GNSS NOTAM. Aline Troadec RNAV approach specialist EUROCONTROL. AI Operations November 2013

Similar documents
Open Questions & Collecting Lessons Learned

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,

ASSEMBLY 39TH SESSION

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

ICAO framework for LPV

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation

RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL

European Aviation Safety Agency

The support of an European ANSP

A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System

ESSP EGNOS Service Provider. ICAO APV Workshop (26/05/2011)

JOINT ICAO EUR PERFORMANCE BASED TASK FORCE & EUROCONTROL RAISG MEETING

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:

Update of ICAO DOC 8071 Volume 1

Approach Specifications

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

Status of PBN implementation in France

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

Guidelines for NOTAM Workflow and Allocation of Responsibilities

ENAV experience on LPV implementation

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

Terms of Reference for a rulemaking task

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

WIDE AREA AUGMENTATION SYSTEM NOTICES TO AIRMEN (NOTAM) OPERATIONAL CONCEPT April 28, 2008

PBN/TF/7 DRAFT Appendix D to the Report D-1

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

MID Region AIM SG/2. AIS-AIM Study Group 31 August Paul Bosman - EUROCONTROL Chair ICAO AIS-AIMSG

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

Air Navigation Bureau ICAO Headquarters, Montreal

Evolving and improving landing networks with EGNOS

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

Título ponencia: Introduction to the PBN concept

Russian Federation ATM modernization program

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

Performance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA

DSNA NAVIGATION STRATEGY

TCAS RA not followed. Tzvetomir BLAJEV Stan DROZDOWSKI

SBAS IS the only effective solution for safe approaches at every airport in Australia and New Zealand NZ Airports Assn 10 th Sept 2015

LPV implementation to non-instrument runways

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments

Flight Procedure Design and Cartography

MEDUSA & NANSC, Egypt

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

PBN and airspace concept

10+ years of EAD: picking the low-hanging fruit. guido HAESEVOETS EAD Customer Management 29/01/2015

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

Implementation of PBN in Armenian airspace

Appendix E NextGen Appendix

Regulations & Obligations

Air Law. Iain Darby NAPC/PH-NSIL IAEA. International Atomic Energy Agency

Patrizio Vanni (Project Coordinator)

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

Legal regulations in transport policy

ADQ Regulators Working Group

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

WORKING PAPER IVATF/2-WP/21 10/6/11. International UPDATEDD ASH RELATED SUMMARY. At the 1.1. to 30. first meeting. Coordination Group to. (e.g. 1.

ATC PROCEDURES WORKING GROUP. Transition Level

Learning Objectives. By the end of this presentation you should understand:

PBN and RNAV concepts

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out

PBN and Flight Planning

French DSNA approach to CNS rationalization & evolution

Technical Resources - Automation European AIS Database (EAD)

AERONAUTICAL INFORMATION CIRCULAR 33/17

Quality Management System (QMS)

MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING

FLIGHT OPERATIONS PANEL (FLTOPSP)

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

Manual on Monitoring the Application of Performance-based Horizontal Separation Minima

Change History. Table of Contents. Contents of Figures. Content of Tables

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

Data Origination, Management and WGS 84. ICAO PBN Seminar Data Origination & Management and WGS 84

APAC PBN UPDATE Slide 1 of xx

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

Airspace User Forum 2012

TWELFTH AIR NAVIGATION CONFERENCE

International Civil Aviation Organization

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

PBN Airspace Concept. ATS requirements

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Global Operational Data Link Doc 10037

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI

SUMMARY. of the North. Reference: A B

Transcription:

GNSS NOTAM Aline Troadec RNAV approach specialist EUROCONTROL AI Operations-9 27-28 November 2013 The European Organisation for the Safety of Air Navigation

Table of content 3 topics on which AI expertise and advices are needed: 1. The updated GNSS NOTAM concept document and in particular new EGNOS warning NOTAM 2. Applicability of current ICAO standards for Aeronautical information to PBN operations 3. NOTAM on GPS Radio Frequency Interference (RFI) AI Operations-9 2

TOPIC # 1 The updated GNSS NOTAM concept & the controversial additional type of EGNOS NOTAM (EGNOS Warning NOTAM)

GNSS NOTAM services in Europe GNSS NOTAM services for GPS (based on AUGUR) for EGNOS (by ESSP) 2008 2009 2010 2011 2012 2013 January Prototyping and tests Prototyping and tests EGNOS degradations Sept. to May March October First Operational service Operational service Upgraded Operational service - 4 countries have subscribed - 3 additional countries have expressed interest - No GPS RAIM NOTAM proposal has been issued since the beginning of the service - 6 countries have subscribed (for about 60 airports) - 5 more countries are ready for the service (to start with 1 st LPV published) GNSS NOTAM concept (1 st version) GNSS NOTAM concept (mature version) - AI Operations # 5 agreed to be submitted it to AIM SWIM Team for adoption as a reference - Adoption compromised by unexpected EGNOS degradations State of the Art (according to the upgraded EGNOS NOTAM service) - Includes new EGNOS Warning NOTAM on which no agreement can be obtained - Warning: the use of Warning NOTAM could be extended in the future to other cases!

The GNSS NOTAM State of the Art - what s new and controversial in the document Type of NOTAM Information inside the NOTAM Operational impact GNSS predictions NOTAM for predicted unavailability Based on a mathematical model (about predictable and scheduled unavailability) GNSS-based operation CANNOT be planned (an alternate procedure is planned) GNSS forecasts Warning NOTAM From observations (service degrades and higher but non predictable risk of unavailability foreseen) GNSS-based operation CAN be planned (NO operational impact) NEW

NOTAM and NOTAM proposal format As described in the document : Compliance with ICAO formatting NOTAM and NOTAM proposal N and C Details on content for Item Q, A, B, C, D and E Q code used: QGAAU, QGAXX and QGAAK NOTAM proposal Unchanged except a new proposed Item E (for EGNOS warning NOTAM see next slide) Official NOTAM

Focus on the new EGNOS Warning NOTAM An EGNOS NOTAM for predicted unavailability: A1234/09 NOTAMN Q)LFBB/QGAAU/I/NBO/A/000/999/4100N00200E005 A)LFBO B)0908240145 C)0908250225 D)24 0145-0230 0630-0645 25 0155-0225 E)EGNOS IS NOT AVAILABLE FOR LPV An EGNOS Warning NOTAM: A1234/09 NOTAMN Q)LFBB/QGAAU/I/NBO/A/000/999/4100N00200E005 A)LFBO B)0908240000 1 week, no Item D C)0908302359 E) BE AWARE OF POTENTIAL EGNOS UNAVAILABILITIES: - LPV FLIGHT PLANNING STILL POSSIBLE - FOR MORE INFORMATION, PLEASE REFER TO XXXX EGNOS warning NOTAM specificities: - Valid for an entire week - Only New NOTAM - No Item D - Same Q code as for any new NOTAM - Harmonised text for Item E - NOF is expected to add reference to other docs, if any, on EGNOS degradations and expected pilot s behaviour under these conditions - One proposed format for all ANSP provided with EGNOS NOTAM proposal service

EGNOS Warnings and NOTAM - Questions Questions to AI Operations: What are your views on EGNOS Warning NOTAM? Is a warning relevant information for a NOTAM?

TOPIC # 2 Applicability of current ICAO standards for Aeronautical Information to PBN operations

Current ICAO standards (1/2) A NOTAM shall be originated and issued whenever the following information is of direct operational significance: the establishment or withdrawal of electronic and other aids to air navigation and aerodromes. This includes: interruption or return to operation, irregularity or unreliability of operation of any electronic aid to air navigation. ICAO Annex 15, Chapter 5 Status monitoring and NOTAM 3.7.6.1 Changes in the current and projected status of GNSS space and ground elements that may have an impact on user performance or operational approvals shall be reported to relevant air traffic service units. Note 1: Additional information is provided in Attachment D, 9 Note 2: To assess the operational impact of changes in status a service prediction tool may be required ICAO Annex 10, Aeronautical Telecommunications (Chapter 3)

Current ICAO standards (2/2) Status monitoring and NOTAM 9.1 System status 9.1.2 Degradation of core satellite constellation(s) or SBAS usually has not only local effects, but additional consequences for a wider area, and may directly affect en-route operations. System degradation of these elements is to be distributed as area-related information. An example is a satellite failure. 9.1.3 Information is to be distributed to indicate the inability of GNSS to support a defined operation. For example, GPS/SBAS may not support a precision approach on a particular approach. This information can be generated automatically or manually based upon models of system performance. 9.2 Information on type of degradation The following information is to be distributed: - Non-availability of service - Downgrade of service, if applicable; and - Time and expected duration of degradation 9.3 Timing of notification For scheduled events, notification should be given to the NOTAM authority at least 72 hours prior to the event. For unscheduled events, notification to the NOTAM authority should be given within 15 minutes. Notification should be given for events of 15 minutes, or longer, duration. ICAO Annex 10, Attachment D

Applying standards to PBN and GNSSbased operations GNSS is different from conventional navigation The information on the system itself is not readily useable by airspace users (need for models) There is not a unique prediction model which is representative of all aircraft performances (need for multiple predictions models) Impact of a particular service degradation is very difficult to predict (inaccurate models) As a result, the provision of NOTAMs indicating predicted GNSS unavailabilities has been abandoned by the FAA (replaced by online prediction tools)

GNSS Outage Information Services in Other Parts of the World The following information is provided in forms of NOTAM: GPS satellite unavailability (from NANUs) WAAS information in case of extreme events : Geo failure Operating on single Geo Scheduled events that remove the entire WAAS service Extreme Storm detector trips SE757 IGPs with high GIVEi Predicted unavailability of WAAS-based procedures GPS RAIM predicted outages GPS Interference (see 3rd part of this presentation) : NOTAM service w : online tool USA w w Canada Japan N/A Australia also available there N/A N/A APAC N/A N/A N/A w w w

Online tools for GNSS predictions Airports or maps with predicted GPS RAIM loss (FAA, Japan, ECAC, APAC) USA Japan ECAC USA Airports with predicted loss of WAAS approach capability (VOLPE)

Current ICAO standards and PBN - Recommendations The members of the AI Operations are invited to: Contribute to the discussion on the applicability of current ICAO standards for Aeronautical information (including NOTAM) to GNSS-based and PBN operations. Provide their views on whether Europe should evolve towards services like the ones provided in the USA? Note: The GNSS NOTAM concept document has become the GNSS NOTAM State of the Art. This allows segregating between the pure description of GNSS NOTAM services in Europe and discussion on other means of information to airspace users than NOTAM for GNSS.

TOPIC # 3 The lack of harmonisation on NOTAM for GPS Radio Frequency Interference (RFI)

NOTAM on GPS interference - Introduction Initial objective was to quantify GNSS Radio Frequency Interference (RFI) vulnerability based on a search for such events reported in NOTAM 3 years of EAD data were analysed Results were presented to NSG 18th meeting (IP17) About 1900 NOTAM referring to GPS RFI were found: 1850 in the USA (using a standard format for Item E) 10 in Europe from UK and France about planned military jamming events (nb is much smaller than expected, some known events were not reflected). 25 from other regions of the world (referring to unplanned jamming events in conflict areas like Iraq, Afghanistan and South Korea)

NOTAM on GPS interference - Examples G0329/09 NOTAMN Q) EGGX/QGWLF/IV/NBO/E /000/400/5800N01413W186 A) EGGX B) 0911181100 C) 0911181500 E) GPS JAMMING EXER NW SCOTLAND AFFECTING SHANWICK AREA: 56N010W 61N010W 61N018W 56N018W. SFC TO 40000FT AMSL. DURING EXER GPS SIGNALS MAY BE LOST FOR PERIODS UP TO UP TO 15MIN. A2080/10 NOTAMN Q) LFBB/QGWXX/IV/NBO/E /000/230/4545N00213E020 A) LFBB B) 1004260730 C) 1004301800 D) 0730-1800 E) GPS DISRUPTION WITHIN A 20NM RADIUS CYLINDER CENTERED ON 45 45 26N 002 13 07E LOCATED ON LA COURTINE MILITARY CAMP FM SFC UP TO FL230 Q) KXXX/QGWLT/IV/NBO/E/000/400/3339N07522W447 A) KZBW KZNY KZMA KZJX B) 0807210100 C) 0807290300 D) 0100-0300 E) GPS UNRELIABLE AND MAY BE UNAVAILABLE WITHIN A 447NM RADIUS OF 333900N 752200W AT FL400, DECREASING IN AREA WITH DECREASE IN ALTITUDE TO 402NM RADIUS AT FL250, 340NM RADIUS AT 10000FT AMSL AND 301NM RADIUS AT 4000FT AGL. F) SFC G) FL400

NOTAM on GPS Interference - Conclusions and recommendations Conclusions from the assessment: GNSS RFI events in Europe are probably not systematically notified by a NOTAM Notification via NOTAM is not made in a harmonised way The members of the AI Operations are invited to: Note the outcomes of the analysis made on RFI events notified via NOTAM, and propose a way forward for a harmonised practice in Europe.

Recommendations (Recap) The members of the AI Operations are invited to: a) Take note of the content of the paper. b) Express their views on Warnings and in particular on whether this is a notion relevant for a NOTAM c) Contribute to the discussion on the applicability of current ICAO standards for Aeronautical information (including NOTAM) to PBN operations d) Note the outcomes of the analysis made on RFI events notified via NOTAM and propose a way forward for harmonised practice in Europe

Thanks for your attention Aline TROADEC RNAV Approach Specialist DSR / CMN / NAV Email. aline.troadec@eurocontrol.int Tel. +33 (0)1 6988 7274