Gladstone RG Tanna and Barney Point Coal Terminals www.gpcl.com.au
Location WORLD Gladstone Port One of the world s top-five coal export ports Exports coal to over 30 countries worldwide Only 10-15 days sailing to Asia AUSTRALIA Gladstone Port Third largest coal export port in Australia Handles 20% of Australia s coal exports GLADSTONE CAIRNS TOWNSVILLE Queensland Gladstone Port Second largest coal export port in Queensland Handles 33% of Queensland s coal exports ABBOT POINT MACKAY DALRYMPLE BAY/HAY POINT ROCKHAMPTON GLADSTONE BUNDABERG BRISBANE p2
Coal Resources & Infrastructure COLLINSVILLE Drake Cows SONOMA Sarum Jax NEWLANDS EASTERN CREEK Byerwen WOLLOMBI/SUTTOR CREEK Lenton NORTH GOONYELLA/EAGLEFIELD HAIL CREEK Ellensfield BURTON GOONYELLA RIVERSIDE BROADMEADOW UNDERGROUND SOUTH WALKER CREEK BROADLEA NORTH COPPABELLA MORANBAH NORTH Grosvenor CARBOROUGH DOWNS ISAAC PLAINS MOORVALE CAVAL RIDGE MILLENNIUM DAUNIA Olive Downs POITREL EAGLE DOWNS PEAK DOWNS Saraji East SARAJI LAKE VERMONT Picardy BLAIR ATHOL CLERMONT NORWICH PARK MIDDLEMOUNT GERMAN CREEK EAST CAPCOAL (GERMAN CREEK) FOXLEIGH OAKY CREEK LAKE LINDSAY GREGORY CRINUM KESTREL YARRABEE Mackenzie North Teresa Washpool JELLINBAH EAST ENSHAM Curragh West CURRAGH NEW MINE UNDER CONSTRUCTION EXISTING MINE EXPANSION PROJECT Advancing export coal project OPERATING MINE QUEENSLAND Coal Queensland - world s largest exporter of seaborne coal Approximately 30 billion tonnes of black coal resources All varieties of black coal thermal, PCI, soft coking, coking, anthracite RAIL Connection Aurizon and Pacific National servicing the Blackwater, Moranbah and Moura lines Strategic network planning to meet future demand MINERVA BLACKWATER COOK Arcturus Springsure Creek BARALABA Meteor Downs South ROLLESTON Belvedere CALLIDE DAWSON MINING COMPLEX (MOURA) Monto 0 50 100 Kilometres Gladstone Port Sheltered deepwater harbour Minimal weather delays Up to 220,000 DWT vessels Current coal export capacity in excess of 80Mtpa QLD Energy Resources Oil Shale Project Cement Australia Holdings Gladsone Friend Point Rio Tinto Alcan Yarwun APLNG Fishermans Landing Wharves QCLNG GLNG Hamilton Point WICT WIGGINS ISLANDS CURTIS ISLAND ARROW RGTCT Clinton Wharves Auckland Point Wharves Barney Point Wharf QUOIN ISLAND Port of Gladstone Orica Australia Pty Ltd NRG Gladstone Power Station South Trees Wharf Boyne Smelter Wharf Qld Alumina Limited QAL SOUTH TREES ISLAND p3
RG Tanna Coal Terminal RG TANNA Coal Terminal 72Mtpa+ throughput capacity Handles coal from more than 17 Central Queensland mines Over 40 varieties of coal handled Up to 220,000+ DWT vessels able to be loaded Quality assurance certification to AS/NZS ISO 9001:2008 Extensive environmental dust and water management system Environmental AS/NZS ISO 14001:2004 Train Unloading Three trains unloaded simultaneously at 6,000tph each TERMINAL Infrastructure Number of Rail Unloading Stations 3 SP19 SP20 Automatic wagon door opening system Bottom dump wagons discharge coal into underground feeders Coal transferred to overhead conveyor system Train Unloading Rate (nominal) 3 x 6,000tph Number of Stockpiles 22 Total Stockpile Capacity 5.8Mt Number of Shiploaders 3 Number of Berths 4 Shiploading Rate (normal) Annual Shiploading Rate 3 x 6,000tph 72Mtpa+ Refer to inside back cover for detailed terminal specifications. p4
FROM TRIPPER STOCKPILE DISCHARGERS TO SHIPLOADING CONVEYORS CONTROL GATE CONVEYOR STOCKPILE CROSS-SECTION Stockpiling Coal directed from overhead conveyor to stockpile via tripper Bulldozers form and maintain stockpiles 22 stockpiles = 5.8Mt total storage capacity SP21 SP22 Shiploading Blending Coal reclaimed using bulldozers pushing coal into stockpile dischargers All blending undertaken during shiploading Stockpiles contain up to three stockpile dischargers Three vessels loaded simultaneously at 6,000tph each Control gates on stockpile discharges allow feed rates to be controlled to meet required blend rates Up to five (5) varieties of coal can be blended at one time p5
Barney Point Coal Terminal BARNEY POINT Coal Terminal Train Unloading Single train unloaded at 2,000tph Automatic wagon door opening system Bottom dump wagons discharge coal into underground feeders Coal transferred to stockpiles via coal stacker 8Mtpa throughput capacity Handles coal from more than 7 Central Queensland mines Up to 105,000 DWT vessels able to be fully loaded Quality assurance certification to AS/NZS ISO 9001:2008 Environmental dust and water management system Environmental AS/NZS ISO 14001:2004 Refer to table opposite for detailed terminal specifications. Shiploading Coal reclaimed using front-end loaders to discharge into reclaim hoppers Single vessel loaded at 2,000tph p6
Port of Gladstone Coal Terminal Specifications LOCATION RG TANNA COAL TERMINAL BARNEY POINT COAL TERMINAL Country Australia Australia State Queensland Queensland Port Name Gladstone Gladstone OWNERSHIP / WORKFORCE Owner Gladstone Ports Corporation Gladstone Ports Corporation Operator Gladstone Ports Corporation Gladstone Ports Corporation Shareholders Queensland Government Queensland Government Employees 700+ CAPACITY Operations Commencement 1980 1967 Annual Throughput Capacity 72Mtpa 8Mtpa TRAIN UNLOADING Average Train Size - Blackwater line 8,100 tonnes 8,100 tonnes Average Train Size - Moura line 6,500 tonnes 6,500 tonnes Number of Unloading Stations 3 1 Train Unloading Rate (nominal) 3 x 6,000tph 2,000tph Train Unloading Method Automatic bottom-dump Automatic bottom-dump STOCKPILING Number of Stockpiles 22 Approx 9 zones Total Stockpile Capacity 5.8Mt 400,000 tonnes Stockpiling Method Overhead conveyor / tripper Stacker Stockyard Equipment D11 Front-end loaders/dozers SHIPLOADING Coal Reclaim Method Blending Bulldozer into underground stockpile dischargers Up to five (5) varieties can be blended during shiploading Front-end loader into hoppers over shiploading conveyor Blending during shiploading Number of Shiploaders 3 1 Shiploading Rate (nominal) 3 x 6,000tph 2,000tph SHIPPING Maximum Vessel Size 220,000+ DWT 105,000 DWT (full-load) Maximum LOA 315m 270m Maximum Beam 55m 45m Sailing Draft 17.0m Up to 18.0m dependent on tide 15.0m Number of Berths 4 1 Wharf Length 1,491m 205m Berth Depth (LAT) 18.0m 15.0m SERVICES Quality Assurance AS/NZS ISO 9001:2008 AS/NZS ISO 9001:2008 Sampling During shiploading Four superintendent companies During shiploading Four superintendent companies Environmental AS/NZS ISO 14001: 2004 AS/NZS ISO 14001: 2004 p7