EXCELLENCE IN ENGINEERING

Similar documents
Company ID. Bosnia and Herzegovina Entity: The Federation of Bosnia and Herzegovina Canton: The Herzegovina-Neretva Canton

The Electric Power System

Elektroprivreda BiH. 6th South East Europe Energy Dialogue (6th SEEED) Redefining SE Europe s Energy Map

IEEJ: June 2010 JICA JFY 2010 Energy Policy (B) NO. J / ID Country Report: Bosnia and Herzegovina March 2010 Prepared by JICA trainee

Trieste, 26 th September 2012

Reforms in Kosovo s power System

IPA Project Building Resilience to Disasters in Western Balkans and Turkey. Enhancing hydrological data management and exchange procedures

Short Project Summary Cebren & Galiste Hydropower Project Republic of Macedonia

112 SYSTEM IN BOSNIA AND HERZEGOVINA

Sarajevo, Bosnia and Herzegovina 1 December 2011

Pumped storage hydroelectric power plants: Issues and applications BIH Case Study

1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS. 2. SECTOR Energy

CROATIA Business climate and opportunities for cooperation with Finland. Helsinki, 14th December 2015

AXICOM COMPOSITE HOLLOW CORE INSULATORS STANDARD TYPES

ACTIVITIES OF THE INTERNATIONAL TRUST FUND FOR DEMINING AND MINE VICTIMS ASSISTANCE (ITF) IN THE REGION OF SE EUROPE

YEARS OF THE WORLD BANK IN BOSNIA AND HERZEGOVINA

The exhibition is carried out through international exhibitions and commodity groups, which saves time of exhibitors.

Security of Natural Gas Supply in BiH

STRATEGY OF DEVELOPMENT 2020 OF THE CCI SYSTEM IN UKRAINE

ALBTOURS D. Where excellence is a habit... Slovenia Croatia. Romania. Serbia. Bulgaria. Macedonia. Albania. Greece. Kosovo. Bosnia & Herzegovina

CAPABILITY STATEMENT TRANSPORT

Your partner in Bosnia & Herzegovina

The role of Serbia in the security of supply in Europe

Public Seminar 30 October 2018, Lisbon. Water sector in B&H

LAW ON THE AGENCY FOR PRESCHOOL, PRIMARY AND SECONDARY EDUCATION

NLB d.d., Ljubljana PRESENTATION

Wind Power Plant Podveležje

Project of E-763 Motorway Construction, Section: Belgrade Ostružnica - Požega Boljare/ Border of Montenegro

Overview of Agreements on Civil Aviation Safety (Bilateral Agreements) signed by the EU

Company Profiles. Kosovo Slovenia Business and Arbitration Forum April 4, 2013, Ljubljana, Slovenia

Progressing towards profitable growth

ADRIATICA.NET GROUP. Atlas, the largest DMC (Destination Management Company) in Croatia and the region (your adriatic host)

EPCG is seated at the address no 2 Vuka Karadžića St. in Nikšić

External Quality of Service Monitoring

Republic of Turkey - Ministry of Economy,

LETTER FROM THE CHAIRMAN OF THE BOARD

University of Mostar in brief. Prof.Dražena Gašpar, Ph.D. Vice-Rector for International Relations and Business

Strategic road map. President & CEO Ole Johansson

CULTURAL HERITAGE ACROSS BORDERS WORKSHOP FEB 9 TH AND 10 TH ISTANBUL, TURKEY

Protection and Sustainable Use of the Dinaric Karst Transboundary Aquifer System

Bosnia and Herzegovina

Ministry of Communications and Transport

Government of Montenegro Ministry of Transport and Maritime Affairs

Internal and external barriers to export success in Kosovo : [presentation given February 25, 2010]

1 st US - Kosovo Trade Forum New York, New York

Management of a Large The Danube. Mr. Mitja Bricelj ICPDR President Perth,13 October 2010

Regional cooperation with neighboring countries (and Turkey)

INTERNATIONAL SERVICES

Belgrade Chamber of Economy.

Company Oris d.o.o. UNIQUE REAL ESTATE SALE LOCATION:

JSPA Initiative FROM AN IDEA TO THE REALITY. THE DANUBE REGION TRANSPORT DAYS Ljubljana, 21 st and 22 nd October 2014

POST SHOW REPORT September th International Food Products and Processing Technologies Exhibition

THE DANUBE WATER PROGRAM PHILIP WELLER, IAWD DANUBE STRATEGY PA 4,, 2015

The Group. Only passions, great passions, can elevate the soul to great things.

TRANSBOUNDARY COOPERATION ON WATER MANAGEMENT

TRANSPORTATION: Airports and Aviation Services

Connecting Sava River. Tihomir L. Divjak

REPUBLIC ADMINISTRATION FOR INSPECTION ACTIVITIES OF THE REPUBLIC OF SRPSKA

EU CBS IN ADRIA REGION

I nitial c ertification date: 1 3, Dec ember,

COMPANY INTRODUCTION

STRABAG SE Successful in Eastern Europe

Energy News in Southeast Europe twice in a month FREE SAMPLE! 2008-IV/

STANDARDS OF THE REPUBLIC OF KOSOVO, STANDARDS AGENCY AND THEIR IMPORTANCE IN IMPROVING THE QUALITY

A F R I C A May Millennium Hall, Addis Ababa, Ethiopia

2014 floods in Serbia

UNOPS IN THE CARIBBEAN

TAV INVESTMENT HOLDING CO.

AUSSEN WIRTSCHAFT B2B-PLATTFORM INFRASTRUKTUR UND VERWANDTE TECHNOLOGIEN

Kosovo Transmission System Development Achievements and Challenges

The Importance of the geographical position of Kosovo in increasing the Trade, Transit and International Transport in the Balkans

FASHION EXPO October 2015

International Sava River Basin Commission - An example of EU/non EU country cooperation in water management

Presentation from 2015 World Water Week in Stockholm. The authors, all rights reserved. SIWI siwi.org

TURTLE SURVIVAL ALLIANCE EXECUTIVE DIRECTOR

Contributing to Mexico s development for more than 50 years. Morelia Michoacán. Corporate Office Ciudad de México

3RD SEETAC ANNUAL MINISTERIAL MEETING AND SEEIF

OPEN SEASON Phase 2 Rules. Project on the development and expansion of Bulgartransgaz EAD gas transmission system (GTS)

YONGNAM HOLDINGS LIMITED (Company Registration No N) (Incorporated in the Republic of Singapore on 19 October 1994)

Member The Association of Organisers of Exhibitions Abroad and of National Participations in International Trade Fairs and Exhibitions

Mr. David Peng, General Manager, Kings Aviation. Set Up an AOC and Operating Helicopters in China

2018 POST SHOW REPORT

CO-OPERATION IN DANUBE RIVER BASIN - THE ROLE OF SHMI SLOVENSKÝ HYDROMETEOROLOGICKÝ ÚSTAV

ASYNCHRONOUS START OF LARGE UNIT IN PUMPED STORAGE HPP "ČAPLJINA" IN PRESENT POWER SYSTEM OF BOSNIA AND HERZEGOVINA

DaHar Danube Inland Harbour Development

INVESTMENT BRIEF BROD MUNICIPALITY

Gas network development in BiH

HOME EXPO May 2015

LIST OF REFERENCE PROJECTS

SECI Regional Projects Update

The Potential of Renewable Energy Sources in Bosnia and Herzegovina

SHIPBUILDING INDUSTRY

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of

Bilateral and regional cooperation good practices of Slovenia

REFERENCES 1999 / 2017

ROMANIA s EXPERIENCE

Belgrade SERBIA. MONTENEGRO KOSOVO Podgorica Skopje MACEDONIA Tirane ALBANIA GREECE. Athens

Bilfinger The international engineering and services group. April 7, 2016

THE REPUBLIC OF SERBIA MINISTRY OF ENVIRONMENTAL PROTECTION DEVELOPMENT OF THE ECOLOGICAL NETWORK IN SERBIA

Your key to global markets

Transcription:

EXCELLENCE IN ENGINEERING

PARTNER OF PROVEN CONFIDENCE TODAY... 1992 1987 1958 1951 Energoinvest is an export-oriented multidisciplinary engineering company with tens of thousands of kilometers of transmission lines, thousands of substations and a significant number of designed and constructed hydro and thermal power plants, and thermal energy and processing plants, realized thanks to skilled and experienced Energoinvest experts. to 1995 The war in Bosnia and Herzegovina interupted the growth and development of the company. achieved its productivity high point as the largest exporter in the former Yugoslavia with a turnover of one billion USD and 42,000 employees. Energoinvest became an export-oriented company whose business was expanding in many countries around the world. founded as a small project office headed by Emerik Blum, Energoinvest developed into a modern European company whose business is based on the realization of complex projects on a turnkey basis. The brand name and trade mark of Energoinvest is protected by : World Intellectual Property Organization (WIPO) - Geneva Institute for Intellectual Property of Bosnia and Herzegovina Bilateral contracts with several countries that are not members of WIPO. 2

DEVELOPMENT STRATEGY successful realization of projects in existing markets in order to meet all customer requirements development of company resources with the ultimate objective of project implementation in the domain of alternative energy sources increase market share through the use of various forms of partnership cooperation strengthening cooperation within the business union Energoinvest Group through the realization of complex projects on a turnkey basis ASSEMBLY SUPERVISORY BOARD INTEGRATED MANAGEMENT SYSTEM MANAGEMENT GENERAL DIRECTOR OFFICE FINANCE HUMAN RESOURCES LEGAL AFFAIRS PROJECT MANAGEMENT SALES AND MARKET DEVELOPMENT CAPITAL DEPENDENT COMPANIES COMMERCE TRANSMISSION AND DISTRIBUTION GENERATION PLANTS CIVIL CONSTRUCTION AND ARCHITECTURE ENVIRONMENTAL PROTECTION AND WATER UTILITIES INFORMATION AND COMMUNICATION TECHNOLOGIES 3

FROM IDEA TO COMPLETE TURNKEY SOLUTIONS Energoinvest dd - Sarajevo through the more than 60 years in the business has developed into a leading engineering company in Bosnia and Herzegovina, which provides services of design and construction of new facilities and also reconstruction, modernization and refurbishment of complex facilities within the country and abroad on a turnkey basis. Energoinvest is recognized as a reliable partner for its business excellence and quality of services. The key to success is in partnership with clients by strengthening relationships through the provision of services of design, engineering, transfer of knowledge and technology, according to the turnkey principle. Qualified professionals are crucial to achieving the company s objectives. In this regard, Energoinvest encourages employees to make the best use of individual skills, by investing in their education and training. Today, Energoinvest has built a reputation in the domestic and foreign market. In the realization of complex projects from the domain of its activities the company operates according to the principles of excellence under contemporary conditions in the world market. 4

TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER GENERATION PLANTS ENVIRONMENTAL PROTECTION AND WATER UTILITIES CIVIL CONSTRUCTION AND ARCHITECTURE INFORMATION AND COMMUNICATION TECHNOLOGIES OIL AND GAS 5

TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER SUBSTATIONS ERBIL KURDISTAN REGIONAL GOVERNMENT - IRAQ, SS 132/33/11kV, 33/11kV turn key SUBSTATIONS IN TRANSMISSION AND DISTRIBUTION UP TO 420 KV ELECTRIC POWER PROJECTS IN HYDRO AND THERMAL POWER PLANTS AND COMPLEX INDUSTRIAL FACILITIES ELECTRIC POWER AND MECHANICAL PROJECTS IN OIL INDUSTRY CATHODIC CORROSION PROTECTION FOR PROCESS INDUSTRY AND PIPELINES AUTOMATION AND SCADA SYSTEMS GRTE - ALGERIA; SS 60/30 kv turn key BASIC ACTIVITIES Design and engineering Equipment procurement LISCO - LIBYA; SS 30/10 kv turn key JP EP SS 132/33/11kV, GIS turn key Construction Supervision Testing and commissioning Provision of support during the warranty and post-waranty period Consalting Training GRTE - ALGERIA; SS 60/30 kv, 220/60 kv, turn key GMMRA - LIBYA; Great Man-Made River Cathodic protection 6

REFERENCES More than 6700 substations, voltage level of 12kV to 36 kv More than 500 substations voltage level 72.5 kv to 420 kv Electric power projects for 22 hydro power plants and more than 10 thermal power plants 8 Electric power projects for the petrol industry Cathodic protection of 130 oil wells in the oil fields Cathodic protection with sacrificial anode system for concrete/steel water pipeline (P.C.C.P.) 400 km length THE MOST IMPORTANT PROJECTS 2000 2013 CLIENT COUNTRY DESCRIPTION OF WORK COMPLETION DATE TURKISH ELECTRICITYTRANSMISSION CORPORATION(TEIAS) TURKEY Construction of 10 SS 170/33 kv 2001 ARABIAN GULF OIL CO. BENGHAZI LIBYA Anti-corrosion cathodic protection of oil wells in Sarir 2001 C.F.E. GERENCIA REGIONAL DE TRANSMISION NORTE MEXICO Construction of SS 230/115 kv 2001 TENAGA NASIONAL BERHAD MALAYSIA Construction of SS 275/132/11kV and 3 SS 132/33/11 kv 2004 UNDP-ENRP IRAQ Construction of SS 132/33/11kV and 33/11kV 2004 GENERAL ELECTRIC COMPANY (GECOL) LIBYA Overhaul of 220 kv GIS bays on SS 220/30/11 kv Rabta and modification of two spare OHTL 220 kv bays to 220 kv Transformator bays 2007 THE GREAT MAN-MADE RIVER (GMMR) PROJECT LIBYA Cathodic protection system for the P.C.C.P. of GMMR project 2007 QATAR GENERAL ELECTRICITY & WATER Co. QATAR Supply and replacement of operating mechanism of 132kV and 66 kv GIS Circuit Breakers at OLD AIRPORT Substation 2008 GRTE-SONELGAZ TRANSPORT DE L ELECTRICITÉ ALGERIA Construction of 5 SS 60/30 kv and extension SS 60/30 kv 2009 LISCO - LIBYAN IRON AND STEEL COMPANY LIBYA Construction of SS 30/10kV 2009 GRTE-SONELGAZ TRANSPORT DE L ELECTRICITÉ ALGERIA Construction of SS 60/30kV and extension 2 SS 220 kv 2010 NATIONAL TELECOMMUNICATIONS CO.LTD, ELAECTRICAL DIVISION NESMA GROUP OF COMPANIES SAUDI ARABIA Design services on Extension of 132 GIS at SS and Reinforcement of existing SS 132/33/13,8 kv 2010 SIEMENS Ltd Doha Qatar QATAR Supervision of works on GIS - Old Airport SS 2012 7

TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER TRANSMISSION LINES SONELGAZ - ALGERIA; 400 kv TL - turn key POWER TRANSMISSION LINES OF ALL VOLTAGE LEVELS UP TO 500 KV UNDERGROUND AND OVERHEAD POWER AND OPTICAL CABLES TELECOMMUNICATION ANTENNAS MECHANICAL TESTING OF POWER TRANSMISSION LINE TOWERS AND OTHER STEEL LATTICE STRUCTURES ELECTRIFICATION OF OIL WELLS EEPCO - ETHIOPIA; 220kV 290km TL - turn key BASIC ACTIVITIES Designig and engineering Production and delivery of steel structure GECOL - LIBYA; 400 kv SC TL- turn key JP EP BIH, HZ, HB, RS - ; 400kV; 220/110kV TL Reconstruction Construction Supervision Testing and commissioning Provision of support during the warranty and postwaranty period Consalting Training KOSTT - KOSOVO; 110kV OPGW installation and splicing ENERGOINVEST - ; Testing station 8

REFERENCES Produced and delivered more than 800,000 tons of transmission towers Designed and constructed more than 60,000 km of transmission lines: 330 kv - 500 kv (4.500 km) 220 kv - 275 kv (13.500 km) 110 kv - 161 kv (10.000 km) up to 88 kv (32.000 km) THE MOST IMPORTANT PROJECTS 2000-2013 CLIENT COUNTRY DESCRIPTION OF WORK COMPLETION DATE EEPCO ETHIOPIA Construction of TL 230kV 140km 2001 SONELGAZ ALGERIA Construction of TL 60kV 140km 2004/2005 EP BiH;HZ HB; RS Reconstruction of TL 400 kv 364 km; 220/110kV 380 km 2005 ELPCO GECOL LIBYA 66 kv 150 km supply of TL towers 2006 TEXEL, MILANO LIBYA Design and supply of TL 66 kv 180 km 2006 ENERGOVOD ENGINEERING LTD. NIGERIA Construction of TL 330 kv 140 km 2007 GECOL LIBYA Construction of TL 66 kv 500 km 2007 EEPCO ETHIOPIA Construction of TL 230 kv 122 km 132 kv 20km 66kV 61 km 2008 SONELGAZ ALGERIA Construction of TL 400 kv 250 km 220 kv 100 km 60 kv 61 km 2008 EEPCO ETHIOPIA TL 220kV 290km Ethiopia - Sudan Interconnection OPGW cables 2011 KOSTT KOSOVO KOSOVO TL 110kV i 220kV - 560 km OPGW cables 2011 EEPCO ETHIOPIA Construction of TL 220kV 290 km 2011 GECOL LIBYA Construction of TL 400 kv 720 km Consortium: ELPCO 38,2% (Libya) Energoinvest 37,2% (Bosnia and Herzegovina) Mitas 24,5% (Turkey), 2013 SONELGAZ ALGERIA TL 220 kv SC 110 km; TL 220 kv DC 40 km + 4 km; turn key 2013 SLOVENSKA ELEKTRIZAČNA PRENOSOVA SUSTAVA (SEPS) SLOVAK REPUBLIC Construction of TL 2 x 400kV 2 x 35km Consortium: Energoinvest (32,99%) VLB Leitungsbau GmbH&CoKG (67,01%); 2013 9

GENERATION PLANTS THERMAL POWER PLANTS FACILITIES FUNCTIONAL SYSTEMS BASIC ACTIVITIES Design and Engineering Equipment procurement Installation Supervision JP ELEKTROPRIVREDA BiH- TPP Tuzla - Replacement of the ESP with modernization of the ash and slag transport system in TPP Tuzla Unit 6 Testing and commissioning Provision of support during the warranty and post-waranty period Consulting Training JP ELEKTROPRIVREDA BiH- BOSNIA AND TPP Kakanj KEK KOSOVO - TPP Kosovo B THE MOST IMPORTANT PROJECTS 2000 2013 CLIENT COUNTRY DESCRIPTION OF WORK JP ELEKTROPRIVREDA BIH Energy Corporation J.S.C. - KEK JP ELEKTROPRIVREDA BIH JP ELEKTROPRIVREDA BIH JP ELEKTROPRIVREDA BIH KOSOVO Reconstruction of existing TPP Kakanj units in order to get heat capacity of 600 MW. Construction of heat station and distributive lines from Kakanj for the purpose of district heating External hydraulic transport of fly and bottom ash fromtpp Kosovo B to disposal site Mirash COMPLETION DATE 2004 2006 Reconstruction of inverter battery in the TPP Kakanj 2008 Repair mechanical and electrical equipment of cooling towers block at TPP Tuzla Replacement of the ESP with modernization of the ash and slag transport system in TPP Tuzla Unit 6 2011 2012 10

HYDRO POWER PLANTS HYDRO POWER PLANTS SMALL HYDRO POWER PLANTS JP EP BiH- Small Hydro Power Plants - turn key JP ELEKTROPRIVREDA BIH - Production of studies - interpretation of the results of dams observation for HPP Grabovica and HPP Salakovac JP EP BiH- HPP Jablanica - Optimization of hydraulic parameters BASIC ACTIVITIES Development of studies Design Engineering Consulting THE MOST IMPORTANT PROJECTS 2000 2013 CLIENT COUNTRY DESCRIPTION OF WORK JP ELEKTROPRIVREDA BIH VODNO PODRUČJE SLIVA RIJEKE SAVE INTRADE D.O.O. I INTRADE ENERGIJA D.O.O. JP ELEKTROPRIVREDA BIH JP ELEKTROPRIVREDA BIH Production of studies - interpretation of the results of dams observation for HPP Grabovica and HPP Salakovac Main design of reconstruction of protective hydraulic plant of earth-bank of the river Sava and Bosna in the area of Odžačka Posavina-II phase Study of alternative solutions of hydroenergetic utilization of upper water course of the river Neretva upstream from settlement Glavatičevo Implementation of geotechnical work and studies to determine the expenditure of leakage and subsidence of dams Hazna and Vidara Preparation of investment-technical documentation of previous and preparatory activities for construction of HPP Ustikolina COMPLETION DATE 2005 2006 2006 2005/2007 2013 11

ENVIRONMENTAL PROTECTION AND WATER UTILITIES ELEKTRO- PRIVREDA SRBIJE (EPS) - SERBIA TPP Nikola Tesla B- Environmental project of Ash handling plant, Obrenovac ELEKTRANA NA MAKEDONIJA FYR MACEDONIA, Oslomej - Transport system of water ash disposal on REK Oslomej UNMIK KOSOVO TE Kosovo B- Hidraulic transport of bottom ash to the disposal site THERMAL POWER PLANTS WATER TREATMENT PLANTS PROCESS PLANTS AUXILIARY PLANTS BASIC ACTIVITIES Design and Engineering Equipment procurement Construction Supervision Testing and commissioning Provision of support during the warranty and postwaranty period Consulting Training THE MOST IMPORTANT PROJECTS 2000 2013 CLIENT COUNTRY DESCRIPTION OF WORK VODNO PODRUČJE SLIVA RIJEKE SAVE Main design of reconstruction of protective hydraulic plant of earth-bank of the river Sava and Bosna in the area of Odžačka Posavina-I phase COMPLETION DATE TPP KOSOVO B: UNMIK KOSOVO Hidraulic transport of bottom ash to the landfill 2006 ELEKTROPRIVREDA BIH AD VODOVOD I KANALIZACIJA ELEKTROPRIVREDA SRBIJE (EPS) ELEKTRANI NA MAKEDONIJA SERBIA FYR MACEDONIA Transport of ash from ESP (electrostatic precipitator) to silos and units for removal of ash. Hydraulic transport of slag to disposal site. 2005 2008 Sewage system of town Bijeljina Main project 2010 Collection of fly ash under ESP and its pneumatic transport to storage facility (silos). Transport of boiler bottom ash to storage facility (silos). Hydraulic transport of fly- and bottom ash from storage facility to disposal site. Transport system of water ash disposal on REK Oslomej - Construction and Commissioning 2010 2013 12

CIVIL CONSTRUCTION AND ARCHITECTURE INDUSTRIAL FACILITIES CONSTRUCTION WORKS ON ENERGY PLANTS PUBLIC BUILDINGS AND FACILITIES ELEKTROPRIVREDA SRBIJE (EPS) - SERBIA TPP Nikola Tesla Construction of silos for fly ash BASIC ACTIVITIES Design Engineering Supervision Consulting PTT POŠTA Adaptation and reconstruction of main Post Office building GRTE ALGERIA Construction of building and steel installation works for SS 60/30kV Abadla THE MOST IMPORTANT PROJECTS 2000 2013 CLIENT COUNTRY DESCRIPTION OF WORK PTT SARAJEVO UNITIC SARAJEVO MKS (FDS) ELEKTROPRIVREDA SRBIJE (EPS) MINISTARSTVO KOMUNIKACIJA I PROMETA GRAD MOSTAR MEMORIJALNI CENTAR POTOČARI SERBIA Adaptation and reconstruction of main Post Office building Reconstruction of business centar - mechanical, electrical and civil works Technical protection of facility (perimeter, video, sensor cable and barriers) Design, supply, installation of steel structure for bottom ash belt conveyor at TPP Nikola Tesla B. Construction of auxiliary facilities for the control equipment, the construction of silos for ashes, the construction of the facility for mixers and pumps Main project of Highway on the Vc LOT 4 Corridor (Donja Gračanica Drivuša) COMPLETION DATE 2001 2004 2006 2010 2011 Design for Sport Center in Mostar 2012 Preparation of Preliminary and Detailed design documentation for II phase of the Potočari Memorial Center 2013 13

INFORMATION AND COMMUNICATION TECHNOLOGIES GECOL LIBYA & SNEL RDC CONGO- Construction of regenerator station SDH signal with solar power supply on a turnkey basis TURN KEY SOLUTIONS FOR TELECOMMUNICATION SYSTEMS (SDH, PDH, DM/ DWDM, PLC, TELEPROTECTION, WIMAX, PTP&PMP, RADIO UHV/HF/VHF/SDH/PDH/ ETHERNET, POWER SUPPLY SYSTEMS, SHELTERS, ETC) TRADITIONAL AND NGN SWITCHING SYSTEMS (PAX/ PABX, XDSL, MSAN, SOFTSWITCH, OSS/BSS) BUSINESS SW SOLUTIONS (FINANCIAL SW PACKAGES, INFORMATION SYSTEMS, SYSTEMS FOR ACCESS AND WORKING TIME CONTROL, ETC) SW SOLUTIONS FOR TELCO OPERATORS (IPTV, MOBILE NETWORK SERVICES, ETC) INTEGRATION AND TELECOMMUNICATION SOLUTIONS FOR MOBILE/FIXED OPERATORS AND OIL/GAS/POWER/UTILITY COMPANIES BASIC ACTIVITIES Consulting and planning Software development and telecommunications services Training Design and Engineering Installation Commissioning Integration and Testing Maintenance and support during the warranty and postwarranty period 14

ENERGOINVEST, - Development of modern software solutions THE MOST IMPORTANT PROJECTS 2000 2013 CLIENT COUNTRY DESCRIPTION OF WORK NOKIA SIEMENS NETWORKS/BH TELECOM Implementation of NSN DWDM network for BH Telecom at 23 locations in COMPLETION DATE ISKRATEL KRANJ SLOVENIA Development of telecommunication software 2009 KOSTT ERICSSON NIKOLA TESLA ZAGREB GECOL CENTRALNA IZBORNA KOMISIJA BIH SNEL KOSOVO CROATIA LIBYA CONGO Design, installation, commissioning and technical support during the warranty period for the construction of a national telecommunications network for the Transmission of Kosovo on 39 substation and two control centers The project for the Ministry of Security and works on installing and setting up the cables for the IP DSLAM device Construction and implementation of national STM-16 SDH / PDH telecommunications network on 400KV network and national and regional control centers for the Libyan Electric power company Designing a new and upgrade of existing application software for the election of the CEC Central Election Committee Design of 2,500 kilometers long national transmission telecommunication network using radio transmission and optics type of SDH / PDH / RR with the design of renewable power (27 locations, 7 signal regenerators) 2008 2008-2011 2011 2008-2013 2012 2011-2013 BH TELECOM - Construction of a national optical SDH and DWDM rings on a turnkey basis GECOL LIBYA - National 400KV project - Modern solution on a turnkey basis for telecommunications transport networks 15

OIL AND GAS ELECTRO-MECHANICAL PROJECTS IN OIL FIELDS AND TERMINALS CATHODIC PROTECTION EXCLUSIVE IMPORTER OF NATURAL GAS FOR MARKET BH GAS - ; Energoinvest, exclusive importer of natural gas for Bosnia and Herzegovina BASIC ACTIVITIES Engineering Supply of equipment and components Construction Maintenance Installation ARABIAN GULF OIL Co. AGOCO - LIBYA; Oil field Nafoora - upgrade of the electricity network THE MOST IMPORTANT PROJECTS 2000-2013 CLIENT COUNTRY DESCRIPTION OF WORK COMPLETION DATE ARABIAN GULF OIL CO. AGOCO LIBYA Cathodic protection on oil fields in Sarir 2001 ARABIAN GULF OIL Upgrade of the electricity network LIBYA CO. AGOCO on oil field Nafoora 2002 ARABIAN GULF OIL CO. AGOCO BH GAS LIBYA Maintenance services on oil fields and terminals Exclusive importer of natural gas for Bosnia and Herzegovina Annual renewal of the contract since 1992 Annual renewal of the contract since 1998 16

ENERGOINVEST IN THE WORLD Energoinvest has achieved a strong market position in most of its markets thanks to the high quality of its products and services. This is confirmed by numerous references as well as constructed facliities of significant capital value. Presence in the market, monitoring of trends and an increase market share are achieved through a network of the company s own and joint-venture companies, representative offices and agents worldwide. In addition to the strong competition that prevails in the world market, the company has successfully provided jobs in its traditional markets with a tendency to increase its presence in new markets in the future. In the realization of its business strategy Energoinvest strives to form consortium arrangements and other forms of cooperation with the world s leading companies and relevant financial institutions in order to increase market share. TRADE AND SERVICES Supply of gas for Bosnia and Herzegovina market. Maintenance services at oil fields and terminals. Procurement and sale of electrical equipment, fittings, mechanical equipment and spare parts in Bosnia and Herzegovina and abroad. 17

IDENTIFYING THE BASIS OF SUCCESS HUMAN RESOURCES Objectives and tasks within Energoinvest are realized thanks to its professional, qualified and fully dedicated staff. Specialized professional knowledge from different business areas provides the basis for the realization of the strategic goals of the company. Energoinvest pays special attention to the processes that contribute to greater competence, motivation and creativity of each individual through career development, education and career guidance. The process of continuous acquisition of new knowledge is carried out through the following activities: Expert training and practices, Cooperation with foreign business partners, Exchange of experiences in the areas of business interest. INTEGRATED MANAGEMENT SYSTEM Quality, along with the protection of the environment and safety in the workplace, is the key factor in Energoinvest s successful business policy. ISO 9001:2008 ISO 14001:2004 BS OHSAS 18001:2007 Energoinvest in its operations applies the requirements of international standards, which were consolidated in the Integrated Management System. The system has been certified by the certification company Lloyd s Register Quality Assurance London. ENVIRONMENTAL PROTECTION Environmental protection is an integral part of the strategic policy at Energoinvest. Energoinvest as a socially responsible company is committed to the full implementation of the legal requirements regarding environmental protection and the requirements of international standard ISO 14001:2004. This has included systematically ensuring the implementation of permanent controls over aspects of Energoinvest s business activities that have or may have a significant impact on the environment. Within the company we actively carry out the continuous education of staff, raise awareness and increase the motivation of employees to pursue improvements in environmental protection. 18

ENERGOINVEST MARKET ORIENTATION HIGH QUALITY COMPETITIVENESS RELIABILITY FLEXIBILITY ENERGOINVEST, d.d. SARAJEVO Hamdije Ćemerlića 2 71000 Sarajevo Bosnia and Herzegovina www.energoinvest.ba info@energoinvest.ba

ENERGOINVEST, d.d. SARAJEVO Hamdije Ćemerlića 2 71000 Sarajevo, Bosnia and Herzegovina Phone: +387 (33) 703 301 Fax: +387 (33) 659 618 www.energoinvest.ba info@energoinvest.ba REPRESENTATIVE OFFICES OWN COMPANIES JOINT VENTURES ENERGOINVEST Branch Office Erbil Dream City, House No. 848 Erbil, IRAQ - KURDISTAN REGION Phone: +964 (0) 66 264 24 70 ENERGOINVEST BUREAU DE LIAISON 36, Rue A Les Crêtes, Hydra 16035 Alger, ALGERIE Phone: + 213 (21) 608 458 Fax: +213 (21) 603 361 ENERGOINVEST P.O. Box 2596 Addis Ababa, ETHIOPIA Phone: +251 (1) 156 043 Fax: +251 (1) 150 3027 ENERGOINVEST Branch Office Tirana, Tre Kullat Rreli Liqeni Kulla Nr.2C Ap 21 Tirana, ALBANIA Phone: +355 (69) 744 0965 ENERGOINVEST Sh.a. Lagja Dafina Bregu i Diellit B2/1 10000 Pristina, KOSOVO Phone: +386 (49) 111 635 ENERGOINVEST Branch Office Trg Kralja Tomislava 22 20340 Ploče, CROATIA Phone: +385 (20) 687 685 Fax: +385 (20) 687 685 ENERGOINVEST Taksim, Ayazpasa Inonu Cad No.31/4 80620 Istanbul, TURKEY Phone: +90 (212) 252 0204 Fax: +90 (212) 252 1738 ENERGOINVEST Branch Office Skopje Ul. Pero Nakov bb 1000 Skopje, MACEDONIA Phone: +387 (61) 199 362 ENERGOINVEST Tripoli, East Janzur P.O.Box 6180, Tripoli, LIBYA Phone: +218 (21) 714 0800 Fax: +218 (21) 714 0700 INTERENERGO G.m.b.H Siegesstrasse 15, D-80802 Munchen, GERMANY Phone: +49 (89) 595 997; 595 998 Fax: +49 (89) 554 507 ENERGOMEX, S.A. de C.V. Fabrica de Equipo Electrico, Avenida Santa Monica No 33, Colonia Xocoyahualco, Tlalnepantla C.P. 54090 Mexico, MEXICO Phone: +525 (55) 397 5687 Fax: +525 (55) 254 0300; 397 5785 SARL ENERGOINVEST ALGERIE 45, Rue A, Les Crêtes, Hydra 16035 Alger, ALGERIE Phone: +213 (21) 692 445 Tel/ Fax: +213 (21) 480 007 ENERGOINVEST-HRVATSKA d.oo. ZAGREB Radnička cesta 228, 10000 Zagreb, CROATIA Phone: +385 (1) 240 4324 Fax: + 385 (1) 240 4310 COMET,d.o.o. Neretljanskih gusara 2 20340 Ploče, CROATIA Phone/ Fax: +385 (20) 677 053 ENERGOINVEST - IMQ d.o.o. Tvornička 3, 71000 Sarajevo Phone: + 387 (33) 628 928, 929 Fax: +387 (33) 460 292 ENERGOINVEST-RTC-AMT d.o.o. Tvornička 3, 71000 Sarajevo Phone: + 387 (33) 473 938 Fax: + 387 (33) 622 246 ENERGOINVEST- INTERENERGO d.o.o. Bul. Despota Stefana br.15 11000 Beograd, SERBIA Phone: + 381 (11) 324 6014 Fax: +381 (11) 324 0928 ELPCO - Electrical Projects Co. Hay Al-Andalous,Gourji Road, Al-jomhouria Bank Building, P.O.Box 11149, Tripoli, LIBYA Phone: +218 (21) 477 4792 Fax: +218 (21) 477 4295 PETROLINVEST, d.d. SARAJEVO Tvornička 3, Stup, 71000 Sarajevo Phone: +387 (33) 779 820 Fax: +387 (33) 546 762 INTERENERGO ISTANBUL Dis.Tic. Sti. Ltd. Taksim, Ayazpasa Inonu Cad No.31/4 80620 Istanbul, TURKEY Phone: +90 (212) 2520204 Fax: +90 (212) 2521738 INMOBILIARIA ENERGOMEX S.A. De C.V. Mexico Avenida Presidente Mazarik No 101- Chapultepec Morales, Miguel Hidalgo, 11570 Mexico D.F., MEXICO Phone: +525 (55) 405 8067 Fax: +525 (55) 254 0300 ENHA Co.Ltd Ul. Studencheskaya 16 308023 Belgorod, RUSSIA Phone: +74 722 264 985 Fax: +74 722 264 246 GOSTARESH SHIRSAZI COMPANY Nikray Street No.5, Mirdamad Blv. 16314 Tehran, I.R. IRAN Phone: +98 (21) 2225 7472 Fax: +98 (21) 2225 7756 ENERGOINVEST, d.d. SARAJEVO - Marketing 2014