Three-Question Matrix and Reference Checks RFP Number: A P1 RFP Name: Airport Ramp Control Services

Similar documents
BOARD OF AIRPORT COMMISSIONERS

FAA Surface CDM. Collaborative Decision Making and Airport Operations. Date: September 25-27, 2017

SAAB REMOTE TOWER. 37th Annual Pennsylvania Aviation Conference 28 September Matt Massiano

VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures

CertAlert. Hurricane Field Condition Report

KJFK Runway 13R-31L Rehabilitation ATFM Strategies

Leveraging on ATFM and A-CDM to optimise Changi Airport operations. Gan Heng General Manager, Airport Operations Changi Airport Group

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Municipal Leadrship Development Program LOOKING FOR DOLLARS WRWA LAND DEVELOPMENT PROJECT

The IMPACT of the DOT REGULATIONS as to TARMAC DELAYS on AIR CARRIERS AND AIRPORTS. Katherine Staton Jackson Walker L.L.P.

LAX Community Noise Roundtable. Aviation Noise News Update. July 8, 2015

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM. April 10 th 2017

Appendix 6.1: Hazard Worksheet

FBO Request for Proposal Lake Cumberland Regional Airport

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT

OLD AIRPORT (PFN) RW 05/23 RW 14/32. 4,884-FEET X 150-FEET MIRL 4-BOX VASIs (5 & 23 APPROACHES) REILS

IRREGULAR OPERATIONS AIRPORT CONTINGENCY PLAN

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

PASSUR Aerospace Annual Shareholder Meeting, April 5, 2017

Irregular Operations (IROPS) Contingency Plan

Irregular Operations (IROPS)

AIRFIELD SAFETY IN THE UNITED STATES

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

BENEFITS OF A COLLABORATIVE PRE- DEPARTURE REROUTING PROCESS AT IAH AIRPORT. Carpenter and Levy 24 April 2013 Saab Sensis Corporation

DRONES + AIRPORTS: BUZZ AROUND HARTSFIELD-JACKSON

Norfolk International Airport

City of Lafayette. Request for Proposals Municipal Airport Fixed Based Operator

Town of East Hampton Airport 200 Daniel s Hole Road Wainscott, NY

Americas Aviation/Baggage Handling

Yakima Air Terminal McAllister Field. Aviation Demand Forecast Workshop October 13, 2011

Table 5-15 Special Use Airspace in the SBMR Airspace ROI

Weathering the Storms, Where to Go, What to Do

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

ACI-NA Agenda. Operations & Technical Affairs CONFERENCE. April 16 19, Planet Hollywood Hotel Las Vegas Nevada (Updated 06 APRIL 2012)

LONG BEACH, CALIFORNIA

Reduced Surface Emissions through Airport Surface Movement Optimization. Prof. Hamsa Balakrishnan. Prof. R. John Hansman

REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT

Benefits Analysis of a Runway Balancing Decision-Support Tool

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT

HOBART AIRSPACE DESIGN

LAX Specific Plan Amendment Study (SPAS) Update. December 3, 2012

Airport Surface Detection. ASDE-X and Data Distribution System Overview. Presented to the Tarmac. Federal Aviation Administration

Department of Transportation, Federal Aviation Administration (FAA). SUMMARY: Under this notice, the FAA announces the submission deadline of

Third Quarter 2014 Community Noise Consortium Meeting Thursday, October 23, 2014

Federal Aviation Administration Portfolio for Safety Research and Development. Seminar Paul Krois October, 2008

Salem Airport Solar Eclipse Event (SASEE) Notice to Pilots McNary Field Salem, OR August 21, 2017

FAA Update Society of American Military Engineers

System Oriented Runway Management: A Research Update

Dynamic Science, Inc. AVIATION SERVICES. dsi

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS

Lake Tahoe Airport Master Plan

OPERATING DIRECTIVE Number: D Aviation Authority Revised: 03/26/13

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

TRANSPORTATION RESEARCH BOARD. Preparing and Using Airport Design Day Flight Schedules. Wednesday, July 18, :00-3:30 PM ET

Burlington ATCT Standard Operating Procedures

JOHNSTON COUNTY AIRPORT AUTHORITY

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017

Chapter 2 FINDINGS & CONCLUSIONS

Master Plan Update Technical Advisory Committee Meeting

Benefits Analysis of a Departure Management Prototype for the New York Area

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

FAA SAFO Turbojet Braking Performance on Wet Runway SAPOE Recommendations

DALLAS/FORT WORTH INTERNATIONAL AIRPORT SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM SMGCS PLAN FOR ARRIVAL RUNWAYS 17L-35R, 17C-35C, AND 18R

Westover Metropolitan Airport Master Plan Update

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

Lee County Port Authority. Southwest Florida International Airport Emergency Contingency Plan

Airlines and Operations Revenue Data Collection

First Quarter 2013 Community Noise Consortium Meeting Thursday, May 16, 2013

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018

AIRPORT: Yakima Air Terminal (YKM) ASSOCIATED CITY: Yakima ARC: C-III Region: South Central

TERMINAL DEVELOPMENT PLAN

Meeting Minutes EAST CENTRAL FLORIDA METROPOLITAN AREA CFASPP STEERING COMMITTEE MEETING June 2, 2010, 10:00 AM Flagler County Airport

Dallas Fort Worth International Airport

ENRI International Workshop on ATM/CNS

FAA s Modernization Plans

National Transportation Safety Board Washington, D.C

National Airspace System Infrastructure Management Conference

Airline Scheduling: An Overview

ACI-NA Conference NextGen at NAV CANADA. John Crichton President and Chief Executive Officer October 11, 2009

Wake Turbulence Standards

HOBART AIRSPACE DESIGN

HOBART AIRSPACE DESIGN

Fourth Quarter 2014 Community Noise Consortium Meeting Thursday, January 22, 2015

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016

Concept of Operations

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

Chapter 1 Introduction

ADVANCED AIRPORT OPERATIONS SEPTEMBER HYATT PLACE LONDON HEATHROW

Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting

HOBART AIRSPACE DESIGN

Community Noise Consortium Newsletter January 22, 2015

HOBART AIRSPACE DESIGN

Consolidated Aircraft Deicing April 19, Salt Lake City International Airport

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

Regional Aviation Baseline Study. Economic Development Board May 2, 2018

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

IAA Submission on the Commission for Aviation Regulation s Draft 2014 Determination of Maximum Level of Charges at Dublin Airport

Transcription:

Three-Question Matrix and Reference Checks RFP Number: RFP Name: Airport Ramp Control Services Ranking (Not Alphabetical) 1 Firm Name Robinson Aviation (RVA), Inc. Questions 1. Have the vendors taken any exceptions to the County's Standard Terms and Conditions? NO EXCEPTIONS 1. Port of Seattle - Seattle-Tacoma International Airport Ramp Control Services 2. Do the vendors have comparable government experience? 2. Federal Aviation Adminstration - FAA Contract Tower DTFAWA 3. Town of East Hampton, New York - East Hampton Air Traffic Control Services and Mobile Tower 3. Have the vendors references been checked? YES (Attached)

Page 2 of 7 - AIRPORT RAMP CONTROL SERVICES Saab Sensis Corporation Contact Name: Jean Southwick Program Mgr Reference date: 07/10/2017 Contact Email: jean.southwick@saabsensis.com Contact Phone: 315-445-5700 Contract No. Leesburg VA remote tower Date Services Provided: Projec Amount: r-twr_rva-1 08/15/2014 09/30/2017 $ 502,518.30 Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No RVA provides a mobile ATCT and control tower operators for both the mobile ATCT and remote tower systems at Leesburg Executive Airport (JYO) in Virginia to assist Saab Sensis in the process of establishing a certification program for the Remote Tower product in the US. p. 42

Page 3 of 7 - AIRPORT RAMP CONTROL SERVICES Saab Sensis Corporation Contact Name: Adam MacKenzie Program Manager Reference date: 07/10/2017 Contact Email: adam.mackenzie@saabsensis.com Contact Phone: 315-634-3048 Surface Management System at John F. Kennedy International Airport Contract No. Date Services Provided: Projec Amount: PANYNJ_4600008491_RVA 05/02/2012 01/15/2018 $ 4,798,297.90 Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No Robinson Aviation (RVA), Inc. is charged with managing and staffing the Departure Metering Coordination Center at JFK International Airport. In a virtual environment, RVA's ground management operators use Saab's proprietary departure metering and sequencing tool, Aerobahn. RVA's application of Aerobahn provides airline and terminal stakeholders with automated flight metering assignments to improve the departure sequencing process for further reduction in taxi times and more efficient use of runways. p. 43

Page 4 of 7 - AIRPORT RAMP CONTROL SERVICES Port of Seattle Contact Name: Dave Crowner Manager, Airfield OpReference date: 07/24/2017 Contact Email: crowner.d@portseattle.org Contact Phone: 206-245-9154 Seattle-Tacoma International Airport Ramp Control Services Contract No. Date Services Provided: Projec Amount: S-00316729 01/01/2011 12/31/2016 $ 6,624,273.00 Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No Robinson Aviation (RVA), Inc. managed and operated the airport ramp control services at Seattle-Tacoma International Airport from 2006 through 2016, providing highly-qualified, fully-trained staff to oversee and direct aircraft movement in designated non-movement areas 24 hours daily. RVA was excellent to work with and very responsive and flexible to operational needs and issues. The On-Site manager served as an extension of staff and provided key operational support & expertize. p. 44

Page 5 of 7 - AIRPORT RAMP CONTROL SERVICES Federal Aviation Administration Contact Name: Stephanie McKnight-Bail Contracting Officer Reference date: 07/19/2017 Contact Email: stephanie.mcknight-bailey@faa.gov Contact Phone: 202-264-0421 Contract No. FAA Contract Tower DTFAWA-15-C-00018 Date Services Provided: Projec Amount: DTFAWA-15-C-00018 07/01/2015 12/30/2020 $ 165,710,475.00 Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No Robinson Aviation (RVA), Inc. operates and provides air traffic control services at 55 locations in Area 2 comprising the southeast area of the United States. p. 45

Page 6 of 7 - AIRPORT RAMP CONTROL SERVICES Federal Aviation Administration Contact Name: Stephanie McKnight-Bail Contracting Officer Reference date: 07/19/2017 Contact Email: stephanie.mcknight-bailey@faa.gov Contact Phone: 202-264-0421 Contract No. FAA Contract Tower DTFAWA-15-C-00020 Date Services Provided: Projec Amount: DTFAWA-15-C-00020 07/01/2015 12/30/2020 $ 120,030,907.00 Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No Robinson Aviation (RVA), Inc. operates and provides air traffic control services at 42 locations in Area 4 comprising the south and southwest areas of the United States. p. 46

Page 7 of 7 - AIRPORT RAMP CONTROL SERVICES Town of East Hampton, NY Contact Name: Contact Email: Reference date: Contact Phone: 631-537-1130 x7501 Contract No. Date Services Provided: Projec Amount: r-twr_rva-1 03/20/2012 03/19/2018 $ 2,273,764.14 Vendor s role in Project: Prime Vendor Subconsultant/Subcontractor Would you use this vendor again? Yes No James L. Brundige jbrundige@ehamptonny.gov Airport Director East Hampton Air Traffic Control Services & Mobile Tower 07/20/2017 RVA provides a mobile ATCT and control tower operators for seasonal air traffic control services at the Town of East Hampton, NY. Robinson Aviation (RVA) has been providing quality seasonal Air Traffic Control Services to HTO since 2012. It is a very professional organization with profession, qualified staff. p. 47