Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,

Similar documents
Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

SK 1.0 SITE STATISTICS PRELIMINARY DOCUMENTS. PROPOSED APARTMENT BUILDING 115 & 117 ERB STREET EAST Waterloo, Ontario PROJECT: DATE: REFERENCE: -

Capitol Hill Prime Retail Space For Lease

KING CONDOMINIUM RESIDENCES (REZONING)

2600 COLORADO ENTRY DESIGN

HEARST GARDENS BERKELEY, CA 94702

Marymount University Ballston Center Redevelopment

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features:

2

Town Hall Meeting. July 28, 2016 Sherwood School of Music 1312 S. Michigan Ave.

MBTA WOLLASTON. Station Improvements Public Meeting. January 14, 2016

Madison Metro Transit System

Kaufland, Chirnside Park

February 2006 COA Report

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019

Introduction BACKGROUND THE PUBLIC EXHIBITION

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

Retail Available in South Lake Union. 9th and Lenora, Seattle, WA

25 th Avenue Grade Separation. December 13, 2017

Leidesdorff Village D&S Developement 2277 Fair Oaks Boulevard, Studio 220 Sacramento, California

Capital Projects Funds

CLIPPER COVE PROMENADE & MARINA DEVELOPMENT

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

Exhibit 18A ANDERSON STREET DETAIL LECOUNT SQUARE New Rochelle, New York

PARKS & BEACHES PROJECTS

Bellevue South Park. Located between E 26th and E 28th at Mt. Carmel Place, in the Borough of Manhattan.

1 TP-08 3 TP-08 TP-06 EX.RL SPRINKLER STORAGE TANKS SPRINKLER PUMP ROOM RETAINING WALL WITH HANDRAIL TOW

Brand New Prestigious Main Floor Retail Space

FOR LEASE. OFFICE & RETAIL Street, Edmonton, AB AVAILABLE NOW! RENTS STARTING AT $12/SF. Completed showsuites, move in ready!

AREA TENANTS CONTACT Dan Clark DEMOGRAPHICS

Purpose of Presentation. Outline of Presentation. Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

BOSTON, MA 171 TREMONT IMPACT ADVISORY GROUP 5/19/16

Dufferin Jog Elimination Project

Astoria Boulevard ADA and Station Renewal Track Improvements. January 30, 2019

FLORIDA S HOLLYWOOD BEACH AND DOWNTOWN BUSINESS AND REDEVELOPMENT OPPORTUNITIES CAPITAL IMPROVEMENT PLAN

M E S T I Z O C U R T I S P A R K

IREDALE GROUP A R C H I T E C T U R E

25 th Avenue Grade Separation. September 13, 2017

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Pedestrian Safety Review Spadina Avenue

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

SUNSET NORTH BELLEVUE, WA

200 Liberty Street 225 Liberty Street 200 Vesey Street 250 Vesey Street 300 Vesey Street

SWEDISH FIRST HILL MEDICAL CENTER

1339, 1431, TH AVENUE NE TH STREET NE

REDEVELOPMENT HIGHLIGHTS

Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016

SCHEMATIC PACKAGE SHEET INDEX

MINUTES DESIGN & REVIEW BOARD. September 8, 2015

635 Wilmer Ave. Orlando, Fl Ph Fx

FOR SALE OR LEASE. Industrial / Office / Warehouse Building. McCartney Cabinet Building 1330 Burlington, North Kansas City, Missouri

gables station s dixie hwy & ponce de leon blvd coral gables, fl 33133

Elevate your Environment Westlake.

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

FLOOR PLANS. Georgia World Congress Center Centennial Olympic Park

Development Agreement No. DA16-002

CA CA CA CA CA CA CA CA CA CA Educational facilities - public elementary and high schools and private schools with a curriculum similar to public

Greenville-Spartanburg International Airport RFP - Janitorial Services Contract Space Exhibits 8/22/17

Landscape Architect: Peter D Brandow, AIA, ASLA 1537 Monrovia Avenue Newport Beach, CA cell:

ROSEVILLE INNOVATION PARK 8040 FOOTHILLS BOULEVARD, ROSEVILLE CA ±160,000 SQUARE FEET AVAILABLE

FOR SALE Rare Mid-Town Location

I-70/I-71 Project Public Meeting Presented By

No 30 x 48 space is provided for a wheelchair under the picnic table.

Trails, steps, & P-Patch to be south of I- 5 Colonnade

PLAN COMMISSION VILLAGE OF DEERFIELD

WEST ADDISON DEVELOPMENT

PROJECT TEAM VICINITY PLAN NTS LOCATION PLANS NTS. Mark Petrella, A.I.A. Kimberly McCarron, NCARB

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

,271

CAPITAL PROGRAM SUMMARY

change your view 200 South Wacker Drive Chicago, IL

AND AND ALL OF SAID LANDS SITUATE, LYING AND BEING IN THE CITY OF HOLLYWOOD, BROWARD COUNTY, FLORIDA, CONTAINING 326,439 SQUARE FEET ( ACRES).

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

CIDNA&Resolution&Re.&Trammell&Crow&Company& April&9,&2014&Amended&

Claremont Project Background and Update Community Meeting September 11, 2017

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014

CONFERENCES & EVENTS

WHY MOVE YOUR BUSINESS TO HOLLYWOOD?

01. PRIMARY MONUMENT WAYFINDING, TYP. 03. RULES/REGULATIONS, INTERPRETIVE SIGN, TYP. PARK MAP, WAYFINDING

11101 NE 9th Street Bellevue, WA

NOTICE OF PUBLIC HEARING

Historical Information Market Location

Innerbelt Bridge Contract Group 2 Tremont / Towpath Trail and Gateway January 8, 2013

THE MOMENT YOUR MEETING FOUND A HOME

FLOORS 17, 18 & 19 NOW LET TO FLOORS 16 & 15 UNDER OFFER CROWN AGENTS BANK SUTTON 6,200 43,400 SQ FT OFFICES THE QUADRANT SUTTON SURREY SM2 5AS

BRUNSWICK'S BOWLING 350 MCHENRY ROAD, BUFFALO GROVE, IL

THE HIGHPOINT East 7800 South. Sandy, Utah Fully Furnished & Move In Ready! Tenant Improvements Available to Suit

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

The Royal Atlantis. Hotel + Residences. Dubai, UAE

NEW STADIUM LUXURY SUITES

Beyond the Door... Experience Artesia s Excitement..you are only a stone s throw away

FOR LEASE TH AVENUE San Diego, CA 92101

Imagery 2017 Google, Map data 2017 Google Commercial Land with finished offsites

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

Schedule of Finishes - Internal. South (Memorial Drive) Building - Memorial Drive Apartments Typical Apartments

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

Transcription:

THE HUDSON

1'-8" 1'-8" 4'-0"4'-3 4'-0"4'-3 1/2" 1/2" Street Street trees trees in in tree tree grates grates along along Kingsbury Kingsbury Street Street - - 3" 3" caliper caliper shade shade trees trees (Ginko) (Ginko) Street Trees - 3" caliper shade trees (Elm Street Cultivars, Trees - 3" Autumn caliper Blaze shade trees Maples, (Elm Cultivars, Lindens) Autumn Blaze Maples, Lindens) 5/8" 33'-6 5/8" 301'-11" 33'-6 301'-11" 5'-5" 5'-5" 11 11 New Metal Fence to to Match Existing BRICK TOWNHOUSES 1,724.2 sq ft 1,688.25 sq ft 6,347.24 sq ft 10% DN 10% 10% 14.5% 14.5% 10% +0'-0" BALCONIES 10% UP 420.88 sq ft BRICK TOWNHOUSES 14 Spaces 20 Spaces Residential 34 Spaces +0'-0" 30 Service Corridor 14 3 3 124 spaces 1,090.21 sq ft Service Corridor Bike 40 BALCONIES 34 Data 111 Curbed planters with groundcover, Curbed perenials, planters and low with evergreen groundcover, shrubs perenials, along Chicago and low Avenue evergreen shrubs along Chicago Avenue Data Server / Security Elevator Lobby 101 Leasing Office 303 Move-In Trash / Move-In Trash Recycling / 112 Recycling 113 /Visitor 7 Spaces Package Closet Package Room Restroom Cart 43'-8 3/4" Bus Duct 15'-2" Mail Mail Existing Bus Stop Existing Bus Stop Residential Lobby +0'-0" Fire Panel Loading 10'X25' Loading BRICK TOWNHOUSES Note: No No crosswalks to to North side side of of Chicago Avenue from from the the East East end end of of property. 12'-2" 12'-2" 6'-6" 6'-6" 4'-0" 4'-0" 1'-8" 1'-8" Existing Existing Fire Fire Hydrant Hydrant Street Street trees trees in in tree tree grates grates along along Hudson Hudson Street Street - 3" - 3" caliper caliper shade shade trees trees (Ginko) (Ginko) Light Light Pole Pole to to be be Relocated www.pappageorgehaymes.com These plans are schematic and are subject to further refinement for compliance with code required exiting, life safety improvements and coordination with existing systems. Cambridge Avenue Cleveland Avenue Hudson Avenue The Hudson An Onni Condominium Project Hudson & Chicago Chicago, Illinois 15'-8" 15'-8" 8'-6" 8'-6" 5'-6" 5'-6" 1'-8" 1'-8" Chicago Avenue Chicago Avenue Lane 8'-0" 5'-6" 1'-8" 8'-0" 5'-6" 1'-8" 15'-2" First Floor / Site Plan Scale: 1" = 30', 1:1.45 N Kingsbury Street North Kingsbury Street Property Property Line Line Existing Gate Open/Green Space 3,400 sq sq ft ft 1/8" 1/8" 119'-0" 119'-0" 1,811.51 sq ft 1,620.67 sq ft 1,783.84 sq ft 1,639.69 sq ft 1,592.9 sq ft 1,358.42 sq ft 13 Spaces Residential 17 Spaces Private Alley for Town Homes to South Private Alley for Town Homes to South /Visitor 8 Spaces Bike Residential Lobby Loading Existing Gate Existing Gate Entrance Entrance Lane Lane North Hudson Street Hudson Avenue Onni Group developer pappageorgehaymes partners 4/25/14 P/H # 132188 COPYRIGHT PAPPAGEORGE/HAYMES Ltd. 2014 Sedgwick Street Superior Street Huron Street Context Plan

Previous West Perspective Current West Perspective Before & After: West Perspective

Previous East Perspective Before & After: East Perspective Current East Perspective

15'-7" 325'-1" 9'-0" 4'-4" 1'-8" 15'-0" Existing Bus Stop H Y D The Hudson An Onni Condominium Project Hudson & Chicago Chicago, Illinois 9'-11 1/2" 12'-2" Street trees in tree grates along Kingsbury Street - 3" caliper shade trees (Ginko) 1'-8" 4'-0" 4'-3 1/2" 6'-6" 4'-0" 1'-8" Street trees in tree grates along Hudson Street - 3" caliper shade trees (Ginko) First Floor / Site Plan Comparison Scale: 1" = 30', 1:1.45 North Kingsbury Street 119'-0" Entrance 10'X25' 10'X25' 8% Loading Trash 16% Ramp DN Residential Trash / Recycling Data, Controls, Security Service Corridor Freight Elevator Lobby 16% Ramp UP Residential Lobby +0'-0" 8% Ramp Residential Entrance North Hudson Street N Bicycle Residential Loading 10'X25' Previous First Floor Plan EXISTING GATE 15'-8" 8'-6" 5'-6" 1'-8" Private Alley for Town Homes to South 33'-6 5/8" 301'-11" 5'-5" 8'-0" 5'-6" 1'-8" 15'-2" Existing Bus Stop EXISTING GATE Existing Fire Hydrant Street trees in tree grates along Kingsbury Street - 3" caliper shade trees (Ginko) North Kingsbury Street 1'-8" 4'-0"4'-3 1/2" Current First Floor Plan Open/Green Space 3,400 sq ft Existing Gate 11 1/8" 119'-0" New Metal Fence to Match Existing 1,811.51 sq ft 1,620.67 sq ft 1,783.84 sq ft 1,639.69 sq ft 1,592.9 sq ft 1,358.42 sq ft 10% 14.5% 14.5% 10% 13 Spaces Residential +0'-0" 17 Spaces Before & After: First Floor Plan 10% DN 10% UP Service Corridor Private Alley for Town Homes to South Data Move-In Server / Security Bike Trash / Recycling /Visitor 8 Spaces Leasing Office Package Closet Restroom Cart 43'-8 3/4" Mail Bus Duct Residential Lobby Fire Panel +0'-0" Loading 10'X25' Loading Existing Gate 12'-2" 6'-6" 4'-0" 1'-8" Entrance Street trees in tree grates along Hudson Street - 3" caliper shade trees (Ginko) North Hudson Street Light Pole to be Relocated Onni Group developer pappageorgehaymes partners www.pappageorgehaymes.com 4/25/14 P/H # 132188 These plans are schematic and are subject to further refinement for compliance with code required exiting, life safety improvements and coordination with existing systems. COPYRIGHT PAPPAGEORGE/HAYMES Ltd. 2014

West Perspective

East Perspective

Street Trees - 3" caliper shade trees (Elm Cultivars, Autumn Blaze Maples, Lindens) Chicago Avenue Curbed planters with groundcover, perenials, and low evergreen shrubs along Chicago Avenue Note: No crosswalks to North side of Chicago Avenue from the East end of property. N 15'-8" 8'-6" 5'-6" 1'-8" 33'-6 5/8" 301'-11" 5'-5" 8'-0" 5'-6" 1'-8" 15'-2" Existing Bus Stop Existing Fire Hydrant Street trees in tree grates along Kingsbury Street - 3" caliper shade trees (Ginko) North Kingsbury Street 1'-8" 4'-0"4'-3 1/2" Open/Green Space 3,400 sq ft Existing Gate 11 1/8" 119'-0" New Metal Fence to Match Existing 1,811.51 sq ft 1,620.67 sq ft 1,783.84 sq ft 1,639.69 sq ft 1,592.9 sq ft 1,358.42 sq ft 10% DN 10% 14.5% 14.5% 10% 13 Spaces Residential +0'-0" 17 Spaces BALCONIES 10% UP Service Corridor Private Alley for Town Homes to South BALCONIES Data Move-In Server / Security Bike Trash / Recycling /Visitor 8 Spaces Leasing Office Package Closet Restroom Cart 43'-8 3/4" Mail Bus Duct Residential Lobby Fire Panel +0'-0" Loading 10'X25' Loading Existing Gate 12'-2" 6'-6" 4'-0" 1'-8" Entrance Street trees in tree grates along Hudson Street - 3" caliper shade trees (Ginko) North Hudson Street Light Pole to be Relocated BRICK TOWNHOUSES BRICK TOWNHOUSES BRICK TOWNHOUSES Ground Floor Plan

Landscape Details

1'-8" 1'-8" 4'-0"4'-3 4'-0"4'-3 1/2" 1/2" Street Street trees trees in in tree tree grates grates along along Kingsbury Kingsbury Street Street - - 3" 3" caliper caliper shade shade trees trees (Ginko) (Ginko) Street Trees - 3" caliper shade trees (Elm Street Cultivars, Trees - 3" Autumn caliper Blaze shade trees Maples, (Elm Cultivars, Lindens) Autumn Blaze Maples, Lindens) 5/8" 33'-6 5/8" 301'-11" 33'-6 301'-11" 5'-5" 5'-5" 11 11 New Metal Fence to to Match Existing BRICK TOWNHOUSES 1,724.2 sq ft 1,688.25 sq ft 6,347.24 sq ft 10% DN 10% 10% 14.5% 14.5% 10% +0'-0" BALCONIES 10% UP 420.88 sq ft BRICK TOWNHOUSES 14 Spaces 20 Spaces Residential 34 Spaces +0'-0" 30 Service Corridor 14 3 3 124 spaces 1,090.21 sq ft Service Corridor Bike 40 BALCONIES 34 Data 111 Curbed planters with groundcover, Curbed perenials, planters and low with evergreen groundcover, shrubs perenials, along Chicago and low Avenue evergreen shrubs along Chicago Avenue Data Server / Security Elevator Lobby 101 Leasing Office 303 Move-In Trash / Move-In Trash Recycling / 112 Recycling 113 /Visitor 7 Spaces Package Closet Package Room Restroom Cart 43'-8 3/4" Bus Duct 15'-2" Mail Mail Existing Bus Stop Existing Bus Stop Residential Lobby +0'-0" Fire Panel Loading 10'X25' Loading BRICK TOWNHOUSES Note: No No crosswalks to to North side side of of Chicago Avenue from from the the East East end end of of property. 12'-2" 12'-2" 6'-6" 6'-6" 4'-0" 4'-0" 1'-8" 1'-8" Existing Existing Fire Fire Hydrant Hydrant Street Street trees trees in in tree tree grates grates along along Hudson Hudson Street Street - 3" - 3" caliper caliper shade shade trees trees (Ginko) (Ginko) Light Light Pole Pole to to be be Relocated www.pappageorgehaymes.com These plans are schematic and are subject to further refinement for compliance with code required exiting, life safety improvements and coordination with existing systems. Cambridge Avenue Cleveland Avenue Hudson Avenue The Hudson An Onni Condominium Project Hudson & Chicago Chicago, Illinois 15'-8" 15'-8" 8'-6" 8'-6" 5'-6" 5'-6" 1'-8" 1'-8" Chicago Avenue Chicago Avenue Lane 8'-0" 5'-6" 1'-8" 8'-0" 5'-6" 1'-8" 15'-2" First Floor / Site Plan Scale: 1" = 30', 1:1.45 N Kingsbury Street North Kingsbury Street Property Property Line Line Existing Gate Open/Green Space 3,400 sq sq ft ft 1/8" 1/8" 119'-0" 119'-0" 1,811.51 sq ft 1,620.67 sq ft 1,783.84 sq ft 1,639.69 sq ft 1,592.9 sq ft 1,358.42 sq ft 13 Spaces Residential 17 Spaces Private Alley for Town Homes to South Private Alley for Town Homes to South /Visitor 8 Spaces Bike Residential Lobby Loading Existing Gate Existing Gate Entrance Entrance Lane Lane North Hudson Street Hudson Avenue Onni Group developer pappageorgehaymes partners 4/25/14 P/H # 132188 COPYRIGHT PAPPAGEORGE/HAYMES Ltd. 2014 Sedgwick Street Superior Street Huron Street Context Plan

Traffic Totals

Recommended Traffic Operations

Collector/Heavier traffic volumes (+/- 600 vph) Lower traffic volumes (+/-200 vph) Access (+/-60 vph) Traffic Volumes

Existing Conditions SITE

1. Pedestrian upgrades & optimize traffic signal cycle length and timings to improve operation 2. Turn lane improvements on Chicago Avenue @ Hudson Avenue 3. Updated crosswalks on Superior Street Proposed Conditions

Unit 5 Unit 6 Unit 7 Unit 8 2 Bed 1 Bed 1 Bed 2 Bed 1,012.95 sq ft 641.13 sq ft 641.13 sq ft 1,013.23 sq ft Unit 4 1 Bed w/ 795.7 sq ft Unit 3 1 Bed 684.37 sq ft 1,554.78 sq ft Unit 9 1 Bed w/ 856.54 sq ft Unit 10 1 Bed w/ 847.44 sq ft Fire, Light & Vent 12' Setback Unit 2 2 Bed 1,120.51 sq ft Unit 1 Unit 12 Unit 11 1 Bed w/ 1 Bed w/ 2 Bed 1,120.51 sq ft 854.6 sq ft 854.6 sq ft Typical Floor Plan

85'-5" 10'-5" 22'-9" +1'-6" 3rd Floor Amenity Deck 407 408 Private Deck @ 22 Private Deck @ 22 Private Deck @ 22 Unit 028 04 2 Bed 1,011.78 sq ft Private Terrace @ 25 Private Terrace @ 25 07 406 07 402 Make-Up Air Unit 412 504 06 1,250.65 sq ft 409 410 Ref/Frz Private Deck @ 3 Private Deck @ 3 854.6 sq ft 04 05 Unit 12 1 Bed w/ Unit 9Make-Up Air Unit 1 Bed w/ 04 856.54 sq ft 401 503 505 05 03 06 413 07 07 06 07 06 05 02 05 Cooling Tower 04 Unit 10 1 Bed w/ 847.44 02 sq ft 1,120.51 06 sq ft Unit 11 2 Bed 05 1,120.51 sq ft 03 01 03 03 01 01 Shallow soil green roof system with mixture of sedums, typ. +1'-6" DW 01 03 Private Terrace @ 25 Private 02 Terrace @ 2501 04 +1'-6" +3'-0" 297'-2" Roof Plan

Perspective of Chicago & Hudson

Perspective of Kingsbury

The Hudson An Onni Condominium Project Hudson & Chicago Chicago, Illinois 1 North Elevation Scale: 1:2.00 2 Zoning Height +240'-0" Material Legend 3 1 2 3 4 5 6 7 Prefinished Aluminum Window System w/ Aluminum Slab Edge Cover Glass/Aluminum Balcony Rail System Elastomeric Coated Cast-in-Place Concrete Brick w/ Cast Stone Trim Prefinished Aluminum Storefront Glass/Aluminum Canopy Prefinished Aluminum Entrance Canopy 7 4 5 6 Onni Group developer Amenity Floor +30'-6" 3rd Floor +18'-8" At Chicago Ave. pappageorgehaymes partners www.pappageorgehaymes.com 1/31/14 P/H # 132188 These plans are schematic and are subject to further refinement for compliance with code required exiting, life safety improvements and coordination with existing systems. COPYRIGHT PAPPAGEORGE/HAYMES Ltd. 2014

The Hudson An Onni Condominium Project Hudson & Chicago Chicago, Illinois 1 South Elevation Scale: 1:2.00 2 Zoning Height +240'-0" Material Legend 1 2 3 4 5 6 7 8 Prefinished Aluminum Window System w/ Aluminum Slab Edge Cover Glass/Aluminum Balcony Rail System Elastomeric Coated Cast-in-Place Concrete Brick w/ Cast Stone Trim Prefinished Aluminum Storefront Glass/Aluminum Canopy Prefinished Aluminum Entrance Canopy Recessed Down Aimed Security Lighting Typical Across Alley 3 4 8 Onni Group developer 7 Amenity Floor +30'-6" pappageorgehaymes partners www.pappageorgehaymes.com 3/6/14 P/H # 132188 These plans are schematic and are subject to further refinement for compliance with code required exiting, life safety improvements and coordination with existing systems. COPYRIGHT PAPPAGEORGE/HAYMES Ltd. 2014

The Hudson An Onni Condominium Project Hudson & Chicago Chicago, Illinois 1 East & West Elevations Scale: 1:2.00 2 Zoning Height +240'-0" Material Legend 1 Prefinished Aluminum Window System w/ Aluminum Slab Edge Cover 2 Glass/Aluminum Balcony Rail System 3 Elastomeric Coated Cast-in-Place Concrete 4 Brick w/ Cast Stone Trim 5 Prefinished Aluminum Storefront 6 Glass/Aluminum Canopy 7 Prefinished Aluminum Entrance Canopy 3 7 Onni Group developer 5 Amenity Floor +30'-6" 3rd Floor +18'-8" At Chicago Ave. pappageorgehaymes partners www.pappageorgehaymes.com 1/ 31/ 14 P/H # 132188 These plans are schematic and are subject to further refinement for compliance with code required exiting, life safety improvements and coordination with existing systems. COPYRIGHT PAPPAGEORGE/HAYMES Ltd. 2014 4