Design and Construction Features of Nivedita Bridge

Similar documents
L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)

AIRPORT MODERNISATION IN INDIA By K Roy Paul Secretary, Ministry of Civil Aviation, India and Chairman, Air-India Limited

Development of Road Infrastructure in India

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

THE ASSET BUILDERS CORPORATE PROFILE

Corridor of growth. Corridor Description and Rating NEW GURGAON. Areas Included:

Investment Opportunities DMIC UP Region

MY CITY OF A M I L L I O N D R E A M S (033)

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.

Article 13, clause no of the Concession Agreement states that:

Bandra Worli Sea Link

Hyderabad Metro Rail in PPP Mode

Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra

JULY - SEPTEMBER, 2015 satya VOICE A QUARTERLY UPDATE OF SATYA GROUP

Visit to METSO Alwar (22Mar.2014) A Brief Review

SADC PPP Network PPPs in SADC

Press Release March 1, Refer to: Anna Salgado

INVITATION FOR EXPRESSION OF INTEREST

ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016

Distinguished guests, parliamentary colleagues, ladies and gentlemen.

CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

ANA HOLDINGS Financial Results for the Three Months Ended June 30, 2018

Godrej Prakriti - The preferred life

The presentation has been prepared for information purpose, it is not a solicitation of any offer to buy or sell any security or instruments.

Global Aviation Market. Connie Muller Mumbai International Airport Limited (MIAL)

West Midlands Sustainable Urban

Phoenix Sky Harbor transit guideway bridge

CHENNAI REAL ESTATE MARKET

Outline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity

Now Available. Urban Rail Transport. in India Urban Bus Transport. in India India Infrastructure Research.

FROM LANDING TO TAKE-OFF: WE CARE! COMPANY PRESENTATION

Puri Pratham Project Highlights

Strategic Transport Forum 21 st September 2018

UNIFYING DIVERSIFICATION

Infrastructure. New capacity additions and good volume growth have. seen our expressway and water treatment concession

ABES. Company Presentation. March ABES Pircher & Partner GmbH Research & Development

Waukee Trailhead Public Art and Amenities Project

Yongnam Holdings Limited. 1HFY2010 Results Presentation

/8/2013 1

ROADMAP FOR THE IMPLEMENTATION OF THE LOMÉ DECLARATION & ACTION PLAN. Addis Ababa, 29 June 2017

Key Projects Carmichael Rail Line (CRL)

GMR Group s Airports Journey. Emerging Airports Show, Kuwait October 2015

A Review on the Recent Large Scale Infrastructure Projects in Hong Kong

Annual revenue crosses US$ 2.5 billion

JAIPUR METRO. One of the world s fastest project completions. A presentation by. Nihal Chand Goel Chairman & MD Jaipur Metro Rail Corporation

Inside Government Conference Case Study: Norwich Northern Distributor Road

5.7 Local road upgrades

East West Rail Consortium

GMR Infrastructure Limited, Q1-FY 11 Performance Highlights. Financial Highlights for Q (Rs. Cr.)

THE MERSEY GATEWAY LASTING INFRASTRUCTURE CONNECTING SOCIETIES

PR091/17 13 October 2017

The Lufthansa Group in Panama A Successful Launch of Operations a six month retrospective

ITA AITES WORLD TUNNEL CONGRESS 2009

8.INFRASTRUCTURE #INVESTINGUATEMALA. Industry in Guatemala

OCBC BANK TO ACQUIRE WING HANG BANK BY WAY OF VOLUNTARY GENERAL OFFER

Corridor Management Committee Meeting. April 2, 2014

Denis Connolly. Hecny Transportation Consultant 2003 Nov 2005

Sources of Information


Statistics of Air, Water, and Land Transport Statistics of Air, Water, and Land. Transport Released Date: August 2015

Capital Mall. The best of retail, entertainment and hospitality under one roof!

PROJECT : IT/ RETAIL PARK

List of Institutions & Its Courses (MBA/MHMCT) Affiliated to West Bengal University of Technology for the Academic Year as on

Compliance at HOCHTIEF Aktiengesellschaft. Turning Vision into Value.

PPP Days 2010 PPPs Lessons from the Last 18 Months


Dear Friends Welcome to an Intelligent Future... Visit or Call us on for more information regarding availability.

US-460 CONCEPTUAL PROPOSAL

The Next International Cruise Tourism Hub

Related Expertise Concession Projects - PPP

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Effect of Support Conditions on Static Behavior of 1400m main span and 700m side span Cable-stayed Bridge

Update on STX France. October, 2017

Welcome to the General Shareholders Meeting Turning Vision into Value.

Economic Development Sub-Committee


Style Service Location

An Incentives Guide to BUSINESS IN NAGOYA

IGI Airport : The Journey so far and the future.

Home About us Contact

Rethink Vancouver. Tourism Industry Summit. March 31, 2011

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

How do you get two buses to pass safely on something

Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR Trade Centre Limited. Table of Contents. Business Plan

Topic on A Technical and Project Review of the 10 Airport Core Projects and their Influence on Current Developments

Shenzhen Longhua MAINLAND AND OVERSEAS GROWTH. total route length of railway operations outside of Hong Kong

Pattullo Bridge Replacement Project

Major Projects Overview

BRAZIL FEDERAL ROADS GIF Advisory Council Meeting. April 18, 2018

Crown Corporation Business Plans. Trade Centre Limited

Rudy McLellan, P.E. GEC, Inc., Baton Rouge, LA For Vicksburg Bridge Commission, VBC

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

MEGAPROJECT Case Study

Strategic Airport Management Programme April Airport Economics. presented by. Eileen Poh Assistant Director (ICAO Affairs)

The Civil Aviation Sector as a Driver for Economic Growth in Egypt

For personal use only

FROM LANDING TO TAKE-OFF: WE CARE COMPANY PRESENTATION

UNVEILING AND OPENING TO TRAFFIC OF THE THIRD GUADARRAMA TUNNEL ON THE AP-6 MOTORWAY

IAT Annual Conference 'Driving Forward

Transcription:

Design and Construction Features of Nivedita Bridge Prof S S Chakraborty FNAE, Managing Director, Consulting Engineering Services (India) Private Limited, New Delhi. The tradition is one of iconic crossings across the river Hooghly in the stretch of the river falling within the enlarged Kolkata metro area Vivekananda Bridge (Bally Bridge), Rabindar Setu, (Howrah Bridge) and Vidyasagar Setu (Second Hooghly Bridge). While the mighty river forms the backdrop of the development of the region over centuries, it had also posed a challenge as regards connecton to the rest of the country. It is this challenge that the continuing tradition addresses, and addresses a new with a state-of-theart, recently opened and the newly christened Nivedita Bridge. In the northern reaches of the river within the metropolitan area the Vivekananda Bridge had served well the requirements of cross-river traffic till about the past decade or two. But, it has proved to be singularly incapable of accommodating the current demands, not to speak of the future what with the region, indeed the state anchoring itself as the hub of the Look East policy of the government. The existing 76 year old Vivekananda Bridge offers only a weak connectivity between National Highways 2 and 6 on the west and the National Highways 34 and 35 on the east of the river Hooghly.

Hence, the planning for a second crossing in the vicinity of the existing facility, started in 1993. This effort has fructified into the Nivedita Bridge, a necessary infrastructure item, a technological marvel and a successful paradigmatic resource mobilization, of the given magnitude through Public Private Participation (PPP), initiative in the bridge sector. The concessionaire company is Second Vivekananda Bridge Tollway Company SVBTC which attests to the origin and also the incubation of the idea. SVBTC comprises a group of developers, consultants and builders of international repute, from India and abroad. SVBTC is led by the Pacific Alliance-Stradec Group Infrastructure Company LLC (PASGIC LLC) from Mauritius, a joint venture association since 1995 between the Pacific Alliance Group from USA, Stradec Group from the Philippines and Trans- Asia Infrastructure Holding LLC from USA that includes Parsons Brinckerhoff Infrastructure Development Company Inc. (PBDIC) from USA, Consulting Engineering Services (India) Pvt. Ltd (CES) from India and Carter- Burgess Phils. Inc. from the Philippines. SVBTC also includes Larsen & Toubro Limited (L&T) as the local co-sponsor from the field of construction. And, IJM Corporation of Malaysia is a Strategic Partner. The uniqueness of the bridge arises in many aspects: the size of the project, the pioneering mode of finance of a bridge project, the state-of-the-art design and construction technologies balanced cantilever, segmental construction, box-pushing etc. During the techno-economic feasibility study stage, carried out by CES in 1993, three alignments were studied and the one 50 m downstream of the Vivekananda Bridge was recommended, from various considerations including connectivity, approaches etc. The hydraulic model study recommended piers aligned with existing piers with 110 m span and with low height pylons to avoid imposition on the spires of the Dakshineswar temple. This resulted in proposing PSC belt suspension system. However, as no temporary support from the river bed was acceptable, temporary stays were adopted and the system quickly metamorphosed into an extradosed bridge with permanent cable stays. And, it also became a pioneering PPP initative. CES was deeply involved in a multitude of aspects including resource mobilization, developing the Concession Agreement between NHAI and SVBTC, and the tripartite State Support Agreement, besides being the anchor on the technical front. The bridge comprises the cable-stayed extradose configuration, a global first, over multiple spans, seven of 110 m and two of 55 m totaling 880 m. One of the arresting structural features of the bridge is the width of the deck, 29 m, with three lanes in each direction with a 2 m shoulder on each side, but supported by a single plane of stay cables along the median. The crossing is 6.1 km long, some stretches on stilts and some on embankments, with an intricate set of entry and exit facilities that enable smooth traffic aggregation and dispersion on both the banks. The Howrah approach is 3.67 km long and Kolkata approach, is 1.56 km. The toll plaza is near the start of the project on Howrah side.

The Nivedita Bridge dramatically changes the traffic circulation scenario while it improves travel conditions in the region. The bridge immeasurably enhances the connectivity between the Kolkata and the Howrah sides, creating a more integrated metropolis for optimal leveraging of the advantages on both the banks. For example, the development of Dankuni sub-city and rejuvenation of Bally, Uttarpara and West Howrah would have been improbable in this stretch of the river. Industrial areas of Kamarhati, Panihati, Titagarh, Barrackpur, and Barasat would have better access to the regional and national road network and ailing industries along the corridor will be revived through improved movement of freight and passenger. Stronger connectivity from Burdwan-Dankuni area to the proposed Rajarhat township and Salt Lake City, emerging as the electronic IT hubs of Kolkata, is a certainty. The city core areas are more accessible from across the river through other linkages that are planned. The connectivity to the international airport stands enhanced. Direct connectivity across the river to the north eastern region and to the rest of the country on the west, for goods and passenger traffic is established, through NH- 34 and NH- 35. For smooth dispersal of traffic from NH-34 and NH-35 and from Barrackpur Trunk Road, the Government of West Bengal has taken many initiatives including a number of gradeseparated interchanges one at Dunlop-BT Road Junction, one near the airport and the other at Nager Bazar at the intersection of Jessore Road and Dum Dum Road. Nivedita Bridge has immeasurably enhance the connectivity between the Kolkata and the Howrah sides, creating a more integrated metropolis the putative twin-city configuration

may even become a super megalopolis, leading to optimal leveraging of the advantages on both banks. The bridge, along with Belgharia Expressway and the proposed Eastern Link Highway could form an outer ring road around Kolkata. This outer ring road together with the western connectivity to Kolkata Port via Kona Expressway and Vidya Sagar Setu, and NH-6 /NH- 2 will form the peripheral express link. The bridge is expected to carry traffic of 42,500 passenger car units at its opening and twenty years later, this number may rise to about 145,000. The Second Vivekananda Bridge Tollway Company (SVBTC) as the Concessionaire has taken up the tasks of funding, developing, planning, designing, execution, and operation and maintenance of the project in a public-private partnership (PPP) format. NHAI the Government agency representing the Ministry of Shipping and Road Transport & Highways is the owner of the project and they have, besides offering a grant, provided the necessary infrastructure and support to the Concessionaire. West Bengal State government has extended all necessary support like power, traffic control, etc. for the successful implementation, within cost, of about Rs. 6,500 million, and on schedule, of this land mark project. Over the years, the Second Vivekananda Bridge Tollway Group (SVBTG), (SVBTC being the successor corporate entity) took extensive efforts in project planning and designing, which eventually brought about the signing of the Concession Agreement between SVBTC and NHAI, and also with the Government of West Bengal in a tripartite State Support Agreement. This is the largest project in PPP format in NHAI s Golden Quadrilateral project. SVBTC, aiming at excellence at all levels of construction and management, brought in the best of global talent with proven track record and resources with formidable commitment. Prof. S S Chakraborty is the Chairman and Dr. Jay Ved, the Co-Chairman of the Board of Directors of SVBTC that represents the shareholders. The Executive Management Committee and QA/QC Audit committee ensures strict adherence to the norms of the highest quality and also corporate governance. SVBTC has entered into three contracts Engineering, Procurement & Construction (EPC), Operation & Maintenance (O&M), and Programme Management. Turnkey EPC contract is with L&T supported by a joint venture between CES & PB in association with International Bridge Technologies (IBT). While an alliance of CES-PB is carrying out planning, development,

design and quality assurance, PASGIC LLC in association with IJM has taken charge of O&M contract. The reputed engineering consultants from Germany, Schlaich Bergermann und Partners have been appointed Independent Consultants. It is to the credit of the Concessionaire and all the technical and managerial professionals associated with the effort that the bridge has been executed on schedule and within budget. Kolkata region needs this bridge. In fact, the nation needs this, if only to assert its technological expertise and the wherewithal to carry out developmental projects. Technical Features of the Project The main bridge, Kolkata side approach, Howrah side approach with a 16-lane toll plaza (may be expanded to 20 lanesin future), with automatic toll collection facility and a toll-free service lane are the main components of the project. Main bridge: The following have been used for the first time: Single plane cable supported extradosed bridge with short pylon. Precat single cell segment for a width of 29 m (6 lane traffic). Monolithically connected superstructure with substructure having bearings at midspan of every alternate span i.e. away from substructure. Bearing allows movement in only longer direction and restraints other movements and rotation in all three directions. Transverse and web prestressing besides longitudinal prestressing

Single column for 26 m height in the river bed. Segments weighing 150 ton in the balanced cantilever segmental construction. Viaducts: First time use of: Dry jointed match cast precast segments for the full length of viaduct. Complete external prestressing in the longitudinal direction. Road Under Bridge (RUB): Box pushing through embankment without stopping train movement This land mark project connects the missing critical link of the Golden Quadrilateral component of National Highway Development Projects between NH2/NH6 and NH34/NH35. Source: http://www.nbmcw.com/articles/bridges/536-design-and-construction-features-of-nivedita-bridge.html