Roberts Bank Terminal 2 Project

Similar documents
Roberts Bank Terminal 2 Project

Roberts Bank Terminal 2 Project Project Definition Consultation Consultation Summary Report: Appendix 1 Invitation and Newspaper Advertisement

South of Fraser Transportation Priorities March 2017 Engagement

NEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY

BACKGROUNDER Office of the Premier Government of Canada

Ship traffic and the Roberts Bank Terminal 2 Project

ateway NOW UNDER CONSTRUCTION! 1777 Clearbrook Road Abbotsford, BC 65,000 SF in Building 1 Available Q ,229 SF in Building 2 Available Q2 2019

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

RW Bruhn Bridge and Approaches Project

2017 STAKEHOLDER REPORT

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

FOR SALE. Opportunity to own a brand new, high quality industrial unit in the core of Metro Vancouver. DELTA LINK BUSINESS CENTRE PHASE II

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

Federal Budget Submission. Prepared for the House of Commons Standing Committee on Finance. Greater Toronto Airports Authority

CONTAINER TERMINAL EXPANSION WILL INCREASE PORT S CAPACITY AND ECONOMIC IMPACT

HOPEWELL DISTRIBUTION CENTRE

Prince Rupert - North America s New Gateway

APPENDIX A: SCREENLINE SURVEY STATION DETAILS

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017

Message from the CEO. Message from the Chair. 2 portofhalifax.ca

PASSENGER TRANSPORTATION BRANCH MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE LICENCE. Passenger Transportation Licence COPY

Pattullo Bridge Replacement Project

OPEN HOUSE WELCOME. YPK Runway Enhancement & Safety Upgrades

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

BC JOBS PLAN ECONOMY BACKGROUNDER. Current statistics show that the BC Jobs Plan is working: The economy is growing and creating jobs.

Port Everglades Master/Vision Plan Update

PortMiami Director and CEO Juan M. Kuryla PUBLIC-PRIVATE PARTNERSHIPS (P3)

The Government s Aviation Strategy Transport for the North (TfN) response

Port Everglades Master/Vision Plan Update

29 December Canada Transportation Act Review Secretariat 350 Albert Street Ottawa ON K1A 0N5

Status. Agreement announced: June 2004 Completed: Value for Money Report. released: Nov 2004 *CCPPP: Financing Award Agreement announced:

Port Everglades 2014 Master/Vision Plan Update

Welcome. Share information on the new investments and funding proposed for the Phase Two Plan

Tough Times: Coming to Terms with Recession

Decision (Applicant claims urgent public need )

Northern Rockies District Value of Tourism Research Project December 2007

Port Metro Vancouver Facilitating our nation s trade

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018.

Economic Impact Study

South Westminster and Bridgeview

Application Summary. Taxi - Amendment to Licence

Port Everglades 2014 Master/Vision Plan Update

TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND. PNWER November 2018

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE PUBLIC WORKS AND UTILITIES DEPARTMENT

Edmonton International Airport Master Plan Open House Display Boards April 16, 2011

PASSENGER TRANSPORTATION BRANCH MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE LICENCE. Passenger Transportation Licence COPY

Clarington. Proud Home of Darlington Nuclear. Multi-Sector Based Community. Building our life Science Sector. Great Commercial Opportunity ttumi ilhf

Chapter 1: Introduction Draft

Westbrook Station. Transit Oriented Development Opportunity

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

A Master Plan is one of the most important documents that can be prepared by an Airport.

The Economic Impacts of the Open Skies Initiative: Past and Future

Regenerating Business. AAPA Partnerships in Planning & Development February 25, 2008

2018 Airport Master Plan. Public Meeting and Open House February 7, 2018

The Panama Canal Expansion: Myths and Realities for the North American Economy

The Economic Contribution of the Qantas Group to Australia

MIAMI INTERNATIONAL REAL ESTATE CONGRESS ERIC OLAFSON MANAGER TRADE DEVELOPMENT

Halifax Economic Report

Leaders in energy management

Waterways Council November 10, 2017

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

Bloomberry Cruise Ship Port Under development

Chapter 1: Introduction

Pattullo Bridge Replacement Project

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES

Memorandum of Understanding with ACT Government

V&A Waterfront Economic Contribution. HEADLINE FINDINGS: January 2015 for the period April 2012 to March 2014

2013/14 Pre-Budget Submission Accommodation Association of Australia

23 January Dear District Leader:

Economic Impact: Business Aviation Operations & Business Aircraft Manufacturing in Canada Annual CBAA Conference

FOR SALE FOR SALE SINGLE-TENANT INVESTMENT OPPORTUNITY 2601 HIGHWAY 6 VERNON, BC SINGLE-TENANT INVESTMENT OPPORTUNITY 2601 HIGHWAY 6 VERNON, BC

LEASING OPPORTUNITIES

Parallel Taxiway and Apron Widening at Abbotsford International Airport

Interim Growth Management Policies City of Brampton Council

Applewood Heights Community Open House

Fort McMurray International Airport

Panama City Beach Travel Market Economic Impact Report. Prepared for: Panama City Beach Convention & Visitors Bureau

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS

Auto Port Operational Strategy. Roy A. Schleicher Senior Director Trade Development & Global Marketing

Walvis Bay and its role as a logistics hub for the SADC region. Christian Faure Executive: Marketing and Strategic Business Development

Assessment Model. Tony Fisher Senior Research Consultant Canadian Sport Tourism Alliance, 116 Lisgar St., Suite 600 K2P 0C2 Ottawa ON

Canada s Airports: Enabling Connectivity, Growth and Productivity for Canada

GENERAL INFORMATION. Updated: 1 September Canadian Automobile Insurance Rate Regulators Association Conference

Paul Steele, Executive Director Air Transport Symposium

Crossing Canada s Other Border. Northern Perspective on a Multi-Use Transborder Corridor Through Canada to Alaska

COLUMBUS REGIONAL AIRPORT AUTHORITY. Economic Impact Study Update. Executive Summary

Creating Connections in Niagara Region

Pattullo Bridge Replacement Project

Toronto Pearson Master Plan Greater Toronto Airports Authority October 4, 2017

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

Study Design Outline. Background. Overview. Desired Study Outcomes. Study Approach. Goals (preliminary) Recession History

TERMINAL DEVELOPMENT PLAN

HEALTH SECTOR ECONOMIC INDICATORS REPORT

Canada. Advancing. Together.

PORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

Pacific Coach Lines Ltd Station Street, Vancouver BC V6A 4C7

Transcription:

OCTOBER 2012 Roberts Bank Terminal 2 Project The Roberts Bank Terminal 2 Project is a proposed new multi-berth container terminal at Roberts Bank in Delta, B.C. that would provide 2.4 million TEUs (twenty-foot equivalent unit containers) of container capacity. The project is part of Port Metro Vancouver s Container Capacity Improvement Program, a longterm strategy to deliver projects to meet anticipated growth in demand for container capacity to 2030. DELTA Proposed Roberts Bank Terminal 2 Existing Roberts Bank Terminals An artist s rendering of the proposed Roberts Bank Terminal 2 Project, adjacent to the existing Roberts Bank terminals. ENVIRONMENTAL ASSESSMENT The proposed Roberts Bank Terminal 2 Project will be subject to a thorough and independent environmental assessment. While the scope and nature of the environmental assessment have not yet been determined by provincial and federal regulators, it is anticipated that it would be some form of panel-level review, the most rigorous form of environmental assessment. Port Metro Vancouver anticipates submitting a Project Description to regulatory agencies in mid-2013, which would start the formal environmental assessment process. For more information about the provincial and federal environmental assessment processes, please visit the following websites: British Columbia Environmental Assessment Office www.eao.gov.bc.ca Canadian Environmental Assessment Agency www.ceaa-acee.gc.ca Port Metro Vancouver www.portmetrovancouver.com/rbt2 1

FIELD STUDIES As part of ongoing environmental and technical work for the proposed Roberts Bank Terminal 2 Project, Port Metro Vancouver is undertaking field studies at Roberts Bank and the surrounding areas. The studies are part of the early planning phase focused on collecting baseline inventory information to help identify aspects of water and sediment quality, biofilm, marine fish, marine vegetation, marine invertebrates, coastal seabirds, coastal geomorphology, marine mammals and terrestrial wildlife that may be affected by the proposed project. The results of the studies would serve as preparatory information for impact assessments as part of the environmental assessment process. For more information, including monthly field studies notices, please visit: www.portmetrovancouver.com/rbt2 Field studies at Roberts Bank ECONOMIC BENEFITS AND JOB CREATION If constructed, the Roberts Bank Terminal 2 Project would drive economic growth and increase employment, benefiting the Metro Vancouver region, British Columbia and Canada. The economic benefits from the proposed project would include gains in economic output and gross domestic product (GDP) during construction and operations. During the construction period, anticipated to be approximately six years, the project would generate the following benefits: Direct Construction Employment: Estimated 2,500 jobs for six years, worth approximately $690 million in wages Indirect and Induced Employment 1 : Estimated 2,000 jobs for six years, worth approximately $450 million in wages Total Direct, Indirect and Induced Employment: Estimated 4,500 jobs for six years, worth approximately $1.14 billion in wages Gross Domestic Product: Approximately $1.63 billion to the Canadian economy Total Economic Output: Approximately $4.1 billion Once operating at capacity, the project would provide the following benefits: Direct Employment: Estimated 9,200 jobs, worth approximately $440 million in wages annually Indirect and Induced Employment: Estimated 9,000 jobs, worth approximately $180 million in wages annually Total Direct, Indirect and Induced Employment: 18,200 jobs, worth approximately $620 million in wages annually Gross Domestic Product: Approximately $1.66 billion to the Canadian economy annually Total Economic Output: Approximately $3.1 billion annually Economic information will be updated as the project proceeds through design and development. 2 1 Indirect employment refers to employment in industries supported by expenditures by port businesses. Induced employment refers to jobs generated by expenditures by those employed directly or indirectly.

PLANNING NOW FOR CANADA S TRADE FUTURE Large infrastructure projects like the proposed Roberts Bank Terminal 2 Project require a long lead time, and that is why Port Metro Vancouver is planning now to make sure that there is enough capacity to meet future demand for containerized trade. In 2011, Port Metro Vancouver moved 2.5 million TEUs, and forecasts show that container traffic is expected to double over the next 10 to 15 years, and triple by 2030. The graph below shows container forecasts for Canada s West Coast (Ocean Shipping Consultants, May 2012). The stepped lines show projects, both underway and planned, that would accommodate these increases in demand 2. Even with recent and current improvements at Port Metro Vancouver s terminals, and planned investments at the Fairview Terminal in Prince Rupert, the west coast of Canada will still need more container capacity by the mid-2020s. Based on the current project schedule, and subject to regulatory approvals, the Roberts Bank Terminal 2 Project could be fully operational by 2024. WEST COAST - FORECAST AND PLANNED CAPACITY INCREASES 10 8 3 DTRRIP and Prince Rupert Phase 2 Stage 1 Prince Rupert Phase 2 Stage 2 Roberts Bank Terminal 2 Inner Harbour Planned Capacity High Case Throughput 85% of Planned Capacity Base Case Throughput 6 Low Case Throughput 4 MILLIONS OF TEUS 2 0 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 YEAR The container capacity provided by the proposed Roberts Bank Terminal 2 Project is needed by 2024 to meet forecasted demand. By 2028, additional container capacity would be needed in the base case and high case throughput scenarios 2 Container ports begin to lose efficiency when they attempt to operate above 85% of their maximum capacity. The dotted purple line on this graph refers to 85% of planned capacity. 3 Deltaport Terminal, Road and Rail Improvement Project 3

ROBERTS BANK TERMINAL 2 PROJECT PROJECT COMPONENTS The Roberts Bank Terminal 2 Project would be located west of the existing Roberts Bank terminal facilities, approximately 5.5 kilometres offshore from the mainland. The project would include the following components: A three-berth marine container terminal on newly created land A container storage yard An intermodal yard (where containers are moved to and from trains) Equipment required to operate a container terminal, including: - Ship-to-shore gantry cranes - Stacking cranes (rail-mounted or rubber-tired) - Rail yard rail-mounted gantry cranes - Transfer equipment (such as shuttle carriers, automated guided vehicles, and/or tractor trailers) A truck gate complex to control truck entry and exit Administrative buildings and employee parking areas Equipment maintenance workshops and facilities Causeway widening and improvements to road and rail infrastructure along the Roberts Bank causeway Improvements to road and rail infrastructure leading to and from the Roberts Bank causeway Improvements to the Roberts Bank tug basin VANCOUVER CANADA N RICHMOND SURREY DELTA LANGLEY USA 41B Street Arthur Drive Highway 17 64 Street 72 Street Boundary Bay Airport VICTORIA Existing Deltaport Overpass Deltaport Way Road Improvements Fisher Yard Rail Improvements Causeway Widening and Road & Rail Improvements Gulf Yard Rail Improvements TFN Proposed Roberts Bank Terminal 2 Roberts Bank Causeway Roberts Bank Tug Basin Existing Roberts Bank Terminals Landmarks Project Components Terminal 2 Rail Additions/Modifications Road Additions/Modifications South Fraser Perimeter Road (Completion 2013) 4 Roberts Bank Terminal 2 Project Components

WHY ROBERTS BANK? Roberts Bank is an established trade gateway and is well positioned to accommodate future growth in trade activity. It has several competitive advantages, including its proximity to major transportation corridors for both truck and rail movements, and one of the most efficient shipto-rail designs of any port in North America. Two initiatives are currently underway that will further improve on these competitive advantages: South Fraser Perimeter Road (SFPR): a new 40-kilometre-long four-lane route along the south side of the Fraser River from Deltaport Way to 176th Street in Surrey. SFPR will offer an efficient trade corridor and will divert trucks and other traffic off municipal roads in Delta and Surrey. Roberts Bank Rail Corridor Program: includes one road network improvement project and eight overpasses in Delta, Surrey, the City of Langley and the Township of Langley. These projects will separate road and rail traffic, improving safety, easing community connections and minimizing train whistling. These projects will help relieve current road and rail congestion on local roads and will accommodate traffic generated by capacity increases at Roberts Bank, including the Roberts Bank Terminal 2 Project. COMMUNITY, STAKEHOLDER AND PUBLIC CONSULTATION In addition to opportunities for public input that will be provided through the environmental assessment process, Port Metro Vancouver will lead several rounds of consultation regarding the proposed Roberts Bank Terminal 2 Project. This Port Metro Vancouver-led consultation began in June 2011 with Pre-Consultation, which asked participants how they wanted to be consulted and about the topics they wished to discuss. A report summarizing input received from Pre-Consultation is available online at: www.portmetrovancouver.com/rbt2 PROJECT DEFINITION CONSULTATION OCTOBER 22 NOVEMBER 30, 2012 Consultation with communities, stakeholders and the public is continuing with Project Definition Consultation, which will run from October 22 to November 30, 2012. As part of this consultation, Port Metro Vancouver will present information regarding the conceptual project design, and will seek input regarding elements of the project related to refining the design and developing environmental mitigation plans. You can provide feedback and learn more by: Reading consultation materials and providing feedback online: www.portmetrovancouver.com/rbt2 (starting October 22, 2012) Attending a stakeholder meeting or open house (see schedule on page 6) Writing a submission: Email: container.improvement@portmetrovancouver.com Mail: Port Metro Vancouver, 100 The Pointe, 999 Canada Place, Vancouver, BC V6C 3T4 Calling 604-665-9337 HOW INPUT WILL BE USED Input received during consultation will be considered, along with technical and economic information, in developing project designs or plans, including engineering and environmental mitigation plans. FIRST NATIONS CONSULTATION A separate, but parallel, consultation process with First Nations is being undertaken regarding the proposed Roberts Bank Terminal 2 Project. 5

PROJECT DEFINITION CONSULTATION MEETING SCHEDULE AREA EVENT DATE TIME LOCATION Delta Stakeholder Meeting Tuesday, October 23 1:30pm 3:30pm Delta Stakeholder Meeting Tuesday, October 23 6:00pm 8:00pm Langley Stakeholder Meeting Wednesday, October 24 6:00pm 8:00pm Delta Stakeholder Meeting Thursday, October 25 1:30pm 3:30pm Richmond Open House Thursday, October 25 6:00pm 9:00pm Delta Open House Saturday, October 27 10:00am 1:00pm Surrey Stakeholder Meeting Tuesday, October 30 1:30pm 3:30pm Richmond Stakeholder Meeting Tuesday, October 30 6:00pm 8:00pm Vancouver Stakeholder Meeting Wednesday, October 31 9:00am 11:00am Surrey Open House Thursday, November 1 6:00pm 9:00pm Delta Open House Tuesday, November 6 6:00pm 9:00pm Langley Open House Thursday, November 8 6:00pm 9:00pm Coast Tsawwassen Inn 1665 56 th Street, Delta Coast Tsawwassen Inn 1665 56 th Street, Delta Newlands Golf and Country Club 21025 48 th Avenue, Langley Delta Town & Country Inn 6005 Highway 17, Delta Hilton Vancouver Airport 5911 Minoru Boulevard, Richmond Delta Town & Country Inn 6005 Highway 17, Delta Northview Golf and Country Club 6857 168 th Street, Surrey Hilton Vancouver Airport 5911 Minoru Boulevard, Richmond Morris J. Wosk Centre for Dialogue 580 West Hastings, Vancouver Northview Golf and Country Club 6857 168 th Street, Surrey Coast Tsawwassen Inn 1665 56 th Street, Delta Newlands Golf and Country Club 21025 48 th Avenue, Langley To register for a stakeholder meeting, please email container.improvement@portmetrovancouver.com or call 604.665.9337. Please visit www.portmetrovancouver.com/rbt2 for any potential changes to this schedule. COMMUNITY LEGACY BENEFITS Port Metro Vancouver is initiating discussions with local and regional government regarding community legacy benefits that could be provided as part of the Container Capacity Improvement Program. These community legacy benefits would be over and above the economic benefits that would result from the project, and mitigation measures that would be required through the environmental assessment process. Contact Us 6 For more information about Port Metro Vancouver and the proposed Roberts Bank Terminal 2 Project, please visit us online at www.portmetrovancouver.com/rbt2. Sign up for our mailing list and receive email notifications about the project, including monthly field studies information sheets and opportunities to participate in consultation. Roberts Bank Terminal 2 Project Port Metro Vancouver 100 The Pointe, 999 Canada Place Vancouver, BC V6C 3T4 Web: www.portmetrovancouver.com/rbt2 Email: container.improvement@portmetrovancouver.com Phone: 604-665-9337 Fax: 1.866.284.4271 Attention: Roberts Bank Terminal 2 Project