Meadowlily Secondary Plan and Integrated and Sanitary Assessments - April Ongoing AECOM Ashley Rammeloo G. Barrett Needed Next Steps tes Online Preferred options - Land use,, and Sanitary Updates to background technical studies required Meadowlily Secondary Plan Psychiatric Hospital Lands Municipal, for Storm Drainage and Servicing Works Stantec Dave Gough B. Debbert Integrated with Act process Thames Valley Parkway - rth Branch - Richmond to Adelaide Prevention and Fall 2014 Dillon Ongoing March CH2MHILL - Jacobs Colonel Talbot Pumping Station Stantec Pottersburg-Vauxhall Interconnect AECOM Marcy McKillop J. Bruin Detailed design Finalizing report for the third and final phase, including the implementation plan approved by MOECC April 2017. The City is progressing detailed design. Final PIC held v. 1, 2017 Thames Valley Parkway PPCP In Design, built by -2019 Funded by Charges PSCT In Design, built by PCPX East Park PS Upgrades RVA Detailed Design. Construction. Design to be tender ready. Timing depended on need and funding. PSEP Solid Waste Solid Waste Vauxhall WWTP Flood Protection Dillon East End Sanitary Servicing Study Ongoing Q1 CH2MHILL South London Sanitary Servicing Study Ongoing Q1 AECOM Vauxhall WWTP Expansion Adelaide WWTP Expansion Long Term Resource Recovery and Waste Disposal W12A Landfill Service Area Amendment Dingman Creek Subwatershed: Servicing Strategy - Schedule 'C' 2016 2021 Golder Jay Stanford & Wesley Abbott Hydraulic modelling and consult with UTRCA, then tice of PIC planned; MOECC has been consulted, CWWF Project Vauxhall 30 day review March CWWF Project ELSS PIC Feb 26,. 30-day review EIS to be undertaken as part of March detailed design Will include consolidation with Potts Growth Projection Flow Analysis ECA Growth Projection Flow Analysis Pending findings of internal study - N.A. Staff Wesley Abbott - N.A. Starting January 2016 December Aquafor Beech West London Dyke Master Repair Plan Stantec Dingman Creek Management Facility. B-4 Dingman Creek rth Lambeth Management Facility. P9 Airport Road South Industrial Management Facilities Delcan Stantec Adrienne Sones of Proposed Terms of Reference (TOR) for submission to MOECC (July ) A. Macpherson Public Meeting #2 April J. Bruin Finalize Report AECOM Dave Gough Select consultant as part of RFOI/RFP Select consultant as part of RFOI/RFP Phase 1-7, Phase 8 subject to Industrial Land Requirements approved by the MOECC in 2016. EPA approvals completed in 2016 Encompasses SWM for entire Dingman Creek Subwatershed; funded by DC and Capital. Funded by capital and Ministry of Resources Currently Funded by Owner Currently Funded by Owner W12A WLD MRP Page 1 of 5
Dayus Creek Drainage Area Storm/Drainage and Storm Water Management Remediation and Servicing Works - Dingman Creek Management Erosion Wetland Facility Fox Hollow Area Storm/Drainage, Management and Sanitary Servicing - Schedule 'C' Addendum Green Valley Drain Green Valley Drain Management and Remediation Works Hyde Park Community Storm Drainage and Management Schedule B Murray Marr Management Facilities Old Oak Area Storm Drainage and Management Servicing Old Victoria Storm/Drainage and Management Servicing Works Schedule 'C' Pincombe Drain Storm/Drainage, Management Servicing and Drain Restoration Works Schedule 'C' Pottersburg Creek downstream of Hamilton Road Slope Stability Pottersburg Creek Storm Drainage and Channel Remediation Project Schedule 'C' Stoney Creek Undeveloped Lands Storm/Drainage and Management Servicing Works - Sunningdale Area Storm/Drainage and Management Servicing for Undeveloped Lands Tributary C Storm/Drainage and Management (SWM), and Sanitary Trunk Servicing Works located within the Downstream Thames River Subwatershed Area Schedule 'C' Assessments - April Next Steps tes Online Delcan Dave Gough Implementation Delcan Dave Gough Constructed Stantec Dave Gough Phase 1, 2, 3 complete, Phase 4 scheduled for 2014 Funded by DC, Capital Delcan Dave Gough Constructed Earth Tech Dave Gough Earth Tech Dave Gough Earth Tech Dave Gough Dave Gough Stantec Dave Gough Phase 1, 2, 3, 4 complete, Phase 5, 6 schedule Phases 1, 2 Constructed, Phases 3,4, 5 subject to Industrial land requirements Phase 1 scheduled for construction, Phases 2 & 3 subject to Industrial Land requirements Phase 1 complete, Phase 2 schedule Phases 1 and 2 Phases 3, 4, 5 scheduled for 2013, 2015, 2020 respectively Funded by DC Riggs Dave Gough Implementation Funded by owner Dave Gough Delcan Dave Gough Earth Tech Dave Gough Phase 1, 2 complete Phase 3 scheduled based on servicing requirements Phase 1, 2, 3 Phase 4, 5, 6 subject to servicing needs Phases 1, 2, 3, 4 complete, Phases 5, 6, 7, 8 & 9 scheduled based on servicing requirements Funded by owner AECOM Dave Gough Functional Design Funded by DC Page 2 of 5
White Oak Area - Storm/Drainage and Management Works - Municipal Class Addendum Wickerson Road Area Storm Drainage and Management Servicing Works Schedule 'C' Municipal Class Assessments - April Next Steps tes Online AECOM Dave Gough Functional Design Funded by DC Dave Gough Phase 1 complete 2005/2008, Phase 2, scheduled for completion 2012 Phase 3, 4 scheduled for 2014 & 2020 respectively Funded by owner Mud Creek CH2MHILL Dave Gough Review of Draft /EIS Hyde Park Addendum Fall 2016 Fanshawe Park Widening - Adelaide to Highbury Hamilton Road - Old Victoria to Veterans Memorial Parkway Hyde Park - Oxford to Sunningdale Road Sarnia Road - Hyde Park to Wonderland Sarnia Road - Wonderland to Sleightholme Sunningdale Road - Wonderland to Adelaide Veterans Memorial Parkway Interchanges Veterans Memorial Parkway South Extension Wonderland Rd - Interchange at Highway 401 Delcan Ted Koza AECOM Dave Gough Issue tice of Commencement Addendum to existing Stantec Josh Ackworth IBI Group Ted Koza Phase 1 to be constructed in 2023 Includes intersection improvements at Old Victoria, Commissioners and Hamilton Hamilton Rd Dillon Ted Koza Sarnia Rd Dillon Josh Ackworth AECOM Josh Ackworth Detailed design Giffels MRC URS s Southdale Road and Boler Sept 2014 Dillon Fanshawe Park Road and Richmond St May 2015 Dillon G. Barrett Construction in 20-50 years Phased widenings tentative to start 2019 G. Barrett Warranty period In Partnership with MTO Maxim Kireev G. Barrett Under construction In Partnership with MTO Ted Koza Sunningdale Rd Veterans Memorial Parkway VMP South Extension Southdale Road & Boler Road Highbury Ave and Hamilton Road October 2014 Dillon Page 3 of 5
Western Road Widening - Platts Lane to Oxford Street W Assessments - April January 2014 AECOM Wonderland Rd South MMM Shift Rapid Transit September 2014 Fall IBI Group/ WSP Maxim Kireev/Ted Koza Jennie Ramsay Cycling February 2015 MMM Doug MacRae Wharncliffe Road widening/optimization - Becher Street to Commissioners Rd vember 2014 Blackfriars Bridge Dillon Uplands Pathway/Richmond St Crossing Next Steps tes Online Western Rd Construction from 401 to 402 starts. DD for other sections within 20 years. Wonderland Rd John Fleming EPR Report early Spring Next steps TPAP SHIFT Andrew Macpherson/ Jeff Bruin Implementation London on Bike Early MMM Josh Ackworth File ESR/start detailed design Wharncliffe May 2014 on hold AECOM K. Gonyou/ J. Bruin Maybe J. Bruin Detailed design Part II bump up received and under review with MOECC & OMB Blackfriars Bridge Recreational Path Richmond rth Western Rd/Sarnia Rd & Philip Aziz Avenue February 2015 on hold AECOM (using Huron St. Water crossing EIS) PIC 2 Pending resolution of SHIFT/RT/Western University reviews Dundas Place June 2015 Dillon Commissioners Rd W Realignment v/dec 2015 Spring CIMA Adelaide/CPR Grade Separation January 2016 Late MMM Wonderland Road Feb 2017 2019 Dillon Bostwick Rd March 2016 Spring Parsons Victoria Bridge Feb 2017 Spring AECOM Southdale Road from Pine Valley to Colonel Talbot, including Bostwick Rd from Southdale to Pack Road Southdale Road from Boler to Wickerson Richmond Street Municipal Underground Utilities Realignment Fall 2016 Spring AECOM August 2016 Spring Dillon K. / A. Spahiu J. Ackworth/ T. Koza Ardian Spahiu/J. Ackworth J. Ackworth/ T. Koza M. / J. Ackworth Ted Koza/Sam Shannon Ted Koza/Maxim Kireev Jim Yanchula File ESR/start detailed design Jerzy Smolarek PIC #3 Spring K. Gonyou/ J. Bruin PIC #1 Spring Finalize Report Jerzy Smolarek PIC 2 for PIC 2 - Spring Coordination with South-East Byron Secondary Plan Coordination with Bostwick and Southdale My Dundas Place Adelaide St and CPR Grade Separation Bostwick Road Southdale Road West Richmond St IBI Group/WSP Edward Soldo tice of Coordinated with RT Project Underground Utilities Page 4 of 5
Assessments - April Next Steps tes Online Clarke Road Widening from VMP Extension to Fanshawe Park June 2017 Spring Stantec Sam Shannon/ Ardian Spahiu Britt O'Hagan PIC 2 Coordination with VMP Extension Clarke Road Adelaide St rth May Winter 2019 M. Kireev/ Matt Davenport Appointment Southwest Area Sanitary Servicing & Schedule B for the Southland Plant Stantec Shawna T. Grawey Implementation to evaluate sanitary servicing options for rth Talbot, Bostwick West, rth Lambeth, and existing Lambeth neighbourhoods. SASS Tributary C Schedule B Sanitary and Crossing Huron St/William St Storm Sewer/Outfall Reconstruction AECOM 2016 Q2 Dillon Watson Park 2016 Q2 AECOM Avalon Street 2017 Q2 RV Anderson Mornington 2017 Q4 Stantec Shawna L. Mottram Preferred sanitary servicing option to be finalized in conjunction with SWM servicing J. Bruin tice of J. Bruin tice of PIC complete; finalizing report tice of Commencement Water Huron Watermain Crossing Stantec Kevin Graham A. Macpherson Construction completed in 2016 Water Long Term Water Storage To commence in 2019 Pat Lupton A. Macpherson Identified to undertake screening and subject lands status reports Beavers in area. New storm outfall for William St. New outfall for Wellington Road storm drainage (river to Commissioners Rd); Recommended alternative is Schedule A+ Schedule B initiated due to potential need to open cut sanitary crossing under Pottersburg Creek at Clarke Road Storm servicing needs for Quebec Street; to determine preferred alternative for ultimate storm servicing Close RFP Feb 23 RFQ completed in 2017 William St Watson Avalon Mornington Watermain Crossing Report te: Some of the information in the table may not be up to date Page 5 of 5