STRATEGIC ENVIRONMENTAL EVALUATIONS AS AN INSTRUMENT FOR ENVIRONMENTAL AND SOCIAL PLANNING FOR IIRSA

Similar documents
MEETING CONCLUSIONS. Andean South America Regional Meeting Lima, Peru 5-7 March ECOTOURISM PLANNING

ECORREGIONAL ASSESSMENT: EASTERN CORDILLERA REAL ORIENTAL PARAMOS AND MONTANE FORESTS

INITIATIVE FOR THE INTEGRATION OF REGIONAL INFRASTRUCTURE IN SOUTH AMERICA. Tenth Meeting of the Executive Steering Committee

INITIATIVE FOR THE INTEGRATION OF REGIONAL INFRASTRUCTURE IN SOUTH AMERICA (IIRSA) Ninth Meeting of the Executive Steering Committee

ANNEX 18 Integration Sectoral Processes

Indicative Territorial Planning

THE SAN JUAN RIVER BASIN PROJECT

VIII MEETING OF NATIONAL COORDINATORS. Pilot Project Program Border Crossings Summary and Conclusions. Jorge H. Kogan

Property Tax in Latin America: Country Facts

Activity Report 2011 IIRSA. Nineteenth Meeting of IIRSA National Coordinators Brasilia, November 29, 2011

Integration Sectoral Processes (PSIs, in Spanish) Progress in 2008

Ecosystem context in the Environmental Impact Assessment of the Dredging Operations in the Argentina s Santa Fe

VI Meeting of the Executive Steering Committee

COMMON LAND BORDER ECUADOR- PERU FORESEEN AREA m² MINES PENDING 7.009, % , % 7.521, %

- Information inter-operability on protected areas - Regional cooperation in areas with international borders

Tropical Andes Biodiversity Hotspot Program for Consolidation

September. ECHO Quito team MONTHLY REPORT

ECOREGIONAL ASSESSMENT EQUATORIAL PACIFIC EXECUTIVE SUMMARY

Have you ever felt the need to be in the middle of the world surrounded by natural and cultural beauty? THIS IS YOUR CHANCE!

*Latin America spans 7,000 miles, from Mexico to Tierra Del Fuego. *3 Regions: Central America, South America, and the Caribbean.

Multi stakeholders interactions in resource allocation in arid and semi-arid areas

Project for Ecosystem Services (ProEcoServ) San Pedro de Atacama -Chile

Environmental Impact Assessment of the dredging operations and aids to navigation works in the Argentina s Santa Fe Confluencia waterway.

Meeting of. Rio de. Janeiro, Brazil. the Integration. System (CMS) Continuous. 3, 4 and 5. obstacles and

I m not poor because I live with my five senses and the four spiritual energies

2012. Proceedings of the 11 European Geoparks Conference. AGA Associação Geoparque Arouca, Arouca, 5-6.

Case: Hydroelectric Power Dams Construction on Bonyic-Teribe and Changuinola Rivers, Palo Seco Forest. Bocas del Toro Province, Panama

Paraguay Parana Wetland System: valuing wetlands and local knowledge for integration

SUSTAINABLE ECOTOURISM DEVELOPMENT IN THE EMBERÁ INDIGENOUS COMMUNITIES, CHAGRES NATIONAL PARK, PANAMA

Value of the Basic and Essential Family Baskets in Galapagos

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Photo: C. Vega, Conservation International

ISA AND ITS BUSINESS UNITS

WWF infrastructure sector work Forest Friendly Roads. Pasto-Mocoa Road. Sofía Rincón Sector Policy Specialist. WWF-Colombia. Michel Roggo / WWF-Canon

An RHP for the Andes-Amazon System

Sample Itinerary for Ecuador

En Terreno. WCS Colombia Newsletter November No

Month June 2011 South America (except Colombia for HA) Date of submission 01/07/11 MONTHLY REPORT

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

QUÉBEC DECLARATION ON ECOTOURISM World Ecotourism Summit Québec City, Canada, 2002

Transparent Extractive Industry Management. W. Russell King Senior Vice President International Relations Freeport-McMoRan Inc.

TOWARDS SUSTAINABLE MANAGEMENT OF MARINE AND COASTAL HABITATS ASIA- PACIFIC DAY FOR THE OCEAN

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

EUROPEAN COMMISSION DIRECTORATE-GENERAL HUMANITARIAN AID AND CIVIL PROTECTION - ECHO

Resolution XI.7. Tourism, recreation and wetlands

Interactive research in water and mining in Peru, Bolivia and Chile

Sustainable development: 'Lanzarote and the Biosphere strategy'. LIFE97 ENV/E/000286

33. Coiba National Park and its Special Zone of Marine Protection (Panama) N 1138 rev)

for HUB MSMEs IX Meeting of the Executive Steering Committee of IX Meeting of the Executive Steering Committee of IIRSA

Essential Questions. 1. How have historical figures and events affected South America today?

Tourism strategies for the renovation of mature coastal tourist destinations in Spain

Ibero-American Road Safety Observatory

ACTION PLAN OF THE SOUTH AMERICAN DEFENSE COUNCIL 2012

UNITED NATIONS EDUCATIONAL, SCIENTIFIC AND CULTURAL ORGANIZATION CONVENTION CONCERNING THE PROTECTION OF THE WORLD CULTURAL AND NATURAL HERITAGE

South America. pg. 520 (5 th) pg. 523 (6 th )

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Chapter 19 Test on South America

An Amazon without boundaries

Meeting of the Technical Executive Group on Planning for the Integration and Development of Border Territories

SPACE ACTIVITIES IN EARTH OBSERVATION IN ARGENTINA. Félix Clementino Menicocci Secretario General Comisión Nacional de Actividades Espaciales

THE STATE OF ZACATECAS, MEXICO

WORLD LAND TRUST-US ANNUAL REPORT 2006

Mikaela Weisse Scott Kloeck-Jenson Fellowship report Travel Award (2014) Lima, Peru

Environmental Impact Assessment in Chile, its application in the case of glaciers. Carlos Salazar Hydro21 Consultores Ltda.

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina

MANUAL OF SUSTAINABILITY POLICIES. Hotel Lomas del Volcán 2018

Debating mining in Correa s Ecuador: social movements, constituent assemblies and cabinet frictions

Biosphere Reserves of India : Complete Study Notes

FOREIGN INVESTMENT IN LATIN AMERICA AND THE CARIBBEAN 2002 REPORT

REDD+ IN YUCATAN PENINSULA

State of Conservation of the Heritage Site. City of Potosí (Plurinational State of Bolivia) (ID Nº 420) (ii), (iv) y (vi)) EXECUTIVE SUMMARY

The Pilcomayo River Basin Argentina

Initiative for Regional Infrastructure Integration in South America MERCOSUR: Rising Opportunities to Japan Infrastructure Investment Opportunities

South America (except Colombia for HA) Date of submission 02/08/12. ECHO Quito team MONTHLY REPORT

Have you ever felt the need to be in the middle of the world surrounded by natural and cultural beauties? THIS IS YOUR CHANCE!

BIODIVERSITY NEW ECONOMIC VARIABLE

Results of the GTE* of the EID** Paraguay-Paraná Waterway (HPP, in Spanish)

URBAN FLOODS IN SOUTH AMERICA

Alianza del Pacífico. October, Germán Ríos May 2012

Community-based Adaptation, Experiences in Bolivia

Transformational Advocacy Journey and Amazon Adventure. Ecuador: Environmental Justice and Indigenous Rights July 17-27, 2013

RESILIENT CITIES IN LATIN AMERICA AND THE CARIBBEAN: Key concepts, experiences and projections CONFERENCE PROGRAMME

MARM ACTIVITIES ON WATER IN IBERO-AMERICA

The Northern Tropics

May El Dorado International Airport. Aeropuerto Internacional El El Dorado

WORKSHOP ON AIR INTEGRATION

The Design of Nature Reserves

THE STATE OF ZACATECAS, MEXICO

MIXED PROPERTIES LATIN AMERICA AND THE CARIBBEAN. 42. Historic Sanctuary of Machu Picchu (Peru) (C/N 274)

LATIN AMERICA / CARIBBEAN COIBA NATIONAL PARK PANAMA

Monitoring the Environmental Status of the Heart of Borneo

Infrastructure: Networks to Sustain Development

Corporate Social Responsibility. Partnerships in Inclusive Development Community Participation and Engagement

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Construction of Two Sections of the Metropolitan Perimeter Road

ARTWEI ARTWEI ARTWEI

(No. 9) (Approved April 8, 2001) AN ACT

Pilot Project for Integrated Management of the Coastal Zone of Bahia de Navidad, Jalisco, Mexico

The results of the National Tourism Development Strategy Assessments

Transcription:

STRATEGIC ENVIRONMENTAL EVALUATIONS AS AN INSTRUMENT FOR ENVIRONMENTAL AND SOCIAL PLANNING FOR IIRSA ANDEAN DEVELOPMENT CORPORATION (CAF, in Spanish) Vice-presidency of Social and Environmental Development Environmental Bureau Quito, November, 2006

INTRODUCTION December, 2005 (Asunción, Paraguay): The Executive Steering Committee (CDE, in Spanish) requests the Technical Coordination Committee (CCT, in Spanish) a pilot test on methodologies in order to deepen the analysis of Groups of Projects. Among the three most important topics is the strategic analysis on environmental and social impact and opportunities, whether direct or indirect ones, that may be generated in the area of influence as a consequence of the possible implementation of the projects proposed. The current summary shows results and proposals of the work carried out by the CCT in response to the subject matter previously mentioned.

INTRODUCTION The following projects for the IIRSA Integration and Development Hubs were revised, for which works equivalent or similar to a Strategic Environmental Evaluation, from the point of view of their scope, were performed or are being performed: - Corridor Santa Cruz - Puerto Suárez, Bolivia (Central Inter-Oceanic Hub, Group 3) - South Inter-Oceanic Road Corridor: Perú (Perú Brazil Bolivia Hub, Group 1) - North Road Corridor: Bolivia (Perú Brazil Bolivia Hub, Group 2) - Hydroelectric Complex: Río Madeira, Brazil (Perú Brazil Bolivia Hub, Group 3) - North Amazon Road Corridor: Perú (Amazon Hub, Group 3)

INTRODUCTION The CCT developed a methodology for the strategic socio-environmental evaluation of the Groups of Projects, which will be soon applied, and at low cost. This methodology would be considered as a pilot case for a Group of Projects that has not undergone an equivalent study: Group 6 of the Andean Hub.

OBJECTIVE To present IIRSA a methodology option viable for the use of the Strategic Environmental Evaluation as part of the environmental and social planning of its Infrastructure Groups of Projects.

PREMISES AND GROUNDS Environmental and social challenges in IIRSA highlight the convenience of a mainly preventive focus The Group of Projects is the ideal level to be evaluated The Groups of Projects are usually structured according to Projects under several development stages Evaluations must provide useful criteria for the planning and subsequent environmental and social management of the Groups of Projects

PREMISES AND GROUNDS Evaluations are more significant if they are carried out before the approval / beginning of the infrastructure works The development of the evaluations and their validation must involve an institutional and public participation process Evaluations must be available relatively soon The cost of the evaluations must be reasonable

METHODOLOGY General presentation and characterization of the projects that make up the Group of Projects Preliminary compilation of environmental and social information Regional infrastructure: Neo-economic mobility and connectivity Reliability of the energy supply Competitiveness of the energy costs Existence and effectiveness of energy inclusion programs as well as digital programs Conflicts of infrastructure with environmental and social aspects

METHODOLOGY Regional profitable development: Dominant and potential economic activities Service supply for the global information, knowledge and tourism networks Importance of the private sector in the region Regional initiatives for staff and business training Mechanisms for the development and technical support of small and micro-producers Replication of actions that show sustainable production in traditional communities and human settlements.

METHODOLOGY Territorial zoning and land possession (cont.): Regional development plans. Regional territorial zoning and territorial use plans. Land possession. Municipal urban zoning plans. Integral management of hydrographic basins. Sustainable management of natural protected areas. Sustainable management of socio-cultural protected areas. Areas of ecological importance without legal protection. Areas of socio-cultural importance without legal protection. Social unrest due to access / possession of regional and local natural resources (land, water). Opportunities for social and cultural development.

METHODOLOGY Basic services and regional and local institutionalization process: Quality of the basic existing services (drinking water, sewer system, solid garbage, electricity, telephony, transportation, education, health). Limitation to keep/improve the quality of the existing basic services (drinking water, sewer system, solid garbage, electricity, telephony, transportation, education, health) in view of the regional/local growth of the population. Operative capacity of public institutions (national, regional and local ones) in order to execute, monitor and/or control the territory.

METHODOLOGY Basic services and regional and local institutionalization process (cont.): Operative capacity of other national, regional and local institutions to execute, monitor and/or control (non-governmental organizations, civil society and similar). Key public institutions depend on budgetary allocations from the central government. Capacity to mobilize and articulate partners/international cooperation.

METHODOLOGY Site work in the area of the Group of Projects Verification of information previously known Gathering of additional information (correction and/or complement) Varying duration depending on access and geographic extension The following topics must be given priority: ecosystems, protected areas, native towns, possession of the land, populated centers, basic services, official parties, and non-governmental parties, institutionalism, productive activities, articulations and other projects planned or in progress different from the IIRSA ones. It must be carried out by a team of qualified and professionals competent

METHODOLOGY Summary of risks and opportunities of strategic action Development on environmental and social description of the area of the Group of Projects. Identification and proposal of critical aspects that allow to understand the risks that the Group of Projects represents from the environmental and social point of view. Recognition of opportunities related to the precaution/mitigation of the critical aspects. Identification of possible local/regional/national parties relevant for the formulation and execution of programs, plans and projects related to the environmental and social management.

METHODOLOGY Identification of environmental and social programs, plans and strategic projects Definition of the kind of environmental and social management required by the Group of Projects in order to prevent/mitigate the risks/impacts identified in the previous stages. Development of programs, plans and projects together with relevant parties that were selected from the ones previously identified. Determination of the preliminary associated cost in order to know the investment amounts needed and the possible financing mechanisms for the environmental and social management in the Group of Projects.

METHODOLOGY Proposal for the negotiation of financial mechanisms destined to the execution of the strategic programs Although it is not a part of the environmental and social evaluation, it is associated to the putting into practice of the conclusions and recommendations it expresses. Establishing of possible financing resources (governments, multilateral organizations, etc.).

Pilot Case: Group 6 of the Andean Hub (Connection: Colombia Ecuador II, Bogotá Mocoa Tena Zamora Palanda Loja). Due to many practical limitations, the site mission was restricted to the Ecuadorian territory; that is why the Colombian special features of the Group of Projects were not analyzed. Characteristics of the Group of Projects The Ecuadorian segment of the Group 6 of the Andean Hub is composed of a border crossing project (San Miguel, Ecuador Colombia border), many road projects between this place and Palanda (Ecuador Perú border), and an airport in Zamora.

Compilation of cabinet information Internet web sites. Application of the Cóndor Geographic Information System (CAF): Report on an analysis related to the approximate layout of the roads that compose the Group of Projects 6, with the thematic layers of populated centers, main road services, relief and protected areas. An alert report provided by the Cóndor Geographic Information System allowed to know the presence, in the area of influence, of the Group of Projects of the Protected Areas: Ecologic Reserve: Cayambe - Coca, Ecologic Reserve: Antisana, Sangay National Park, Podocarpus National Park and Sumaco Napo Galeras National Park; and to take into consideration the high importance of their biodiversity (Napo Rain Forest and Bosques Montanos Oriente Cordillera Real - Forest).

Current Situation

Articulations

Site visit to the area of influence Team made up of 3 professionals (Pedro Bara - Advisor VIN-CAF; Mario Hurtado - Advisor DMA CAF Ecuador; and Alfredo Paolillo - Chief Executive DMA - CAF). Duration: 8 days (June 28th July 5th, 2006). Itinerary: Quito Coca (by plane), Coca San Miguel Tena Puyo Macas Sucúa Santiago de Méndez Gualaquiza Zamora Loja (by road), and Loja Quito (by plane).

Institutions interviewed during the site mission - 16 governmental organizations as well as productive and non-governmental organizations. 1. Environmental Impact Bureau, Ministry of Public Works (Dirección de Impactos Ambientales, Ministerio de Obras Públicas). Quito 2. Environmental Planning Bureau, Ministry of the Environment (Dirección de Planificación Ambiental, Ministerio de Ambiente). Quito 3.Natural Capital Bureau, Ministry of the Environment (Dirección de Capital Natural, Ministerio de Ambiente). Quito 4. Natura Foundation (Fundación Natura). Quito 5.System of Economic and Social Indicators (Sistema de Indicadores Económicos y Sociales). Quito 6.General Maritime Bureau (Dirección General de Intereses Marítimos). Quito 7.Sugar Cane Agroindustrial Cooperative (Cooperativa Agroindustrial de la Caña de Azúcar). Fátima 8.Planning Bureau, Provincial Council of Morona Santiago (Dirección de Planificación del Consejo Provincial de Morona Santiago). Macas 9.Department of Integral and Rural Development and the Environment, Provincial Council of Morona Santiago (Departamento de Desarrollo Rural Integral y Medio Ambiente del Consejo Provincial de Morona Santiago). Macas 10. Ministry of the Environment, Province of Morona Santiago (Ministerio del

Institutions interviewed during the site mission (cont.) 11. Bureau of the Sangay National Park, (Ministry of the Environment) Dirección del Parque Nacional Sangay (Ministerio del Ambiente). Macas 12. National Bureau of Mining, (Ministry of Energy and Mining, Province of Zamora Chinchipe) - Dirección Nacional de Minería (Ministerio de Energía y Minas de la Provincia de Zamora Chinchipe). Zamora 13. Zamora Technical Office, Ministry of the Environment (Oficina Técnica Zamora del Ministerio de Ambiente). Zamora 14. Environmental, Agricultural and Tourism Bureau, Provincial Council of Zamora Chinchipe (Dirección Ambiental, Agropecuaria y Turística del Consejo Provincial de Zamora Chinchipe). Zamora 15. Provincial Council of Zamora Chinchipe (Consejo Provincial de Zamora Chinchipe). Zamora 16. Arcoiris Foundation (Fundación Arcoiris). Loja

Compiled/examined documentation during the site mission - 38 documents and other printed and electronic information Reviewed internet information - 37 web sites Identified productive activities Support services to petroleum activities in Coca. Petroleum activities in Coca - Lago Agrio (Nueva Loja). Cultivation of African palm tree in the region of Coca-Lago Agrio (Nueva Loja), El Eno and Río Payamino.

Identified productive activities Cow stockbreeding in the region of Lago Agrio-San Miguel, San Sebastián del Coca, Río Payamino, Carlos Julio Arosemena, Pomona-Puyo and Río Pastaza-Río Upano, Chinimbimi-Méndez, Cambanaca-El Rosario, Plan de Milagro-San Juan Bosco and Gualaquiza-Zamora. Agriculture in the region of Lago Agrio-San Miguel. Cultivation of coconuts, corn, banana and cocoa in the region of El Eno. Cultivation of corn in the region of Rió Huataraco. Cultivation of sugar cane in the region of Cajabamba-Fátima. Cultivation of sugar cane and yucca in the region of Pomona-Vencedores. Cultivation of papaya in the region of San Luis-Tesoro. Metal recycling (scrap) in the region of La Joya de Los Sachas.. Logging and carpentry in the region of La Joya de Los Sachas

Identified productive activities (cont.) Pisciculture (tilapia and cachama) in the region of La Joya de Los Sachas, Río Payamino and between Macas and Santa Marianita. Recreation (aquatic parks, zoos, botanic gardens) in the region of La Joya de Los Sachas, Cotundo and Puyo. Malanga packing company in the region of San Sebastián del Coca.

Identified productive activities (cont.) Cleaning-up of hydrocarbon spillage in the region of San Sebastián del Coca. Tourism/ecotourism in the region of Nuevo Rocafuerte, Río Payamino, Río Suno, Pasohurco, Archidona, Puerto Misabradi, Cajabamba, Fátima, Pomona, Zamora. Naranjillo crop in the region of Sumaco. Production of brown sugar from sugar cane in the region of Fátima, Pomona-Vencedores. Production of milky by-products (cheese and milk) with local trademark in Puyo. Production of bricks between Macas and Santa Marianita.

Protected areas identified in the area of indirect influence 1. Sumaco-Napo-Galeras Biosphere Reserve. 2. Sangay National Park. 3. Cóndor National Park. 4. Podocarpus National Park. 5. Antisana Ecologic Reserve. 6. Cayambe-Coca Ecologic Reserve. 7. Cotococha Buffer Forest. 8. Cutucú Buffer Forest. 9. Tinajillas-Río Gualaceño Buffer Forest. 10. Sakimi Buffer Forest. 11. Río Blanco Buffer Forest. 12. Tuna Carama Buffer Forest. 13. Alto Nangaritza Buffer Forest.

New potential protective areas and/or under proposal processes 1. Podocarpus Biosphere Reserve. 2. Ecologic corridor between Cóndor National Park and Cutucú Buffer Forest. 3. Legal status without specification, between Cóndor and Palanda. 4. Legal status without specification, in Tres Picachos, Las Sabanas and Chito high zone (Cantones de Palanda and Chinchipe).

Risks/impacts identified during the site mission 1. Deforestation in order to grow pasture for cattle in most of the area of the Group of Projects. 2. Occupation of territory in order to set up recreational country houses as a part of the expansion of Quito in the region of El Chaco, located between the Sumaco-Napo-Galeras Biosphere Reserve and the Cayambe Coca Ecologic Reserve. 3. Environmental and social management that is not adequate due to petroleum activities (polluted areas because of spillage and social conflicts).

Risks/impacts identified during the site mission (cont.) 4. Much peopling in the region of Coca-Lago Agrio-General Farfán, Río Payamino (very recent and with high level of marginal inhabitants) and Río Huataraco. 5. Drug traffic and kidnapping due to guerrilla forces in the region of the San Miguel border crossing. 6. Inadequate health services. 7. Inadequate electric supply. 8. Invasion attempts in the Tusumbay sector of the Sangay National Park (extra-activist activities). 9. Illegal metal and non-metal mining in the San Luis, Quebrada de Las Minas and Sabanillas sectors of the Podocarpus National Park. 10. Illegal extraction of wood from the Podocarpus National Park (more than 1000 people devoted to this activity).

Risks/impacts identified during the site mission (cont.) 11. The livestock activity affects 7% of the area of the Podocarpus National Park. The Numbala sector is being invaded for this purpose. 12. High incidence of illegal forest production in Zamora (50 % of the production). 13. Very important project for the open-air exploitation of copper in El Pangui (Cóndor Mountain Range). 14. 60 % of the Province of Zamora is under mining concession. 15. The company that will exploit the copper mine in El Pangui plans to use the road that links Zamora with Loja in order to extract the mineral and take it to Puerto Bolivar, in the Pacific Ocean. 16. The Cutucú Buffer Forest, the Sangay National Park and the Cóndor National Park do not have management plans.

Risks/impacts identified during the site mission (cont.) 17. The Sangay National Park is in trouble due to invasions and is threatened because of projects aimed at the construction of new roads, which would cross the park in the regions of Sucia-Shoray and Pablo Sexto-Chambo. 18. The Podocarpus National Park has an outdated management plan, which is not implemented and has problems related to illegal mining, illegal wood logging and illegal production of cattle. 19. The Ministry of the Environment lacks logistics and also the economic resources to guard the areas and the work performed with the local communities.

Opportunities identified during the site visit 1. Tourism/ecotourism almost in all the area of influence. 2. Creation of new protected natural areas, particularly in the Province of Zamora Chinchipe, in order to protect their high biological value and reduce current threats related to non-sustainable activities. 3. Improvement of the existing management of protected areas. 4. Binational management of protected natural areas. 5. Less conflicts with indigenous towns. 6. Improvements in health, electricity and drinkable water. 7. Regional/local added value for the agricultural production and the autochthonous biodiversity (naranjillo, natural tinctures and medicinal plants).

Opportunities identified during the site visit (cont.) 8. Improvement of the sustainable forest production and reduction of illegal activities in the Province of Zamora. 9. Strengthening of the competence decentralization process related to the environmental and social management, which started in the year 2002, as regards the provinces of Sucumbíos, Napo, Orellana, Pastaza, Morona Santiago and Zamora Chinchipe. 10. Initiative strengthening by the regional and local non-governmental organizations (agroforestry, natural products, environmental education, work with local Creole and indigenous communities, creation and management of protected areas, tourism/ecotourism, recycling, environmental quality). 11. Contribution to the sustainable management of mining production in the Cóndor Mountain Range.

Relevant institutions to be considered for the identification /formulation /execution of plans, programs and projects 1. Ministry of Energy and Mining (Ministerio de Energía y Minas). 2. Ministry of Public Works and Communications (Ministerio de Obras Públicas y Comunicaciones). 3. Ministry of the Environment (Ministerio del Ambiente). 4. Ministry of Tourism (Ministerio de Turismo). 5. Frente Social. 6. Provincial Council of Morona Santiago (Consejo Provincial de Morona Santiago). 7. Provincial Council of Napo (Consejo Provincial de Napo). 8. Provincial Council of Orellana (Consejo Provincial de Orellana). 9. Provincial Council of Pastaza (Consejo Provincial de Pastaza). 10. Provincial Council of Sucumbíos (Consejo Provincial de Sucumbíos). 11. Provincial Council of Zamora Chinchipe (Consejo Provincial de Zamora Chinchipe). 12. Ecuador Mining Chamber (Cámara Minera del Ecuador). 13. Technical Support Service for Forest Management (Servicio de Asistencia Técnica para el Manejo Forestal). 14. Municipal Government of Coca (Gobierno Municipal de Coca).

Relevant institutions to be considered for the identification /formulation /execution of plans, programs and projects (cont.) 15. Municipal Government of Macas (Gobierno Municipal de Macas). 16. Municipal Government of Tena (Gobierno Municipal de Tena). 17. Municipal Government of Zamora (Gobierno Municipal de Zamora). 18. Institute for the Regional Ecodevelopment of the Amazon (Instituto para el Ecodesarrollo Regional Amazónico). 19. Ecuadorian Technical University for the Ecodevelopment of the Amazonia (Universidad Técnica Ecuatoriana para el Ecodesarrollo de la Amazonía). 20. International Conservation (Conservación Internacional). 21. Antisana Foundation (Fundación Antisana). 22. ATASIM Foundation (Fundación ATASIM). 23. Arcoiris Ecological Foundation (Fundación Ecológica Arcoiris). 24. Ecuadorian Foundation for Ecological Studies (Fundación Ecuatoriana de Estudios Ecológicos). 25. Natura Foundation (Fundación Natura). 26. Local Initiative Service for the Ecuadorian Amazonia (Servicio de Iniciativa Local para la Amazonía Ecuatoriana). 27. Amazon Forest Service Foundation (Fundación Servicio Forestal Amazónico). 28. The Nature Conservancy.

Identification of environmental and social programs, plans and projects 1. Program for the Reinforcement of Adventure and Nature Tourism 2. Program for the Support of the Protected Natural Areas a. Plan for New Protected Areas in Zamora Chinchipe b. Plan for the Reinforcement of the Protected Natural Areas Management - Project for the Support of the Management of: Podocarpus National Park, Sangay National Park and Cutucú Buffer Forest - Project for the Binational Management of Protected Areas in Serranía El Cóndor 3. Program for the Support of Indigenous Towns 4. Investment Program related to Basic Services

Identification of environmental and social programs, plans and projects (cont.) 5. Program for Production Improvement a. Plan for the Support to the Sustainable Mining Production in El Cóndor mountain range. b. Plan to Add Regional Value to the Agricultural Production - Project for Processing Meat and Milk Products c. Plan for the Sustainable Use of Biodiversity - Project for Improving Forest Production 6. Program for the Support of the Competence Decentralization Process related to Environmental and Social Management

Approximate cost of the pilot case (Group 6 of the Andean Hub). USD 25,000.. Includes planning, site mission and document development.. Includes the fees of the 3 professionals, the air tickets: Caracas Quito - Caracas (2), Quito - Coca and Loja - Quito (3), the traveling expenses of the 3 professionals (7 days) and land transportation.. It does not include costs related to the Colombian sector of the Group 6 of the Andean Hub.

COMMENTS ON THE NEXT STEPS 1) Methodology is useful for the IIRSA environmental and social purposes. 2) Methodology allows the strategic analysis of Groups of Projects, but it requires a minimum of 4 professionals and 3-4 months work per Group of Projects. 3) To prioritize the Groups of Projects taking criteria as a base. 4) To establish a schedule to develop progressively the Strategic Environmental Evaluations of Groups of Projects. 5) In the case that a Group of Projects has a project that has not been started, an analysis of the alternatives (scenarios or options) must be carried out, including the absence of a project, the change in the original plan and the improvement of similar projects under operation.

COMMENTS ON THE NEXT STEPS 6) It must be avoided the financing of long-term and expensive baseline studies as a part of the Strategic Environmental Evaluations of the Groups of Projects. 7) The site missions to the areas of the Groups of Projects must be part of the process to develop high-quality Strategic Environmental Evaluations in IIRSA. 8) Search with all the interested possible parties must also be an integral part for the development of the Strategic Environmental Evaluations of the Group of Projects.