RIVENWOOD PHASE 2, NEWTOWNARDS TRANSPORT

Similar documents
aviation and airports

London Borough of Barnet Traffic & Development Design Team

A GLOBAL PERSPECTIVE ON SHOPPING CENTER INDUSTRY

07/08 08/09 09/10 Total Carisbrooke Rest of Newport

PRIDE OF OWNERSHIP.

LOCAL EXPERTISE, INTERNATIONAL PERSPECTIVE

International Civil Aviation Organization. Seventh Meeting of CNS/MET Sub-Group of APANPIRG and Tenth Meeting of CNS/ATM IC Sub-Group of APANPIRG

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Forecasting Forum 2017: what will happen to travel pricing in the year ahead?

Transport Assessment Appendix M: Avonmouth Impacts

Sky Temporary Car Park Transport Statement

Puffins at Junctions Design & Modelling Implications. JCT Symposium Paper 18 September 2003

Pedestrian Safety Review Spadina Avenue

Travelling to Liverpool

CITIES IN FOCUS 2018 GLOBAL STUDENT ACCOMMODATION INDICATOR

AEAS 2019 Australian Schools International Events Program

Rethinking Global City Competitiveness. Jeremy Kelly, Global Research, JLL 7 th June 2018

Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems

Transaction volume increases in 2017 amid steady regional hotel performance

Indra In China. Beijing April 2013

Province of Nova Scotia - Ministerial Summary of Expenses

Thank you and acknowledgements. Community of Metros. CoMET

NORTH-WESTERN EUROPE DURING THE GRAVETTIAN

Certificate of Approval

Past Events

Suzhou Cultural & Tourism Development, China

TO FIND YOUR NEAREST AGENT CALL OR GO TO HELLOWORLD.COM.AU AMAZING SMALL GROUP JOURNEYS. Business Premier

ASIA/PACIFIC PREMIER AWARD

APEC Port Services Network and the Green Port Award System

PART 1: EXISTING AND EVOLVING GLOBAL FARE COLLECTION INDUSTRY Introduction Transit ticketing industry 6

Click to edit Master title style. Job Opportunities at Architecture and Engineering Firms: You can work with us

International Civil Aviation Organization. Sixth Meeting of CNS/MET Sub-Group of APANPIRG. Bangkok, Thailand, July 2002

Product Change Notification - SYST-17IUKE000

GLOBAL NETWORK BRANCHES

The Runway Decision. We have been making the case for expanding airport capacity in London and the South East for 3 years.

Representative Project Qualifications. Singapore

Cathay Pacific Vantage Pass 2019

THE HONGKONG AND SHANGHAI HOTELS, LIMITED

Asia Pacific Events Calendar. As of November 23, 2018 Subject to Change

RATP. Moving ahead with the world's leading multimodal transportation network

Property Code WIFI. Property Name City Country Daily Rate (excl tax) Parking Breakfast Fitness Centre. Cancellation Policy

About your flights to Barcelona

NEWS RELEASE. Page 1 of 5. JUMBOGroupLimited

Masoneilan 40 Series Pressure Regulator for Reducing & Back Pressure Applications

Travel redemption catalogue

Exploring Digital Geographies Cityscape Global. Jeremy Kelly, Head of Global Research Craig Plumb, Head of Research, MENA

Name Address Country Regulatory Authority Physical Presence The Bank of Nova Scotia Executive Offices 44 King Street West Toronto, Ontario, M5H 1H1

Asia Pacific Aviation

2011 Hotel investment strategy :

Hong Kong: Helping Manage Opportunities and Challenges in China. Christopher Jackson Assistant Executive Director 3 March 2009

CONTENTS. Page. Contents. Welcome. The neighbourhood. Homes. Work. Masterplan. Location. Connectivity. Developer/Disclaimer THE NEIGHBOURHOOD

Product Change Notification - SYST-17UOQS265

PENINSULA EN ROSE PINK HIGHLIGHTS THIS OCTOBER

LIGHTING CONTROL EQUIPMENT PART 1 TA 82/99 THE INSTALLATION OF TRAFFIC SIGNALS AND ASSOCIATED EQUIPMENT SUMMARY

Asia-Pacific Aviation: Growth and Challenges

VICE-CHANCELLOR DESTINATION TRANSPORT TRAVEL SUBSISTENCE

Passenger Flows Zurich Airport. July to November 2011

UNITED STATES OF AMERICA TRUMPS TRAVEL IN 2017, BUT BRITS STILL CAN T RESIST THE SPANISH CHARM

Go Global. powered by:

Press Release 23/05/11

For Sale. gva.co.uk/7523. Dunsley Hall Country House Hotel. Whitby North Yorkshire YO21 3TL

Major Scheme Business Case Summary Report for Programme Entry

5 REASONS WHY OUR CORPORATE TRAVEL PROGRAMME IS PERFECT FOR YOU

The following slides collate the insights relating to transport only.

Special event planning and management: Micro operations in the macro landscape. A case study of the Singapore Grand Prix

The Hongkong and Shanghai Hotels announces groundbreaking ceremony for The Peninsula London

Progress Report of the APEC Expert Group on New & Renewable Technologies

Hong Kong West Kowloon Station of High Speed Rail as New Gateway to Mainland China

THE GROWTH OF THE HOSPITALITY INDUSTRY IN DUBAI

Colliers International March 2016 The New Bund

THE PENINSULA SPA TAKE WELLNESS TO THE NEXT LEVEL OF LUXURY

City of Durban: Draft Visitor strategy. Strategetic

ENGAGING ALUMNI WORLDWIDE

April 10-13, 2014 Shanghai World Expo Exhibition & Convention Center

EXHIBITION STATISTICS & INFORMATION (as at 13 July 2017)

Sydney Office Visitors Guide A helpful guide for those planning to visit the Sydney Office of Sullivan & Cromwell

Ronan Delaney. DELANEY_RONAN_AVIATION_JUN_2018.DOCX

CAA Passenger Survey Report 2017

60 Greater China Industry Leaders Reign at the 7 th Annual TTG China Travel Awards

SPINEXPOTM PARIS OFFICIAL EXHIBITORS MANUAL JULY 2018 CITÉ DE LA MODE ET DU DESIGN.

For sale. Development Opportunity. Land At High Street Semington Trowbridge Wiltshire BA14 6JR

EDITO RIAL. Tomorrow is already here

TOKYU BINH DUONG GARDEN CITY

YouGov PlaceIndex results

The ideal partner to boost your business worldwide in the beauty industry

Fraser Suites Nanjing: a fine example of Singapore partners in the China market, says Minister of State Lee Yi Shyan

An Introduction to HS2

CONTINGENCY PLAN OF VIET NAM

From the biggest project. To the smallest detail.

Manufacturing/distribution opportunities 20, ,000 sq ft

Manufacturing/distribution opportunities 20, ,000 sq ft

User Forum Capacity Planning with DDR2 & NEST. Thierry Champougny / Laszlo Elbert / Stephanie Vincent

Session 2: Media and Tourism Promotion

APAC HOSPITALITY INVESTMENTS IN 2013 HIGHEST IN 5 YEARS. 1H 2014 continues to see healthy level

High-Speed Rail Inquiry

Architectural and interior design for hotel, service apartment and tower office

TOURISM AND HOSPITALITY IN ASIA PACIFIC. February 2018

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

APART HOTELS IN EUROPE. Your home away from home. The Ascott Limited is represented in Europe by:

We Make It Fly. Airbus Commercial Aircraft Presentation November 2017

Transcription:

RIVENWOOD PHASE 2, NEWTOWNARDS TRANSPORT

TABLE OF CONTENTS 1. AM BASE TRAFFIC FLOWS 3 2. PM BASE TRAFFIC FLOWS 3 3. TRIP GENERATION PHASE 2 3 4. ACCESS JUNCTION ASSESSMENT 3 5. ACCESS JUNCTION DESIGN OPTIONS 3

A21 Bangor Road A48 Donaghadee Road NS21 EDR NS2 EDR Stratheden Heights 96 56 31 89 645 325 22 24 237 11 89 122 3 44 636 126 355 49 17 Movilla Road 35 392 21 23 273 378 396 92 116 4 38 11 55 AM Base 176 24 Old Movilla Road figure 1 759 Zion Place 61 479 426 Abbot Drive NS19 EDR

A21 Bangor Road A48 Donaghadee Road NS21 EDR NS2 EDR Stratheden Heights 99 48 56 125 388 578 346 34 576 36 23 74 1 13 47 149 647 1 351 21 Movilla Road 65 365 51 68 3 194 29 25 8 81 62 37 29 2 PM Base 148 83 Old Movilla Road figure 2 525 Zion Place 12 458 855 Abbot Drive NS19 EDR

Trip Generation - Rivenwood Phase 2 (24 dwellings) People Trips 24 AM Peak PM Peak In Out Two-Way In Out Two-Way People Trip Rate.381 1.238 1.619.769.548 1.317 People Trips 78 253 33 157 112 269 Any variance due to rounding Mode Share of Phase 2 Residential Travel Mode Share Walk 1% Cycle <1% Bus, minibus or coach 13% Train <1% Car passenger 16% Car driver 51% Other 9% Total 1% People Trips by Mode AM Peak PM Peak In Out Two-Way In Out Two-Way Walk 8 25 33 16 11 27 Cycle 1 1 1 1 Bus, minibus or coach 1 33 43 2 15 35 Train 2 2 1 1 2 Car passenger 12 4 53 25 18 43 Car driver 4 129 168 8 57 137 Other 7 23 3 14 1 24 Total 78 253 33 157 112 269 Any variance due to rounding Trip Generation figure 3

Rivenwood Phase 2 Movilla Road / Rivenwood Boulevard Systra Ltd has undertaken a capacity assessment of the proposed signal controlled access junction to the development from Movilla Road. This is to ensure that the traffic generated by Phase 1 (1 units) and Phase 2 (24 units) can be accommodated by the proposed junction design. The assessment has been undertaken using the industry-standard software package, LinSig 3. The table below provides the results of our modelling exercise. The results include the Degree of Saturation (DoS) and Mean Maximum Queue (MMQ) for each lane while the overall Practical Reserve Capacity (PRC) and junction delay are provided. A DoS of less than 9% indicates that the lane will operate within practical capacity while a positive PRC indicates that the junction as a whole will operate within capacity. Lane 1/1 2/1 + 2/2 3/2 + 3/1 Description Movilla Rd (W) Ahead Left Movilla Rd (E) Ahead Right Rivenwood B vard Left Right Junction AM Peak PM Peak DoS MMQ DoS MMQ 24.4% 5 32.1% 6 4.7% 8 19.6% 3 4.5% 4 32.2% 2 PRC Delay PRC Delay 12.9% 5.87pcuHr 179.3% 3.4pcuHr The results presented in the table above demonstrate that the proposed signal controlled access junction to the development from Movilla Road will operate well within capacity during both the weekday AM and PM peak period with ample Practical Reserve Capacity. A more detailed summary of the results has also been provided (see LinSig Summary).

Basic Results Summary Basic Results Summary User and Project Details Project: Title: Location: SCT4173_NewtownardsResidentialPhase2 Movilla Road / Rivenwood Boulevard File name: Author: Company: Movilla Road_Rivenwood Boulevard.lsg3x greenj Systra Ltd Address: Notes: Scenario 1: '217 AM Base plus Phase 1 & 2 (34 Units)' (FG3: '217 AM Base plus Phase 1 & 2 (34 Units)', Plan 2: 'Phase 2 Not Called') Network Layout Diagram

Basic Results Summary Network Results Item Lane Description Lane Type Full Phase Arrow Phase Num Greens Total Green (s) Arrow Green (s) Demand Flow Sat Flow (pcu/hr) Capacity Deg Sat (%) Turners In Gaps Turners When Unopposed Turners In Intergreen Total Delay (pcuhr) Av. Delay Per PCU (s/pcu) Mean Max Queue Network: Movilla Road / Rivenwood Boulevard Movilla Road / Rivenwood Boulevard - - - - - - - - - 4.7% 15 5.9 - - - - - - - - - - - 4.7% 15 5.9 - - 1/1 Movilla Road West Ahead Left U A 1 64-256 194 151 24.4% - - - 1.2 16.8 4.6 2/1+2/2 Movilla Road East Ahead Right U+O B E 1 64 428 1915:1824 114+37 4.7 : 4.7% 15 2.3 19. 8.4 3/2+3/1 Rivenwood Boulevard Left Right U C F 1 25 19 1848:28 349+121 4.5 : 4.5% - - - 2.4 45.7 4.3 C1 PRC for Signalled Lanes (%): 12.9 Total Delay for Signalled Lanes (pcuhr): 5.87 Cycle Time (s): 12 PRC Over All Lanes (%): 12.9 Total Delay Over All Lanes(pcuHr): 5.87

Basic Results Summary Scenario 2: '217 PM Base plus Phase 1 & 2 (34 Units)' (FG6: '217 PM Base plus Phase 1 & 2 (34 Units)', Plan 2: 'Phase 2 Not Called') Network Layout Diagram

Basic Results Summary Network Results Item Lane Description Lane Type Full Phase Arrow Phase Num Greens Total Green (s) Arrow Green (s) Demand Flow Sat Flow (pcu/hr) Capacity Deg Sat (%) Turners In Gaps Turners When Unopposed Turners In Intergreen Total Delay (pcuhr) Av. Delay Per PCU (s/pcu) Mean Max Queue Network: Movilla Road / Rivenwood Boulevard Movilla Road / Rivenwood Boulevard - - - - - - - - - 32.2% 3 1 3.4 - - - - - - - - - - - 32.2% 3 1 3.4 - - 1/1 Movilla Road West Ahead Left U A 1 77-45 194 1261 32.1% - - - 1.3 11.4 6.2 2/1+2/2 Movilla Road East Ahead Right U+O B E 1 77 249 1915:1824 1112+158 19.6 : 19.6% 3 1.7 1.4 3. 3/2+3/1 Rivenwood Boulevard Left Right U C F 1 12 85 1848:28 196+68 32.2 : 32.2% - - - 1.4 59.2 2.2 C1 PRC for Signalled Lanes (%): 179.3 Total Delay for Signalled Lanes (pcuhr): 3.4 Cycle Time (s): 12 PRC Over All Lanes (%): 179.3 Total Delay Over All Lanes(pcuHr): 3.4

5.5 57.5 54. 57. EP 56. 56.5 TP 55.5 55. 53.5 54. 54.5 58. 54. 53. 52.5 57.5 51. 51.5 52. 53.5 57. 57. 5.5 N 5. 56. 56.5 56.5 AV TMH TP 55.5 56. C 55. 55.5 54.5 55. 54. 54.5 54. 53.5 54. 53. 53.5 53.5 52.5 52. 53. EP 51.5 52.5 51. 52. B 51.5 5. TMH 51. CONIFERS RS 5.5 5. LP RS 49.5 49. 5.5 EP LP A 5. 49.5 AV SV 48.5 RS TMH LP 49. 48. 48.5 RS 48. 5.5 51. SCT374/MR/SK1 LEVELS RELATED Movilla Road, Newtownards Drawn - DD Checked - CR Date - May 214 35135 3514 35145 3515 35155 25 West George Street, Glasgow, G2 4QY 3516 T 141 221 43 F 8 66 4367 E scotland@jmp.co.uk W www.jmp.co.uk

SYSTRA provides advice on transport, to central, regional and local government, agencies, developers, operators and financiers. A diverse group of results-oriented people, we are part of a strong team of professionals worldwide. Through client business planning, customer research and strategy development we create solutions that work for real people in the real world. For more information visit www.systra.co.uk Birmingham 5th Floor, Lancaster House, Newhall St, Birmingham, B3 1NQ T: +44 ()121 233 768 F: +44 ()121 233 7681 Dublin 2nd Floor, Riverview House, 21-23 City Quay Dublin 2,Ireland T: +353 ()1 542 6 F: +353 ()1 542 61 Edinburgh Prospect House, 5 Thistle Street, Edinburgh EH2 1DF United Kingdom T: +44 ()131 22 6966 Glasgow Seventh Floor, 124 St Vincent Street Glasgow G2 5HF United Kingdom T: +44 ()141 225 44 Lille 86 Boulevard Carnot, 59 Lille, France T: +33 ()3 74 7 F: +33 ()1 53 17 36 1 London Seventh Floor, 15 Old Bailey London EC4M 7EF United Kingdom T: +44 ()2 7529 65 F: +44 ()2 3427 6274 Lyon 11, rue de la République, 691 Lyon, France T: +33 ()4 72 1 29 29 F: +33 ()4 72 1 29 28 Manchester 25th Floor, City Tower, Piccadilly Plaza Manchester M1 4BT United Kingdom T: +44 ()161 236 282 F: +44 ()161 236 95 Marseille 76, rue de la République, 132 Marseille, France T: +33 ()4 91 37 35 15 F: +33 ()4 91 91 9 14 Newcastle PO Box 438, Newcastle upon Tyne, NE3 9BT United Kingdom T: +44 ()191 2136157 Paris 72 rue Henry Farman, 7515 Paris, France T: +33 ()1 53 17 36 F: +33 ()1 53 17 36 1 Woking Dukes Court, Duke Street Woking, Surrey GU21 5BH United Kingdom T: +44 ()1483 72851 F: +44 ()1483 75527 Hong Kong 14th Floor West, Warwick House, TaiKoo Place, 979 King's Road, Island East, Hong Kong T: +852 2529 737 F: +852 2527 849 Shenzhen Room 95, Excellence Mansion, No.98, No.1 Fuhua Road, Futian Central Zone, Shenzhen, PRC, Post Code:51848 T:+86 755 3336 1898 F:+86 755 3336 26 Shenzhen - Beijing Branch Office Room 153, Block C, He Qiao Mansion, No. 8 Guanghua Road, Chaoyang District, Beijing, PRC, Post Code:126 T:+86 1 8557 116 F:+86 1 8557 126 Beijing Joint Venture Room 157, Main Building, No. 6, Nan Li Shi Road, Xi Cheng District, Beijing, PRC, Post Code:145 T:+86 1 887 3718 F:+86 1 684 3744 Mumbai Antriksh, Unit no. 31, 3rd Floor, CTS Nos. 773, 773/1 to 7, Makwana Road, Marol, Andheri East, Mumbai 469 T: +91 22 2647 3134 B 37, Great Eastern Summit Sector - 15, CBD Belapur Navi Mumbai - 4 614 T: +91 22 2757 2745 New Delhi 5th Floor Guru Angad Bhawan, 71 Nehru Place, New Delhi 1119 T: +91 11 2641 331 Noida 3/F, C-131, Sector 2, Noida-2131, U.P. T: +91 12 432 6999 Singapore 25 Seah Street #4-1 Singapore 188381 T:+65 6227 3252 F:+65 6423 178 Thailand 37th Floor, Unit F, Payatai Plaza Building,128/44-45 Payathai Road, Rajthewee, Bangkok 14, Thailand T:+662 216 6652 F:+662 216 6651 Vietnam 5/F Perfect Building, Le Thi Hong Gam St, District 1, Ho Chi Minh City, Vietnam T:+84 8 3821 7183 F:+84 8 3821 6967