AVIATION > ICAO NAT PBCS/2. Inmarsat Update. ICAO NAT PBCS Workshop/2 Paris June th, 2015 Presented by Andrew Ives

Similar documents
Inmarsat Aviation Safety Services Update

Initial 4D Trajectory Management via SwiftBroadband Iris Event Salzberg

Air Traffic Management/Safety Services

PBCS Flight Plan RCP RSP Codes

Problem Reporting and System Performance Analysis

Inmarsat Aviation update

Inmarsat GADSS Solutions Global Aeronautical Distress and Safety System

Services for Air Transport. The mobile satellite company

Boeing Air Traffic Service (ATS) Data Link Perspectives and Capabilities

OPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018

Manufacturer updates

Sixth Meeting of CNS/MET Sub-Group of APANPIRG. Bangkok, Thailand, July 2002 SITA ENHANCED GROUND TO AIR (EGTA) VOICE SERVICE

Excerpts from ICAO PBCS Manual

Emerging Locator & Flight Data Technology

ICAO provisions on data link implementation

PBCS Charter Concept

TAKE YOUR BUSINESS TO ANY ALTITUDE

The benefits of satcom to airlines. Prepared by Helios for

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

AIRCOM Datalink Infrastructure

Performance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA

Seeking Connec+vity Op+ons: We are here to learn!

Advisory Circular. Special Authorization (SA) for Required Communications Performance (RCP) 240 and Required Surveillance Performance (RSP) 180

Performance Based Communication and Surveillance

EFB Wireless Connectivity & Security Considerations

Federal Aviation Administration. PBCS: Operator Approvals UNITED STATES. NAT PBCS Workshop/ February 2018 Paris, France

AFI REGIONAL DATA LINK MONITORING AGENCY (DL/CMRA)

ICAO NAM/CAR/SAM ATS Data Link Implementation Workshop

COMMUNICATIONS PANEL. WG-I 20 Meeting

Manufacturer updates. Bill Peltola VP Asia-Pacific

Smart business. AVIATOR S Series. SMART FLEET TM. Next generation satcom solutions for a more connected and profitable airline.

Manual on Monitoring the Application of Performance-based Horizontal Separation Minima

ATN London, September SITA DATALINK SERVICES & APPLICATIONS Enabling CNS Evolution

SB-S. Real-time visibility into global operations. The first and only global, secure, IP connection for operations and safety communications

THE LARGEST FAMILY-OWNED BUSINESS AVIATION SERVICE CENTER IN THE WORLD

FLIGHT STANDARDS SERVICE LESSON PLAN

Overview of Worldwide Data Link Equipage Mandates

AeroMACS. Why it is important for aviation. AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL

Electronic visibility via ADS-B for small aircraft. John Korna, NATS

GOLD / PBCS Operational Approval (Compliance)

North Atlantic Initiatives

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003

THE NEXT GENERATION OF AIRCRAFT DATA LINK. Presented by: Rockwell Collins Cedar Rapids, Iowa 52498

INFLIGHT INTERNET ANYWHERE

OVERVIEW OF THE FAA ADS-B LINK DECISION

Data Link Checklist. As of: 9/10/2017 1

Aeronautical Communications: Changes Ahead - FCI

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

Wide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

GOLD. Global Operational Data Link Document. Introduction to RCP and RSP

GOLD. Global Operational Data Link Document (GOLD) Implementation and Amendments. AFI CNS SG /4, Dakar, Senegal, July 2011

(Presented by the Secretariat)

Aircraft Systems and 4D Trajectory Management

Performance Analysis of Space-Based ADS-B

Aeronautical Mobile Airport Communications System (AeroMACS) Technical Development Briefing

Benefits of CNS/ATM Implementation for the Region

MANUAL FOR AERONAUTICAL MOBILE SATELLITE (ROUTE) SERVICE Part 1. DRAFT v March 2007

AVBUYER THIS MONTH. GAMA 2014 Year-End Shipment Analysis. Safety Focus: Keeping Pace with Technology. Aircraft Comparative Analysis - Bell 206B-3

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

SUMMARY. of the North. Reference: A B

AERONAUTICAL INFORMATION CIRCULAR 33/17

U.S. Domestic CPDLC Flight and Route Planning Guide

AeroMACS. Why it is important for aviation. AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL

GOLD Chapter 4 Controller Procedures

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy

Federal Aviation Administration Operations in the New York Center Oceanic CTA/FIR

Air/Ground ATN Implementation Status ATN Seminar, Chiang Mai - 11/14 December

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

ACARS: Timeless tech for the connected aircraft age

CONNECT UP! Your Flight Path to the Connected Aircraft. In-Flight Internet Onboard Entertainment Flight Operations

Next Generation Airspace Developments: Key Operational Trends and Enablers

Dual Use of Commercial Avionics Data Links for the U. S. Air Force

ADVANCED TECHNOLOGIES AND OCEANIC PROCEDURES (ATOP) SYSTEM. Presented by the United States of America SUMMARY

ESA Iris Programme: satellite communications for Air Traffic Management

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Rockwell Collins ARINC MultiLink SM Flight Tracking Service

ADS-B via Low Earth Orbiting Satellites Benefits Assessment

Place image here (10 x 3.5 ) FAA NEXTGEN DATA COMM TOWER SERVICE: CPDLC DCL NEW OPERATOR INTRODUCTION HARRIS.COM #HARRISCORP

PDC VERSUS DCL. Southwest Airlines. Data Comm Update 2/26/2016

ESA Iris Programme Overview of results from Iris Phase 1. Briefing 28 July

ARINC Project Initiation/Modification (APIM)

NEXT GENERATION SATELLITE SYSTEMS FOR AERONAUTICAL COMMUNICATIONS

What you should know: Future Air Navigation System (FANS)

AEROMACS AIRBORNE ARCHITECTURE OPTIONS V1.0

Applicability / Compatibility of STPA with FAA Regulations & Guidance. First STAMP/STPA Workshop. Federal Aviation Administration

Global Operational Data Link Doc 10037

3.3 Specific Developments in Air Navigation CNS AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) (Presented by the United States of America) SUMMARY

DVB-S2/RCS Suitability for the Provision of Air Traffic Management Services

AIRCRAFT SURVEILLANCE VERSUS TRACKING

ITU-T. ITU-T Focus Group on Aviation Applications of Cloud Computing for Flight Data Monitoring Avionics and Aviation Communications Systems

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE. Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13)

CIVIL AVIATION PUBLICATION CAP 10 CPDLC

We are IntechOpen, the world s leading publisher of Open Access books Built by scientists, for scientists. International authors and editors

International Civil Aviation Organization Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force

Surveillance and Broadcast Services

INMARSAT. CWC update 2017

ATC Datalink on Boeing Airplanes

Transcription:

AVIATION > ICAO NAT PBCS/2 Inmarsat Update ICAO NAT PBCS Workshop/2 Paris June 17-19 th, 2015 Presented by Andrew Ives

01 AVIATION > ICAO NAT PBCS/2 Alphasat update

Alphasat Update Background Alphasat, also known as Inmarsat-4A F4, was launched on the 25 th July 2013 Alphasat provides performance improvements in terms of power, capacity and available spectrum in the I4-EMEA region Inmarsat successfully transitioned the EMEA (I4F2) Classic Aero and SwiftBroadband services to Alphasat on 24 th March 2015 (replacing I4F2 at the same orbital slot) 3 Inmarsat Global Limited 2015 ICAO NAT PBCS/2 17-19 June 2015

Classic Aero & SwiftBroadband I-4 Coverage Map with Alphasat Burum (SBB) Fucino (Classic & SBB) Beijing (SBB) Paumalu (Classic & SBB) 4 Inmarsat Global Limited 2015 ICAO NAT PBCS/2 17-19 June 2015

02 AVIATION > ICAO NAT PBCS/2 SB Safety Initial FANS Performance

SwiftBroadband (SB) Safety New development that entered flight trials in 2014, that Will satisfy the demand for greater cockpit bandwidth Be backward compatible with Classic Aero Provides cockpit communications 2 Channels of Cockpit Voice ACARS Data, supporting FANS 1/A Reduced ACARS message delivery times Prioritised IP data supporting new applications: Electronic Flight Bag New Operational IP-based applications Flight Data Recorder data download Enhanced aircraft position reporting and tracking Built-in: i.e. additional to ADS-C & waypoint reporting Position reporting rate is highly configurable Low cost + lightweight terminals In-built aircraft position reporting and flight tracking 6 Inmarsat Global Limited 2015 ICAO NAT PBCS/2 17-19 June 2015

ACARS & FANS1/A over SwiftBroadband Architecture Air Traffic Service Providers Airline AOC Centres Air Traffic Service Providers Airline AOC Centres DP 1... DP n Inmarsat DCN and DP, SP Networks ACARS + Position Reports Prioritised IP Standard IP Ground to Air Voice PSTN Voice + ACARS ACARS Ground Gateway (AGGW) VoIP Server Classic Aero I-4 Ground Segment CN Air to Ground Voice Aero GES SGSN GGSN MSC RAN BGAN Ground Segment Classic Aero Service as Fallback Fallback to Classic Aero Normal Operation over SBB I4 Satellite Constellation SB Safety Service over SwiftBroadband Classic Aero Modem Antenna SBB Modem PS Voice SB Safety AES ACARS Voice ACARS Airborne Gateway (AAGW) VoIP Server High Availability Safety Comms - Meeting ICAO GOLD RCP240 and RSP180 ACARS Voice Prioritised IP Standard IP FANS and AOC Applications over ACARS 2 Channels of Cockpit Voice Prioritised IP Applications (e.g. EFB) Standard IP Applications (e.g. EFB, Cabin) 7 Inmarsat Global Limited 2015 ICAO NAT PBCS/2 17-19 June 2015

SwiftBroadband Safety Status All system infrastructure modifications in place and tested ARINC 781, RTCA MASPS and RTCA MOPS standards have been developed, ICAO Manual close to finalisation First STC has been completed on Hawaiian Airlines B767 Successful first FANS flights of SB Safety for passenger operations In the initial phase of an in-service evaluation during 2015 on 8 HAL B767 aircraft Reduced aircraft separations being applied from the start of the trial Signing with second airline for 3 MD11 aircraft to join FANS evaluation FANS operational evaluation approval expected by the FAA PARC CWG in Q1 2016 8 Inmarsat Global Limited 2015 ICAO NAT PBCS/2 17-19 June 2015

SB Safety FANS Approvals Process The FANS Over SwiftBroadband Safety (FOSS) project initiated at FAA PARC CWG will monitor SB Safety service performance against the ICAO GOLD Specifically it will examine Service availability CPDLC message latency performance against the GOLD RCP240 performance criteria ADS-C message latency performance against the GOLD RSP180 performance criteria If the required service performance is deemed to be met by the PARC then the PARC CWG chair is expected to recommend that the service can be used for routine FANS operations, including reduced separations 9 Inmarsat Global Limited 2015 ICAO NAT PBCS/2 17-19 June 2015

FANS1/A over SBB Project Plan & Report FAA PARC CWG activity with surrounding ANSP participation in the Pacific Region Evaluation Schedule Will collect ICAO GOLD results until the end of 2015 FANS1/A Aircraft Hawaiian Airlines 767 & Airline #2 (To be confirmed) AOC ACARS Aircraft In use today and growing Mixture of airlines and bizjets that wish to use ACARS over IP and have EFB/Crew Data Applications Recommendations Expect to exceed Classic Aero RCP240/RSP180 performance January 2016 10 Inmarsat Global Limited 2015 ICAO NAT PBCS/2 17-19 June 2015

Initial SBB AOC ACARS Flight Routes Flying today over: CONUS NAT Gulf of Mexico WATRS AOC Airlines in 2015 NAT ASIA PACIFIC Initial flights with Airbus ACJ showing 1-minute position reporting

ACARS transac ons Preliminary SBB AOC ACARS Latency Performance SBB AOC ACARS - Airbus ACJ flying today - Note: Latency data shown for Inmarsat network portion only (does not include CSP or ANSP networks) - Note: Small sample size Higher AOC Usage compared to air transport, but limited number of flights 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Initial SBB ACARS ACARS Latency AGGW Performance From Aircra Chart (from aircraft) 3.4 sec @95% 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Latency [s] 4.5 sec @99.9% 456 AOC ACARS Messages ~45 sec @95% for Classic 12 Inmarsat Global Limited 2015 ICAO NAT PBCS/2 17-19 June 2015

First SB-S FANS Evaluation Flight 3 rd June 15 13 Inmarsat Global Limited 2015 ICAO NAT PBCS/2 17-19 June 2015

First SB-S FANS Evaluation Flight 3 rd June 15 14 Inmarsat Global Limited 2015 ICAO NAT PBCS/2 17-19 June 2015

ACARS transactions Preliminary SB Safety FANS Latency Performance SB Safety FANS - Note: Latency data shown for Inmarsat network portion only (does not include CSP or ANSP networks) - Note: Small sample size First data from HAL N588HA - 3 rd to 17 th June 15 100% 90% 80% 70% 60% 50% 40% 30% 20% Initial SB Safety ACARS FANS AGGW Latency From Performance Aircraft Chart (from aircraft) 2.8 sec @95% 3.5 sec @99.9% 10% 0% 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Latency [s] 15 Inmarsat Global Limited 2015 ICAO NAT PBCS/2 17-19 June 2015

Preliminary SB Safety FANS Latency Performance First HAL aircraft SB only ADS-C downlink latency Data prepared by FAA s s 16 Inmarsat Global Limited 2015 ICAO NAT PBCS/2 17-19 June 2015

Preliminary SB Safety FANS Latency Performance For first HAL aircraft All media ADS-C downlink latency 3 rd to 9 th June Data Prepared by FAA 17 Inmarsat Global Limited 2015 ICAO NAT PBCS/2 17-19 June 2015

AVIATION > ICAO NAT PBCS/2 Thank You For follow-up questions please contact: Andrew Ives or Gary Colledge andrew.ives@inmarsat.com gary.colledge@inmarsat.com