Flight 158 ARIANE 5. Follow the launch live on the internet broadband at (starting 20 minutes before lift-off)

Similar documents
July VA 219. ATV Georges Lemaître

Boosting two communications satellites into orbit

LAUNCH KIT. September 2018 VA243. Horizons 3e. Azerspace-2/Intelsat 38

LAUNCH KIT. December 2017 VA240. Galileo FOC-M7 SAT

Satellites launched for Europe and India

Satellites launched for the USA and Asia

A satellite launch for Mexico and Thailand

September VA 218. MEASAT-3b OPTUS 10

December VA 221 DIRECTV-14 GSAT-16

A launch for the International Space Station

Two Telecom satellites

A launch for the International Space Station

April VA 222 THOR 7 SICRAL 2

LAUNCH KIT. December 2018 VA246 GSAT-11 GEO-KOMPSAT-2A

ARIANESPACE LAUNCHES SATELLITES FOR TWO MAJOR EUROPEAN OPERATORS

September VA 226. Sky Muster ARSAT-2

SATELLITES FOR SPAIN AND SOUTH KOREA

LAUNCHING TWO DIRECT BROADCAST TV SATELLITES

LAUNCH KIT. November 2017 VV11. MOHAMMED VI A satellite

November VA 227 ARABSAT-6B (BADR -7) GSAT-15

LAUNCH KIT. February 2017 VA235. SKY Brasil-1 Telkom 3S

LAUNCH KIT. September 2017 VA239. Intelsat 37e. BSAT-4a

LAUNCH KIT. February 2019 VA247. Saudi Geostationary Satellite 1/Hellas Sat 4 GSAT-31

Flight th Ariane 5 to boost communications and weather satellites

SPOT 5 incorporates major upgrades, with several new instruments improving the quality of images and services offered to customers.

LAUNCH KIT AUGUST 2018 VV12 AEOLUS

LAUNCH KIT. January 2018 VA241 SES-14. Al Yah 3

Flight th launch for Eutelsat

Arianespace 2013 Organization, History and Programs

CONTENTS VS21 ARIANESPACE TO ORBIT THE FIRST SIX SATELLITES IN THE ONEWEB CONSTELLATION. OneWeb F6

LAUNCH KIT. April 2019 VS22. O3b Satellites

LAUNCH KIT MAY 2017 VS17 SES 15

Arianespace Launch Service Operator Policy for Space Safety

LAUNCH KIT. December 2018 VS20 CSO-1

Ariane 5 production and integration operations: ten years of continuous efficiency and quality improvement

Missions, Operations & Ground Infrastructure

The President s Commission on Implementation of US Space Exploration Policy

TECHNICAL INFORMATION Europe Head office USA Subsidiary French Guiana Singapore Liaison office Japan Liaison office

Space Transportation. The highlights of the year were bound up with the decisions taken at the ESA Ministerial Council in Paris on 27 May.

KOUROU. September 2015 ARIANE 5. Data relating to Flight 226. Sky Muster ARSAT-2

Payload Adapters and Separation Systems

Successful Return to Flight of the H-IIA Launch Vehicle

Quality of service and reliability

François CAHUZAC / Arnaud BIARD

THE ARIANE 6 SYSTEM : ON BOARD-GROUND INTERFACES AND LAUNCH FACILITY

Space Transportation Systems. System Concepts

Introducing. RUAG Space. From our Electronics portfolio: Antenna. From our Spacecraft portfolio: Thermal Insulation

Missione Rosetta: come raggiungere ed esplorare una cometa

Bob Hawkins Deputy Lead Engineer SLS Integrated Avionics and Software

DEMETER satellite disposal, CNES give an example of French Space Act compliance. Florence DUCHEVET & Henri DARNES - CNES

VORCORE/STRATEOLE. VORCORE / STRATEOLE Workshop. September 16-17, Paris VORCORE SYSTEM DESCRIPTION VORCORE IMPLEMENTATION 1/10/02

GUIDELINES FOR THE AWARD OF MAAA WINGS MOP027

Launching a Sub-Orbital Spacecraft

Efficiency has to be the key to success

Vega Operational Launch System Overview on launch operations and launch service cost drivers

MASER SOUNDING ROCKET MICROGRAVITY FLIGHTS

History of Sea Launch

FLIGHT OPERATIONS INTRODUCTION ICAO Air Navigation Commission

HIGH SPEED FLIGHT DEMONSTRATION PROJECT

Low Cost Spacelift to LEO, GTO, and Beyond Using the OSP-2 Minotaur IV Space Launch Vehicle. Scott Schoneman, Lou Amorosi, Ron Willey, and Dan Cheke

Total failure of the. on its maiden flight. Ian Sommerville 2001 CS 365 Ariane 5 launcher failure Slide 1

COSMO-SkyMed COSMO-3

The Suborbital Space Tourism Project of EADS Astrium

Planned Orbital Flight Test of a 6m HIAD

ESA-EDA: Paving the Way for New UAS Capabilities in Europe

RUAT Junior Glider Design Competition Version 1.5

Introduction to Aerospace Engineering

Sven Kaltenhäuser, Frank Morlang, Dirk-Roger Schmitt German Aerospace Center DLR

Life cycle Solutions partner for the entire life cycle of industrial assets

April 16, Erik Larson

TEAM AMERICA ROCKETRY CHALLENGE 2014 EVENT RULES

Japan Fiscal Year 2009 Summer Launch Season. Launch/Operation and Control Plans for

Estimating the Risk of a New Launch Vehicle Using Historical Design Element Data

Forty years of vision. The EUROCONTROL Maastricht UAC story. years of vision EUROCONTROL MAASTRICHT UAC EUROCONTROL

Context Scope Procurement approach Topics for discussions Timeline. EDA/ESA UAS Workshop May

Preparatory Course in Business (RMIT) SIM Global Education. Bachelor of Applied Science (Aviation) (Top-Up) RMIT University, Australia

TEAM AMERICA ROCKETRY CHALLENGE 2017 RULES

The Boeing Next-Generation 737 Family Productive, Progressive, Flexible, Familiar

ARIANE 5. Flight 501 Failure

DUOTEL PLUS. Installation and User Manual. 2 Port Telephone Exchange Simulator. Issue 1.4

COSMO-SkyMed COSMO-1

Space Transportation Systems. Demand / Market Analysis

H-II TRANSFER VEHICLE TRAJECTORY PLANNING AND FLIGHT OPERATION RESULTS

Review of the Space Shuttle Program

Propulsion Solutions for Fishing Vessels SERVICES

Accident Prevention Program

EQUATORIAL LAUNCH AUSTRALIA

Spacecraft Avionics. Lecture #26 December 2, 2014 Avionics overview Shuttle systems Constellation systems MARYLAND U N I V E R S I T Y O F

Space Based ADS-B. Transforming the Way you See the Sky February, 2015

July 2018 TRENDS IN TRANSPORT. The UK's Spaceport an opportunity in the commercial spaceflight market

SABCA ANNUAL ANNOUNCEMENT Regulated information Inside information, published on 25/04/2018 at h

British Prime Minister, David Cameron, on a visit to RAF Brize Norton to see the new A400M. TACTICAL AIR TRANSPORT. 20 rolls-royce.

Daher s TBM 930 makes its mark in the charter sector

Performance. Aircraft System

Commit to Safety: Professional Pilots Always Use a Checklist INITIAL EQUIPMENT SETUP

Magnetospheric MultiScale Mission. SpaceWire Implementation

2018 RULES TEAM AMERICA ROCKETRY CHALLENGE

Facts and figures Zahlen und Fakten 2016

FASTWing CL flight tests with a high-glide ram-air parachute for 6,000 kg payloads.

ECLIPSE 500. Aircraft Overview. Do Not Use For Flight

Transcription:

ARIANE 5 Boosting Rosetta on an interplanetary voyage For its first mission of the year, Arianespace will launch the Rosetta spacecraft. Part of the European Space Agency s solar system exploration program, Rosetta will rendezvous with the comet Churyumov-Gerasimenko after an interplanetary voyage lasting nearly ten years. An Ariane 5G+ will boost Rosetta into a hyperbolic liberation orbit, in a mission calling on the delayed ignition capability of Ariane 5 s EPS upper stage. This is the first time that an Ariane launcher is being used for this type of trajectory. The launcher will perform a ballistic trajectory lasting 1 hour 45 minutes (about an orbit and a half around the Earth), immediately following separation of the main stage, in order to delay ignition of the upper stage engine and therefore optimize performance. With missions such as these, Ariane 5 is demonstrating its ability to carry out a wide variety of assignments, ranging from the launch of scientific spacecraft into special orbits, to commercial launches into geostationary orbit. Built by EADS-Astrium, the Rosetta spacecraft will weigh about 3,000 kg at launch. It is shaped like a cube: its upper part carries the instruments making up the payload, while the bottom part has the platform s subsystems. Two solar panels, each measuring 32 square meters, will give this interplanetary probe an in-orbit span of over 32 meters. To build up sufficient energy to reach its orbit, the spacecraft will fly three times around the Earth and once around Mars, using the gravitational fields of these two planets to modify its trajectory. During its ten-year voyage, Rosetta will enter the asteroid belt twice. Because of the time needed for the voyage, the onboard instruments will be have to be placed in hibernation for long periods. Maneuvers to rendezvous with the comet Churyumov-Gerasimenko are slated for May 2014. Rosetta s primary mission is to study the core of the comet and its environment; in November 2014, a lander carried by the spacecraft will touch down on the comet s surface. 1 - ARIANESPACE FLIGHT 158 MISSION. 2 - RANGE OPERATIONS CAMPAIGN: ARIANE 158 ROSETTA. 3 - LAUNCH COUNTDOWN AND FLIGHT EVENTS. 4 - FLIGHT 158 TRAJECTORY. 5 - THE ARIANE 5 LAUNCH VEHICLE. 6 - THE ROSETTA SATELLITE. APPENDIX 1. Flight 158 Key personnel. 2. Launch environment conditions. 3. Synchronized sequence. 4. ARIANESPACE, its relations with ESA and CNES. Follow the launch live on the internet broadband at www.arianespace.com (starting 20 minutes before lift-off) Arianespace - Flight 158 1

1. Arianespace Flight 158 mission The 162 nd Ariane launch (Flight 158/Ariane 518) will use an Ariane 5 to place into a liberation orbit the Rosetta spacecraft, part of the European Space Agency s solar system exploration program. The Ariane 518 launcher will carry a payload of 3,187 kg (7,011.4 lb), including about 3,065 kg (6,743 lb) for the satellite. The launch will be carried out from the ELA 3 launch complex in Kourou, French Guiana. Because of the special conditions of this mission, the launch slot is relatively limited, lasting just 21 calendar days as from February 26, 2004. If this schedule is not met, the rendezvous will be missed and the mission cannot be carried out. Injection orbit* Infinite velocity Declination 3,545 m/s 2 degrees * This orbit (for a launch the night of February 26 from Kourou) may change in case the launch is delayed. The lift-off is scheduled on the morning of February 26, 2004 at one precise moment: Launch opportunity Universal time (GMT) Paris time Washington time Kourou time H 0 07:36.49 am 08:36.49 am 02:36.49 am 04:36.49 am on February 26, 2004 February 26, 2004 February 26, 2004 February 26, 2004 Ariane 518 payload configuration The ROSETTA satellite was built by EADS-Astrium and integrated by Alenia Spazio for the European Space Agency (ESA). For more d information, visit us on www.arianespace.com Arianespace - Flight 158 2

2. Range operations campaign : ARIANE 5 ROSETTA The launch of Rosetta was postponed as a precautionary measure following the Flight 157 failure. The preparation campaign for Rosetta and for its Ariane 5 launcher initially was conducted from September 2002 to January 2003, and then from October 2003 to February 2004. Satellites and launch vehicle campaign calendar Ariane activities Dates Satellites activities September 12, 2002 Arrival in Kourou and beginning of ROSETTA preparation campaign in S1A building Campaign start review November 18, 2002 EPC Erection November 18, 2002 EAP transfer and positionning November 20, 2002 Integration EPC/EAP November 21, 2002 EPS Erection November 22, 2002 Integration equipement bay November 22, 2002 November 25, 2002 Transfer of ROSETTA into the S5B building Nov. 27 and 29, 2002 ROSETTA filling operations in S5B building December 2002 Transfer of Rosetta into the S3B building for off-loading March-April 2003 April-October 2003 October 22, 2003 Restart of launcher campaign January 19, 2004 January 27, 2004 Roll-out from BIL to BAF February 10, 2004 February 13, 2004 Satellite and launch vehicle campaign final calendar J-7 Monday, February 16 ROSETTA integration on launcher J-6 Tuesday, February 17 ROSETTA integration on launcher J-5 Wednesday, February 18 Fairing integration on launcher J-4 Thursday, February 19 Filling of SCA and EPS J-3 Friday, February 20 Launch rehearsal Off-loading of the MMH propellant Launch campaign put on hold to readapt Rosetta for its new mission Restart of launch campaign Filling of ROSETTA with MMH Transfer of ROSETTA in the BAF J-2 Monday, February 23 Launch rediness review (RAL) and arming of launch vehicle J-1 Tuesday, February 24 Roll-out from BAF to Launch Area (ZL), launch vehicle connections and filling of the EPC Helium sphere J-0 Wednesday, February 25 Launch countdown including EPC filling with liquid oxygen and liquid hydrogen H-0 Thursday, February 26 Synchronized sequence Lift-off For more d information, visit us on www.arianespace.com Arianespace - Flight 158 3

3 - Launch countdown and flight events The countdown comprises all final preparation steps for the launcher, the satellites and the launch site. If it proceeds as planned, the countdown leads to the ignition of the main stage engine, then the two solid boosters, for a liftoff at the targeted time, as early as possible in the satellites launch window. The countdown culminates in a synchronized sequence (see appendix 3), which is managed by the control station and onboard computers starting at T-7 minutes. If an interruption in the countdown means that T-0 falls outside the launch window, then the launch will be delayed by one, two or more days, depending on the problem involved, and the solution developed. Time Events 11h 30 mn Start of final countdown 7 h 30mn Check of electrical systems 4 h 50mn Start of filling of main cryogenic stage and with liquid oxygen and hydrogen 3 h 20mn Chilldown of Vulcain main stage engine 1 h 10mn Check of connections between launcher and telemetry, tracking and command systems 7 mn 00 s "All systems go" report, allowing start of synchronized sequence 4 mn 00 s Tanks pressurized for flight 1 mn 00 s Switch to onboard power mode 04 s Onboard systems take over 03 s Unlocking of guidance systems to flight mode HO Ignition of the cryogenic main stage engine (EPC) ALT (km) V. rel. (m/s) +7.0 s Ignition of solid boosters 0 0 +7.3 sliftoff 0 0 + 13 s End of vertical climb and beginning of pitch rotation (10 seconds duration) 0.08 33.6 + 17 s Beginning of roll maneuver 0.29 66.1 + 2 mn 19 s Jettisoning of solid boosters 66.2 2086.0 + 3 mn 11 s Jettisoning of fairing 105.8 2315.0 + 8 mn 19 s Acquisition by Natal tracking station + 9 mn 50 s Extinction of main cryogenic stage 169.3 8098.3 + 9 mn 56 s Separation of main cryogenic stage 173.4 8117.2 + 9 mn 57 s Beginning of balistic phase + 12mn 10 s Acquisition by Ascension tracking station + 21mn 50 s Acquisition by Malindi tracking station (Kenya) + 48mn 10 s Acquisition by Dongara tracking station (Australia) +1 h 46mn 13 s Acquisition by South Point tracking station (Hawaï) +1 h 54mn 47 s Ignition of EPS 652.6 7591.3 +2 h 11mn 04 s Acquisition by Kourou tracking station +2 h 11mn 48 s Injection of EPS 1091.8 10410.1 +2 h 11mn 48 s Begining of ROSETTA orientation 1091.8 10410.1 +2 h 13mn 30 s Separation of ROSETTA satellite 1364.3 10228.9 +2 h 50mn 00 s End of ARIANESPACE Flight 158 mission 6370.0 8050.0 For more d information, visit us on www.arianespace.com Arianespace - Flight 158 4

4 - Flight 158 trajectory The launcher s attitude and trajectory are totally controlled by the two onboard computers, located in the Ariane 5 vehicle equipment bay (VEB). 7.05 seconds after ignition of the main stage cryogenic engine at T-0, the two solid-propellant boosters are ignited, enabling liftoff. The launcher first climbs vertically for 6 seconds, then rotates towards the East. It maintains an attitude that ensures the axis of the launcher remains parallel to its velocity vector, in order to minimize aerodynamic loads throughout the entire atmospheric phase, until the solid boosters are jettisoned. Once this first part of the flight is completed, the onboard computer optimizes the trajectory in real time, minimizing propellant consumption to bring the launcher first to the intermediate orbit targeted at the end of the main stage propulsion phase, and then the final orbit at the end of the flight of the upper stage (EPS). Between the EPC jettisoning and ignition of the EPS, the launcher will perform a balistic phase of about 1 hour and 46 mn. The main stage falls back west of the Galapagos Islands in the Pacific Ocean. On orbital injection, the launcher will have attained a velocity of approximately 10,410 meters/second, and will be at an altitude of about 1.092 kilometers. The fairing protecting the ROSETTA spacecraft is jettisoned shortly after the boosters are jettisoned at about T+191 seconds. For more d information, visit us on www.arianespace.com Arianespace - Flight 158 5

5 - The Ariane 5 Launcher (Industrial architect: EADS Launch Vehicles) 46.1 m Payload fairing (Contraves) Heigh:12.73 115 m 3 (useful) 2000 kg ACU - Adaptateurs de C.U. (EADS) 0,86 à 0,95 m de haut 120/130 kg Separation EPS - Storable propellant upper stage (EADS) Heigh: 3.36 m Dry mass 1.2 t 9.7 t of storable propellant Aestus engine Without TP 29.7 kn Isp 321.3 s 1100 s of propulsion Vehicle equipment bay (EADS-Astrium) Heigh: 1.56 m Mass: 1.5 t Fligh control system, safety, electrical power... EPC - Main Cryogenic stage (EADS) Heigh: 30.53 m3 Mass: 12.2 t 158.1 t of Cryo propellant Vulcain Engine (Snecma) 590 s of propulsion 5.46 m 3.05 m EAP - Solid Rocket boosters (EADS) Heigh: 31.41 m Mass 277.4 t 269 t for the MPS MPS - Solid rocket motor (Europropulsion) Heigh: 27.1 m Mass: 31 t 238 t of powder 129 s of propulsion EACH EACH Maître d'œuvre : Arianespace Architecte industriel : EADS Launch Vehicles 4400 kn (moy.) 1140 kn Isp 431 s 6650 kn (max.) Nozzles E 10.36 749 metric tons at HO with payload For more d information, visit us on www.arianespace.com Arianespace - Flight 158 6

6 - The ROSETTA satellite Customer ESA Prime contractor EADS-Astrium Mission Rendez-vous with Comet 67P/Churyumov-Gerasimenko Mass Total mass at lift-off 3,065 kg including Propellants: 1,670 kg Scientific payload: 165 kg Lander 100 kg Stabilization 3 axis stabilized Dimensions 2.8 x 2.1 x 2.0 m Span in orbit 32 m On-board power 850 W at 3.4 AU and 395 W at 5.25 AU Life time 12 years Press Contact : Franco BONACINA ESA - Agence Spatiale Européenne Tel. + 33 (1) 53 69 71 55 - Fax: + 33 (1) 53 69 76 90 E-mail : franco.bonacina@esa.int For more d information, visit us on www.arianespace.com Arianespace - Flight 158 7

Annex 1 - Arianespace Flight 158 key personnel In charge of the launch compaign Mission Director (CM) Dan MURE ARIANESPACE In charge of the launch service contracts ARIANE Payload Manager (RCUA) Alexandre MADEMBA-SY ARIANESPACE ARIANE Deputy Mission Manager (RCUA/A) Patrick LOIRE ARIANESPACE In charge of ROSETTA satellite Satellite Mission Director (DMS) John ELLWOOD ESA Satellite Project Director (CPS) Claude BERNER ESA Satellite Preparation Manager (RPS) Claude BERNER / Flemming PEDERSEN ESA In charge of the launch vehicle Launch Site Operations Manager (COEL) André SICARD ARIANESPACE ARIANE Production Project Manager (CPAP) Franck VASSEUR ARIANESPACE In charge of the Guiana Space Center (CSG) Range Operations Manager (DDO) Thierry VALLEE CNES/CSG Flight Safety Officer (RSV) Hervé POUSSIN CNES/CSG Annex 2 - Launch environment conditions Acceptable wind speed limits at liftoff range from between 7.5 m/s. to 9.5 m/s. according to the wind direction. The most critical is a northerly wind. For safety reasons, the wind s speed on the ground (Kourou) and at a highaltitude (between 10.000 and 2.000 m) is also into account. Annex 3 - The synchronized sequence The synchronized sequence starts 7 mn before ignition (T-0). It is primarily designed to perform the final operations on the launcher prior to launch, along with the ultimate checks needed following switchover to flight configuration. As its name indicates, it is fully automatic, and is performed concurrently by the onboard computer and by two redundant computers at the ELA 3 launch complex until T-4 seconds. The computers command the final electrical operations (startup of the flight program, servocontrols, switching from ground power supply to onboard batteries, etc.) and associated checks. They also place the propellant and fluid systems in flight configuration ans perform associated checks. In additionn, it handles the final ground system configurations, namely : startup of water injection in the flame trenches and jet guide (T-30 sec); hydrogen aspiration for chilldown of Vulcain engine in the jet guite (T-18 sec); burnoff of hydrogen used for chilldown (T-5.5 sec); At T-4 seconds, the onboard computer takes over control of final engine startup ans liftoff operations : It starts the ignition sequence for the Vulcain main stage engine (T-0); It checks engine operation (from T+4.5 to T+7.3 sec); It commands ignition of the solid boosters for immediate liftoff at T+7.3 seconds. Any shutdown of the synchronized sequence after T - 7 mn automatically places the launcher back in its T-7 min configuration. For more d information, visit us on www.arianespace.com Arianespace - Flight 158 8

Appendix 4 - ARIANESPACE, its relations with ESA and CNES FROM A PRODUTION BASE IN EUROPE, ARIANESPACE, A PRIVATE COMPANY, SERVES CUSTOMERS ALL OVER THE WORLD. Arianespace is the world s first commercial space transportation company, created in 1980 by 36 leading European aerospace and electronics corporations, 13 major banks and the French space agency CNES (Centre National d Etudes Spatiales). The shareholder partners in Arianespace represent the scientific, technical, financial and political capabilities of 12 countries : Belgium, Denmark, Germany, France, Great Britain, Ireland, Italy, Netherlands, Norway, Spain, Switzerland and Sweden. In order to meet the market needs, Arianespace is present throughout the world : in Europe, with its head office located near Paris, France at Evry, in North America with its subsidiary in Washington D.C. and in the Pacific Region, with its representative offices in Tokyo, Japan, and in Singapore. Arianespace employs a staff of 300. Share capital totals 317,362,320. Arianespace is in charge of these main areas : markets launch services to customers throughout the world ; finances and supervises the construction of Ariane expendable launch vehicles ; conducts launches from Europe s Spaceport of Kourou in French Guiana ; insures customers for launch risks. Personalized reliable service forms an integral part of Arianespace launch package. It includes the assignment of a permanent team of experts to each mission for the full launch campaign. The world s commercial satellite operators have contracted to launch with Arianespace. This record is the result of our company s realistic cost-effective approach to getting satllites into orbit. RELATIONS BETWEEN ESA, CNES AND ARIANESPACE Development of the Ariane launcher was undertaken by the European Space Agency in 1973. ESA assumed overall direction of the ARIANE 1 development program, delegating the technical direction and financial management to CNES. The ARIANE 1 launcher was declared qualified and operational in January 1982. At the end of the development phase which included four launchers, ESA started the production of five further ARIANE 1 launchers. This program, known as the "promotion series", was carried out with a management arrangement similar to that for the ARIANE 1 development program. In January 1980 ESA decided to entrust the commercialization, production and launching of operational launchers to a private-law industrial structure, in the form of ARIANESPACE company, placing at its disposal the facilities, equipment and tooling needed of producing and launching the ARIANE launchers. Ariane follow-on development programs have been undertaken by ESA since 1980. They include a program for developing uprated versions of the launcher : Ariane 2 and Ariane 3 (qualified in August 1984) ; the program for building a second ARIANE launch site (ELA 2) (validated in August 1985) ; the Ariane 4 launcher development program (qualified on June 15th, 1988) ; and the preparatory and development program of the Ariane 5 launcher and its new launch facilities : ELA 3 (qualified on November, 1997). All these programs are run under the overall direction of ESA, which has appointed CNES as prime contractor. In general, as soon as an uprated version of the launcher has been qualified 5 Oct, 1998, ESA makes the results of the development program together with the corresponding production and launch facilities available to ARIANESPACE. ESA is responsible (as design authority) for development work on the Ariane launchers. The Agency owns all the assets produced under these development programs. It entrusts technical direction and financial management of the development work to CNES, which writes the program specifications and places the industrial contracts on its behalf. The Agency retains the role of monitoring the work and reporting to the participating States. Since Flight 9 Arianespace has been responsible for building and launching the operational Ariane launchers (as production authority), and for industrial production management, for placing the launcher manufacturing contracts, initiating procurements, marketing and providing Ariane launch services, and directing launch operations. THE GUIANA SPACE CENTER: EUROPE S SPACEPORT For over 30 years, the Guiana Space Center (CSG), Europe s Spaceport in French Guiana, has offered a complete array of facilities for rocket launches. It mainly comprises the following: CNES/CSG technical center, including various resources and facilities that are critical to launch base operation, such as radars, telecom network, weather station, receiving sites for launcher telemetry, etc. Payload processing facilities (ECPU), in particular the new S5 facility. Ariane launch complexes (ELA), comprising the launch zone and launcher integration buildings. Various industrial facilities, including those operated by Regulus, Europropulsion, Air Liquide Spatial Guyane and EADS, which contribute to the production of Ariane 5 elements. A total of 40 European manufacturers and local companies are involved in operations. Europe s commitment to independent access to space is based on actions by three key players: the European Space Agency (ESA), French space agency CNES and Arianespace. ESA has helped change the role of the Guiana Space Center, in particular by funding the construction of the launch complexes, payload processing buildings and associated facilities. Initially used for the French space program, the Guiana Space Center has gradually become Europe s own spaceport, according to the terms of an agreement between ESA and the French government. To ensure that the Spaceport is available for its programs, ESA takes charge of the lion s share of CNES/CSG fixed expenses, and also helps finance the fixed costs for the ELA launch complexes. French space agency CNES plays several roles at the Space Center: It designs all infrastructures and, on behalf of the French government, is responsible for safety and security. It provides the resources needed to prepare the satellites and launcher for missions. Whether during tests or actual launches, CNES is also responsible for overall coordination of operations. It collects and processes all data transmitted from the launcher via a network of receiving stations, to track Ariane rockets throughout their trajectory. In French Guiana, Arianespace is in charge of launcher integration in the Launcher Integration Building (BIL), coordinates satellite preparation in the payload processing facility (EPCU), and integrates them on the launcher in the Final Assembly Building (BAF). It is also responsible for launch operations, from the CDL 3 Launch Center. Arianespace has created a top-flight team and array of technical resources to get launchers and satellites ready for their missions. Building on this unrivalled expertise and outstanding local facilities, Arianespace is now the undisputed benchmark in the global launch services market. For more d information, visit us on www.arianespace.com Arianespace - Flight 158 9