NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

Similar documents
CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

TWELFTH AIR NAVIGATION CONFERENCE

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE

5.2 Port-of-Spain Declaration PORT-OF-SPAIN DECLARATION. (Presented by the Secretariat) EXECUTIVE SUMMARY

ICAO ASBU Implementation/ Surveillance and ATS Automation

Regional Air Navigation Plan - Planning Methodologies and Tools. H. Sudarshan

(Presented by United States) EXECUTIVE SUMMARY

LSSIP Mechanism serving ICAO The ASBU implementation monitoring report

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

TWELFTH AIR NAVIGATION CONFERENCE

ATFM/CDM ICAO s Perspective

Packaging Tomorrow s Aviation System

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

Russian Federation ATM modernization program

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

2018 LSSIP Event. ASBU monitoring in the ICAO European Region Using the Master Plan reporting mechanism for ASBU monitoring

NACC/WG/4 WP/16 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

TWELFTH AIR NAVIGATION CONFERENCE

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

PROPOSED AMENDMENT OF THE RPBANIP. (Prepared by Canada and United States) EXECUTIVE SUMMARY

TWELFTH AIR NAVIGATION CONFERENCE

The ICAO Global Air Navigation Plan and the monitoring of ASBU implementation

NAM/CAR Regional Performance-Based Air Navigation Implementation Plan (RPBANIP) v3.1 April 2014 International Civil Aviation Organization

TWELFTH AIR NAVIGATION CONFERENCE

2012 Performance Framework AFI

MID Region Air Navigation Strategy

NACC/WG/4 WP/08 20/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

4.1 Global/Regional Air Navigation Developments A COMPREHENSIVE STRATEGY FOR THE REVISED GLOBAL AIR NAVIGATION PLAN. (Presented by the Secretariat)

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

Continuous Improvement of the Global Air Traffic Management System

INTERNATIONAL CIVIL AVIATION ORGANIZATION

ICAO GANP Requirements and Evolution

International Civil Aviation Organization. Aviation System Block Upgrade (ASBU) Methodology An Overview

(Presented by the Secretariat) EXECUTIVE SUMMARY

GUATEMALA State Air Navigation Plan

The evolving air navigation system and the impact on avionics

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

Welcome to AVI AFRIQUE IFEANYI Ogochukwu, Chief Technology Strategist; Debbie Mishael Group

TWELFTH AIR NAVIGATION CONFERENCE

AFI Air Navigation Services Key Performance Indicators

Safe Skies for Air Navigation over Africa

NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017)

FAA: ASBU Deployment Status. ASBU Prepared by: Midori Tanino, ATO International NextGen Lead Date: August, 2016

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project

Technology Roadmaps. CNS and IM plus Avionics. Vaughn Maiolla. Dakar, Senegal, September 2017

MET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN

Enhancing capacity beyond infrastrucutre

Using LSSIP information for ATM Master Plan and ICAO ASBU monitoring

New Barbados State Air Navigation Plan

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

Development of the Global AIM Strategy (AIM Projects)

Presented by: Trinidad and Tobago

TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

BELIZE Air Navigation Plan

ASBU Block 0 Implementation and Regional ANPs

INTERNATIONAL CIVIL AVIATION ORGANIZATION NORTH AMERICAN, CENTRAL AMERICAN AND THE CARIBBEAN REGIONAL AND SOUTH AMERICAN REGIONAL OFFICES

SAMPLE TEMPLATE APPENDIX 3.5C-1

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

Safety and efficiency performance framework ASBU methodology. H.Sudarshan Air Navigation Bureau, ICAO

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

ATFM Implementation Thailand and Southeast Asia. 55 th DGCA Conference October 2018 Nadi, Fiji

Review of Air Navigation Matters 2.1 Global Air Navigation and CAR/SAM developments NAM/CAR Regional Air Navigation Implementation Plan

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

ICAO Performance Based Approach

4.2 Regional Air Navigation/Safety Developments and Achievements. Group (NAM/CAR ANI/WG) INTEGRATION OF UNMANNED AIRCRAFT SYSTEMS (UAS)

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2)

Global Air Navigation Plan

Preparation for ASBU B1 (PBN)

30 SEP - 02 OCT, 2014

SURVEILLANCE PROJECT Coordinator: Ghana DOMAIN: IIM (Infrastructure & Information Management)

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

Circular 330-AN/189 Civil/Military Cooperation in Air Traffic Management

SAMPLE TEMPLATE. Regional and National planning for ASBU Modules

Circular 330-AN/189 Civil/Military Cooperation in Air Traffic Management. Sven Halle ICAO- Paris

INTERNATIONAL CIVIL AVIATION ORGANIZATION

International Civil Aviation Organization. Aerodrome Certification Implementation Task Force (ADCI TF/1)

UK Implementation of PBN

PIRG and RASG Global Coordination Meeting Setting the Stage. Nancy Graham. Director, Air Navigation Bureau

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

DRAFT Global Air Navigation Plan

Performance Based Navigation (PBN) Implementation Plan. The Gambia

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

Global Air Navigation Plan

ICAO Cyber Summit & Exhibition CLOSING REMARKS. 10 April 2017

Integration of Meteorological Data in the ATM System. Dhipak Lalla Air Traffic and Navigation Services

Civil and military integration in the same workspace

ART Workshop Airport Capacity

THE GLOBAL PERSPECTIVE ON GASP/GANP/GASOS

NAM/CAR AND SAM REGIONAL AIR NAVIGATION PLANS (SURVEILLANCE SYSTEMS)

Transcription:

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

Outline NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Regional Performance Objectives- Our Air Navigation priorities ASBU adopted modules Follow-up to mandatory requirements and operational improvements 2

RPBANIP NAM/CAR Regional Performancebased Air Navigation Implementation Plan (RPBANIP)? 3

RPBANIP Vision Strategy The concepts to implement the safety and capacity/efficiency strategic objectives (Global ATM Operational Concept) Global Air Navigation Plan Global Aviation Safety Plan Tactics Global Performance ASBU approach Global Safety Initiatives (GSI) Action Global and regional work plans (eanp) and action plans (States) RPBANIP

Air Navigation Implementation Overview Global ATM Operational Concept RPBANIP The Global Air Traffic Management System Operational Concept; Doc 9854 describes how an integrated global air navigation system should operate describes what is envisaged on the basis of services describes how the services form an integrated system utilizes an information rich environment, that solves most problems strategically, through a collaborative process provides States and industry with clearer objectives for the design and implementation of ATM and supporting CNS systems ATM user expectations are drivers for change, requiring: Safety case Business case Technical Enablers Operational Enablers procedures Socio-economic Enablers

RPBANIP Performance based Global Air Navigation Systems (2008) Aviation System Block Upgrade (ASBU) Methodology (2012)

RPBANIP NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP)? Performance-based Plan and ASBU oriented plan Official Plan that contains all Air Navigation Areas of implementation: AIM, AGA, ATM, CNS, MET, SAR Encompasses our mandatory and optional Air Navigation requirements High Level Regional (NAM/CAR) Action Plan for implementing Air Navigation matters Live document to be reviewed and updated every 3 years

RPBANIP NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP)? Approved by the North America, Central America and Caribbean Directors of Civil Aviation (NACC/DCAs) Guidance and reference for implementation: NACC/WG, ANI/WG, ANSPs and other regional implementation groups and States (National Plans) First edition in 2008: Performance Approach Second edition in 2011: RPO updates Third edition in 2014: ASBU methodology compliant Main source for new Volume III CAR/SAM eanp

RPBANIP

Regional Performance Objectives- Our Air Navigation priorities Regional Performance Objectives (RPO) Our Air Navigation priorities the NAM/CAR regional priorities / Regional Performance Objectives (RPO) 2013 to 2018. Collaborative Decision- Making (CDM) processes RPO should address requirements on the basis of assessments and studies

high-level tasks, establishing the expected operational benefits and the metrics for progress measurements, benefits and achievements Further detailed actions plans for the RPOs shall be developed by the regional implementation groups as needed group of common benefits for all stakeholders that can be achieved through the implementation strategies. Regional Performance Objectives- Our Air Navigation priorities Regional Performance Objectives (RPO) Our Air Navigation priorities

Regional Performance Objectives- Our Air Navigation priorities Regional Performance Objectives (RPO) Our Air Navigation priorities 1. IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN) 2. IMPLEMENTATION OF FLEXIBLE USE AIRSPACE (FUA) 3. IMPROVE DEMAND AND CAPACITY BALANCING (DCB) 4. IMPROVE SITUATIONAL AWARENESS 5. ENHANCE CAPACITY AND EFFICIENCY OF AERODROME OPERATIONS IN THE CAR REGION

Regional Performance Objectives- Our Air Navigation priorities Regional Performance Objectives (RPO) Our Air Navigation priorities 6. OPTIMIZATION AND MODERNIZATION OF COMMUNICATION INFRASTRUCTURE 7. IMPLEMENTATION OF AERONAUTICAL INFORMATION MANAGEMENT (AIM) 8. IMPROVE AVAILABILITY OF METEOROLOGICAL INFORMATION 9. IMPROVE SEARCH AND RESCUE (SAR) SERVICES

ASBU adopted modules the NAM/CAR Regions adopted, in principle, the 18 Block 0 (B0) modules 15 of the modules are detailed in RPBANIP RPOs contain the basic elements to be implemented for the different ASBU B0 Modules ASEP, OFPL and WAKE - shall be included in future reviews of the RPBANIP, if required

ASBU adopted modules RPO and ASBU Block 0 relationship

SAMPLE of TARGETS : RPBANIP ASBU adopted modules

ASBU adopted modules AN-CONF/12 Recommendation 6/1 Regional performance framework planning methodologies and tools That States and PIRGs: a) finalize the alignment of regional air navigation plans with the Fourth Edition of the Global Air Navigation Plan (Doc 9750, GANP) by May 2014; b) focus on implementing aviation system block upgrade Block 0 Modules according to their operational needs, recognizing that these modules are ready for deployment; c) use the eanps as the primary tool to assist in the implementation of the agreed regional planning framework for air navigation services and facilities; d) involve regulatory and industry personnel during all stages of planning and implementation of aviation system block upgrade modules; e) develop action plans to address the identified impediments to air traffic management modernization as part of aviation system block upgrade planning and implementation activities;

ASBU adopted modules NAM/CAR SUPPORT AND IMPLEMENTATION WORKING GROUP http://www.icao.int/nacc/pages/ nacc-regionalgroups-aniwg.aspx

ASBU adopted modules http://www.icao.int/nacc/pages/regional-groups.aspx