THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

Similar documents
Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

APAC PBN UPDATE Slide 1 of xx

RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

Flight Operations Inspector Manual

Approach Specifications

PBN Operational Approval The Process. ICAO PBN Operational Approval Course

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

PBN Operational Approval Continental En Route Navigation Specifications

Advisory Circular. Radius to Fix (RF) Path Terminator

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No.

Approach 15 Australasian PBN Forum. Flight Deck Equipage to Enable CNS/ATM

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

RNP AR APCH Approvals: An Operator s Perspective

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Performance Based Navigation (PBN) Implementation Plan. The Gambia

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

TABLE OF CONTENTS 1.0 INTRODUCTION...

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

Regulations & Obligations

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Operational Approval Overview

FAA RNP 10 JOB AID With FAA Order B References (20 May 2010)

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

CONTROLLED AIRSPACE CONTAINMENT POLICY

Advisory Circular. Automatic Dependent Surveillance - Broadcast

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Advisory Circular. File No.: Z U Issue No.: 01

Related Rules This Advisory Circular relates specifically to CAR Part 175-Aeronautical Information Services Organisations Certification.

European Aviation Safety Agency

Learning Objectives. By the end of this presentation you should understand:

UK Implementation of PBN

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

Open Questions & Collecting Lessons Learned

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:

TWELFTH AIR NAVIGATION CONFERENCE

Excerpts from ICAO PBCS Manual

AERONAUTICAL INFORMATION CIRCULAR 33/17

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Performance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA

General Guidelines for Obtaining Airworthiness and Operational Approvals for PBN Navigation Specifications. Version 1.0 8/8/08

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

Advisory Circular. Special Authorization (SA) for Required Communications Performance (RCP) 240 and Required Surveillance Performance (RSP) 180

OPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

Different in character or other means of compliance. Less protective or partially implemented not implemented

OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

EASA RNP (AR) Workshop The Landscape Working Together

Subject: Aircraft and Operators Approval For RNAV 10(RNP10) Operations.

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

North Atlantic Initiatives

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

An advisory circular may also include technical information that is relevant to the standards or requirements.

Annex to Decision 2016/015/R

SESAR Active ECAC ATC16 Implement ACAS II compliant with TCAS II change 7.1 REG ASP MIL APO USE INT IND NM

PBN Implementation in the UK

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out

AERONAUTICAL INFORMATION CIRCULAR 18/18

Guidance material AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 1O OPERATIONS (DESIGNATED AND AUTHORIZED AS RNP 10)

34 th Airline/ATS Safety Forum

What is B-RNAV? 1. 1 Adaptado de [ ]

AIC 01/ Aug 2012

NOTICE OF PROPOSED RULE MAKING

ICAO Changes to the Present Flight Plan Form. Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out

Aircraft and Operators approval for RNP 2 operations

Navigation 101 Chapter 3 RNP-10

Contents. Subpart A General 91.1 Purpose... 7

AMC ICAO DOC 9613 AMC 20-4 ICAO DOC 9613 TGL-10 ICAO DOC 9613 AMC AMC AMC ICAO DOC 70300

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1

RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

UK Performance-based Navigation (PBN) Implementation Status

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

PROCEDURES SPECIAL OPERATIONS

Subject: Aircraft and Operators approval for RNP Approach (RNP APCH) Operations

This Advisory Circular provides guidance to facilitate compliance with the requirements for a Flight Radiotelephone Operator rating.

Terms of Reference for a rulemaking task

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach

FLIGHT OPERATIONS PANEL (FLTOPSP)

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

Transcription:

IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS mandate, decommissioning of navigation aids and implementation of RNP 1 and RNP 2. As the implementation date of 26 th May 2016 approaches there have been some revisions which necessitate the withdrawal and replacement of IBAC Bulletin 16-01. The CASA website has just been updated to take into account the current policy along with the revised documents. Operators are referred to the following urls: - https://www.casa.gov.au/airspace/standard-page/cns-atm-navigation - https://www.casa.gov.au/aircraft/standard-page/foreign-operators For ease of reference four documents are attached hereto. Performance-based Navigation in Australian airspace General guidance on the GNSS mandate, decommissioning of navigation aids, and implementation of RNP 1 and RNP 2 AIRSERVICES NAVIGATION RATIOANLIZATION PROJECT: AIC H11/16 AUSTRALIA S TRANSITION TO A PERFORMANCE BASED NAVIGATION ENVIRONMENT: AIC H10/16 C0100/16 NOTAMN

IMPACT ON FOREIGN OPERATORS IBAC has been advised that non-commercial operators that do not wish to take advantage of the RNP 1 and RNP 2 traffic services are not required to apply to operate in accordance with the Exemption EX 06/16 via Form 0667. Only Commercial Operators, that can comply with the requirements of Form 0667, and that wish to take advantage of the RNP 1 and RNP 2 traffic services, are required to apply for Exemption 06/16 via submission of Form 0667. There is no Exemption needed for Foreign Registered aircraft for the foreseeable future if they are not RNP-1 and/or RNP 2 compliant. The operator must annotate on the flight plan Filing blocks, the Nav Spec of the aircraft's capability and that the flight crew are qualified to use. Air Services will continue to accept aircraft that are not RNP 1 and/or RNP 2 capable for the foreseeable future as long as the operator notates on the flight plan Filing blocks the Nav Spec capability of the aircraft for which the crew are qualified to use. Operations into Australian airspace by aircraft that are RNP 1 and RNP 2 capable, operated by appropriately qualified crew, are required to flight plan in accordance with the requirements specified in the Australian AIP. Operators should reference AIP amendments that become effective on the 26 th May 2016. Prepared by P.R. Ingleton IBAC 16 May 2016 ATTACHMENTS (4)

General guidance only please refer to regulatory documentation at www.casa.gov.au Date of issue: 16 May 2016 Performance-based Navigation in Australian airspace General guidance on the GNSS mandate, decommissioning of navigation aids, and implementation of RNP 1 and RNP 2 1) Implementation of Performance-based Navigation (PBN) 1 is a State responsibility under ICAO Annex 11, paragraph 2.7. Australia has developed the framework to implement PBN through a range of regulatory measures which, when combined, provide for the necessary aircraft equipment, operational and airworthiness requirements to meet applicable ICAO PBN navigation specifications. Details on Australia s transition to a PBN environment are contained in AIC H10/16 2. 2) Key to the overall implementation of PBN is the application of high performance navigation capabilities that ensure highly accurate track keeping in all dimensions. This will be facilitated in Australian airspace by way of the carriage and use of suitable GNSS equipment in all IFR aircraft as required by the GNSS mandate. 3) Under Civil Aviation Order (CAO) 20.18 3, from 4 February 2016 all Australian registered aircraft operating under the IFR must be equipped with an (E)TSO C129, C145, C146 or C196a GNSS 4 system. Amongst other things, because the RNP 1 and RNP 2 navigation specifications have been developed on the basis of these (E)TSOs, this GNSS mandate has the effect that all Australian registered IFR aircraft will be RNP 1 and RNP 2 capable. 4) CAO 20.91 5 clause 8.1 requires Australian aircraft to operate in accordance with the particular ICAO PBN navigation specification in any airspace for which that PBN specification is required this obliges Australian aircraft to comply with ICAO PBN requirements in foreign States. 5) CAO 20.91 includes all of the navigation specifications for RNAV 5, RNAV 1 & 2, RNP 1, RNP 2, RNP APCH, RNP AR etc. Oceanic RNP 4 and RNP (RNAV) 10 navigation specifications are contained in CASR Subpart 91.U 6. Further information on PBN navigation authorisations is contained in AC 91.U-01 7 and airworthiness requirements in AC 91.U-04 8 1. See ICAO Performance-based Navigation (PBN) Manual (Doc 9613) 2. AIC H10/16 Australia s Transition to a Performance Based Navigation Environment 3. Civil Aviation Order 20.18 (Aircraft equipment basic operational requirements) Instrument 2014 4. Advisory Circular AC 21-36 Global Navigation Satellite Systems (GNSS) Equipment Airworthiness Guidelines 5. Civil Aviation Order 20.91 (Instructions and directions for performance-based navigation) Instrument 2014 6. Civil Aviation Safety Regulation Subpart 91.U Navigation Authorisations 7. Advisory Circular AC 91.U-01 - Navigation authorisations Adelaide Brisbane Cairns Canberra Darwin Melbourne Perth Sydney Tamworth Townsville GPO Box 2005 Canberra ACT 2601 Telephone 131 757 <www.casa.gov.au> Page 1 of 6

General guidance only please refer to regulatory documentation at www.casa.gov.au 6) CAO 20.18 and CAO 20.91 also contain requirements for aircraft equipment, pilot qualifications and training, and continuing airworthiness. PROGRESSIVE IMPLEMENTATION of RNP 1 and RNP 2 7) Australia is actively transitioning to RNP 1 exclusive terminal operations (SIDS & STARS) and RNP 2 exclusive continental enroute operations. RNP 2 routes and RNP 1 SIDS and STARS will be progressively implemented commencing 26 May, 2016. Australian registered aircraft 8) The ICAO RNP 1 and RNP 2 navigation specifications have been developed on the basis of the FAA and European TSOs for GNSS systems. Hence, aircraft fitted with CAO 20.18 GNSS equipment ( boxes ) have the RNP 1 and RNP 2 capability already contained in the box. Therefore, Australian registered aircraft and Australian qualified pilots are automatically RNP 1 and RNP 2 compliant. Accordingly: a) Australian pilots are automatically eligible to specify RNP 2 or RNP 1 on an IFR flight plan notification if: the aircraft meets the requirements of CAO 20.18, and the pilot is authorised to conduct a flight under the IFR using GNSS and competent in the use of the radio navigation aids according to CASR Part 61 requirements. 8. Advisory Circular AC 91.U-04 Airworthiness requirements for performance based navigation Adelaide Brisbane Cairns Canberra Darwin Melbourne Perth Sydney Tamworth Townsville GPO Box 2005 Canberra ACT 2601 Telephone 131 757 <www.casa.gov.au> Page 2 of 6

General guidance only please refer to regulatory documentation at www.casa.gov.au b) For Australian pilots, the RNP 1 and/or RNP 2 route specifications are met if: the aircraft is fitted with radio navigation aids that meet the requirements of CAO 20.18 and these navigation aids are used, and the pilot is authorised to conduct a flight under the IFR using GNSS and competent in the use of the radio navigation aids according to CASR Part 61 requirements; and the pilot maintains the aircraft within as close as practicable to the route centreline and certainly within a Flight Technical Error (FTE) below half the RNP value in order to meet a Total System Error (TSE) of: (i) 2NM of the centreline for RNP 2 operations and (ii) 1NM of the centreline for RNP 1 operations. c) Route lowest safe altitudes (LSALT) depicted on ERC and TAC charts are only valid for RNP 2 operations. For other than RNP 2 operations, use a pilot calculated route LSALT or default to grid LSALT - see Australian AIC H13/16 9 Foreign registered aircraft and international operators 9) CASA, Airservices Australia and the Royal Australian Air Force will facilitate the continued operation of International Operators that are unable to comply with RNP 1 and RNP 2 Navigational Specifications (Nav Spec) into Australian terminal and continental enroute airspace on RNP 1 procedures and RNP 2 routes. This may require special CASA assistance to both the International operator, and the applicable NAA, such that the NAA can issue a No technical objection for RNP operations, for that particular operator, in Australian continental and terminal airspace. 10) Australia expects that foreign operators will obtain RNP 1 and RNP 2 authorisations from State of Registry or State of Operator for flights in Australian terminal (SIDS and STARS) and continental enroute airspace on and after 26 May 2016. However, Australia recognises that RNP 2 in particular is a relatively new navigation specification and consequently many States have not yet established processes for including RNP 2 authorisation on their Operations Specifications (Ops Spec). Additionally, aircraft manufacturers may not have provided their customers with AFM, AFM Supplement or OEM service letters specifying the available PBN capability per airframe. 11) For these reasons Australia has instigated transition arrangements applicable to foreign registered aircraft and International operators for a two-year period. In order to facilitate RNP 1 and RNP 2 operations within Australian continental enroute and terminal airspace (SIDS and STARS) an Acceptable Means of Compliance (AMC) has been provided. The AMC requirements are reflected in regulatory instrument CASA EX06/16. 10 9. AIC H13/16 RNP 2 and Route Lowest Safe Altitudes (LSALT) 10. General Exemption CASA EX06/16 - RNP 1 and RNP 2 Acceptable means of Compliance using GNSS based RNAV 1 and RNAV 2 Adelaide Brisbane Cairns Canberra Darwin Melbourne Perth Sydney Tamworth Townsville GPO Box 2005 Canberra ACT 2601 Telephone 131 757 <www.casa.gov.au> Page 3 of 6

General guidance only please refer to regulatory documentation at www.casa.gov.au 12) The AMC will allow RNAV 1 and RNAV 2 authorisations issued by the State of Registry or State of Operator, together with GNSS equipment complying with ICAO Doc 9613 (ICAO PBN Manual) and Ops Spec authorisations for RNAV 1 and RNAV 2 based on GNSS, to be accepted as equivalent to RNP 1 and RNP 2 authorisations for the purposes of operations within Australian continental enroute and terminal airspace (SIDS & STARS) for the duration of the transition arrangements. The AMC will take effect for flights on or after 26 May 2016. All flights operating in accordance with the AMC will be required to enter RMK/CASA RNP AMC in item 18 of the flight plan. 13) Operators intending to take advantage of CASA EX06/16 should register their intent with CASA International Operations by completing the template form at: https://www.casa.gov.au/files/form667pdf prior to the first operation on or after 26 May 2016, providing all details called for by CASA EX06/16. Fleet operators are encouraged to identify all aircraft types expected to be operated in Australia under the AMC first submission. 14) In Australia, Airservices Australia and the Royal Australian Air Force (Australia s ANSPs) are responsible for the provision of air traffic services in accordance with ICAO Annex 11. Reliance is placed on accurate notification of navigation capabilities in the flight plan. ATC automated systems in Australia have the capability to highlight to controllers the navigation performance of each aircraft based on the flight plan notification; appropriate ATC separation standards and procedures are then applied. 15) Operations under other PBN navigation specifications (i.e. RNP (RNAV) 10, RNAV 5, RNP 4, RNP APCH and RNP AR) will be permitted in accordance with the flight plan but are subject to the Ops Spec requirements defined for those PBN Nav Specs. Such flights will not receive the benefits of an RNP 2 air traffic service but instead will receive a service commensurate with the navigation capability notified in the flight plan. DECOMMISSIONING OF NAVIGATION AIDS 16) The GNSS mandate of 4 February 2016 will enable Airservices Australia to implement the Navigation Rationalisation Project (NRP) which will see the reduction in ground-based navigation capability by approximately 50% with the decommissioning of about 190 ground based aids see AIC H11/16 11. The remaining network of navigation aids will form the Backup Navigation Network (BNN). 17) The BNN will serve as a contingency network in the case of GNSS failure to enable aircraft to make a safe landing at an airport. However, because of the limited number and wide geographical spacing of remaining navaids, the BNN may not be capable of sustaining navigation services to flight planned destination. Those ground-based navigation aids identified for decommissioning will be removed from service on 26 May 2016 AIRAC. 11. AIC H11/16 Airservices Navigation Aid Rationalization Project (NRP) Adelaide Brisbane Cairns Canberra Darwin Melbourne Perth Sydney Tamworth Townsville GPO Box 2005 Canberra ACT 2601 Telephone 131 757 <www.casa.gov.au> Page 4 of 6

General guidance only please refer to regulatory documentation at www.casa.gov.au 18) The navaids decommissioned under the NRP will be replaced, where necessary, by area navigation waypoints. The route amendments substituting waypoints for navaids will take effect from 26 May 2016, the first AIRAC chart publication date after the February GNSS mandate. Beyond the substitution of waypoints for navaids, no other significant route amendments will take place at this time. SUMMARY 1. The RNP 1 and RNP 2 ICAO PBN Nav Specs will be the standard navigation specifications from 26 May, 2016 for terminal area (SID & STARS) and continental enroute operations, respectively, in Australia. Australia will progressively implement RNP 2 exclusive routes and RNP 1 exclusive SIDS & STARs commencing 26 May, 2016. Notification of changes will be made via the AIS system in the normal way. 2. From 4 February 2016, all aircraft operating under the IFR must be equipped with GNSS systems meeting (E)TSO C129, C145, C146 or C196a specifications which enables compliance with RNP 1 terminal area and RNP 2 enroute operations. 3. Foreign operators intending to enter Australian continental enroute and terminal airspace on and after 26 May 2016 should obtain authorisations for RNP 1 and RNP 2 from State of Registry or State of Operator to assist the full implementation of RNP 1 and RNP 2 and enable operators to accrue benefits. 4. As soon as an authorisation for RNP 1 and/or RNP 2 has been issued by State of Registry or State of Operator, this should be notified in the flight plan immediately no need to wait until May 2016. RNP 2 is indicated in the flight plan by GRZ in field 10a and NAV/RNP2 in field 18. 5. In cases where foreign operators are administratively unable to obtain RNP 1 and/or RNP 2 authorisations from State of Registry or State of Operator because such States have not yet established processes for these authorisations, for a transition period of 2 years Australia will apply Acceptable Means of Compliance (AMC) arrangements as reflected in regulatory instrument CASA EX06/16. 6. On and after 26 May 2016 all flights operating in accordance with the AMC will be required to enter RMK/CASA RNP AMC in item 18 of the flight plan for each flight. The Flight Plan entries should be used as soon as available. 7. Operations under other PBN Nav Specs will be permitted in accordance with the Nav Specs on the flight plan but are subject to the Operating Specifications requirements defined for those PBN Navigation Specifications. 8. Where necessary, ICAO 5 character waypoints will replace approximately 190 ground based navigation aids from 26 May 2016 when the navigation aids are decommissioned. 9. AIP, charts and the Designated Airspace Handbook (DAH) are being updated with effect from 26 May 2016 to reflect route amendments substituting waypoints for Adelaide Brisbane Cairns Canberra Darwin Melbourne Perth Sydney Tamworth Townsville GPO Box 2005 Canberra ACT 2601 Telephone 131 757 <www.casa.gov.au> Page 5 of 6

General guidance only please refer to regulatory documentation at www.casa.gov.au navigation aids, RNP 2 for continental enroute and RNP 1 for terminal operations (SIDS & STARS). 10. From 26 May 2016, route LSALT published in DAH and on Charts are only valid for RNP 2 operations. For other than RNP 2 operations use a pilot calculated route LSALT or default to grid LSALT. Andrew Tiede Manager CNS/ATM Airspace and Aerodrome Regulation Division Civil Aviation Safety Authority Andrew.tiede@casa.gov.au Adelaide Brisbane Cairns Canberra Darwin Melbourne Perth Sydney Tamworth Townsville GPO Box 2005 Canberra ACT 2601 Telephone 131 757 <www.casa.gov.au> Page 6 of 6

C0100/16 NOTAMN Q) YUXX/QXXXX/IV/BO/AE/000/999/ A) YSHO B) 1605251600 C) 1608180000 EST E) AIP ENR SECTION 1.10 APPENDIX 2 ATS FLIGHT NOTIFICATION - USER GUIDE AMD ITEM 10 - EQUIPMENT AND CAPABILITIES TABLE AMD FOR CONTINENTAL ROW, PBN CAPABILITY RNP2 ITEM 10 ONLY REQUIRES 'G' AND 'Z'. ITEM 18 'NAV/RNP2'. WHEN NOTIFIYING RNP2 'R' IS NOT REQUIRED IN ITEM 10.