance: Signature: Date: Name of Post Holder Operations: Signature: Date: Name of Post Holder Training: Signature: Date: 6. FOR OFFICIAL CCAA USE ONLY Subject Responsible Date Signature 1. FOD-FRM-012 and item 4 application package checked for completeness. OPS 2. Airworthiness Approval granted (Appendix to Certificate of Airworthiness). AWI 3. Operational Approval granted (applicant s operating practices, procedures and training programs have been found in compliance with applicable requirements) OPS 5. Steep approach approval process administratively completed (OPS Update, and Exchange of Certificates). OPS Withdrawal of steep approach Approval Reason: Name: Date: Signature: PUB Page: 5 of 5