PLAN. 1. Generalities 2. Current Situation 3. Future Strategy + Actions required 4. Conclusion. Ministry of transport 2013

Similar documents
EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

Status of PBN implementation in France

European Aviation Safety Agency

NEW CALEDONIA PBN PLAN

APAC PBN UPDATE Slide 1 of xx

DSNA NAVIGATION STRATEGY

Título ponencia: Introduction to the PBN concept

Performance Based Navigation Operational End-State 2023

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

French DSNA approach to CNS rationalization & evolution

E-GNSS systems for GA

GNSS AVIATION APPLICATIONS AND PROGRAMMES IN MADAGASCAR

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

Open Questions & Collecting Lessons Learned

Learning Objectives. By the end of this presentation you should understand:

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

(RN R A N V A V & & RN R P N

UK Implementation of PBN

SDM WORKSHOP ON PBN (19/10/2017)

PBN Implementation Plan Tonga

APV IMPLEMENTATION PLAN

ICAO framework for LPV

Presentation of the First Deputy Director, Scientific and Research Institute of Airnavigation

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

EASA RNP (AR) Workshop The Landscape Working Together

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

Navigation at the. Federal Aviation Administration Crossroads

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

INTERNATIONAL CIVIL AVIATION ORGANIZATION

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

GETTING EXPERIENCE IN PBN PROCEDURES DESIGN. GENERAL OVERVIEW OF INECO ACTIVITIES AROUND THE WORLD

NEW FPL Transition Phase & Implementation Stages

PBN Implementation in the UK

Evolving and improving landing networks with EGNOS

E GNSS in Aviation: status and trends, aviation grants Workshop Deployment of Galileo and EGNOS in Portugal

PBN Implementation Plan Italy. Version 1

PBN Implementation Plan - Fiji Version 1 19 January 2010

NANSC VISSION AND MISSION. NANSC CNS/ATM Roadmap FUTURE ASBU. 3 Future works. alignment 3/13/2014

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Project RLA/06/901 Lima, Peru, 22 September to 3 October Final Version

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013

A Pilot s perspective

EUROCONTROL EUROCONTROL S CIVIL-MILITARY VIEWS ON A EUROPEAN AIR NAVIGATION STRATEGY

ASBU-Bloc0 Moroccan achievements and planned activities

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Patrizio Vanni (Project Coordinator)

PBN Operational Approval Continental En Route Navigation Specifications

EGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information

Draft PBN Implementation Plan Papua New Guinea

What is B-RNAV? 1. 1 Adaptado de [ ]

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015

GNSS/EGNOS services and applications in civil aviation

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1

PBN and Procedure Design training

Contextual note SESAR Solution description form for deployment planning

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

Performance-Based Navigation Implementation Roadmap

PBN Implementation inside Italian Airspace Status update Summer 2013

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

Final Approach Operations Symposium

Implementation of PBN in Armenian airspace

PBN and RNAV concepts

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

GNSS/EGNOS services and applications in civil aviation

EGNOS History, Status and Plans

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

Subject: Aircraft and Operators approval for RNP Approach (RNP APCH) Operations

SBAS Frequently Asked Questions

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

DSNA Navigation Strategy. Benoit Roturier (DSNA)

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

MEDUSA & NANSC, Egypt

International Civil Aviation Organization. MIDANPIRG ATM/SAR/AIS Sub-Group. Twelfth Meeting (ATM/SAR/AIS SG/12) (Cairo, Egypt, November 2011)

SBAS as a solution for safe approaches in New Zealand and Australia

Sudan PBN Implementation Plan PBN SG/2

Flight Inspection Services

Flight Procedure Design and Cartography

TERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW

Nepal PBN Implementation Plan. Civil Aviation Authority of Nepal Babarmahal, Kathmandu

Approach Specifications

THIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION.

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

Avionics requirements for State aircraft

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

AREA NAVIGATION RNAV- MANAGEMENT

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

The support of an European ANSP

LPV implementation to non-instrument runways

Sudan PBN Implementation Plan PBN SG/3

Regulations & Obligations

Update of ICAO DOC 8071 Volume 1

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

easyjet, EGNOS and LPV EGNOS Workshop, Athens, 3rd October 2017

VFR FLIGHTPLAN EQUIPMENTS

Transcription:

PLAN 1. Generalities 2. Current Situation 3. Future Strategy + Actions required 4. Conclusion

Generalities

Generalities Through the Office of Civil Aviation and Airports : OACA A contract between the OACA and TELESPAZIO within the project was signed on November 22, 2012 by both parties.

Current Situation

Current Situation : En-Route Basic Area Navigation B-RNAV was implemented in the Tunisian airspace since December 2006 over FL155. The BRNAV is similar to RNAV5.

Current Situation : Approach. In the Tunis FIR / UIR, the use of the GPS constellation reinforced by an internal integrity service navigation system on board of ABAS, provides the framework for the use of non-precision approach procedures : RNAV - GNSS.. NOTAM GNSS are issued every 24 hrs for each tunisian A/D. It is mandatory to provide a GNSS signals recorder equipement and optional to broadcast a monitoring tool.

Current Situation : Infrastructure AIDS Aéroports: 9 Aéroports internationaux Aides à la navigation aérienne 9 DME 13 VOR 3 NDB 9 ILS 2 PSR & 3 SSR Ministry of transport 2013

Current Situation : Infrastructure Coverage Senseurs VOR/DME Calculated coverage in FL 95 with actual aids Ministry of transport 2013

Current Situation : Infrastructure Coverage Senseurs DME/DME DME/DME FL95 Ministry of transport 2013

Current Situation : Infrastructure Coverage Senseurs DME/DME DME/DME 3000ft Ministry of transport 2013

Current Situation : Radar Coverage Akouda SSR Coverage: 1000 ft up to FL 100 Ministry of transport 2013

Current Situation : Statistiques du trafic Aéroport 2007 2008 2009 2010 2011 AITC 52755 58057 62688 68501 61230 AINH - - - 36068 25255 AIMHB 35206 33826 31158 29451 10663 AIST 26671 25564 32887 29924 32101 AIDZ 26185 26495 26369 26156 26580 AIGM - - - 1096 2092 AITN 3599 3870 3391 3213 2361 AIGK 6421 4498 2556 2492 2044 AITA 2252 3098 2353 2990 1814 Ministry of transport 2013

Future strategy and actions required

Future strategy Short terme Mean terme Long term En-route RNAV5 RNAV5 RNAV1 4D Trajectory RNAV2 Terminal conventional SIDand STAR & RNAV1 & B-RNP1 conventional SIDand STAR & RNAV1 & B-RNP1 RNAV1&B-RNP1 Approach NPA PACATI APV/ BARO VNAV &RNPAPCH/ BARO VNAV NPA PACATI/IIGNSS APV BARO VNAV &RNPAPCH & RNPARAPCH PA GNSS APV/BARO VNAV &RNPAPCH & RNPARAPCH

Actions Required : En route RNAV 5 Extension of RNAV 5 to the FL95 in the entire Tunisian airspace. Installation of two new DMEs : one in Sidi Ben Aoun, the other in El Borma.

Actions Required : terminal Zone RNAV 1 The implementation of RNAV 1 in the TMAs of Tunis and Djerba The implementation of (CBN, SFX and BAN) 3 DMEs

Actions Required : terminal Zone B-RNP 1 GNSS is the primary navigation system for Basic RNP 1 in environments where ATS surveillance is either unavailable or limited. It is necessary to meet the requirements of recording and monitoring the GNSS signals.

Actions Required : Approach RNP APCH RNP APCH has no specific requirements for communications or ATS surveillance and will be adopted for some Tunisian airports. 2D lateral aspect of navigation Infrastructure aid of navigation GNSS

Actions Required : Approach RNP AR APCH RNP AR APCH will be adopted at the airport of Tabarka Ain Draham via a specific study 2D lateral aspect of navigation Infrastructure aid of navigation GNSS

Actions Required : Approach APV BARO-VNAV The APV Baro-VNAV cover the vertical navigation aspect.

Actions Required in the project: Provision of missing data to complete the security study ; Final check and validation of all the studies and procedures developed ; Technical Training for flight procedure designers ; Flight Validation of the LPV procedures developed.

Conclusion

Conclusion: The Opportunity to transfer knowledge in design and the use of LPV procedures ; The Implementation and the publication of the LPV procedures: Ensure that EGNOS provide the best coverage of the desired Tunisian airspace ; Ensure the right monitoring of the GNSS signals (GPS + EGNOS) ; Amend the Tunisian legislation on the subject and establish the necessary agreements and contracts.

Thank you for your attention