Second Meeting of the Air Navigation System Implementation Group (ANSIG/2)

Similar documents
MID Region Air Navigation Strategy

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

ATFM/CDM ICAO s Perspective

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

SAMPLE TEMPLATE APPENDIX 3.5C-1

Block 0 to Block 1 Vaughn Maiolla

NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN

International Civil Aviation Organization. Fifth Meeting of MID Region AIM Database Task Force Fourth Meeting of MIDANPIRG AIM Sub-Group

Welcome to AVI AFRIQUE IFEANYI Ogochukwu, Chief Technology Strategist; Debbie Mishael Group

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

(Presented by United States) EXECUTIVE SUMMARY

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

AIR NAVIGATION REPORT ICAO Middle East Region

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented

Russian Federation ATM modernization program

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

PROPOSED AMENDMENT OF THE RPBANIP. (Prepared by Canada and United States) EXECUTIVE SUMMARY

Packaging Tomorrow s Aviation System

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

ASBU Block 0 Implementation and Regional ANPs

Preparation for ASBU B1 (PBN)

ICAO ASBU Implementation/ Surveillance and ATS Automation

APAC AIR NAVIGATION PLAN VOLUME III

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

Date Planned/Implemented Status Not commenced. Status Details Planned for m new MMMX airport 2 Element Description: Airport CDM tools

Objective. To show how the aviation system block upgrades (ASBUs) can help to improve safety at airport level and some regional initiatives.

GUATEMALA State Air Navigation Plan

TWELFTH AIR NAVIGATION CONFERENCE

ATM processes automatization for Runway (Airport) Throughput Enhancement

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

Approach to implementation Process and checklist

AFI AIR NAVIGATION SYSTEM IMPLEMENTATION ACTION PLAN FOR THE AFRICA-INDIAN OCEAN (AFI) REGION

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY

Connecting ASBU with your State Air Navigation Plan

MID AIR NAVIGATION PLAN VOLUME III

AIR NAVIGATION SYSTEMS IMPLEMENTATION GROUP DEVELOPMENTS RELATED TO AIR NAVIGATION CAPACITY AND EFFICIENCY IN OTHER ICAO REGIONS

BELIZE Air Navigation Plan

New Barbados State Air Navigation Plan

Connecting ASBU with your State Air Navigation Plan

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD

APIRG/20. Air Navigation System Implementation Action Plan (aligned with ASBU Methodology) Yamoussoukro, Cote d Ivoire 30 November 2 December 2015

INTERNATIONAL CIVIL AVIATION ORGANIZATION REPORT OF THE FIRST MEETING OF THE AIR NAVIGATION SYSTEMS IMPLEMENTATION GROUP ANSIG/1

ASBU-Bloc0 Moroccan achievements and planned activities

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

International Civil Aviation Organization AIR NAVIGATION SYSTEMS IMPLEMENTATION GROUP

NAM ASBU Handbook Supporting analysis and implementation reporting of the ICAO ASBU Modules

MET/SG/12-WP/05 REV2-23/11/14

INTERNATIONAL CIVIL AVIATION ORGANIZATION

THE Aviation System Block Upgrades THE FRAMEWORK FOR GLOBAL HARMONIZATION (DRAFT 2016)

Aviation System Block Upgrades

International Civil Aviation Organization. Performance Framework for AIM implementation in the MID Region

INTERNATIONAL CIVIL AVIATION ORGANIZATION

ICAO GANP Requirements and Evolution

ASBU modules mapped to Work Programme

Bits to Blocks Aviation System Block Upgrades (ASBU)

ASBU Ready Solutions. A Global ATM Solution Provider s Response. Shankar Satish KUMAR Business Development India 20 th October 2014

Ted Thrasher ICAO Environmental Modelling Unit

INTERNATIONAL CIVIL AVIATION ORGANIZATION. SIXTH MEETING OF DIRECTORS GENERAL OF CIVIL AVIATION (DGCA/6) (Brazzaville, Congo, 2 4 November 2016)

SERVICE DEVELOPMENT ROADMAP

GANP ASBU Symposium 2017

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

Aviation System Block Upgrades

AFI/MID Workshop on Aviation System Block Upgrades (ASBUs)

Home LIST OF ACRONYMS

INTERNATIONAL CIVIL AVIATION ORGANIZATION

AIR NAVIGATION SYSTEM IMPLEMENTATION PLAN FOR THE AFI REGION

INTERNATIONAL CIVIL AVIATION ORGANIZATION

The ICAO Global Air Navigation Plan and the monitoring of ASBU implementation

ICAO ASBU Implementation Monitoring Questionnaire. Reference period 2017

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

MET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN

AIM in support of ATM

SAMPLE TEMPLATE. Regional and National planning for ASBU Modules

SESAR Solutions. Display Options

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

TWELFTH AIR NAVIGATION CONFERENCE

International Civil Aviation Organization. Sixth Meeting (MSG/6) (Cairo, Egypt, 3-5 December 2018) MID Region Air Navigation Priorities and Targets

THE UGANDA ASBU PLAN- HIGHLIGHTS ASBU WORKSHOP 18 TH TO 22 RD SEPT, DAKAR

APPENDIX D IDENTIFICATION AND DEVELOPMENT OF AERONAUTICAL METEOROLOGY PROJECTS. Programme Title of the Project Start End

ART Workshop Airport Capacity

DIRECTORS GENERAL OF CIVIL AVIATION-MIDDLE EAST REGION. First Meeting (DGCA-MID/1) (Abu Dhabi, UAE, March 2011)

2018 LSSIP Event. ASBU monitoring in the ICAO European Region Using the Master Plan reporting mechanism for ASBU monitoring

ORGANISER HOST LEAD SPONSOR

NAM/CAR Regional Performance-Based Air Navigation Implementation Plan (RPBANIP) v3.1 April 2014 International Civil Aviation Organization

The evolving air navigation system and the impact on avionics

ASBU Implementation Monitoring Report

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN

METEOROLOGY PROJECT.1. Programme Title of the Project Start End

Prosper Zo o Minto o

INTERNATIONAL CIVIL AVIATION ORGANIZATION THE MIDDLE EAST AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (MIDANPIRG)

You and ASBU. Javier Vanegas CANSO

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

ASBU IMPLEMENTATION. ASBU industry consideration. Date 16/08/2017. Edson Fagundes Gomes

Transcription:

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2) Cairo, Egypt, 6 8 December 2016 The United Arab Emirates Presented by Hamad Al Belushi

Outline Brief on the UAE National ASBU Implementation Plan Status of ASBU Implementation Lessons Learned Challenges Recommendations Outlook 2020 ANSIG/2, Cairo, Egypt, 6 8 December 2016 2

Brief on the UAE National ASBU Implementation Plan ASBU Framework UAE ATM Strategic Plan NASAC Implementation Plans Working Groups Projects Implementation Implementation Plans Plans NASAC WG NASAC WG NASAC WG ANSIG/2, Cairo, Egypt, 6 8 December 2016 3

B0 APTA: Optimization of Approach Procedures including vertical guidance Elements Applicability Status Action Plan/Timelines Remarks States PBN State UAE PBN Implementation Plan is in place. Implementati on Plans LNAV All RWYs Ends at International Aerodromes LNAV/VNAV All RWYs Ends at International Aerodromes OMAA OMAL OMAD OMDB OMDW OMFJ OMRK OMSJ ANSIG/2, Cairo, Egypt, 6 8 December 2016 4

B0 SURF: Safety and Efficiency of Surface Operations (A SMGCS Level 1 2) Elements Applicability Status Action Plan/Timelines Remarks A SMGCS As per the OMAA Level 1 MID Air OMDB Navigation Strategy OMDW A SMGCS Level 2 As per the MID Air Navigation Strategy OMAA OMDB OMDW scheduled for 2018 ANSIG/2, Cairo, Egypt, 6 8 December 2016 5

B0 ACDM: Improved Airport Operations through Airport CDM Elements Applicability Status Action Plan/Timelines Remarks A CDM As per the MID Air Navigation Strategy NASAC WG 14 is tasked to develop a unified national Concept of Operations Abu Dhabi international airport is developing Procedures Implement A CDM at major international airports in accordance with the Concept of Operations The uniform and timely implementation of A CDM is coordinated through dedicated NASAC Working Group 14. The management of TTOT and CTOT is coordinated with the initiatives for a national operation centre (NOC) and ATFCM activities (NASAC Working Group 12) ANSIG/2, Cairo, Egypt, 6 8 December 2016 6

B0 FICE: Increased Interoperability, Efficiency and Capacity through Ground Ground Integration Elements Applicability Status Action Plan/Timelines AMHS State OMAE (ACC) OMAA capability AMHS Impl. /interconnec tion OMAL NO OMAD NO OMDB OMDW OMFJ NO OMRK NO OMSJ NO State OMAE (ACC) OMAA NO OMAL NO OMAD NO OMDB OMDW OMFJ NO OMRK NO OMSJ NO International AMHS Connections to Jeddah Doha Muscat Amman Remarks Further connections depend on the readiness of partners ANSIG/2, Cairo, Egypt, 6 8 December 2016 7

B0 FICE: Increased Interoperability, Efficiency and Capacity through Ground Ground Integration Elements Applicability Status Action Plan/Timelines Impl. of ACC(s) OMAE OMAA OMAE OMAL AIDC/OLDI OMAE OMAD between OMAE OMDB adjacent OMAE OMDW OMAE OMFJ NO ACCs OMAE OMRK OMAE OMSJ OMAE OTHH OMAE OOMM OMAE OBBB OMAE OEJD OMAE OII NO NO NO NO OMAE OMFJ under Test OMAE OBBB under Test All connection use OLDI Remarks Test with OOMM have been suspended until OOMM will declare readiness after their transition to new ACC. ANSIG/2, Cairo, Egypt, 6 8 December 2016 8

B0 DATM: Service Improvement through Digital Aeronautical Information Management Elements Applicability Status Action Plan/Timelines Remarks National State Established and monitored by The AIM Regulator Roadmap AIM State Completed eaip State Completed QMS State Completed WGS 84 ENR AD TMA GUND Completed ANSIG/2, Cairo, Egypt, 6 8 December 2016 9

B0 DATM: Service Improvement through Digital Aeronautical Information Management Elements Applicability Status Action Remarks Plan/Timelines etod Area 1 Terrain Completed. Recurrent Survey planned for 2017 etod Area 1 Obstacle Completed. Recurrent Survey planned for 2017 etod Area 4 Terrain Completed. etod Area 4 Obstacle Completed. ANSIG/2, Cairo, Egypt, 6 8 December 2016 10

B0 AMET: Meteorological information supporting enhanced operational efficiency and safety Elements Applicability Status Action Plan/Timelines Remarks SADIS 2G or Secure SADIS FTP State implemented Data is collected and processed by National Center of Meteorology & Seismology (NCMS), section Aviation Meteorology. QMS State implemented Quality management is performed by NCMS. They are certified and regularly audited by GCAA Regulator. ANSIG/2, Cairo, Egypt, 6 8 December 2016 11

B0 FRTO: Improved Operations through Enhanced En Route Trajectories Elements Applicability Status Action Plan/Timelines Remarks Flexible use of airspace (FUA) State ongoing As per UAE Civil/Military Coordination Plan Flexible routing State ongoing UAE Airspace Restructuring Project (ARP3) Target Date: December 2017 ANSIG/2, Cairo, Egypt, 6 8 December 2016 12

B0 ACAS: ACAS Improvements Elements Applicability Status Action Plan/Timelines Remarks State Regulation on carriage of ACAS (TCAS v7.1) State implemented Civil Aviation Regulations (CARs) CAP OPS 1.398: Use of Airborne Collision Avoidance System CAR OPS 1.668 Airborne Collision Avoidance System Also Published in AIP GEN 1.5.6 ANSIG/2, Cairo, Egypt, 6 8 December 2016 13

B0 CDO: Improved Flexibility and Efficiency in Descent Profiles (CDO) Elements Applicability Status Action Plan/Timelines Remarks PBN STARs International aerodromes/tmas with CDO As per the MID Air Navigation Strategy As per the MID Air Navigation Strategy RNAV 1 STARs for OMDB Completed OMDW Completed OMAA Completed OMAD Completed OMDL Completed OMBS Completed OMFJ Completed OMAL Completed ongoing UAE Airspace Restructuring Project (ARP3) Target Date: December 2017 ANSIG/2, Cairo, Egypt, 6 8 December 2016 14

B0 CCO: Improved Flexibility and Efficiency Departure Profiles Continuous Climb Operations (CCO) Elements Applicability Status Action Plan/Timelines Remarks PBN SIDs International aerodromes/tmas with CCO As per the MID Air Navigation Strategy As per the MID Air Navigation Strategy RNAV 1 SIDs for OMDB Completed OMDW Completed OMAA Completed OMAD Completed OMDL Completed OMBS Completed OMFJ Completed OMAL Completed ongoing As per UAE PBN Implementation Plan UAE Airspace Restructuring Project (ARP3) Target Date: December 2017 ANSIG/2, Cairo, Egypt, 6 8 December 2016 15

Other ASBU Block 0 Modules (priority 2) Implemented by the State Module Module Title Status Remarks Yes No B0 WAKE Increased Runway Throughput through Report on RECAT status for UAE Optimized Wake Turbulence Separation Q4 2016 Regulations Completed Trials/Simulations in progress at DB B0 RSEQ Improve Traffic flow through Runway Sequencing (AMAN/DMAN) Safety Case in progress at DB AMAN for OMDB AMAN for OMAA first tests DMAN planned B0 ASUR Initial capability for ground surveillance B0 ASEP Air Traffic Situational Awareness (ATSA) B0 OPFL B0 SNET B0 TBO Improved access to optimum flight levels through climb/descent procedures using ADS B Increased Effectiveness of Ground Based Safety Nets Improved Safety and Efficiency through the initial application of Data Link En Route ADS B used in En route WAM planned Not applicable in UAE ANSIG/2, Cairo, Egypt, 6 8 December 2016 16

Lessons Learned The implementation of an integrated plan for ASBUs to achieve the maximum benefits is complex and requires holistic planning. Implementation of Improvements need to be coordinated between all stakeholders. The implementation of working groups for different subjects has proven to be very useful and effective. ANSIG/2, Cairo, Egypt, 6 8 December 2016 17

Challenges Aviation is a complex system and value chain that depends on its various parts working together in a holistic manner with a clear understanding of the respective needs and requirements of the other parts. A major aspect for the implementation will be the discussion on regional, inter regional and global, ATFM. ANSIG/2, Cairo, Egypt, 6 8 December 2016 18

Recommendations Building future ATM Systems requires a holistic view and the involvement of all stakeholders. To assure this, all stakeholders should have a buy in and are continuously involved in the loop. The Regulator ANSPs Airports Airspace Users ANSIG/2, Cairo, Egypt, 6 8 December 2016 19

Outlook 2020 (Status of ASBU Block 0 Modules by 2020) Module Module Title Status by 2020 Remarks FI PI NI N/A B0 APTA Optimization of Approach Procedures including Part of the Airspace Restructuring Phase vertical guidance 3 Project Due date December 2017 B0 WAKE Increased Runway Throughput through Optimized Wake Turbulence Separation B0 RSEQ B0 SURF B0 ACDM B0 FICE Improve Traffic flow through Runway Sequencing (AMAN/DMAN) Safety and Efficiency of Surface Operations (A SMGCS Level 1 2) Improved Airport Operations through Airport CDM Increased Interoperability, Efficiency and Capacity through Ground Ground Integration Existing AMAN will be enhanced as part of ATM Modernization. DMAN implementation for Abu Dhabi and Dubai International Airports Abu Dhabi and Dubai Airports will be ready. Other international airports will start implementations at later stages. Plans for Abu Dhabi and Dubai International airports are currently in progress. Final Implementation and Full integration will require upgrades of all stakeholders systems. ANSIG/2, Cairo, Egypt, 6 8 December 2016 20

Outlook 2020 (Status of ASBU Block 0 Modules by 2020) Module Module Title Status by 2020 Remarks FI PI NI N/A B0 DATM Service Improvement through Digital Aeronautical Information Management B0 AMET Meteorological information supporting enhanced operational efficiency and safety B0 FRTO Improved Operations through Enhanced En Route Trajectories B0 NOPS B0 ASUR B0 ASEP Improved Flow Performance through Planning based on a Network Wide view Initial capability for ground surveillance Air Traffic Situational Awareness (ATSA) Airspace Capacities are defined, usage is monitored. On National Level the SWIM DB System will collect and consolidate all information from national and international sources to provide information sharing to the stakeholders. ADS B Implemented, WAM will be used to complement existing radar coverage. ANSIG/2, Cairo, Egypt, 6 8 December 2016 21

Outlook 2020 (Status of ASBU Block 0 Modules by 2020) Module Module Title Status by 2020 Remarks FI PI NI N/A B0 OPFL Improved access to optimum flight levels through climb/descent procedures using ADS B B0 ACAS ACAS Improvements B0 SNET Increased Effectiveness of Ground Based Safety Nets B0 CDO Improved Flexibility and Efficiency in Descent Profiles (CDO) B0 TBO B0 CCO Improved Safety and Efficiency through the initial application of Data Link En Route Improved Flexibility and Efficiency Departure Profiles Continuous Climb Operations (CCO) Technical Readiness as part of ATM Modernization Project by 2019. Activation dependant on operational validation and approval ANSIG/2, Cairo, Egypt, 6 8 December 2016 22

ANSIG/2, Cairo, Egypt, 6 8 December 2016 23