Sport Mega-Events and Local Development: the impacts of 2014 FIFA World Cup in the East Zone of São Paulo

Similar documents
JHSF Participações S.A. November 2016

JHSF Participações S.A. November 2016

METROPOLITAN REGIONS COMPETITIVENESS AND GOVERNANCE

ICT: MINAS GERAIS. Federation of Industries of the State of Minas Gerais

CONSTANTINE GONDOLAS- CONSTANTINE, ALGERIA SKIKDA GONDOLAS- SKIKDA, ALGERIA TLEMCEN GONDOLAS- TLEMCEN, ALGERIA SOLVE CONGESTION REDUCE TRAVEL TIME

Executive summary. Project description. Project name. Project address. Apartment mix. Deposit required. Estimated construction commencement date

URBAN FLOODS IN SOUTH AMERICA

BRAZIL: YOUR GATEWAY TO BUSINESS AND INVESTMENT

Samara Urban Area Samara Region Russian Federation

LATAM Airlines Group presents technical airport infrastructure requirements for the Northeast hub based on study by the consulting firm Arup

16th-23th. July 2011 CHARACTER LEADERSHIP COEXISTANCE YMCA INTERNATIONAL YOUTH GAMES SÃO JOSÉ DOS CAMPOS BRAZIL

Thiago Alonso de Oliveira CEO

Thiago Alonso de Oliveira CEO

1 Bicentenario Centrality Convention Center of the Metropolitan District of Quito

RIO HILLS COUNTRY & LAKE RESORT

June May the best team win!

UNIVERSITY AVE SAN DIEGO, CA 92104

Global Study Tour November 2018 Brazil and Argentina

Brazil. Population & Culture

The Land Use Plan and The Green Corridor in Cali An Urban Transformation Opportunity

PLANETA BRASIL INCOMING

Fact Sheet ELANBiz: Country Profile Brazil 1

Albert Luthuli Hospital - Durban (South Africa)

Global Mega-trends Urbanisation a key driver of growth. Steve McCann Group CEO and Managing Director Lend Lease

January 22 nd, Ede Ijjasz-Vasquez Senior Director Social, Urban, Rural & Resilience The World Bank

Draft Greater Sydney Region Plan

Slum Situation Analysis

Informational Meeting

Television Stations in The Gambia

Just more than 30 years...

Real Property Management Brazil - State of Rio de Janeiro

Company Oris d.o.o. UNIQUE REAL ESTATE SALE LOCATION:

Presentation on DIRSI Residential Complex, TBILISI. Description of Project September AS GEORGIA AS Group Investment LLC

Dufry reinforces its presence in Brazil and signs contracts in São Paulo, Brasilia, Viracopos, Natal and Goiânia

Reasons to invest in Pernambuco

Public Concession Opportunities in Brazil

The Cuban economy: Current Situation and Challenges.

Regional Seminar on Basel III and Implementation Challenges March, 14th 15th

Provincial Review 2016: Limpopo

WALA Conference. January 2017 Bologna

MAKKAH The Holy City.

SESSION 4 INFRASTRUCTURE

Latin America Logistics Overview. Brazil, Argentina and Chile

A i Q C a p i t a l M a n a g e m e n t L i m i t e d

Public Transport funding in a crisis: A National Treasury perspective

Detailed Itinerary DAY 1 DAY 2 DAY 3

Integrating GIS and Input-Output systems for assessing the impacts of floods in São Paulo

PREMIER PLAZA PHASE 1

Evipaccesstickets.com

Scoping Paper Belo Horizonte - Brazil

Conference Call 1Q14 Results. Investor Relations May 15, 2014

AUTOMOTIVE: MINAS GERAIS BUSINESS OPpORTUNITIES. Federation of Industries of the State of Minas Gerais

17 th FPP Edu-Media EXPOs Brazil Roadshow

UGANDA S URBAN DEVELOPMENT; A SCRUTINY OF TRANSPORT PLANNING AND MOBILITY IN TOWNS AND CITIES

Porto planning for people, not cars. John Bartlett Towards Carfree Cities Conference IX York 28 June 2010

ANNEXURE A Terminology and definitions

The Growth of International Tourism to Colombia is Above the Global Average

BRAZIL. Issuing Authorities

Tomorrow's Cities: A day in the life of a smart slum

RESIDENTIAL COMMUNITY PARK RIDGE T R A N Q U I L I T Y D R I V E AT PARK RIDGE

Description of the Fieldwork Area

TOURISM INFRUSTRUCTURE DEVELOPMENT OF MOUNTAIN RESORTS OF GEORGIA. The Municipal Development Fund of Georgia

ECONOMY AND PLANNING SECRETARIAT. State of São Paulo: Overview. State of São Paulo: The best investment opportunities ECONOMY AND PLANNING SECRETARIAT

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name

Tourism in Brazil Environment, management and segments. Edited by Gui Lohmann and Dianne Dredge

Over the decades, however, many parks created in Natural Protected Areas became just paper parks, not reaching their purposes.

Sales of IT Hardware in The Gambia

4Q15 and 2015 Results Presentation. March 30, 2016

(Specification B) Insert. General Certificate of Secondary Education Foundation Tier and Higher Tier June 2015

Provincial Review 2016: KwaZulu-Natal KwaZulu-Natal

WHERE WE ARE NUMBERS OF CEMIG NUMBERS OF CEMIG NUMBERS OF MINAS GERAIS NUMBERS OF CEMIG. Brazil. Minas Gerais

Copa Holdings Reports Record Earnings of US$41.8 Million for 4Q06 and US$134.2 Million for Full Year 2006

Carbon Neutralization

SUBURBPROFILE POPULATION TO DOUBLE OV E RVIE W CITY OF WY ND H AM FORECAST POPULATION WYNDHAM CITY COUNCIL

To Mumbai, Back and Forth. Circulatory Urbanism Photo Essay. Photos by Ishan Tankha Text by Rahul Srivastava and Matias Echanove

2nd Quarter. AEDC is pleased to present the Anchorage Quarterly Economic Indicators Report for the second quarter of 2010.

Rakennusalan mahdollisuudet Latinalaisessa Amerikassa. Heta Pyhälahti Region Americas

New Construction - Corner Retail in High-Density Trade Area

KAMPALA: THE GARDEN CITY

MUNICIPALITY OF GUATEMALA

Connectivity for Urban Tourism Competitiveness

Household Travel Survey Overview

FORTALEZA- CEARÁ- BRAZIL

FGV-EAESP (Escola de Administração de Empresas de São Paulo da Fundação Getulio Vargas)

Land use in Rio de Janeiro

From: OECD Tourism Trends and Policies Access the complete publication at: Chile

Second Quarter 2017 Results Presentation. August 2017

Hotels & Retail Industry

Quality Infrastructure Investment

PROGRAMING - UNDERSTANDING RISK BRAZIL 2012 NOVEMBER 12 TH

Retailing in India is one of the pillars of its

LIFE IN METROPOLITAN AREAS IN THE 21 ST CENTURY

8.INFRASTRUCTURE #INVESTINGUATEMALA. Industry in Guatemala

Discover the Azores MC

An Integrated Investment Incentives and Cargo Hub Airports to Stimulate Air Cargo Demand. June,2017

GROWTH, CONFIDENCE AND OPPORTUNITIES TO INVEST

INVITATION A INTERNATIONAL CHALLENGE EVENT & A WORLD RANKING TOURNAMENT

visits4u Case Studies: Historical Centre of Athens Athens, Greece

PERNAMBUCO INVESTMENT OPPORTUNITIES

State of the Economy St. John's Metro

Transcription:

Sport Mega-Events and Local Development: the impacts of 2014 FIFA World Cup in the East Zone of São Paulo Prof. Dr. Eduardo A. C. Nobre FAUUSP/NAPPLAC/LabHab II International Conference Mega-events and the City Rio de Janeiro, 27-30 Abril 2014

Introduction The East Zone Expansion The East Zone Today Local Development Projects The 2014 FIFA World Cup What would the legacy be?

São Paulo Metropolitan Region 8,501 sqkm (10% of national territorry) 39 municipalities; 2,210 sqkm of urbanised area. 19.7 million inhabitants (10.3% of national population), 11.3 million living in the capital, the MSP Municipality of São Paulo. Gross domestic product was US$ 421 billion, 19% of GNP (74% services and 26 % industry). Uneven development: 63% of households earn less than 5 MW (USD 1,620) and only 6% earn more than 20 MW (USD 6,480)

Uneven and segregated urban space The middle and high incomes strata occupied the areas provided with jobs, accessibility, infrastructure and services The low income sectors have been evicted to less privileged area considering these factors on a great level of precariousness and inadequate living conditions in central area slums, favelas and peripheral illegal settlements 4

The East Zone Expansion The East Zone was the main low income population expansion axis. Geographical features (low and wetlands) EFCB construction (Brazil Central Railway linking São Paulo to Rio de Janeiro) Road works and bus services stock of land for low-income peripheral settlements In the 1970s, major large public housing development projects due to its cheaper land. Lack of efficient public transport, infrastructure and public facilities (only in 1988, metro lines arrived to the area).

Public Housing Developments. Source: PMSP (www.infocidade.prefeitura.sp.gov.br)

The East Zone today 3.6 millions inhabitants (32.4% of city population) 291 sq km (20% of the area) Population Density 125 inhabitants/hectare (MSP = 74 inhab/ha) Low-income population concentration Low concentration of jobs: 25 to 50 jobs/hectare (City Center more than 250 jobs/hectare) Source: PMSP (www.infocidade.prefeitura.sp.gov.br)

Income concentration. Source: PMSP (www.infocidade.prefeitura.sp.gov.br)

Formal jobs and illiteracy concentrations. Source: PMSP (www.infocidade.prefeitura.sp.gov.br)

Metropolitan transport system travel demand. Source: Metro-SP apud. Santo Amore, Reis e Pereira, 2013.

Local Development Projects Attempts to bring jobs and economic activities to the area: 1981 Land Use Act transformed rural land into industrial districts; 2004 Rio Verde Jacu Urban Operation Act established zoning incentives along the new ring road under construction; 2007 Incentive Zoning Act established tax exemptions for economic and job generating activities in the area 2011 The area was chosen to host the Corinthians Arena defined by FIFA as the opening field for 2014 World Cup

Corinthians Arena stimated cost R$ 850 millions (US$ 380 millions) 50% from tax exemptions 50% from BNDES loan Costs arrived to R$ 1.2 billions (US$ 540 millions)

Road works cost ± R$ 312 millions (US$ 143 millions) City Hall and São Paulo State Road Development Co.

What would the legacy be? The impacts of 2014 World Cup made us consider what could it legacy be. Will it finally bring jobs and economic activities for the area? And if it brings, will them be appropriate for local population? Let s consider some facts!

Despite incentives to attract job generating activities, tertiary sector new developments (hypermarkets, car dealers, building material stores) creates little qualified jobs. Infrastructure works were restricted to Jacu-Pêssego Avenue and around Itaquera Institutional Pole. Industries complain of narrow streets and lack of sewage Despite of being just 2 miles away from Jacu-Pêssego Avenue, industrial district roads are narrow and sloping, hindering maneuvers... In eight years, only 5 companies had tax incentive Without infrastructure, companies are not coming... Local entrepreneurs complain of narrow streets and lack of sanitation Worse still, the finishing of Jacu-Pêssego Avenue has contributed to worsen circulation conditions as it brought huge truck traffic to the area. Lourival Mariano Filho, owner of Petnik Serigraphy Services, which employs 30 workers, says the transit caused him to move his company away from the industrial pole. ESP, 14/12/2012

Increased land speculation, enhancing its dormitory town character, but with a gentrification process. World Cup Stage, Itaquera has become developers bet Prices for existing homes rose... With the major part of the stadium and public works built, the region has become a bet for developers. FSP, 03/17/2013. Developers hold releases in Itaquera to sell them more expensively land prices have climbed after the announcement that Itaquera would be the stage of World Cup they went from R$200/R$300 (per square meter) to R$ 1,000/R$ 1,500. FSP, 03/17/2013. Favelas removal near the Arena guarantee real estate development investment return Road works in progress and the implementation of the Rio Verde Linear Park resulted in the removal of 601 families from Favela da Paz and Miguel Ignacio Cury.

Subprefeitura Distrito Total Estoque (m2) Comprometido (m2) Disponível (m2) Consumido BT MORUMBI 30000 29998,48 1,52 100% CL VILA ANDRADE 250000 249147,32 852,68 100% IP SAC OMA 120000 120000 0 100% IP IPIRANGA 110000 109995,84 4,16 100% IP C URSINO 110000 109984,13 15,87 100% LA LAPA 75000 74999,76 0,24 100% LA JAGUARE 32000 31999,5 0,5 100% LA VILA LEOPOLDINA 190000 189981,51 18,49 100% MG VILA MARIA 80000 79902,05 97,95 100% MG VILA GUILHERME 40000 38645,49 1354,51 97% MO AGUA RASA 100000 99999,61 0,39 100% MO MOOC A 160000 159997,97 2,03 100% MO BELEM 50000 49998,69 1,31 100% MO TATUAPE 350000 194001,3 155998,7 55% SE C AMBUC I 20000 19999,92 0,08 100% SE BELA VISTA 50000 49973,49 26,51 100% SE LIBERDADE 25000 24951,06 48,94 100% IQ C IDADE LIDER 25000 3889,51 21110,49 16% IQ ITAQUERA 100000 11966,43 88033,57 12% IQ JOSE BONIFAC IO 80000 0 80000 0% IQ PARQUE DO C ARMO 10000 0 10000 0% Residential aditional building rights consumed by Subprefecture and district. Source: PMSP/SMDU, 2014. (http://outorgaonerosa.prefeitura.sp.gov.br/relatorios/relestoquenaoresidencial.aspx)

Subprefeitura Distrito Total Estoque (m2) C omprometido (m2) Disponível (m2) C onsumido SE BELA VISTA 40000 40849,59-849,59 102% SE C ONSOLAC AO 60000 57666,26 2333,74 96% SE SANTA C EC ILIA 30000 27612,7 2387,3 92% SA SANTO AMARO 100000 99967,52 32,48 100% SA C AMPO GRANDE 50000 49918,58 81,42 100% SA C AMPO BELO 20000 18327,79 1672,21 92% PI ITAIM BIBI 90000 89999,92 0,08 100% PI JARDIM PAULISTA 50000 43169,68 6830,32 86% MO MOOC A 40000 39777,42 222,58 99% MO BELEM 40000 20415,22 19584,78 51% MO TATUAPE 120000 56835,83 63164,17 47% LA LAPA 20000 20000 0 100% LA VILA LEOPOLDINA 60000 60000 0 100% LA JAGUARE 8000 7999,38 0,62 100% IQ C IDADE LIDER 5000 2131,33 2868,67 43% IQ ITAQUERA 20000 0 20000 0% IQ JOSE BONIFAC IO 10000 0 10000 0% IQ PARQUE DO C ARMO 3000 0 3000 0% Non Residential aditional building rights consumed by Subprefecture and district. Source: : PMSP/SMDU, 2014. (http://outorgaonerosa.prefeitura.sp.gov.br/relatorios/relestoquenaoresidencial.aspx)

So, considering present situation, it seems that 2014 FIFA World Cup legacy for Itaquera will be a gentrifyied neighboorhood, expelling lower-income strata for further on, without the increase of qualified jobs opportunities. As far as it seems, it is only opening a new frontier for real estate capital expansion.

Thank you for your attention!! eacnobre@usp.br