Manatee County Impact Fee Schedule Effective April 18, 2016 (1)

Similar documents
SUMTER COUNTY ANNUAL TRAFFIC COUNT PROGRAM 2017 TRAFFIC REPORT

Appendix D: North Bellingham Trail Plan. See attached map and route descriptions.

A&H Project Proposal 2017

A&H Project Proposal 2017

UNCLASSIFIED FY 2017 OCO. FY 2017 Base. FY 2017 Base FY 2017 OCO. Total Obligation Authority

CHOICE OF CEREAL PANCAKE STACK/SYRUP BACON FRUIT JUICE CHOICE OF COFFEE, SKIM MILK

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Willow Ridge Healthcare

SELF-CONTAINED GRADE A OFFICE BUILDING 10,575 SQ FT ( SQ M) 44 CAR PARKING SPACES

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base. Total Obligation Authority

THE SUMMIT AT QUADRA VILLAGE THE SUMMIT AT QUADRA VILLAGE

Genex Kidston Connection Project: Draf t Environmental Assessment Report Powerlink Queensland

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 P-1 Line #6

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 9 P-1 Line #14

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base. Quantity Total Obligation Authority

BUILDING 5 FOR LEASE OR SALE ±362,880 SF! AVAILABLE Q3 19 A M E Y O

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

CA CA CA CA CA CA CA CA CA CA Educational facilities - public elementary and high schools and private schools with a curriculum similar to public

CHAPTER 2. Corridor Context. Existing Land Use

Part Number Naming Convention

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base. Quantity

North Beach Redevelopment Initiative Alternative 1 Corpus Christi, Texas

AECOM City of London Pedestrian Pathway Connection Across CNR Lands in Kiwanis Park Municipal Class Environmental Assessment Screening Report

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 P-1 Line #7

FOR LEASE 5431 H Street Sacramento, CA

Aviation Maintenance Industry Outlook and Economic Impact

Exclusively offered by da Vinci Realty, LLC E. Aspen Ave., Flagstaff, AZ 86001

Step up to SpaciouS family living

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Start Time:3:40 pm End Time:4:00 pm Distance:6.57 mi. Driver Sign-Off Time:04:05 pm

UNCLASSIFIED FY 2013 OCO. FY 2013 Base

Clinton County Comprehensive

Tourism in Israelan. & Employment in Tourism Industries. outline

RFTA REGIONAL BICYCLE, PEDESTRIAN AND TRANSIT ACCESS PLAN. Map A.7: El Jebel/Willits Existing Conditions Map. A-8 Exisiting Conditions Maps

Letter of Agreement. IVAO Switzerland & France Divisions. 1. Purpose. 2. General procedures

INTERLOCAL AGREEMENT BETWEEN THE CITY OF KISSIMMEE AND OSCEOLA COUNTY FOR ANNEXATION OF SMALL ENCLAVES

AIRPORT LAYOUT PLAN FOR FRIEDMAN MEMORIAL REPLACEMENT AIRPORT - SITE 12 FRIEDMAN MEMORIAL AIRPORT AUTHORITY INDEX OF SHEETS SHEET TITLE

Municipal Policy Committee (MPC) Meeting, Planning and Development Services

OMNI REAL ESTATE OFFERED FOR SALE PRIME LAND 5+/- ACRES ON PINE ISLAND ROAD IN CAPE CORAL, FL 33991

HASTINGS RANCH FOR LEASE 3801 E. FOOTHILL BOULEVARD, PASADENA, CA FOR MORE INFORMATION CONTACT:

N W Elev:83ft

IPv6 Trends, Taiwan, Asia-Pacific and Worldwide: an update from TWNIC OPM Taipei, 21 June 2018

Property Summary HWY 7 Warsaw, Missouri 65355

SWEDISH FIRST HILL MEDICAL CENTER

543 MAIN STREET DELTA, COLORADO HISTORIC DOWNTOWN BUILDING

DUBAI INTERNATIONAL AIRPORT SOUTHERN RUNWAY REHABILITATION Summer 2019 SHL Summary 16 th April to 30 th May 2019

LOCALITY MAP. For leasing info: BROKERS WELCOME. custom leasing solutions in a native environment. Comments:

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 P-1 Line #74

LOS VALLECITOS BUSINESS CENTER

DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA

LOS VALLECITOS BUSINESS CENTER

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

SIMULATION USE ONLY. DO NOT USE FOR REAL WORLD NAVIGATION N IVAO HONG KONG

Welcome to Sage Hill Corner

LOS VALLECITOS BUSINESS CENTER

Comparison Between Old and New ALUC Plans

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 19 P-1 Line #2

Table of Contents. Utility Information Water Sanitary Sewer Employment Helpful Links Property Photographs Area Attractions Contact Information

A Multimodal Tour of the Tri-State Region Saturday, July 24, and Sunday, July 25, 2010

LOS VALLECITOS BUSINESS CENTER

LOS VALLECITOS BUSINESS CENTER

San Carlos AIRPORT ENVIRONMENTAL DESIGN TOOL AEDT PROCESS. Airport. Flight Tracks. Profile Analysis. Existing & Forecast Operations/Fleet Mix

FY COMPANIES ASSISTED BY THE BEACON COUNCIL

SUPER VACANT LAND REAL ESTATE OPPORTUNITIES

" Voting Place " " Prince William County, Virginia Gainesville Election District Voting Precincts and Voting Places EVERGREEN BATTLEFIELD ALVEY

CRISTAL Toulouse. Fourth Meeting of ADS-B Study and Implementation Task Force October 2005 Nadi, Fiji

IVAO Switzerland Division

PURCHASE PRICE. Utah Food Processing & Frozen Distribution Facility 1811 WEST 1700 SOUTH SALT LAKE CITY, UTAH $4,195,000 ($45.

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 14 P-1 Line #5

DEPARTAMENTO DE OPERACIONES ESPECIALES SPECIAL OPERATIONS DEPARTMENT

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

VILLAGE BOARD OF TRUSTEES ANNUAL SCHEDULE OF MEETINGS Calendar Year 2017

PROTECT Outlines Vision for Forest Preserve Classification of 69,000 Acres of former Finch/TNC Lands to be Purchased by the State

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

LOS VALLECITOS BUSINESS CENTER

DEUS CARITAS EST SATB Choir, Soloist, Organ. œ œ. œœœœœ. œ œœœ œ œ œ

THE OFFICIAL TROLLEY TOUR OF THE BOSTON TEA PARTY SHIPS & MUSEUM RESIDENCE INN CHARLES ST. BY MARRIOTT CAMBRIDGE BOSTON MARRIOTT CAMBRIDGE ST.

AvalonVillage WALNUT CREEK EXCLUSIVE RETAIL AGENTS: EXCLUSIVE OFFICE AGENT:

Chris. This recommendation only applies to City owned land within the park and not land owned by other entities. Dorothy

LOS VALLECITOS BUSINESS CENTER

Value of contracts awarded in April reached 4.9 billion READ MORE. London topped the regions for contract awards with 20.

HARD CORNER PAD AVAILABLE AT BRAND NEW HIGHWAY INTERCHANGE LOCATED IN THE CITY OF PRESCOTT S GROWTH AREA

October 2013 compared with September 2013 Industrial production down by 1.1% in euro area Down by 0.7% in EU28

38± AC PALM PARKWAY MIXED-USE DEVELOPMENT LAND ORLANDO, FL 208,000± AADT PALM PARKWAY - 15,200± AADT

Naples, Marco Island, Everglades Convention and Visitors Bureau November 2012 Visitor Profile

Eat. Work. Park. Rest. .co.uk

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 26 P-1 Line #24

SURVEY OF MINNESOTA MOTELS

Summi triumphum. & bc. w w w Ó w w & b 2. Qui. w w w Ó. w w. w w. Ó œ. Let us recount with praise the triumph of the highest King, 1.

Naples, Marco Island, Everglades Convention and Visitors Bureau September 2013 Visitor Profile

Going Beyond GDP and Measuring Poverty: new challenges ahead

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 20 P-1 Line #2

What is Shovel Ready Palm Beach? What is a Shovel Ready Site?

Airline On-time Arrival Performance (Nov 2018, by VariFlight) SC Retains top spot among China s Major Airlines in APAC OTP Chart for

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO. Total Obligation Authority

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 15 P-1 Line #17

Transcription:

anatee County Impact Fee Schedule ffective pril 8, 206 nf. ulti-odal ransportation atural esrcs duc dmin. SIIL (Per Housing Unit) SIGL-FILY CH 000 sq ft or less $78 $95 $2,290 $2,85 $,686 $,335 $430 $96 $3,238 $44 $6,37 $6,266 $5,767 $5,46 00-300 sq ft $276 $48 $3,564 $3,400 $2,623 $2,078 $669 $49 $3,238 $69 $8,3 $7,949 $7,72 $6,627 30-700 sq ft $378 $202 $4,874 $4,650 $3,588 $2,833 $95 $204 $3,238 $94 $9,905 $9,68 $8,69 $7,864 70-2200 sq ft $477 $255 $6,26 $5,843 $4,509 $3,560 $,54 $257 $3,238 $9 $,626 $,343 $0,009 $9,060 220 or more sq ft $595 $39 $7,633 $7,282 $5,69 $4,434 $,44 $32 $3,238 $49 $3,696 $3,345 $,682 $0,497 HU/UPLX 000 sq ft or less $78 $95 $2,290 $2,85 $,686 $,335 $430 $96 $3,424 $44 $6,557 $6,452 $5,953 $5,602 00-300 sq ft $276 $48 $3,564 $3,400 $2,623 $2,078 $669 $49 $3,424 $69 $8,299 $8,35 $7,358 $6,83 30-700 sq ft $378 $202 $4,874 $4,650 $3,588 $2,833 $95 $204 $3,424 $94 $0,09 $9,867 $8,805 $8,050 70-2200 sq ft $477 $255 $6,26 $5,843 $4,509 $3,560 $,54 $257 $3,424 $9 $,82 $,529 $0,95 $9,246 220 or more sq ft $595 $39 $7,633 $7,282 $5,69 $4,434 $,44 $32 $3,424 $49 $3,882 $3,53 $,868 $0,683 UFCU H 000 sq ft or less $78 $95 $2,290 $2,85 $,686 $,335 $430 $96 $739 $44 $3,872 $3,767 $3,268 $2,97 00-300 sq ft $276 $48 $3,564 $3,400 $2,623 $2,078 $669 $49 $739 $69 $5,64 $5,450 $4,673 $4,28 30-700 sq ft $378 $202 $4,874 $4,650 $3,588 $2,833 $95 $204 $739 $94 $7,406 $7,82 $6,20 $5,365 70-2200 sq ft $477 $255 $6,26 $5,843 $4,509 $3,560 $,54 $257 $739 $9 $9,27 $8,844 $7,50 $6,56 220 or more sq ft $595 $39 $7,633 $7,282 $5,69 $4,434 $,44 $32 $739 $49 $,97 $0,846 $9,83 $7,998 ULI-FILY/H 000 sq ft or less $78 $95 $2,290 $2,85 $,686 $,335 $430 $96 $,763 $44 $4,896 $4,79 $4,292 $3,94 00-300 sq ft $276 $48 $3,564 $3,400 $2,623 $2,078 $669 $49 $,763 $69 $6,638 $6,474 $5,697 $5,52 30-700 sq ft $378 $202 $4,874 $4,650 $3,588 $2,833 $95 $204 $,763 $94 $8,430 $8,206 $7,44 $6,389 70-2200 sq ft $477 $255 $6,26 $5,843 $4,509 $3,560 $,54 $257 $,763 $9 $0,5 $9,868 $8,534 $7,585 220 or more sq ft $595 $39 $7,633 $7,282 $5,69 $4,434 $,44 $32 $,763 $49 $2,22 $,870 $0,207 $9,022 80% of Supportable ates from anatee County Impact Fee Study dopted ecember 3, 205 (anatee County rdinance 5-43) and 50% of Supportable ates from anatee County School Impact Fee Study dopted January 7, 206 (anatee County rdinance 6-03) Page of 2

anatee County Impact Fee Schedule ffective pril 8, 206 nf. ulti-odal ransportation atural esrcs duc dmin. SIIL (Per,000 sq ft unless otherwise stated) Commercial/Shop Ctr $473 $0 $0,433 $9,953 $7,680 $7,464 $0 $9 $0 $60 $,085 $0,605 $8,332 $8,6 ffice & ther Services $85 $0 $4,083 $3,895 $3,006 $2,92 $0 $42 $0 $7 $4,48 $4,293 $3,404 $3,39 Hospital $222 $0 $4,894 $4,669 $3,602 $3,502 $0 $42 $0 $7 $5,329 $5,04 $4,037 $3,937 ini-arehouse $42 $0 $925 $882 $68 $662 $0 $98 $0 $50 $,5 $,072 $87 $852 arehouse $59 $0 $,38 $,257 $970 $942 $0 $98 $0 $50 $,525 $,464 $,77 $,49 anufacturing $64 $0 $,44 $,349 $,04 $,0 $0 $98 $0 $50 $,626 $,56 $,253 $,223 Light Industrial $7 $0 $2,580 $2,46 $,899 $,846 $0 $98 $0 $50 $2,845 $2,726 $2,64 $2, ursing Home $27 $0 $2,84 $2,684 $2,07 $2,03 $0 $42 $0 $7 $3,54 $3,024 $2,4 $2,353 ay Care/School $70 $0 $3,770 $3,596 $2,775 $2,697 $0 $42 $0 $7 $4,53 $3,979 $3,58 $3,080 Lodging $94 $0 $2,084 $,988 $,534 $,49 $0 $26 $0 $4 $2,28 $2,22 $,668 $,625 otes edical offices are assessed at the ffice rate. ursing homes, assisted living facilities, and residential treatment facilities are assessed at the ursing Home rate. Hospitals are assessed per,000 square feet. Lodging facilities (hotels, motels, etc.) are assessed per room. ote that above fees do not include water or sewer (connection or facility investment) fees. Contact the anatee County Utilities epartment, ew Services ivision, at (94) 792-88, xtension 4976. r, go to www.mymanatee.org/utilities and click on the link to "ates." 80% of Supportable ates from anatee County Impact Fee Study dopted ecember 3, 205 (anatee County rdinance 5-43) and 50% of Supportable ates from anatee County School Impact Fee Study dopted January 7, 206 (anatee County rdinance 6-03) Page 2 of 2

anatee County Impact Fee Schedule ffective pril 8, 207 nf. ulti-odal ransportation atural esrcs duc dmin. SIIL (Per Housing Unit) SIGL-FILY CH 000 sq ft or less $200 $07 $2,577 $2,458 $,896 $,502 $484 $08 $4,856 $50 $8,382 $8,263 $7,70 $7,307 00-300 sq ft $3 $67 $4,00 $3,825 $2,95 $2,338 $752 $67 $4,856 $77 $0,340 $0,55 $9,28 $8,668 30-700 sq ft $426 $228 $5,483 $5,23 $4,037 $3,87 $,030 $230 $4,856 $06 $2,359 $2,07 $0,93 $0,063 70-2200 sq ft $536 $287 $6,89 $6,574 $5,072 $4,005 $,298 $289 $4,856 $34 $4,29 $3,974 $2,472 $,405 220 or more sq ft $670 $359 $8,587 $8,92 $6,322 $4,989 $,62 $36 $4,856 $67 $6,62 $6,226 $4,356 $3,023 HU/UPLX 000 sq ft or less $200 $07 $2,577 $2,458 $,896 $,502 $484 $08 $5,36 $50 $8,662 $8,543 $7,98 $7,587 00-300 sq ft $3 $67 $4,00 $3,825 $2,95 $2,338 $752 $67 $5,36 $77 $0,620 $0,435 $9,56 $8,948 30-700 sq ft $426 $228 $5,483 $5,23 $4,037 $3,87 $,030 $230 $5,36 $06 $2,639 $2,387 $,93 $0,343 70-2200 sq ft $536 $287 $6,89 $6,574 $5,072 $4,005 $,298 $289 $5,36 $34 $4,57 $4,254 $2,752 $,685 220 or more sq ft $670 $359 $8,587 $8,92 $6,322 $4,989 $,62 $36 $5,36 $67 $6,90 $6,506 $4,636 $3,303 UFCU H 000 sq ft or less $200 $07 $2,577 $2,458 $,896 $,502 $484 $08 $,09 $50 $4,635 $4,56 $3,954 $3,560 00-300 sq ft $3 $67 $4,00 $3,825 $2,95 $2,338 $752 $67 $,09 $77 $6,593 $6,408 $5,534 $4,92 30-700 sq ft $426 $228 $5,483 $5,23 $4,037 $3,87 $,030 $230 $,09 $06 $8,62 $8,360 $7,66 $6,36 70-2200 sq ft $536 $287 $6,89 $6,574 $5,072 $4,005 $,298 $289 $,09 $34 $0,544 $0,227 $8,725 $7,658 220 or more sq ft $670 $359 $8,587 $8,92 $6,322 $4,989 $,62 $36 $,09 $67 $2,874 $2,479 $0,609 $9,276 ULI-FILY/H 000 sq ft or less $200 $07 $2,577 $2,458 $,896 $,502 $484 $08 $2,644 $50 $6,70 $6,05 $5,489 $5,095 00-300 sq ft $3 $67 $4,00 $3,825 $2,95 $2,338 $752 $67 $2,644 $77 $8,28 $7,943 $7,069 $6,456 30-700 sq ft $426 $228 $5,483 $5,23 $4,037 $3,87 $,030 $230 $2,644 $06 $0,47 $9,895 $8,70 $7,85 70-2200 sq ft $536 $287 $6,89 $6,574 $5,072 $4,005 $,298 $289 $2,644 $34 $2,079 $,762 $0,260 $9,93 220 or more sq ft $670 $359 $8,587 $8,92 $6,322 $4,989 $,62 $36 $2,644 $67 $4,409 $4,04 $2,44 $0,8 90% of Supportable ates from anatee County Impact Fee Study dopted ecember 3, 205 (anatee County rdinance 5-43) and 75% of Supportable ates from anatee County School Impact Fee Study dopted January 7, 206 (anatee County rdinance 6-03) Page of 2

anatee County Impact Fee Schedule ffective pril 8, 207 nf. ulti-odal ransportation atural esrcs duc dmin. SIIL (Per,000 sq ft unless otherwise stated) Commercial/Shop Ctr $532 $0 $,737 $,97 $8,640 $8,397 $0 $34 $0 $68 $2,47 $,93 $9,374 $9,3 ffice & ther Services $208 $0 $4,594 $4,382 $3,38 $3,286 $0 $59 $0 $80 $5,04 $4,829 $3,828 $3,733 Hospital $249 $0 $5,505 $5,252 $4,053 $3,939 $0 $59 $0 $80 $5,993 $5,740 $4,54 $4,427 ini-arehouse $47 $0 $,040 $993 $766 $744 $0 $ $0 $56 $,254 $,207 $980 $958 arehouse $67 $0 $,482 $,44 $,09 $,060 $0 $ $0 $56 $,76 $,648 $,325 $,294 anufacturing $72 $0 $,590 $,57 $,7 $,38 $0 $ $0 $56 $,829 $,756 $,40 $,377 Light Industrial $3 $0 $2,903 $2,768 $2,37 $2,076 $0 $ $0 $56 $3,20 $3,066 $2,435 $2,374 ursing Home $43 $0 $3,65 $3,020 $2,330 $2,264 $0 $59 $0 $80 $3,547 $3,402 $2,72 $2,646 ay Care/School $92 $0 $4,24 $4,046 $3,22 $3,034 $0 $59 $0 $80 $4,672 $4,477 $3,553 $3,465 Lodging $06 $0 $2,345 $2,237 $,725 $,678 $0 $30 $0 $5 $2,496 $2,388 $,876 $,829 otes edical offices are assessed at the ffice rate. ursing homes, assisted living facilities, and residential treatment facilities are assessed at the ursing Home rate. Hospitals are assessed per,000 square feet. Lodging facilities (hotels, motels, etc.) are assessed per room. ote that above fees do not include water or sewer (connection or facility investment) fees. Contact the anatee County Utilities epartment, ew Services ivision, at (94) 792-88, xtension 4976. r, go to www.mymanatee.org/utilities and click on the link to "ates." 90% of Supportable ates from anatee County Impact Fee Study dopted ecember 3, 205 (anatee County rdinance 5-43) and 75% of Supportable ates from anatee County School Impact Fee Study dopted January 7, 206 (anatee County rdinance 6-03) Page 2 of 2

anatee County Impact Fee Schedule ffective pril 8, 208 nf. ulti-odal ransportation atural esrcs duc dmin. SIIL (Per Housing Unit) SIGL-FILY CH 000 sq ft or less $222 $9 $2,863 $2,73 $2,07 $,669 $538 $20 $6,475 $55 $0,392 $0,260 $9,636 $9,98 00-300 sq ft $345 $85 $4,455 $4,250 $3,279 $2,598 $836 $86 $6,475 $86 $2,568 $2,363 $,392 $0,7 30-700 sq ft $473 $253 $6,092 $5,82 $4,485 $3,54 $,44 $255 $6,475 $8 $4,80 $4,530 $3,203 $2,259 70-2200 sq ft $596 $39 $7,657 $7,304 $5,636 $4,450 $,442 $32 $6,475 $49 $6,959 $6,606 $4,938 $3,752 220 or more sq ft $744 $399 $9,54 $9,02 $7,024 $5,543 $,80 $40 $6,475 $86 $9,547 $9,08 $7,030 $5,549 HU/UPLX 000 sq ft or less $222 $9 $2,863 $2,73 $2,07 $,669 $538 $20 $6,848 $55 $0,765 $0,633 $0,009 $9,57 00-300 sq ft $345 $85 $4,455 $4,250 $3,279 $2,598 $836 $86 $6,848 $86 $2,94 $2,736 $,765 $,084 30-700 sq ft $473 $253 $6,092 $5,82 $4,485 $3,54 $,44 $255 $6,848 $8 $5,83 $4,903 $3,576 $2,632 70-2200 sq ft $596 $39 $7,657 $7,304 $5,636 $4,450 $,442 $32 $6,848 $49 $7,332 $6,979 $5,3 $4,25 220 or more sq ft $744 $399 $9,54 $9,02 $7,024 $5,543 $,80 $40 $6,848 $86 $9,920 $9,48 $7,403 $5,922 UFCU H 000 sq ft or less $222 $9 $2,863 $2,73 $2,07 $,669 $538 $20 $,478 $55 $5,395 $5,263 $4,639 $4,20 00-300 sq ft $345 $85 $4,455 $4,250 $3,279 $2,598 $836 $86 $,478 $86 $7,57 $7,366 $6,395 $5,74 30-700 sq ft $473 $253 $6,092 $5,82 $4,485 $3,54 $,44 $255 $,478 $8 $9,83 $9,533 $8,206 $7,262 70-2200 sq ft $596 $39 $7,657 $7,304 $5,636 $4,450 $,442 $32 $,478 $49 $,962 $,609 $9,94 $8,755 220 or more sq ft $744 $399 $9,54 $9,02 $7,024 $5,543 $,80 $40 $,478 $86 $4,550 $4, $2,033 $0,552 ULI-FILY/H 000 sq ft or less $222 $9 $2,863 $2,73 $2,07 $,669 $538 $20 $3,525 $55 $7,442 $7,30 $6,686 $6,248 00-300 sq ft $345 $85 $4,455 $4,250 $3,279 $2,598 $836 $86 $3,525 $86 $9,68 $9,43 $8,442 $7,76 30-700 sq ft $473 $253 $6,092 $5,82 $4,485 $3,54 $,44 $255 $3,525 $8 $,860 $,580 $0,253 $9,309 70-2200 sq ft $596 $39 $7,657 $7,304 $5,636 $4,450 $,442 $32 $3,525 $49 $4,009 $3,656 $,988 $0,802 220 or more sq ft $744 $399 $9,54 $9,02 $7,024 $5,543 $,80 $40 $3,525 $86 $6,597 $6,58 $4,080 $2,599 00% of Supportable ates from anatee County Impact Fee Study dopted ecember 3, 205 (anatee County rdinance 5-43) and 00% of Supportable ates from anatee County School Impact Fee Study dopted January 7, 206 (anatee County rdinance 6-03) Page of 2

anatee County Impact Fee Schedule ffective pril 8, 208 nf. ulti-odal ransportation atural esrcs duc dmin. SIIL (Per,000 sq ft unless otherwise stated) Commercial/Shop Ctr $59 $0 $3,04 $2,44 $9,600 $9,330 $0 $49 $0 $75 $3,856 $3,256 $0,45 $0,45 ffice & ther Services $23 $0 $5,04 $4,869 $3,757 $3,65 $0 $77 $0 $89 $5,60 $5,366 $4,254 $4,48 Hospital $277 $0 $6,7 $5,836 $4,503 $4,377 $0 $77 $0 $89 $6,660 $6,379 $5,046 $4,920 ini-arehouse $52 $0 $,56 $,03 $85 $827 $0 $23 $0 $62 $,393 $,340 $,088 $,064 arehouse $74 $0 $,647 $,57 $,22 $,78 $0 $23 $0 $62 $,906 $,830 $,47 $,437 anufacturing $80 $0 $,767 $,686 $,30 $,264 $0 $23 $0 $62 $2,032 $,95 $,566 $,529 Light Industrial $46 $0 $3,225 $3,076 $2,374 $2,307 $0 $23 $0 $62 $3,556 $3,407 $2,705 $2,638 ursing Home $59 $0 $3,57 $3,355 $2,589 $2,56 $0 $77 $0 $89 $3,942 $3,780 $3,04 $2,94 ay Care/School $23 $0 $4,72 $4,495 $3,469 $3,37 $0 $77 $0 $89 $5,9 $4,974 $3,948 $3,850 Lodging $8 $0 $2,605 $2,485 $,97 $,864 $0 $33 $0 $7 $2,773 $2,653 $2,085 $2,032 otes edical offices are assessed at the ffice rate. ursing homes, assisted living facilities, and residential treatment facilities are assessed at the ursing Home rate. Hospitals are assessed per,000 square feet. Lodging facilities (hotels, motels, etc.) are assessed per room. ote that above fees do not include water or sewer (connection or facility investment) fees. Contact the anatee County Utilities epartment, ew Services ivision, at (94) 792-88, xtension 4976. r, go to www.mymanatee.org/utilities and click on the link to "ates." 00% of Supportable ates from anatee County Impact Fee Study dopted ecember 3, 205 (anatee County rdinance 5-43) and 00% of Supportable ates from anatee County School Impact Fee Study dopted January 7, 206 (anatee County rdinance 6-03) Page 2 of 2

6 P I L L S 7 8 9 20 C U Y 4 22 C U Y 39 C U Y 30 H I L L S B U G H 2 H I L L S B U G H C U Y SFFL I-7 5 Lake I-275 C 6 S 4 (B 4 V 3 F H L S 64 35S S V LV H V HIFIL V LCK IG BUY L K 36H S UL V S Y C PK 30 5 S S 70 H PK B LV 4 IL I I 89 LU LI L GCY B I-75 7 S LLVS FI L P K SU Y B B LV G C H BLV L UL CH U 45 S L V UIVSIY PKY S 64 675 L LVS 64 V BHY C C IC X HIF I C 675 B LV S 70 BLV 63 S 37 S 33 S LI 60 S 37 S 45 S 30 S tee 5 S LK C H BLV 39 S G JHS 27 S 5 S 30 S 9 S 63 V G HB PK 9 S 9 S 30 BLV na C-YKK HIFIL V U V S U U S BIG S 5 S 4 a K IV 4 S 26 S e S 64 B U LI G 34 S UPP I H 0 8 V 9 S 26 S 4 S 43 S H P S 37 S 59 S U 5 S 43 S 30 S 34 S VILLG G PKY 75 S BLV L S 7 S L P ak 75 S 70 Sarasota Bay L S 64 r GS PKY 6 C e F S H BY v S GU LF 60 V S 64 i 789 44 V 57 V 64 LF GU 38 V 53 V Y CZ B 4 Y B LV BLV 53 V 35S 26 V 30 V 30 I-75 684 0 n S 3 26 V Y K Y PK G 7 V 34S Y L I UY 4 e S 6 d P H B L KIG V a C Z G SL BI S G H r 29 V C U Y B GULF 2 V 75 V 9 V 7 V i v e r 26 S IVVI BLV V 36 V V 4 V 59 S n a t e e H PL SL CUY 3 0 BLV B IV S 64 a 675 7 S G BIG 75 S 7 S P H G 9 V IVVI BLV 5 0 S S I L HY 7 V 67 U J Y G BI Y L 0 0 L U 7 S ) 3 Y B 4 PI Z I-75 23 S I 30 I LL GILL 6 V 683 CL Bay S 62 U 9 33 S 33S 37 S 62 UL 37 S LF 62 S 62 49 S (XPIL F ) Ceia GU S S 62 I PLVI erra 34 6 S 62 VICY KY 69 S BYS 9 9 S P LL 275 H I-275 C 39 CC SI 36 V ay B 37 CCSI LL 4 3 0 a mp 4 a 4 Parrish 33S S 70 UIVSIY PKY 70 oad Impact Benefit s S 70 L HU UC anatee County, Florida 36S 36S L F G U S 7 0 anatee County oad Benefit s U.S. Highway orthast F S State oad orthest 780 County oad Southast CLY GULLY C U Y Business oad Southest ailroad X unicipality IC 37S SUGBL 37S Interstate (S 72 Projection: State Plane Florida est (U.S. Feet) Coordinate System: ransverse ercator atum: orth merican 983 False asting: 65666.666667 False orthing: 0.000000 Central eridian: -82.000000 Scale Factor: 0.99994 Latitude of rigin: 24.333333 his map was developed by the anatee County Geographic Information Systems ivision. It is provided for general reference and is not warranted in any way. rrors from non-coincidence of features from different sources may exist. he anatee County BCC shall be held harmless for inappropriate or unintended uses of the information. ) S S C U Y C U Y Ú Kilometers 0 2 4 iles 0 2 4 ap uthor: LKish Creation ate: 6 Feb 2007 ap ocument ame: _BFI_sized.mxd 6 7 8 9 20 2 22