Chapter 21 Route window W6 West Ealing station. Transport for London

Similar documents
Chapter 4 Route window W23 Taplow station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 13 Route Window NE12 Harold Wood station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 16 Route Window NE15 Brentwood station. Transport for London

Chapter 7 Route Window C6 Farringdon station. Transport for London

Maidenhead Bridge. Proposed Work

Chapter 12 Route window W15 Dog Kennel bridge. Transport for London

Chapter 9 Route Window C8 Whitechapel station. Transport for London

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

Chapter 26 Route Window SE6A Manor Wharf. Transport for London

Elizabeth line Services

A STUNNING SELECTION OF STUDIO SUITES, 1, 2 & 3 BEDROOM LUXURY APARTMENTS FACT SHEET

London Borough of Barnet Traffic & Development Design Team

Sky Temporary Car Park Transport Statement

CROSSRAIL Moving London Forward

EALING BUSINESS PARTNERSHIP (EBP) Thursday 3 July 2014 at 7:00 pm

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

ravengreen THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential

Profile west. Impressive modern office environment. Excellent national and international access.

HORTON WHARF HORTON ROAD, WEST DRAYTON, UB7 AN EXCEPTIONAL WATERFRONT DEVELOPMENT OPPORTUNITY BENEFITTING FROM PLANNING PERMISSION FOR 87 RESIDENCES.

The Point Roundabout Improvement Scheme

AN OUTSTANDING RESIDENTIAL, RESTAURANT, RETAIL AND LEISURE DESTINATION IN EALING, LONDON W5

4.1.1 Improved facilities and layout cont.

H1: BIRMINGHAM CURZON STREET STATION

Transport Assessment Appendix M: Avonmouth Impacts

WOKING INTEGRATED TRANSPORT PROJECT

98 Manor Way, Beckenham, Kent BR3 3LR

ISSUE 40 OCTOBER 2016 MOVING AHEAD CROSSRAIL PROJECT OCTOBER UPDATE. Andrew Wolstenholme CEO Crossrail Ltd

Consultation Round 2: Results and Crossrail s Response

Our location OUR LOCATION

Newly refurbished Grade A offices

Non-technical summary

Crossrail: Socio-Economic Technical Report

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A. CONCLUSIONS OF THE FGEIS

AIRPORT SURFACE ACCESS STRATEGY

HIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK

M4 Junctions 3 to 12 Smart motorway

Scotchbarn Lane, Prescot Accessibility Statement

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

Guildford Borough Transport Strategy 2017, Topic Paper: Transport, June 2017 (accompanying Local Plan 2017) Local Plan Transport Strategy 2017

John Betts School Crossing Review

Board meeting

AECOM Metro Wolverhampton City Centre Extension (WCCE) Transport Assessment 55

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Crossrail transforming travel across London - Infrarail

The Leeds Railway Station (Southern Entrance) Order

CROSSRAIL INFORMATION PAPER A1 DEVELOPMENT OF THE CROSSRAIL ROUTE

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Capital & Counties. October 2007

Queen s Circus Roundabout

Govia Thameslink Railway consultation on December 2015 timetable - APTU response

Jobcentre Plus advisers giving guidance to a job seeker at the Crossrail Visitor Information centre

Isleworth & Brentford Area Forum Action Plan

Team London Bridge Response to the Department for Transport Consultation on the combined Thameslink, Southern and Great Northern franchise

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

The resignalling scheme

Welcome. Great Yarmouth Third River Crossing. Norfolk County Council

Crossrail / Elizabeth Line An Update

The case for a local rail station. At Great Blakenham, Suffolk.

Multi-storey station car park opens in New Year

E40. Temporary activities

TfL Planning. 1. Question 1

APP/P4.1 Eddie Mellor Transport Planning Main Proof of Evidence

BRENT CROSS THAMESLINK

Threats to possible orbital light-rail in outer London from the current Brent Cross planning application...

Movement Strategy. November On behalf of Barton Oxford LLP

PARKSIDE BOW, LONDON E3

Business Forum. 16 March 2016

Station Improvement Proposals. Clapham Junction Action Group

Cuadrilla Elswick Ltd

Reducing traffic: a new plan for public transport

Considering Access to Healthcare Services Bus Planning

Appendix 8 Sawston Greenway Review

All reports. 1. Governance Service receive draft report Name of GSO DPR

D L R C C T R A F F I C N E W S

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

Sydney CBD - Partnering with the coach industry for solutions

PRENTON PARK BOUND. Here s all you need to know

TRAFFIC MANAGEMENT INFORMATION ED SHEERAN PAIRC UI CHAOIMH

Crossrail Business Case Update: Summary Report July 2011

Felixstowe Branch Line FAQ

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Route Windows Central route section

W3C QAWG Face-to-face Meeting

CONTEMPORARY GRADE A OFFICES SUITABLE FOR ALL TYPES OF BUSINESS 3,770 41,860 SQ FT

7.0 GROUND TRANSPORT DEVELOPMENT PLAN OVERVIEW. Sydney Airport Master Plan

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Map showing location of public transport projects in vicinity of railway station

ACORNS PROJECTS LIMITED

Northern Beaches Transport Action Plan

High quality refurbished offices adjacent to Canary Wharf

Trigger Point Justification Note 30 th August 2013

Context. Site Development. Brassington Avenue

Transcription:

Chapter 21 Route window W6 West Ealing station

WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is in Travelcard zone 3. The area surrounding West Ealing station is residential with a precinct of shops north of the station on The Avenue. West Ealing station is shown in figure 21.1 below. 21.1 21.2 21.3 21.4 21.5 Introduction Within this route window the main Crossrail works will involve: provision of new track and bay platform for the Greenford branch; platform extensions ; and construction of a new ticket hall and new footbridge with lifts. 21.7 The Crossrail project will provide a reconstructed station including a new ticket hall and overbridge with mobility impaired passenger access to all Crossrail platforms. Crossrail services will provide new direct links and additional capacity to the West End, City and Canary Wharf business district and onwards to Essex and via interchange at Abbey Wood to North Kent. Journey time savings to these key destinations will be substantial as set out below. West Ealing will become the terminus and interchange point for all Greenford Branch services. West Ealing station worksite will serve the West Ealing station works: It is estimated that the construction of the station and the provision of new track for the Greenford branch will take one year and nine months. The drawings provided at the end of this chapter present the main features of the route window, construction lorry routes assessed, existing facilities in the vicinity of West Ealing station and transport linkages. 21.8 21.9 21.10 Figure 21.1: West Ealing station entrance Argyle Road is a two-way single carriageway road leading to the A40 Western Avenue, which is a major route for traffic heading in and out of west London. Less than 100 m north of the station, the B452 Drayton Green Road forms a staggered junction with The Avenue and Manor Road. The Avenue is a two-way road leading from Drayton Green Road to St. Stephens Road. The station lies west of Ealing Broadway on the Great Western Main Line. There are four trains per hour in the morning peak period travelling to London Paddington. The fastest trains to London Paddington take 12 minutes with the stopping services taking nearer to 20 minutes. There are currently direct services between Greenford to the north and London Paddington calling at West Ealing. Currently three local bus services serve the area surrounding West Ealing station. There are no bus stops directly outside the station; four bus stops are within a short walk of the station, situated along Argyle Road and Drayton Green Road and further high frequency routes serve bus stops on the Uxbridge Road, within walking distance of the station. There are no station car parks. There are over 100 car parking spaces available at a supermarket to the south of the station, however the maximum permit to stay is one and a half hours making the car park unsuitable for use by commuters. W6 page 3

ROUTE WINDOW W6 21.11 21.12 21.13 The majority of on-street parking at West Ealing station is on Drayton Green Road, Manor Road and Argyle Road where there are no parking restrictions. The Avenue restricts parking to a maximum stay of two hours. There is no taxi rank at the station, but minicab offices are located on Drayton Green Road and The Avenue. West Ealing station is not conducive to the set-down and pick-up of passengers outside the station entrance due to the parking restrictions. No cycle parking is available at the station. Cycle stands are situated over 50 m south of the station on the traffic island between the slip lane and carriageway on Alexandria Road and north of the station on the footway at the junction of Drayton Green Road and The Avenue. 21.21 21.22 Worksite assessment The worksite is directly accessed off Manor Road and is described below. The lorry route is shown on Map W6 (iv). West Ealing station worksite The West Ealing station worksite is located to the west of the station in an unused area of land between Manor Road and the new bay-line construction (the old Milk Dock ) on the northern edge of the Great Western Main Line. Figure 21.2 shows the access to this worksite. 21.14 There are no crossing facilities immediately outside the station. There are two zebra crossings with dropped kerbs on Drayton Green Road a short way north and south of the station entrance. 21.15 Access to the station ticket hall is step-free, but access to the platforms is via stairs. As such, mobility impaired passengers are not currently catered for at West Ealing station. Potential changes in baseline conditions 21.16 The proposal for the West London Tram project would affect this route window if it came forward. The scheme, which would run along parts of the A4020 Uxbridge Road does not form part of the baseline for Crossrail (see Volume 8A). If it were to be implemented, the scheme could have a significant impact on traffic flows within this route window and therefore, upon the significance of Crossrail upon this route window in traffic and transport terms. If this were to be the case a detailed construction-phasing plan would be developed to minimise any potential disruption. The permanent works 21.17 21.18 21.19 21.20 New sections of track will be introduced west of West Ealing station that will accommodate the Greenford branch. On completion of the works, passengers using the Greenford branch will be required to change at West Ealing, since through services to and from Paddington will no longer be available. Greenford services will use a new 50 m long bay platform, located on the north side of the station over the alignment of the disused sidings. During construction, a replacement bus shuttle service will be provided over several weekend possessions between West Ealing and Greenford. This will not result in a temporary significant impact. The existing ticket hall located on the road overbridge at the east end of West Ealing station will be converted to commercial use and a new facility will be constructed on the north side of the station, adjacent to the taxi rank off Manor Road. This will lead to a new footbridge, which will have lift towers to provide access to the platforms. To accommodate longer Crossrail trains, both platforms will be extended at the western end. New canopies will be constructed over part of the platforms. It will also be necessary to relay the trackwork forming the junction with the Greenford branch. 21.23 21.24 21.25 21.26 Figure 21.2: Eastern access to West Ealing station worksite Another access point has been identified, necessary for access to the tracks for permanent way works. This worksite will be accessed via an existing access point at the western end of Manor Road, approximately 500 m west of the station. Egress from the site will be directly onto Manor Road approximately 200 m west of the station. There will be no temporary significant impact caused by the use of this worksite. Lorry route assessment All lorry routes to the site will be via A406 Hanger Lane, A4020 Uxbridge Road, the B452 Drayton Green Road and Manor Road. Peak construction activities will occur for a period of approximately 12 weeks, during which time the number of lorries generated by the worksite will be 14 per day. At other times the typical number of lorries will be approximately eight. W6 page 4

WEST EALING STATION 21.27 21.28 21.29 21.30 21.31 21.32 21.33 21.34 21.35 No significant traffic and transport impacts have been identified as a result of this lorry route and volumes. Mitigation and temporary impacts There are no significant traffic and transport impacts in this route window, so no mitigation is required. Mitigation and permanent impacts The significant operational impacts and mitigation measures are indicated in table 21.2. There are two significant operational impacts to note at West Ealing station relating to station impacts and public transport. Passenger numbers with Crossrail are expected to increase by about 750 passengers entering and 150 passengers leaving the station in the morning peak period (which represents an increase in two way flows on the without Crossrail scenario of approximately 70%). The 2016 with Crossrail flows predicted at the station are approximately 2,150 two-way between 0700 and 1000. The design of the new station building will provide sufficient capacity for the forecast passengers and will provide step free access for mobility impaired passengers from street level to the Crossrail platforms. There are measures that can be carried out for the benefit of road users and pedestrians that will mitigate these impacts, however these will require further consents to be obtained before they can be implemented. In line with the approach set out in Volume 8a, an assessment of the impact of Crossrail has been carried out assumes that such measures are in place. Significant impacts on rail users at West Ealing are forecast. Rail passengers are forecast to experience significant journey time benefits. These are discussed below. Passengers traveling on the Greenford branch, which includes stations at Drayton Green, Castle Bar Park, South Greenford and Greenford to and from London Paddington will no longer have direct services and will need to change at West Ealing. The train frequency on the Greenford branch will be increased, offsetting delays due to the need to interchange. There will be no significant impact relating to rail journey times for passengers undertaking these journeys. Impact on journey times Table 21.1 sets out representative journey time savings between West Ealing and selected Crossrail stations. They are typical of the journey time benefits to many of the stations served by Crossrail. Table 21.1: Journey times savings with Crossrail at West Ealing (Platform to Platform) From / To From West Ealing To West Ealing Without Crossrail 29 With Crossrail 15 Savings (mins) 14 Heathrow Savings (%) 48% Without Crossrail With Crossrail Savings (mins) 16 Savings (%) 55% Tottenham Liverpool Court Road Farringdon Street Canary Wharf 28 28 32 41 45 17 20 22 29 33 11 8 10 12 12 Stratford 39% 29% 31% 29% 27% 29 32 31 33 46 49 13 17 20 23 29 34 15 10 10 16 15 47% 32% 30% 35% 31% Table 21.2: Route Window W6 Permanent impacts at West Ealing station Potential impact Significance Committed Mitigation Station Impacts OT5 OT5 Significant increase (+72%) in passenger movements About 750 more peak period entries and about 150 exiting passengers. New access for mobility impaired passengers to Crossrail s platforms Public OT2c Improved journey time see journey times table Significant An appropriate package of mitigation measures will be developed in due course to address pedestrian and highway impacts. This package will require further consents to be obtained. Please refer to 21.32. Residual Impact Description Capacity adequate for predicted passenger flows. Significance Not Significant Significant N/a N/a Significant Significant N/a N/a Significant W6 page 5