Construction of Ueno Tokyo Line

Similar documents
Transportation >Tokyo Metropolitan Area Network

Copyright 2017 East Japan Railway Company. All rights reserved. Rethinking the Safety Philosophy Yasutake Kojima Director June 12, 2017

Measures Perpetuating JR East s Unlimited Growth Potential

Station Space Utilization

High-Speed Rail Operations in Japan Takao NISHIYAMA

Development of Transportation Networks

High-Density Transport Systems Supporting Giant Metropolis of Tokyo

RailTokyo March 2015 Japan High-Density Metropolitan and Intercity Railway Transportation

Tokyo-Aomori 3.0 million passengers. per year. Shin-Aomori. Aomori. Hachinohe (631.9km) Airport. Odate-Noshiro. Airport. Akita (662.

34 Review of Operations. 46 To Achieve Sustainable Growth. 65 Facts and Figures. Contents

Transportation Shinkansen Network

Updated Priority Initiatives Going Forward

TRANSPORTATION BUSINESS SUPPORTS JR EAST AS A STABLE PROFIT RESOURCE

Japanese Station Lunchbox Wrappers

Planning and development of urban transportation system Experience from Tokyo

Tokyo Station. History of Tokyo Station (Opening 1970s) 4 November Prime Minister Takashi Hara assassinated on station concourse

Construction Scheme of Shinkansen

Non-Transportation > Station Space Utilization

Revenue Management in Tokyo. JR-EAST (East Japan Railway Company)

We have been pursuing initiatives in light of the Group Philosophy since 1987.

Feature: Priority Initiative 01 Railway Network Expansion

Summary of Life-Style Service Business Growth Vision (NEXT10)

High Speed Network in Asian Countries: China, Korea and Japan. Naoto YANASE UIC, Senior Advisor High Speed Paris, France

High Speed Lines Operation in Japan

Shinkansen Network in Japan and OutlineO of East Japan Railway Company. East Japan Railway Company

Deployments in JR East Under-Viaduct Spaces and Ekinaka Commercial Spaces

Special feature article Toward the World's Safest Railway that Passengers can Ride Free From Anxiety

FY Second Quarter Financial Results Presentation. October 29, 2015 East Japan Railway Company

Transporting Oil Products to Disaster Areas

Updated Priority Initiatives Going Forward of JR East Group Management Vision V Ever Onward

JR East s five-route Shinkansen network. Shin-Aomori. Hachinohe. Morioka. Akita. Shinjo. Yamagata Niigata. Sendai. Fukushima. Takasaki. Omiya.

Japan Railways Successful Financing Models

FY Financial Results Presentation. May 1, 2014 East Japan Railway Company

1. Launch of the Tokyo-Osaka Hokuriku Arch Pass. November 4, 2015 East Japan Railway Company

2008 OCEA Award (Outstanding Civil Engineering Achievement Award)

High Speed System in Japan

Japan Rail Pass Fact Sheet

Railway Master Plan in Tokyo (2016)

Tokyo Metropolitan Area Network, Intercity Network, and Shinkansen

Regional Developments through High-Speed Rail Project. Yuki TANAKA Director, Japan International Transport Institute

THE TOBU KYURYO LINE (POPULAR NAME:LINIMO) A MAGNETIC LEVITATION SYSTEM

Parallel Deployment of Superconducting Maglev on the Chuo Shinkansen and the Northeast Corridor

Reference Data. July 2000 Explanatory Meeting for Investors. Tokyu Corporation

Updated Priority Initiatives Going Forward of JR East Group Management Vision V Ever Onward

Hokkaido. Oga. Akita. Shinjo. Aterazawa. Yamagata Yamagata. Shinkansen. Nikko. Takasaki. Omiya. Oku-Tama Musashi- Itsukaichi Hachioji

Case Study on Station Redevelopment in Japanese Railways

Station Space Utilization

JR East Damage and Recovery from Great East Japan Earthquake and Tsunami

JAPAN RAIL PASS Exchange Order cannot be purchased inside Japan.

Promoting JR EAST Groupʼs Inbound Initiatives

Highlight of Agatsuma Route. Kusatsu in color of autumn and beauty of the gorge


Station Development Eki-naka concept and practice. Hironori Tsujimura East Japan Railway Company London Office

64 railway and bus companies in the Kanto region established the Greater Tokyo Pass Council

Release of Tokaido Sanyo Shinkansen Reservation App

Thriving with Communities, Growing Globally. Annual Report 2015

Name Plate Design of Japanese Express Trains

DELIVERING RELIABLE OPERATION AND AGILE RESPONSE

East Japan Railway Company

Overview of Hokkaido Shinkansen (Opening between Shin-Aomori and Shin-Hakodate-Hokuto)

Earnings per share Diluted. Total assets Net assets Equity ratio. Millions of yen Millions of yen %

Priority Initiatives Going Forward for JR East Group Management Vision V - Ever Onward

Earnings per share Diluted. Total assets Net assets Equity ratio. Millions of yen Millions of yen %

JR COMMUTER TRAINS (1)

Arriving at Narita Airport and Traveling to Aizu-Wakamatsu

Our local knowledge teamed with our global expertise provides our customer base with the complete heavylift and transportation solution across

Signaling System and Communication System on Shinkansen of JR-EAST

East Japan Railway Company

CENTRAL JAPAN RAILWAY (JRC) A TOTAL SYSTEM APPROACH TO HIGH- SPEED RAIL PRESENTED BY: RICHARD P. LAWLESS CEO, U.S.-JAPAN HIGH-SPEED RAIL

Sixth Management Plan Key Initiatives

10039TT 8/2/2010. Inquiries related to these materials

JR Central s Plan to Begin Operating the Chuo Shinkansen Line (SCMAGLEV) in 2027

FY Financial Results Presentation. May 1, 2017 East Japan Railway Company

Dufferin Jog Elimination Project

THE IMPACT OF THE PARTLY-OPENED KYUSHU SHINKANSEN

JR East: International and Domestic Perspectives

Damage and Provision of Aid of Water Supply in Disaster-hit Areas, the Great East Japan Earthquake and Tsunami

Improving Safety at Level Crossings - JR East Developments

Android App Japan Connected-free Wi-Fi is newly-launched

JR East: Earthquake Measures

INFORMATION NOTES FOR ITU/MIC TRAINING ON BRIDGING THE STANDARDIZATION GAP December 2008

Eurailspeed Parallel Session A.3. Koji Karaike Director, Marketing and sales Dept. Kyushu Railway Company Japan

Maximizing the Potential of Station Locations in Japan. Emiko Sayama Director, JR East NY Office New York, NY

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

The Annual Conference The Japanese Society for the History of Economic Thought

AWMFT2015 Transportation Information

Assembly instructions for Eurotramp trampolines Series: Ultimate, Grand Master Exclusiv, Grand Master, Master

TRANSPORT INFRASTRUCTURE

An Incentives Guide to BUSINESS IN NAGOYA

Special edition paper Development of a Crew Schedule Data Transfer System

WAIPU COVE RESERVE BOARD POLICY DOCUMENT ANNUAL SITE DEVELOPMENT REGULATIONS

Solar Power Shade INSTRUCTION MANUAL

Glossary. Rolling Stock Kilometers means the number of train kilometers (as defi ned below) multiplied by the number of railcars comprising the train.

JR East: Domestic and International Perspectives

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

New Shinkansen Carriages

Characteristics of damage to transportation facilities induced by the ground shaking and the tsunami of the 2011 East Japan mega earthquake

2010 OCEA Award (Outstanding Civil Engineering Achievement Award)

FY Second Quarter Financial Results Presentation. October 28, 2011 East Japan Railway Company

History of Vauxhall Bridge

Transcription:

Construction of Ueno Tokyo Line JR East Construction Department Introduction East Japan Railway Company has a wide-ranging operations area from Kanto and Koshin etsu to Tohoku. When JR East was established in 1987, traffic conditions on most sections of conventional (narrow-gauge) lines in the Tokyo area, including major sections of lines radiating from central Tokyo (Tokaido, Chuo, Joban, Sobu lines), the Yamanote Line, etc., had morning rush-hour congestion rates in excess of 200%. As a result, enhancing transportation capacity to alleviate congestion was a major issue. Furthermore, with subsequent diversification of values accompanying social changes, users railway needs went beyond merely alleviating congestion to shorter travel times and improved comfort while travelling, etc., so problems related to improving transportation in the Tokyo area also diversified. In this context, JR East has taken various initiatives to improve the quality of railway services. This article gives an overview of work on the Ueno Tokyo Line, which is one such initiative. Project Overview The Ueno Tokyo Line started as a plan to develop new double-track between Tokyo Station and Ueno Station Table 1 Congestion Rate and Passenger Condition Congestion rate 100% 150% Passenger condition All passengers are able to sit, or hold on to a strap or column near doors. It is possible to hold open and read a newspaper easily. 180% It is possible to read a newspaper if folded. 200% 250% Contact with adjacent passengers, but possible to read a magazine. Unable to maintain balance when train sways, or to move arms. to support through services between the Utsunomiya, Takasaki, Joban, and Tokaido lines (Fig. 1). The Council for Transport Policy Report No. 18 published in January 2000, targeted opening of the Ueno Tokyo Line (A1) by 2015. In November 2007, the Minister of Transport gave permission to change the basic plan to a plan for laying new tracks between Tokyo Station and Ueno Station and then permission was given in March 2008 to change the railway facilities. Construction started in May 2008 and was completed in about 6 years. The line opened on 14 March 2015, following 5 month training run. Expected Effects Alleviating congestion on Yamanote and Keihin-Tohoku lines The sections between Ueno Station and Okachimachi Station on the Yamanote and Keihin-Tohoku lines have high densities of passengers travelling from northern Tokyo, northwest Chiba, and Ibaraki towards Tokyo Station and Shimbashi Station; these sections have some of the highest congestion rates during morning rush hours in the JR East operations area. Train occupancy between Ueno Station and Okachimachi Station in 2012 was 197% but this is expected to be alleviated to less than 180% following the opening of the Ueno Tokyo Line. Improved travel times using through trains Journeys between the Utsunomiya, Takasaki, and Joban lines and the Tokaido main line used to require transfer to the Yamanote Line and Keihin-Tohoku Line at Ueno Station and Tokyo Station. During rush hours, trains on the Yamanote and Keihin-Tohoku lines stop at every station, most of which are only about 1-km apart, causing long travel times. The opening of the Ueno Tokyo Line has shortened the travel time by about 7 to 10 minutes due to the start of through services between the Utsunomiya and Takasaki lines and the Tokaido main line as well as through trains to Shinagawa Station on the Joban Line. No. Passengers Passenger capacity=average congestion rate (http://www.mlit.go.jp/kokudokeikaku/monitoring/system/english/ contents/11/11-1-1.pdf ) Japan Railway & Transport Review No. 66 Oct 2015 28

Figure 1 Takasaki, Utsunomiya, Joban and Tokaido Main Line Route Map Takasaki Line Koga Oyama Kumagaya Konosu Utsunomiya Line Tsuchiura Omiya Abiko Toride Joban Line Akabane Kitasenju Kashiwa Ueno Tokyo Narita Shinagawa Yokohama Kawasaki Ofuna Tokaido Main Line Regional revitalization by strengthening railway network in capital region The Shonan Shinjuku Line started operations in December 2001 connecting the north and south regions of the Tokyo Metropolitan Area (TMA) with through services running between the Saikyo Line and Rinkai Line in conjunction with the opening of Osaki Station on the Rinkai Line in December 2002. These routes run on the west side of the Yamanote Line, passing through Ikebukuro Station, Shinjuku Station and Shibuya Station, and have generated new direct traffic between Yokohama and Omiya, helping revitalize areas along the routes. The present development of the Ueno Tokyo Line adds a new through route east of the Yamanote Line running through Shimbashi Station and Shinagawa Station, strengthening TMA north south connections and encouraging traffic between the Utsunomiya, Takasaki, and Joban lines and the Tokaido main line (Fig. 1) and contributing to further trackside revitalization. Plan Overview The conventional lines between Tokyo Station and Ueno Station use the quadruple tracks of the Yamanote Line Construction of Ueno Tokyo Line near Kanda Station and Keihin-Tohoku Line (sextuple tracks between Tokyo Station and Kanda Station with Chuo Line). In the Japanese National Railways era until 1975, the current section of the Tohoku Shinkansen between Tokyo and Kanda included conventional tracks but the extension of the Tohoku Shinkansen from Ueno Station to Tokyo Station used the roadbed for conventional lines as the shinkansen roadbed, stopping local passenger trains using these tracks from 1973; train services also stopped on the deadhead line between Tokyo Station and Ueno Station in November 1982. Construction work on the Tohoku Shinkansen in 1983 29 Japan Railway & Transport Review No. 66 Oct 2015

Figure 2 Overview of Construction Work Track upgrade section (0.9 km) Newly built section of viaduct (1.3 km) Track upgrade section (1.6 km) Shuto Expressway Yamanote Line Keihin-Tohoku Line Tokaido Shinkansen Tokyo Tohoku Shinkansen Kanda Chuo Line Kanda River Adjacent Chuo Line Akihabara Materials yard To Ueno To Shinagawa Approach section to Tokyo (0.35 km) Multilayered section (0.6 km) Approach section to Akihabara (0.35 km) Figure 3 Cross Section image of Mutilayered Section in Kanda Station Ueno Tokyo Line Chuo Line Keihin- Tohoku Line Yamanote Line Keihin- Tohoku Line from Tokyo to Tokyo to North Inner circle Outer circle to South Newly built section Shinkansen Existing section removed some conventional-line viaducts obstructing the shinkansen track structures; the Ueno Tokyo Line restores these tracks but Tohoku Shinkansen structures near Kanda Station required locating the Ueno Tokyo Line as a layered structure above the shinkansen structures (Figs. 2 and 3). Tokyo Station yard Tokyo Station serves the Tokaido main line using two island platforms for tracks seven to ten. Abolishing locomotivewaiting tracks on the north side of Tokyo Station when Blue Train services stopped allowed construction of structures for the Ueno Tokyo Line. Furthermore, lead tracks in Tokyo Station yard were upgraded for Ueno Tokyo Line structures and converted to main lines. The No. 8 turnout north of Tokyo Station was upgraded to a No. 12 turnout in conjunction with the Ueno Tokyo Line conversion. Multilayered section The Keihin-Tohoku Line and the Tohoku Shinkansen run parallel to each other about 600 m from Kanda Station, where the viaducts for the two lines become very close. Since there was no available free space, the structures for the Ueno Tokyo Line have been built directly above the shinkansen structures (Fig. 4). Japan Railway & Transport Review No. 66 Oct 2015 30

Figure 4 Existing Shinkansen Viaduct and New Viaduct for Ueno Tokyo Line Legend Existing Newly built Ueno Tokyo Line To Ueno To Tokyo Shuto Expressway Kanda Station Shinkansen Akihabara Station Sobu Line Sotobori Street Kanamono Street Chuo Street Yasukuni Street Kanda River Sakuma Street Approach section to Tokyo (0.35 km) Multilayered section (0.6 km) Approach section to Akihabara (0.35 km) RC rigid-frame viaduct Girder structure: PC girders (17), steel girders (2) Piers and abutments structure: S structure RC rigid-frame viaduct Kanda Station Conventional lines Shinkansen lines Conventional lines and Shinkansen line located adjacently. Aerial view of multilayered section before construction 31 Japan Railway & Transport Review No. 66 Oct 2015

Panorama of southern yard To Tokyo Tokaido Shinkansen Storage track for maintenance vehicles Gantry crane Members temporary-storage yard Mobile buffer stop Tokaido Line Members delivery yard To Shinagawa Construction Site in Southern Yard Starting from Tokyo Station, the Ueno Tokyo Line intersects the Shuto Expressway near the 0k700m marker; at around 1k050m, it is directly above the shinkansen where the grade of the 350-m section is 35. At 1k650m, it is no longer directly above the shinkansen, but the 350-m section until 2k000m (where it intersects the Sobu Line at Akihabara Station) also has a grade of about 35. This is called the approach section (AP section). Existing steel piers and abutments on the Tohoku Shinkansen were extended with new steel frame members for use as piers and abutments for the Ueno Tokyo Line with a substructure of eight steel piers and eight steel abutments. Seventeen PC girders and two steel girders were erected by on-site assembly of pre-cast members on the piers and abutments. Ueno Station yard The south side of Ueno Station yard had ten storage tracks connected to three platforms at Ueno Station by three deadhead lines.these tracks are the main lines for the Ueno Tokyo Line so, in conjunction with work to convert the deadhead lines to main lines, four elevated storage tracks were retained above the shinkansen tunnel near Akihabara Station and the other storage tracks were abolished. To provide alternate functions, it was necessary to upgrade storage tracks in Oku Station yard on the Tohoku Line for compatibility with partial 15-trainset configurations. This work started in March 2007 before work on the Ueno Tokyo Line. Work Overview Selecting the construction method for the Ueno Tokyo Line structures imposed very severe conditions. Many factors needed careful consideration because the work was in a densely-inhabited area between Tokyo Station and Ueno Station. Moreover, it was above key track sections, especially the Tohoku Shinkansen, Yamanote Line, Keihin-Tohoku Line, etc., with many nearby residents. In the multilayered section near Kanda Station, the Yamanote and Keihin-Tohoku lines Japan Railway & Transport Review No. 66 Oct 2015 32

Figure 5 Series of Vehicles for Erecting Steel Frames Driving bogie 100-tonne crane bogie Steel-frame carrying bogie (i) Steel-frame carrying bogie (ii) 100-tonne all-terrain crane erecting steel frame run very close to the Tohoku Shinkansen. The approach road to the shinkansen viaduct was just 8.0-m wide with a row of private buildings. Furthermore, ensuring safe and stable transport on the shinkansen and conventional lines required working only during a 6-hour track possession period each night after the end of commercial operations. Steel frame erection Steel frame erection required securing a delivery route for heavy machinery and steel frame members. However, since there was no space for a work yard near the shinkansen, a temporary gantry was erected at the south end of the platforms for the Tohoku Shinkansen at Tokyo Station (called the southern yard) about 1.5 km from the erection site; it was developed into a delivery and loading yard for the steel frame members. Furthermore, the crane for erecting the steel frame members was moved onsite during the track possession period each night using a series of vehicles comprised of a driving bogie, 100-tonne crane bogie, and steel-frame carrying bogies (Fig. 5). Every possible measure was taken to build-in redundant systems so they could still run even in the unlikely event of a breakdown. Next, the various constraints on the sizes of the steel frame members and cranes had to be considered. These were related to the size of members that could be transported safely on a road trailer from the factory to the 33 Japan Railway & Transport Review No. 66 Oct 2015

southern yard; not obstructing the structure gauge when moving members from the southern yard to the erection site; keeping the maximum width for hoisting the steel frame within the 4.0-m width of the overhead contact wires, etc. As a result, 263 members were used in the 16 piers and abutments. The crane used to erect the steel frames was a 100-tonne all-terrain crane with a maximum lift mass per member of about 20 tonnes. It was self-propelled and moved between the shinkansen up and down lines to avoid the overhead catenary structures while erecting members above them. Movement of heavy machinery to and from the erection site took 60 minutes, leaving only 180 minutes for erection work from 01:00 to 04:00. Only one member could be erected in this limited time frame each day and sometimes other work prevented construction, so only about half the days in a month were used for erecting steel frames. As a result, the first of the 263 frames was erected in September 2009 and the last 26 months later in October 2011. PC and steel-girder erection Since no yard could be secured for delivery of PC and steel girders and the frontage was narrow, we created an access aperture on the newly built viaduct between the conventional lines and shinkansen lines near the start direction for delivery and assembly of girders. Delivery of girders using large heavy machinery was impossible due to space constraints, so the plan was to produce the PC girders and steel girder members at a factory, disassemble them, carry them onsite, and hoist them using a gantry crane on a temporary gantry to reassemble them. Size constraints due to road-trailer restrictions from the factory to the yard kept the mass of each member to 30 tonnes or less and the aperture size to 12 m 4 m or less. As a result, we divided the PC girders into 11 to 19 members/girder and the steel girders into 25 to 30 members/girder, resulting in a total of 304 members. The total weight of PC girders came to 590 tonnes, and 550 tonnes for the steel girders. Since there was no space to install a large crane over the shinkansen, the launch construction method was used. A mobile erection machine with a maximum length of about 210 m and a mass of about 1700 tonnes was used to erect a girder with a maximum span of about 60 m. The machine was composed of a launching machine, driving girder, suspension girder, front tower, and back tower; a propulsion jack inside the launching machine moved the driving girder. All girders were erected during the night track possession periods. Preparatory work included moving the erection machine onsite and moving assembled girders onto the driving girder. When girders were erected, they were hoisted Girder Erection Japan Railway & Transport Review No. 66 Oct 2015 34

Panorama of erection machine Front tower Back tower Suspension girder Launching machine Girder Driving girder Kanda Station Shinkansen lines Conventional lines Overview of girder erection Gerder erection in progress 35 Japan Railway & Transport Review No. 66 Oct 2015

Figure 6 Step-by-Step Girder Erection Step 1: Assembling girder ITP SA1 SP1 SA2 SP2 SP3 Step 2: Moving girder on to driving girder ITP SA1 SP1 SA2 SP2 SP3 Step 3: Pushing out driving girder ITP SA1 SP1 SA2 SP2 SP3 Step 4: Lowering girder Night when girder erected Erection completed ITP SA1 SP1 SA2 SP2 SP3 Japan Railway & Transport Review No. 66 Oct 2015 36

by the suspension girder, extended in the finishing direction by the driving girder, and lowered into position. To reduce risk when moving the erection machine and ensure safety if an earthquake struck, the machine was secured at all times to the already-constructed Ueno Tokyo Line structures. A period of 1 to 2 months was usually required to erect each girder taking into consideration the time for carrying blocks to the assembly position and erection of the PC block girders; erection of all 19 girders started in December 2010 and was completed 28 months later in April 2013. Safety management The work directly above the Tohoku Shinkansen was difficult and had no precedent worldwide. If any trouble occurred, an enormous amount of time would be required to recover, resulting in stoppage of shinkansen services between Tokyo Station and Ueno Station and preventing operation of all trains on the Tohoku, Joetsu, Nagano, Yamagata, and Akita shinkansen. To minimize any impact, shuttle trains were prepared at Ueno Station. At the time, Tokyo Station and Ueno Station were on the same AT feeder section, so cutting the power at Tokyo Station during a problem would cut off Ueno Station too. To prevent this risk, a disconnection switch was Conclusion Completed Ueno Tokyo Line running near Kanda Station installed to separate the feeder sections for Tokyo Station elimination of transfers. Furthermore, transportation capacity and Ueno Station. A special timetable for abnormal between Tokyo Station and Ueno Station has been improved circumstances was prepared along with an emergency substantially, alleviating congestion, especially during the announcement system to provide passenger guidance if a morning rush hour. problem occurred. The work was large-scale and difficult, but thanks to the cooperation and guidance of many people, it was completed without mishap. The Ueno Tokyo Line opened on 14 March 2015 after a 6 year construction and 5 months test drive period. It has enhanced the Tokyo railway network and enabled direct access from the Utsunomiya Line, Takasaki Line, and Joban Line to Tokyo Station and Shinagawa Station, and from the Tokaido main line to Ueno Station, dramatically improving convenience by shortening travel times due to Acknowledgement This article was contributed by JR East Construction Department. 37 Japan Railway & Transport Review No. 66 Oct 2015