CONSTRUCTION SERVICES FOR MINING WWW.STRACONGYM.COM 1
LEADING WORLD CLASS MINING CONTRACTOR IN LATIN AMERICA OUR VALUES ARE THE INPUT FOR OUR ETHICS CHARTER, POLICIES, PROCESSES, LEADERSHIP STYLE, AND DECISION MAKING. OUR VALUES ARE: SAFETY COMPLIANCE QUALITY INTEGRITY EFFICIENCY Shahuindo Project (Peru) WE FORM PART OF THE GRAÑA Y MONTERO GROUP WWW.GRUPOGRANAYMONTERO.COM WHAT MAKES US DIFFERENT? We ensure the success of our clients through sustainable mining operations. OPERATIONAL LEADERSHIP "ALL OUR EMPLOYEES SUSTAINABLE RELATIONS EXPERIENCE and efficient execution of the projects returning home safely, everyday" and support to local communities Peru - Chile - Panama - Colombia - Mexico 2 3 3
OUR PEOPLE We add value through our people, who understand the needs of our clients and provide customized solutions. A successful organisation has a clear purpose, is community-oriented and inspires its personnel to live its values, fostering a culture of trust. STEVE DIXON CHIEF EXECUTIVE OFFICER n n n n EXPERIENCED MANAGEMENT TEAM focused on operational leadership PERSONNEL SPECIALIZED in safety, planning, execution and control of projects ONGOING DEVELOPMENT of operators and community members STATE-OF-THE-ART-SIMULATORS for training 4 La Arena Project (Peru) 5
OUR CONSTRUCTION SERVICES FOR MINING We have participated in the successful construction and expansion of several greenfield and brownfield operations throughout Latin america. STRACON GyM offers integrated solutions to these requirements, including: Construction of mine infrastructure (tailing dams, leach pads, reservoirs, etc.). Earthworks services This service is provided from the first stage of the project, through the clearing, the construction of access and haul roads, the construction of workshops and camps, the excavation and mass filling of civil structures. High safety standards LTIFR: 0.31* *Loss Time Injury Frequency Rate per 200,000 man-hours worked Efficient equipment fleet management 90% equipment availability Site preparation and clearing Construction of access and haul roads. Construction of workshops, camps, fuel stations and magazines. Engineering and construction +100 km of access and haul roads built Man-hours worked per year ~20 million (2015) Engineering development and project management. 6 La Arena Project (Peru) 7
Construction of Tailing dams Construction of Leach Pads Engineering and construction 45 million m³ of mass excavation works 40 million m³ of mass fill and structural fill +2 million m² of geotextile membrane installed Engineering and construction 6 million m³ of mass excavation works 3 million m³ of structural fill and low-permeability soil We operate ancillary equipment valued at more than +$38 million International experience 7 million man-hours worked (2015) Leach pads built 7 pads +150 hectares 8 million man-hours worked (2015) 8La Arena Project (Peru) 9
OUR EXPERIENCE Earthworks services La Arena Tahoe Resources La Libertad - Peru Cmdty: gold - 38 MTPY (2010 - to date) Shahuindo Tahoe Resources Cajamarca - Peru Cmdty: gold 25 MTPY (2015 - to date) La Zanja BVN & Newmont Cajamarca - Peru Cmdty: gold 16 MTPY (2010 to date) Cobre Panama First Quantum Minerals Colon - Panama Cmdty: copper - 36M de m³ (2013 - to date) ** Imagen de Alio Gold Inc. Ana Paula Alio Gold Cerro Negro, México Cmdty: oro, plata (2017-2018) Development of the 1,200m underground ramp, and associated works.* El Brocal Soc. Minera El Brocal S.A.A. Cerro de Pasco - Peru Cmdty: poly-metallic - 20 MTPY (1998-2015) Punta de Lobos Soc. Minera Punta de Lobos Iquique - Chile Cmdty: salt - 10.5 MTPY (2011-2012) Marcona Shougang Hierro Perú S.A.A. Ica - Peru Cmdty: iron - 32 MTPY (2008-2012) Constancia Hudbay Minerals Cusco - Peru Cmdty: copper - 80 MTPY (2012-2016) ** Imagen de Alio Gold Inc. San Francisco Alio Gold Sonora, México Cmdty: oro (2017-2019) Pre-stripping works of Stage 2 of La Chicharra open pit.* 10 La Zanja Project (Peru) *Work is carried out through STRACON GyM s mexican subsidiary, GDI STRACON GyM S.A. de CV. 11
OUR EXPERIENCE Constancia Project (Peru) Construction of Tailing dams Construction of Leach Pads Toromocho Minera Chinalco Peru cmmty: cooper 950 MT of tailings (2011-2013) Cerro Corona Gold fields cmmty: cooper / gold 158 MT of tailings (2006-2008) La Arena Tahoe Resources La Libertad - Peru 78Ha - 4 leach pads built (2010 - to date) Shahuindo Tahoe Resources Cajamarca - Peru 26Ha - 2 leach pads built (2015 - to date) Cobre Panama First Quantum Minerals cmmty: cooper 950 MT of tailings. (2013-2016) Constancia Hubday Minerals cmmty: cooper 277M-dry tons (Commenced: 2012) La Zanja BVN & Newmont Cajamarca - Peru 14Ha - 1 leach pad built (2010 - to date) 12 13
OUR REPUTATION STRACON GyM has built its reputation as a leading mining contractor in the region by upholding its values. We strive to become strategic partners of our clients, providing them with efficient solutions, adding value to their operations. Our success is demonstrated by the success of our clients operations. Here are some of our working partners: ALEX BLACK EX-CHIEF EXECUTIVE OFFICER AND PRESIDENT OF RIO ALTO MINING LIMITED Rio Alto is a Peruvian success story that owes a lot of its formative achievements to its Mining Alliance with STRACON GyM. The Mining Alliance at the La Arena Gold Mine was the first of its kind in Peru, based on a cooperative and collaborative relationship between Rio Alto management and the management of STRACON GyM. A best for project principal was implemented from the outset with a united approach to getting La Arena started and run on the most optimal basis to the benefit of both Alliance Partners without conflict or adversity. The flexibility and willingness of the STRACON GyM team to work with Rio Alto management to get the job done at La Arena was a key component to the project s success. With Hudbay venturing into new territory, open pit mining at altitude, new country, new language, no employee base, etc. STRACON GyM had the communication and transparency that provided us with the confidence that they would be good partners to manage the risks associated with the mining and the civil earthworks. That left us to concentrate on plant construction, permitting, social engagement and government relations. The venture was successful and the cooperation at all levels was consistent. STRACON GyM proved flexible in their contract style and conflict resolution. They have also facilitated a seamless transition to owner mining. They were and are a key and integral part of the Constancia success. CASHEL MEAGHER CHIEF OPERATING OFFICER AT HUDBAY MINERALS 14 La Arena Project (Peru) 15
Shahuindo Project (Peru) STRACON GyM S.A. Graña y Montero Group Lima, Peru Av. República de Panamá #4675 Surquillo, Lima 34, Peru Tel. (511) 208-0230 Fax (511) 421-6045 Cocle, Panama Harinos Mall, Piso 2, Oficina 12 Penonome. Cocle, Panama Mexico Desierto de los Leones #24 Int.401 Col. San Ángel, Del Álvaro Obregón, C.P. 01000, Mexico DF Colombia Calle 7 Sur N 42-70 Oficina 709 Medellin, Antioquia. E-mail info@stracongym.com www.stracongym.com Follow us on: 16