The Point Roundabout Improvement Scheme

Similar documents
PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

Major Scheme Business Case Summary Report for Programme Entry

M2 Junction 5. improvements scheme. Preferred route announcement

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

M621. Junctions 1 to 7 Improvement scheme. Share your views

D L R C C T R A F F I C N E W S

5.5 Material Assets - Transportation

D L R C C T R A F F I C N E W S

Chapter 2 Route window W25 Maidenhead station. Transport for London

M56. New Junction 11a Summary of the consultation report

A. CONCLUSIONS OF THE FGEIS

WOKING INTEGRATED TRANSPORT PROJECT

5.7 Local road upgrades

Finchley and Golders Green Area Committee 27 April 2017

Chapter 21 Route window W6 West Ealing station. Transport for London

M54 to M6/M6 Toll Link Road Public consultation

College Green Traffic Management Measures Consultation Submission On behalf of Parliament Street Businesses and Residents

NEWSLETTER #04 June 2018

Traffic Calming and Road Safety Provision Options Woore Village

We further recognise that some pain and changes are required from the entire City in order to construct and deliver the project.

Chapter 7 Route Window C6 Farringdon station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Wolverhampton City Council

M25 J25 Improvement Scheme Report on Public Consultation June 2017

D L R C C T R A F F I C N E W S

Downtown Ferry Basin Redevelopment - Stage 1. Integrated Transport Assessment

Transport Assessment Appendix M: Avonmouth Impacts

N11 Arklow / Rathnew & N7 Newlands Cross PPP Contract. Kieran Kelly

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Road Closure & Traffic Mangement Information during the 2018 ASICS Windermere Marathon Race.

Context. Site Development. Brassington Avenue

Sky Temporary Car Park Transport Statement

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

Cork County Council. M28 Cork to Ringaskiddy Motorway Scheme. Preferred Route Alignment & Junction Strategy Consultation Report

Boxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure

YOU SAID, WE DID You were concerned about the bus stop design we have amended the design at 22 bus stops to create additional space between the bus an

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

Proposed M9 Spur Extension. Kirkliston

Cork County Council. M28 Cork to Ringaskiddy Motorway Scheme. Carr s Hill Interchange & Associated Works Consultation Report

Wellesley Station Second Exit and Automatic Entrance Public Open House. Tuesday, September 23, 2014 Central YMCA 20 Grosvenor Street

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

7.0 GROUND TRANSPORT DEVELOPMENT PLAN OVERVIEW. Sydney Airport Master Plan

Event Title - Isle of Wight Festival MEMBERS BRIEFING June 2011

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

IRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City

Launceston City Council. Kings Meadows Traffic Management Report for Public Consultation

M4 Junctions 3 to 12 Smart motorway

Map showing location of public transport projects in vicinity of railway station

New free City connector bus service

Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April

Appendix C Stage 1 Road Safety Audit

M56. New Junction 11a Preferred route announcement

As at 1 May Sponsoring Authority. Halton Borough Council. Halton Borough Council. Halton Borough Council. Halton Borough Council

Monthly Traffic Update

Noise Mitigation Program

Proposed Housing Developments In Great Horkesley

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

TEUE-OAR-008. Tiverton EUE Extension. Option Assessment Report Final Draft December 2013

John Betts School Crossing Review

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

A350 and C13 route management scheme

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

BUSINESS ZONE - OPTION 400 (Western footpath) Have your say. Love the Bay Delivering on the Cycleway

Business Case Approved. Under Construction. Business Case Approved. Under Construction

A31 Ringwood improvement scheme

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

Hospital Link Project Project Update Winter 2018

Next Generation Cycleway Design. Improving connectivity and cycling behaviours through design

Christ Church Grammar School, Claremont

From M1 (Swords): can park here. Reception is directly opposite this car park. From M50 (Ballymun)

4. The Council s LTCCP decision on 30 June 2009 confirmed the extended tram route and funding.

M3 junction 9 improvements scheme

TRAFFIC MANAGEMENT INFORMATION ED SHEERAN PAIRC UI CHAOIMH

Annex 1 Revised TEE, AMCB and Public Accounts Tables Print Version

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

A BORDER UPDATE LUIS E. RAMIREZ THOMAS PHOENIX, ARIOZNA FEBRUARY 27, 2012

CITY OF EDINBURGH COUNCIL WRITTEN SUBMISSION

EXPLANATORY STATEMENT

07/08 08/09 09/10 Total Carisbrooke Rest of Newport

Coca-Cola Zero Belfast Bikes.

STATEMENT OF CASE ON BEHALF OF IMPERIAL WAR MUSEUM GROUP

Board meeting

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

15.0 TRAFFIC AND TRANSPORTATION

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

Kilkenny Mobility Management age e Plan The plan sets out a series of mobility management proposals together with an implementation pro

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014

Councillor Briefing on Elvetham Chase

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Concord Road Interchange. Standard hours of work

South East Traffic Solution

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

Transcription:

The Point Roundabout Improvement Scheme

Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the Dublin Docklands area. It is a key junction for pedestrians, cyclists and vehicular traffic travelling between areas north and south of the River Liffey. The junction is a three arm roundabout with no formal crossings for pedestrians and cyclists. There are high volumes of pedestrians, cyclists and vehicular traffic travelling through the junction during the peak commuter periods. This often results in high levels of queuing along the East Link Bridge during the peak PM period. During events at the 3 Arena there is significant pedestrian activity in the area as well as pick-up and drop-off activity. The existing vehicular access to Dublin Port (Terminal 3) is off East Wall Road and is a left-in, left-out junction. This junction arrangement results in additional HGV movements along East Wall Road as traffic exiting the Port must use the Point Roundabout to U-turn before travelling northwards. East Wall Road is becoming an increasingly important public transport node with an important bus stop served by frequent routes such as the 747, Aircoach and Swords Express and The Point Luas stop in the general area. As the existing facilities require buses which serve the northbound bus stop to stop online, general traffic is often delayed while passengers are boarding. The Point Roundabout Improvement Scheme looks to improve the road network in the local area for all road users by providing dedicated pedestrian and cycle crossing facilities at the Point Roundabout junction as well as improving the facilities along East Wall Road. It is also proposed to improve the traffic management in the area by providing an additional traffic lane northbound along East Wall Road and by relocating the Port access to the Sheriff Street Upper/East Wall Road junction.

Upper She riff Street Port Access (Left-in, Left-out) East Wall Roa d East Wall Road/ Sheriff Street Upper Junction North W all Quay Point Roundabout East Link Bridge

Proposed Scheme As part of the scheme it is proposed to upgrade the Point Roundabout junction to a three-arm signalised junction with a left-turn slip lane from North Wall Quay to East Wall Road. This junction will include toucan crossings to accommodate pedestrians and cyclists on North Wall Quay and the East Link Bridge. The upgrade of this junction will result in the requirement of a new access arrangement for Dublin Port to accommodate northbound movements. The scheme proposes to provide a new access to Dublin Port by providing a fourth arm at the signalised junction of East Wall Road and Sheriff Street Upper. This new access will enable the closure of the existing leftin left-out access to Dublin Port along East Wall Road. Additionally, to improve traffic management in the area, it is proposed to widen East Wall Road to provide an additional northbound lane along with a cycle track and footpath. The additional lane will allow a relatively free flow of traffic from North Wall Quay onto East Wall Road while also helping to ease the levels of queuing on the East Link Bridge.

Main Benefits The main benefit of the scheme will be the significant improvement to pedestrian and cycle facilities in the area, especially crossing facilities at the junction of North Wall Quay and East Wall Road. Pedestrians and cyclists will be able to cross this junction in a safe and convenient manner. The additional northbound lane will ease the levels of queuing experienced on the East Link Bridge while allowing northbound traffic to pass buses which are stopped online along East Wall Road. The proposed closure of the existing Port access and provision of a new access at the junction of East Wall Road and Sheriff Street Upper will reduce the number of HGV s travelling along East Wall Road. It also removes an existing conflict between pedestrians/ cyclists travelling southbound and HGV s accessing and egress from the Port. The scheme is also consistent with Dublin Port plans to develop their cruise ship facilities which would see a number of pedestrians at the Point junction.

Main Impacts Next Stages As the provision of safe and convenient pedestrian and cycle crossing facilities requires a reduction in junction capacity, there will be slight increases in queuing on certain arms of the main junctions. Traffic modelling shows that there will be an increase in queuing during peak periods on the East Wall Road and East Link Bridge arms of the Point junction. At the junction of East Wall Road and Sheriff Street Upper, it is estimated that there will be a small increase in queuing on East Wall Road (North) during the AM and PM peak hour periods. As there are a significant amount of utilities in the area, the works are likely to require the re-routing, replacement or protection of a number of services. This work will be carried out in co-ordination with the utility companies to minimise any disruptions. During the construction stage, mitigation measures will be put in place by the main contractor to minimise the impacts noise, dust and vibrations. Dublin City Council will endeavour to carry out works which may cause significant traffic disruption outside of peak traffic periods. An assessment of the risk of contaminated land within the works area has also been carried out, with the risk rated as being low to medium and it is unlikely that any significant mitigation would be required. Following this public consultation stage, submissions from the public and key stakeholders will be taken into account and changes will be made to the design where appropriate. Once a final design has been approved, the detailed design will be carried out and following a tender process a contractor for the works will be appointed. The construction stage is likely to last for 7 to 8 months. An indicative timeline for the project is as follows: 2015 Q3 Public Consultation 2016 Q3-2017 Q1 Construction Stage 2015 Q 4-2016 Q2 Detailed Design & Procure Contractor

Details of the scheme proposals will be on display at the locations and times below each weekday from Friday 17 th July 2015 until Monday 31 st August 2015. - Dublin City Council Civic Offices, Wood Quay, Dublin 8 (09:00 to 16:30). - Dublin Docklands Development Authority Offices, Custom House Quay, Dublin 1. (09:00 to 17:00). Members of the design team will be available to answer queries at the locations listed below on the following dates and times: - Dublin Docklands Development Authority Offices, Custom House Quay, Dublin 1: Wednesday 5 th August 2015, from 3pm to 6pm. Submissions or observations with respect to the proposed scheme may be made in writing to the following address before 16:30 on Monday 14 th September 2015. Submissions should be headed Point Roundabout Improvement Scheme. Executive Manager, Planning Department, Dublin City Council, Block 4 Floor 3 Civic Offices, Wood Quay, Dublin 8. This application relates to a proposed development within the North Lotts & Grand Canal Dock SDZ Planning Scheme area.