NETWORK OF DANUBE WATERWAY ADMINISTRATIONS data & user orientation SOUTH EAST EUROPE TRANSNATIONAL COOPERATION PROGRAMME ATLAS OF BERTH

Similar documents
Public berths in the Czech Republic

TALVESADAM Port rules

Managing Destinations along the Danube in Croatia

NATIONAL PLAN FOR IWW MAINTENANCE IN THE REPUBLIC OF CROATIA

Guidance for operators of recreation craft

2. SECTOR Energy 1. PROJECT TITLE LOWER VRBAS HYDROPOWER PLANTS

Terms, conditions and prices

Bye-Laws for the Port of of Gothenburg

Consultation on Town Quay Mooring Redevelopment Proposals

Notice To Mariner No. 147 PORT OF FUJAIRAH & VHFL TERMINAL BERTH CONSTRUCTION & DESIGN CRITERIA

DEVELOPMENT OF RECREATIONAL NAVIGATION INCLUDING WATER TOURISM

Bantry Bay Port Company Limited

FEES OF THE PORT OF PÄRNU

Valencia, 17 th December 2015

Dredging in Fowey Chapter 3 Post departure of the Lantic Bay

The Lower Prut Floodplain Natural Park (Romania)

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016

Wilts and Berks Canal Trust

Water Space. A development opportunity at the Canting Basin, Pacific Quay, Glasgow

Section 4 / Rev Page 1 of 5

Paper 87 - INTERNATIONAL COLLABORATION CONCERNING THE USE OF THE DANUBE RIVER IN ROMANIA

Bantry Bay Port Company Limited

Terms, conditions and prices Trondheim Port Authority Valid from 1 January 2018

The strategic importance of the Danube for a sustainable development of the region. Transnational pilot-workshop Cross-programme ETC Danube projects

WAIMAKARIRI DISTRICT COUNCIL REPORT. Craig Sargison, Manager Community and Recreation

Goodpractice: MURA-DRAVA.BIKE. Pomurje region Slovenia

Development of Sochi transport node envisaged by items of Program of Olympic venues construction and Sochi development as an alpine resort

Joan Stemler. Water Control. St. Louis District. November US Army Corps of Engineers BUILDING STRONG

FERRY TERMINAL ST LUCIA

Contribution to the implementation of the EUSDR's Action Plan. Priorities for the year 2013 Ministry of Infrastructure of Ukraine

1) Riverbed surveying

PORT CHARGES AND FEES

Hellesylt. GEIRANGERFJORD CRUISE PORT

REPUBLIC OF CROATIA MINISTRY OF MARITIME AFFAIRS, TRANSPORT AND INFRASTRUCTURE AGENCY FOR INLAND WATERWAYS

Forth Ports Limited. Ruling Depths & Under Keel Clearances

Sava Commission Activities. KICK-OFF MEETING DANTE, February 17, 2017, Budapest

PORT USERS GROUP (COMMERCIAL) MONDAY 03 NOVEMBER hrs GATE 2, ALBERT TERMINAL

THE PERFECT LOCATION IN THE HEART OF CANAL COUNTRY

TARIFF OF HARBOUR DUES

Outline. The main objectives. The main objectives. Distribution of stable isotopes in the Sava River in Serbia

Rehabilitation and development of navigation on the Sava river

Project Hereward A New Dawn An Ongoing Campaign

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title:

Summary Report. Contact with Wharf General Villa. 5 March 2006

Project Data Sheet BASIC PROJECT DATA

"Transboundary coordination according to the FD Directive in the shared river basins of Greece

The Danube A Stream of Energy

The search results explanations of hydrological data

Floating Crane. operation with capacity. Height Lifting capacity 100 tons on 10. meters. our berths, Hatch. Floating. 200 tons. is R=0.

Transboundary River Management in the Danube Basin

The Huizen Municipality Port Decree

THE PERFECT LOCATION IN THE HEART OF CANAL COUNTRY

Developments in berth layout

Management of a Large The Danube. Mr. Mitja Bricelj ICPDR President Perth,13 October 2010

WELCOME. Living on Water offers a vibrant and exciting way of life that opens up a whole host of opportunities.

Ohio Freight Conference Great Lakes Commercial Navigation

WELCOME. Living on Water offers a vibrant and exciting way of life that opens up a whole host of opportunities.

2007 Winston Marine Yachts 128' CUSTOM

1. PROJECT TITLE LOWER DRINA HYDROPOWER PLANTS

12V MAX Mobile Brushless Jigsaw

PORT CHARGES For the use of PORT OF BERGEN's infrastructure and services (SHORT VERSION FOR CRUISE SHIPS, PLEASURE CRAFTS/YACTHS)

500 FLY. When it comes to innovative features and pure excitement the Galeon 500 Fly has no equal let yourself be amazed by this ultimate party boat!

ABERYSTWYTH MARINA, ABERYSTWYTH, SY23 1AS N W FOR SALE

Wilts & Berks Canal. Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4.

1975 Custom Built 108' NAVALIA- PORTUGAL CUSTOM 108' COMMERCIAL DAY BOAT

Lennusadam Marina (Seaplane Harbour) Marina Rules

THE ICs INTERNATIONAL BRISBANE AREA AQUA PARK PROPOSAL

Sava Commission Activities. DANUBE SKILLS KICK OFF EVENT, February 21, 2017, Bucharest

Common Principles and Technical Requirements for Pan-European River Information Services (RIS)

Marine Notice No. 19 of 2014 This Marine Notice supersedes Marine Notice No. 12 of 2013.

DOCKING AND ROUTING PLAN

Navigation and operation 20. port procedures manual 22. communication 22. port security 23. Services

Cofferdam Performance Hurricanes Harvey & Irma

ANNEX IV. Heavily Modified Surface Water Bodies in Serbia and Montenegro

INDEX NAVIGATION SUPPORT RATE (T0) 3 VESSEL RATE (T1) 4 1. ZONE I: SHORT STAY BERTHING 4 2. ZONE I: PROLONGED STAY BERTHING 5

BOWLING BASIN WEST DUMBARTON

BABIA GÓRA DECLARATION ON SUSTAINABLE TOURISM DEVELOPMENT IN MOUNTAIN AREAS

STATUS QUO REPORT ON WATERWAY MAINTENANCE HUNGARY

Zoran Đuroković, B. Sc. (Civ.Eng.) Davor Haničar, B. Sc. (Civ.Eng.) Ladislav Grđan, B. Sc. (Civ.Eng.) Silvio Brezak, B. Sc. (Civ.Eng.

CPP failure caused heavy contact with lock

EU Strategy for the Danube Region framework for development of inland navigation

Make Model Length Price Year Condition. Azimut 62 Flybridge 62 ft $ 579, Used. Boat Name Hull Material Number of Engines Fuel Type

2000 Navigator Classic

EON-NTM CR4 Export Cable Installation Update Update. Notice to Mariners

PIRITA SADAM. Port regulations

Yorkshire s Offshore, Renewable Energy and Operations and Maintenance Centre. 7 th October 2014

MoorMaster, automated mooring for ports automation

Presentation Overview

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY

Port dues and charges Free port of Ventspils

PULAU SEBAROK - VOPAK TERMINAL (OSV) MAX DISPL. (tonnes) MAX LOA(m) 45, ,000 80, ,000 13,000 12, ,000 19,500 19,500

St. Mary s Harbour. Port Waste Management Plan

State Enterprise «Ukrainian Sea Ports Authority» PASSENGER TERMINAL OF ODESSA SEA PORT DESCRIPTION OF TECHNICAL SPECIFICATIONS

DaHar Danube Inland Harbour Development

Flood protection for Hamburg s Niederhafen port. Construction of the new Niederhafen flood protection barrier in Hamburg city centre

Transport of Biomass on the Danube River. Bettina Matzner, viadonau 24 June 2014, JRC Danube Bioenergy Nexus Workshop

Danube Commission. 70th anniversary of the. Ship waste management along the Danube. 7 th ASEM Sustainable Development Dialogue

APPLICATION OF THE NO-SPECIAL-FEE SYSTEM IN THE BALTIC SEA AREA

Condor Ferries schedule 2018/19. August 2017

Transcription:

NETWORK OF DANUBE WATERWAY ADMINISTRATIONS data & user orientation SOUTH EAST EUROPE TRANSNATIONAL COOPERATION PROGRAMME ATLAS OF BERTH Republic of Croatia Document ID O 4.2.6 Activity Act. 4.2 Author/organisation Version/date Lidija Hubalek/AVP Final version/ 03.11.2014.

TABLE OF CONTENTS 1 OVERVIEW LIST OF THE BERTH/MOORING PLACES...3 2 MAP OF BERTHS... CHYBA! ZÁLOŽKA NIE JE DEFINOVANÁ. Act 4.2 ATLAS OF BERTH - AVP page 2

ATLAS OF BERTHS OVERVIEW LIST OF THE BERTH/MOORING PLACES Backwater section (power plant) = name the section of river River km From To berth/mooring place (name) useable length of the berth in meters river bank* 1 Location of berth* 2 the construction of the river bank* 3 local berth conditions* 4 Batina 1425,5 Batina 14,5 m R ARS E 0 2 pontoon Aljmaš 1380,2 Aljmaš 14,5 m R ARS E 0 2 pontoon Vukovar 1332,8 Vukovar 75 m R ARS E 0 4 pontoon Ilok 1298,8 Ilok pontoon 55 m R ARS E 0 3 * in meters or max. number of vessels permitted to berth abreast width of the berthing area on the water* * 5 Act 4.2. - ATLAS OF BERTH - AVP page 3

Explanation river L left river bank bank* 1 R D right river bank at the dam location* 2 DPP "downstream" side of a power plant DL UL UPP ARS "downstream" side of a lock (lock entrance area) "upstream" side of a lock (lock entrance area) "upstream" side of a power plant along the river stretch construction (of the river bank) SPW sheet pile wall * 3 E QW DA DO NA embankment quay wall dam dolphins natural (wild) width of the berthing area* 5 X maximum number of vessels permitted to berth abreast local berth conditions* 4 (berthing order) 0 berthing permitted (i.e. anchoring or making fast to the bank) 1 berthing area reserved for pushing-navigation vessels that are required to carry one blue cone 2 berthing area reserved for pushing-navigation vessels that are required to carry two blue cones 3 berthing area reserved for pushing-navigation vessels that are required to carry three blue cones Act 4.2. - ATLAS OF BERTH - AVP page 4

MAP OF BERTHS Batina pontoon Danube km: 1425,5-1425,45 GPS coordinates: North: 45 51' 9.76" East: 18 51' 14.99" berths information length: 14,5 m river bank L left river bank R right river bank T at the dam location DPP "downstream" side of a power plant DL "downstream" side of o lock (lock entrance area) UL "upstream" side of a lock (lock entrance area) UPP "upstream" side of a power plant ARS along the river strech OTH others (before a habour entrance in an old river branch) local berths conditions 0 berthing permitted (i.e. anchoring or making fast to the bank) 1 berthing area reserved for pushingnavigation to carry one blue cone 2 berthing area reserved for pushingnavigation to carry two blue cones 3 berthing area reserved for pushingnavigation to carry three blue cones OTH other restrictions (only for small motor crafts, only for border control, only for damaged vessels after an accident, max. time allowed for berthing,...)) river bank construction sheet pile wall embankment (slope) quay walls dam dolphins pontoon natural (wild) specimen widths 1 beam 2 beams 3 beams two ship breadths connections ports/harbours in the surrounding area > 30km Port Vukovar villages, cities in the surrounding area < 5 km Batina access road Act 4.2. - ATLAS OF BERTH - AVP page 5

facilities stairs to go ashore possibility to load and unload cars from a vessel lighting maintenance and disposal facilities electricity supply fresh water supply waste disposal petrol station safety in case of flood or storm Parking fees/costs Batina pontoon Act 4.2. - ATLAS OF BERTH - AVP page 6

Act 4.2. - ATLAS OF BERTH - AVP page 7

Aljmaš pontoon Danube km: 1380,2 1380,15 GPS coordinates: North: 45 31' 52.69" East: 18 57' 7.29" berths information length: 14,5 m river bank L left river bank R right river bank T at the dam location DPP "downstream" side of a power plant DL "downstream" side of o lock (lock entrance area) UL "upstream" side of a lock (lock entrance area) UPP "upstream" side of a power plant ARS along the river strech OTH others (before a habour entrance in an old river branch) local berths conditions 0 berthing permitted (i.e. anchoring or making fast to the bank) 1 berthing area reserved for pushingnavigation to carry one blue cone 2 berthing area reserved for pushingnavigation to carry two blue cones 3 berthing area reserved for pushingnavigation to carry three blue cones OTH other restrictions (only for small motor crafts, only for border control, only for damaged vessels after an accident, max. time allowed for berthing,...)) river bank construction sheet pile wall embankment (slope) quay walls dam dolphins pontoon natural (wild) specimen widths 1 beam 2 beams 3 beams two ship breadths connections ports/harbours in the surrounding area > 30km Port Vukovar villages, cities in the surrounding area < 5 km Aljmaš access road Act 4.2. - ATLAS OF BERTH - AVP page 8

facilities stairs to go ashore possibility to load and unload cars from a vessel lighting maintenance and disposal facilities electricity supply fresh water supply waste disposal petrol station safety in case of flood or storm Parking fees/costs Aljmaš pontoon Act 4.2. - ATLAS OF BERTH - AVP page 9

Act 4.2. - ATLAS OF BERTH - AVP page 10

Vukovar pontoon Danube km: 1332,8 1332,7 GPS coordinates: North: 45 21' 6.3" East: 19 0' 22.16" berths information length: 75 m river bank L left river bank R right river bank T at the dam location DPP "downstream" side of a power plant DL "downstream" side of o lock (lock entrance area) UL "upstream" side of a lock (lock entrance area) UPP "upstream" side of a power plant ARS along the river strech OTH others (before a habour entrance in an old river branch) local berths conditions 0 berthing permitted (i.e. anchoring or making fast to the bank) 1 berthing area reserved for pushingnavigation to carry one blue cone 2 berthing area reserved for pushingnavigation to carry two blue cones 3 berthing area reserved for pushingnavigation to carry three blue cones OTH other restrictions (only for small motor crafts, only for border control, only for damaged vessels after an accident, max. time allowed for berthing,...)) river bank construction sheet pile wall embankment (slope) quay walls dam dolphins pontoon natural (wild) specimen widths 1 beam 2 beams 3 beams four ship breadths connections ports/harbours in the surrounding area < 5km Port Vukovar villages, cities in the surrounding area < 5 km Vukovar access road Act 4.2. - ATLAS OF BERTH - AVP page 11

facilities stairs to go ashore possibility to load and unload cars from a vessel lighting maintenance and disposal facilities electricity supply fresh water supply waste disposal petrol station safety in case of flood or storm Parking fees/costs Vukovar pontoon Act 4.2. - ATLAS OF BERTH - AVP page 12

Act 4.2. - ATLAS OF BERTH - AVP page 13

Ilok pontoon Danube km: 1298,8 1298,75 GPS coordinates: North: 45 13' 50.17" East: 19 22' 44.4" berths information length: 55 m river bank L left river bank R right river bank T at the dam location DPP "downstream" side of a power plant DL "downstream" side of o lock (lock entrance area) UL "upstream" side of a lock (lock entrance area) UPP "upstream" side of a power plant ARS along the river strech OTH others (before a habour entrance in an old river branch) local berths conditions 0 berthing permitted (i.e. anchoring or making fast to the bank) 1 berthing area reserved for pushingnavigation to carry one blue cone 2 berthing area reserved for pushingnavigation to carry two blue cones 3 berthing area reserved for pushingnavigation to carry three blue cones OTH other restrictions (only for small motor crafts, only for border control, only for damaged vessels after an accident, max. time allowed for berthing,...)) river bank construction sheet pile wall embankment (slope) quay walls dam dolphins pontoon natural (wild) specimen widths 1 beam 2 beams 3 beams three ship breadths connections ports/harbours in the surrounding area > 30km Port Vukovar villages, cities in the surrounding area < 5 km Ilok access road Act 4.2. - ATLAS OF BERTH - AVP page 14

facilities stairs to go ashore possibility to load and unload cars from a vessel lighting maintenance and disposal facilities electricity supply fresh water supply waste disposal petrol station safety in case of flood or storm Parking fees/costs Ilok pontoon Act 4.2. - ATLAS OF BERTH - AVP page 15

end of document Act 4.2. - ATLAS OF BERTH - AVP page 16