THE ARIANE 6 SYSTEM : ON BOARD-GROUND INTERFACES AND LAUNCH FACILITY

Similar documents
Arianespace 2013 Organization, History and Programs

Arianespace Launch Service Operator Policy for Space Safety

Space Transportation. The highlights of the year were bound up with the decisions taken at the ESA Ministerial Council in Paris on 27 May.

Ariane 5 production and integration operations: ten years of continuous efficiency and quality improvement

LAUNCH KIT. November 2017 VV11. MOHAMMED VI A satellite

LAUNCH KIT. September 2018 VA243. Horizons 3e. Azerspace-2/Intelsat 38

Missions, Operations & Ground Infrastructure

LAUNCH KIT. December 2017 VA240. Galileo FOC-M7 SAT

July VA 219. ATV Georges Lemaître

François CAHUZAC / Arnaud BIARD

December VA 221 DIRECTV-14 GSAT-16

April VA 222 THOR 7 SICRAL 2

LAUNCH KIT AUGUST 2018 VV12 AEOLUS

LAUNCH KIT. February 2017 VA235. SKY Brasil-1 Telkom 3S

November VA 227 ARABSAT-6B (BADR -7) GSAT-15

September VA 226. Sky Muster ARSAT-2

LAUNCH KIT. December 2018 VA246 GSAT-11 GEO-KOMPSAT-2A

Vega Operational Launch System Overview on launch operations and launch service cost drivers

Space Transportation Systems. System Concepts

September VA 218. MEASAT-3b OPTUS 10

LAUNCH KIT. September 2017 VA239. Intelsat 37e. BSAT-4a

Quality of service and reliability

LAUNCH KIT. February 2019 VA247. Saudi Geostationary Satellite 1/Hellas Sat 4 GSAT-31

ARIANESPACE LAUNCHES SATELLITES FOR TWO MAJOR EUROPEAN OPERATORS

Boosting two communications satellites into orbit

The President s Commission on Implementation of US Space Exploration Policy

A launch for the International Space Station

LAUNCH KIT MAY 2017 VS17 SES 15

CONTENTS VS21 ARIANESPACE TO ORBIT THE FIRST SIX SATELLITES IN THE ONEWEB CONSTELLATION. OneWeb F6

LAUNCH KIT. January 2018 VA241 SES-14. Al Yah 3

Low Cost Spacelift to LEO, GTO, and Beyond Using the OSP-2 Minotaur IV Space Launch Vehicle. Scott Schoneman, Lou Amorosi, Ron Willey, and Dan Cheke

A satellite launch for Mexico and Thailand

LAUNCHING TWO DIRECT BROADCAST TV SATELLITES

Satellites launched for Europe and India

SATELLITES FOR SPAIN AND SOUTH KOREA

Bob Hawkins Deputy Lead Engineer SLS Integrated Avionics and Software

LAUNCH KIT. April 2019 VS22. O3b Satellites

A launch for the International Space Station

Flight th launch for Eutelsat

LAUNCH KIT. December 2018 VS20 CSO-1

Space Transportation Systems. Demand / Market Analysis

SPOT 5 incorporates major upgrades, with several new instruments improving the quality of images and services offered to customers.

Satellites launched for the USA and Asia

Payload Adapters and Separation Systems

AIRBUS Generic Flight Test Installation

Flight 158 ARIANE 5. Follow the launch live on the internet broadband at (starting 20 minutes before lift-off)

KOUROU. September 2015 ARIANE 5. Data relating to Flight 226. Sky Muster ARSAT-2

TECHNICAL INFORMATION Europe Head office USA Subsidiary French Guiana Singapore Liaison office Japan Liaison office

The Suborbital Space Tourism Project of EADS Astrium

Two Telecom satellites

Global Investor Forum Airbus. Fabrice Brégier Chief Executive Officer Airbus. Page 1

aero-notes Letter to Shareholders Number 2 August 2001 Dear Shareholders, European Aeronautic Defence and Space Company EADS N.V.

PASSAGE DE CÂBLES. +33 (0) PASSAGE DE CABLES DISTRIBUTION OF POWER LINES

SABCA ANNUAL ANNOUNCEMENT Regulated information Inside information, published on 25/04/2018 at h

Successful Return to Flight of the H-IIA Launch Vehicle

1st Airworthiness safety conference. DGAC regulations/procedures relating to Parts 66/147

Rapport d'activités des CN 2006 Activity Report Form 2006

A Survey of Time and Space Partitioning for Space Avionics

Flight th Ariane 5 to boost communications and weather satellites

Trends and Perspectives in Space Launch Activities

MASER SOUNDING ROCKET MICROGRAVITY FLIGHTS

Introducing. RUAG Space. From our Electronics portfolio: Antenna. From our Spacecraft portfolio: Thermal Insulation

BILFINGER SE NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND SERVICES

Jeppesen Total Navigation Solution

WELCOME TO DAMEN SONG CAM

WELCOME TO DAMEN SONG CAM

Propulsion Solutions for Fishing Vessels SERVICES

ESPACE DES ONG / NGO SPACE 39 e session de la Conférence générale / 39 th session of the General Conference

Your success is our goal. Rely on our engineering.

Materna Integrated Passenger Services (Materna ips)

Available Technologies. Session 4 Presentation 1

SAVOIR industrial perspectives Thales Alenia Space View

W E M O V E A R O U N D Y O U

Considerations for Facility Consolidation

November Azipod XO. ABB Group November 17, 2010 Slide 1

TECHPORT AUSTRALIA - AUSTRALIA S PREMIER NAVAL INDUSTRY HUB

Estimating the Risk of a New Launch Vehicle Using Historical Design Element Data

Efficiency has to be the key to success

CREATIVE. Theme Parks, Rides & Shows, Cultural Attractions, Resorts & Mixed-Use, Themed Dining, Entertainment Centers, and Themed Retail

MINISTRY OF TOURISM CUSTOMER CHARTER

SERVICES OVERVIEW PERFORMANCE. INNOVATION. HERITAGE Commodity Circle Orlando, FL Phone:

Sven Kaltenhäuser, Frank Morlang, Dirk-Roger Schmitt German Aerospace Center DLR

Frankfurt Airport Preparing for the Future!

Space Based ADS-B. Transforming the Way you See the Sky February, 2015

Humanity Tents. fast, flexible, versatile

European Wind tunnel Association Two years activity (April 2004 March 2006)

Location: 2. It shows on at least two more places an example of the principle of dichotomy,

Passenger-friendly and operationally efficient rail-vehicle interiors

Canadian Coast Guard Programs Update. Shipping Federation of Canada Meeting

Warehouse case study. Cargo Facility, Stansted. 35 million, transit warehouse cargo facility pre-let to Federal Express at Stansted Airport

IAI - MALAT. IAI Unclassified

Procurement Plan. I. General

SCADE for AIRBUS critical avionics systems

Better regulation for general aviation (update July 2010) July 2010 Better regulation for General Aviation 1

Available Technologies. Asia / Pacific Regional Runway Safety Seminar Session 4

July 2018 TRENDS IN TRANSPORT. The UK's Spaceport an opportunity in the commercial spaceflight market

DANUBE FAB real-time simulation 7 November - 2 December 2011

UAS: French situation and perspectives

REPORT TO THE BOARD OF DIRECTORS RECOMMENDATION TO AWARD CONTRACTS FOR TAXICAB CONCESSIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT

1. Acting Deputy City Manager s report, Planning and Infrastructure, dated 23 June 2015 (ACS2015-PAI-INF-0003).

Transcription:

THE ARIANE 6 SYSTEM : ON BOARD-GROUND INTERFACES AND LAUNCH FACILITY Jean-Marc ASTORG CNES Directeur des Lanceurs European Space Launchers Conference 3-4th of November, 2015 Les Lanceurs Européens Colloque International 3-4 novembre 2015

CONTENTS Background The Ariane 6 system A new governance for the European launch sector ELA 4 description Main challenges Conclusions 2 Les Lanceurs Européens Colloque International 3-4 novembre 2015

BACKGROUND Ariane 5 : 67 success in a row! Ariane 5, Soyouz and VEGA operational in Kourou and Arianespace maintaining its market share A rude competition with new technical and economical models Ariane 6 and Vega-C developments decided during the Luxembourg MC in December 2015 Airbus Safran Launcher (ASL) created in December 2014 A new governance for Ariane 6 development with design authority to industry. Ariane 6 and VEGA-C contracts signed in August 2015 3 Les Lanceurs Européens Colloque International 3-4 novembre 2015

ARIANE 6 KEY OBJECTIVES Guaranteed access to space for Europe Industry supporting the commercial risk Time-to-market : Maiden flight in 2020, Fully operational in 2023 Maximizing commonalities within the European launcher family Proven reliability to customers Family of launchers addressing both institutional and commercial markets Advanced launch service procurement for European institutional missions Half the costs of Ariane 5 per kg and target launch service prices for institutional missions Fast track development plan and simplified management rules for minimized decision time Vulcain main stage engine flight proven on Ariane 5 Vinci upper stage extensively ground tested Common Solid Rocket Motor P120C with Vega-C (implying specific organization) as extension of Vega flight proven P80 to be flight qualified in 2018 on Vega-C Progressive phasing in of Ariane 6 and phasing out of Ariane 5 4 Les Lanceurs Européens Colloque International 3-4 novembre 2015

ARIANE 6 : THE A62 AND A64 DESIGN CONCEPTS 2 P120s 4 P120s A62 (5 t into GTO) 70 million A64 (10.5 t into GTO) 5 Les Lanceurs Européens Colloque International 3-4 novembre 2015

ARIANE 6 MAXIMIZING COMMONALITIES, MODULARITY AND HERITAGE P-80 P-120C Ariane 5 ME development IMC / Avionics TVC / Structures Upper Part / Aero Structures Upper Stage & Vinci Vega C development P-120C 6 EPC / Vulcain 2 simplified design Les Lanceurs Européens Colloque International 3-4 novembre 2015 Ariane 6 two configurations of the same launcher Ariane 62 (with 2 x P120C) 5t GTO Ariane 64 (with 4 x P120C) 10.5t GTO

A NEW GOVERNANCE FOR THE EUROPEAN LAUNCH SECTOR Basic principles : Actions Industry in charge of design, qualification and exploitation of the Ariane 6 launcher Guaranteed number of European institutional launches Commercial exploitation risk born by industry 7 Les Lanceurs Européens Colloque International 3-4 novembre 2015

CT ESA/CNES : 4000113680/15/F/MT CT ESA/CNES CT ARIANE 6 DEVELOPMENT ORGANISATION MOA and launch system architect : ESA with CNES acting as technical directorate L.S.A. A6 - LS A6 - LB P120C MOE launcher development : AIRBUS SAFRAN Launchers MOE ground segment : CNES A62 A64 8 Les Lanceurs Européens Colloque International 3-4 novembre 2015

A NEW ROLE FOR CNES DIRECTION DES LANCEURS Co-located with ESA at Paris Daumesnil Actions Common ESA-CNES Ariane Project Team Acts as ESA Technical Directorate for launchers Participates to an embedded team at ASL (Les Mureaux,Vernon) Closely coordinates with ASL Is Ground Segment prime contractor and design authority 9 Les Lanceurs Européens Colloque International 3-4 novembre 2015

ARIANE 6 LAUNCH SYSTEM Some example of activities at System Level Operational concept for test / integration / final chronology Ground / launcher interfaces (mecchanical / fluids / electrical) IRD ½ Control benches (one family for Europe and French Guyana) Ground Stand-by phase (dynamics) Take-off environement (acoustic, blast wave ) Lightning protection Combined Test in French Guyana and Qualification flight Growth potential : A66. 10 Les Lanceurs Européens Colloque International 3-4 novembre 2015

EXAMPLE : ARIANE 6 LIFT-OFF STUDIES 11 Les Lanceurs Européens Colloque International 3-4 novembre 2015

ARIANE 6 GROUND SYSTEM EAST Position first chosen in 2014 WEST Position chosen in 2015 for flight safety 12 Les Lanceurs Européens Colloque International 3-4 novembre 2015

13 Les Lanceurs Européens Colloque International 3-4 novembre 2015 ARIANE 6 LAUNCH PAD (ELA4)

ARIANE 6 LAUNCH PAD (ELA4) Route de l Espace ZLS Zone de Lancement (ZL4) South View Zone de servitudes Launcher Assembly Building (BAL) 14 Les Lanceurs Européens Colloque International 3-4 novembre 2015

ARIANE 6 LAUNCH PAD (ELA4) Roche Nicole ELA3 Route de l Espace North View BAL Launch Zone (ZL4) Kikiwi 15 Les Lanceurs Européens Colloque International 3-4 novembre 2015

OPERATIONAL SCENARIO Mi juillet 2015 : décision intégration à l horizontale 16 Les Lanceurs Européens Colloque International 3-4 novembre 2015

ELA4 GENERAL DESCRIPTION 1. Zone de lancement 2. Zone de préparation avec le bâtiment d assemblage Lanceur (BAL) 3. Stockages LOX 4. Stockages LH2 5. Zone de traitement des effluents 6. Zone servitudes (Energie, climatisation, eau,..) 7. Zone de pompage eau Dimensions ELA4 : 1,5 to 2 x Soyouz ELA4 : 170 ha 17 Les Lanceurs Européens Colloque International 3-4 novembre 2015

ARIANE 6 BAL (BATIMENT D ASSEMBLAGE LANCEUR) BAL : 2 lignes de production, une ligne de préparation finale Ligne d assemblage Airbus A350 18 Les Lanceurs Européens Colloque International 3-4 novembre 2015 Ligne d assemblage Falcon 9

ARIANE 6 LAUNCH ZONE Cryo arms RSM A5 (LOX et LH2) Mât ombilical fixe Carneaux Mâts éclairage Portique mobile Stockage LH2 Mâts foudre 19 Les Lanceurs Européens Colloque International 3-4 novembre 2015 Table fixe & Massif enterré

18 m 18 m ARIANE 6 LAUNCH ZONE 2 symetric covered exhaust ducts sized to evacuate 4 (ESR) + 1 (Vulcain) motors combustion gases Exhaust ducts : 60 000 m3 (24 olympic pools) Bunker 18 m 90 m Deflector Water retention after lift off Duct bottom level = - 18 NGG 20 Les Lanceurs Européens Colloque International 3-4 novembre 2015 14 m

ARIANE 6 LAUNCH ZONE Surface area : 2000 m² L x W x H = 90 * 40 * 6 m Number of floors = 1 To LOX storage To LH2 storage Launcher pit Ombilical Mast Technical rooms for all operational systems 21 Les Lanceurs Européens Colloque International 3-4 novembre 2015

LAUNCH ZONE OPERATIONS ESR on fixed launch table within 1 day L/V erection Mise à la verticale du corps central grâce à un chariot érecteur type Soyouz Mobile Gantry (non air conditioning) 6 days of operations in ZL 6 days of revalidation after launch Launch rate : 1 flight every 3 weeks 22 Les Lanceurs Européens Colloque International 3-4 novembre 2015

23 Les Lanceurs Européens Colloque International 3-4 novembre 2015 ARIANE 6 TRANSPORTER and TABLE

ARIANE 6 GROUND SEGMENT PLANNING End of infra studies RDP1: December 2015 End of Launch Base studies : APD RDP2 : May 2016 Infrastructure start ELA4 : mid 2016 P120 hot firing test (BEAP) 2017 and 2018 Launch Base Technical Qualification: 2019 Combined tests (L/V + ground) : 2019 24 Les Lanceurs Européens Colloque International 3-4 novembre 2015

PROGRESS OF ACTIVITIES TERRASSEMENTS (EIFFAGE TP /G + DLE + EIFFAGE TP) Démarrage sur ELA4 et LUNA depuis le 29/06/2015 Voies d accès et plateformes des bâtiments de l ELA4 Voies d accès chantier ELA4 25 Les Lanceurs Européens Colloque International 3-4 novembre 2015

CONCLUSIONS : MAIN ACTIONS To consolidate the current launchers fleet exploitation until Ariane 6 / Vega-C : Increase of A5 GTO performance Competitiveness To develop Ariane 6 and VEGA-C as quickly as possible To actively prepare post A6 launchers with the pre-development of a future low-cost and potentially reusable engine 26 Les Lanceurs Européens Colloque International 3-4 novembre 2015