Green Fields Leppington

Similar documents
Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council

place for new beginnings.

PO Box 257 PO Box 257 PARRAMATTA NSW 2124 PARRAMATTA NSW 2124

SUSTAINABILITY HIGHLIGHTS

The Sunshine Coast is part of the global community and generates wealth through export, high-value industries and new investment.

SYDNEY S SECOND AIRPORT

Draft Western District Plan

Overview of Ford Land Projects PTY Limited aspirations

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

Submission on Draft Ingleburn Structure Plan. Prepared for: Ingleburn Chamber of Commerce & Industry Inc. 6 February 2015

I508. Devonport Peninsula Precinct

LEASING OPPORTUNITIES AUSTRALIAFAIR.COM.AU

Western Sydney Australia's development site

SIT BACK AND WATCH THE WORLD GO BY. FROM A CORNER THAT S ALL YOUR OWN.

Citigroup Investor Conference October 2010

positively +flexible microsoft campus+ 1 Epping Road, North Ryde

Concept Curtin Precinct Map and Code

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

information memorandum Business and Technology Precinct Westlink Green Darra

OUTLOOK EAST LEPPINGTON

Draft Planning Controls Planning Scheme Amendment GC81

17-21 Oxenham Street. Dudley Park SA 5008 INFORMATION MEMORANDUM FOR SALE BY EXPRESSIONS OF INTEREST CLOSING WEDNESDAY 12 JULY 2017 AT 12:00PM (ACST)

TARLO-WODEN.COM.AU EASTY STREET, WODEN. Developed by

5 Rail demand in Western Sydney

MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES. November 6, 2017 Regular Meeting of Council

EXCLUSIVE NEW LUXURY TOWNHOUSES ON SYDNEY HARBOUR S FORESHORE

SPACE OPPORTUNITY CONNECT CORPORATE CENTRE O RIORDAN STREET, MASCOT

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

MARKET OUTLOOK. 01 Walkability & Accessibility 02 Infrastructure & Employment 03 Demographics 04 Residential Analysis 06 Rental Analysis

LIVE. WORK. PLAY. STATUS OF DEVELOPMENT FALL Produced for information by the Town of Markham

10,000 sq ft of refreshingly contemporary office space To Let or For Sale. garden place. let your business grow

LIVE YOUR LIFE AT THE TOP

GUNGAHLIN TOWN CENTRE

GOOD LOCATION ROCHEDALE MOTORWAY ESTATE 28 BRICKWORKS PLACE, ROCHEDALE, QLD

EDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN

Review of Environmental Factors

Stockland is Australia s largest diversified property group

Draft Greater Sydney Region Plan

A place to flourish. Designed with community and connection at its core, Orchid Lane is the perfect environment to create your story.

WESTERN SYDNEY PARKLANDS PLAN 2020 CORPORATE

Draft Greater Sydney Region Plan

ENVIRONMENT ACTION PLAN

2175 Lake Shore Boulevard West Official Plan and Zoning Amendment, and Removal of the Holding Provision Applications Final Report

ABOVE+ BEYOND OAKDALE SOUTH INDUSTRIAL ESTATE MILLNER AVENUE, KEMPS CREEK, NSW

CONNECTED URBAN LIVING

CORPORATE ACCOMMODATION SOLUTIONS

North District Plan OVERVIEW

State Environmental Planning Policy (Sydney Region Growth Centres) Amendment (Catherine Fields Precinct) 2013

THE HEART OF A VIBRANT COMMUNITY

Boardwalks and cycling trails make their way through playing fields, landscaped gardens and extensive natural bushland.

For personal use only

YOUR NEW LIFE IN STYLE STARTS HERE

NOW LEASING FOOD AND BEVERAGE OPPORTUNITIES

Ms P Goldfinger Date: 18 September 2017 Head of Programme The Architecture Centre Our Ref: M15/

Sunshine Coast Airport Master Plan September 2007

Investor Report. Connecting the best of both worlds

PERFECT IN EVERY ASPECT.

LOCATION + SPACE THE PARK 5 TALAVERA ROAD, MACQUARIE PARK

Coomb House, 7 St. John s Road, Isleworth, London, TW7 6NH

CANNING CITY CENTRE. the new energy of the southeast

Mirvac have prepared a vision statement for 39 Herbert Street (the site) which is attached as an appendix to this letter.

JUNE 2007 UPDATE REPORT SYDNEY METROPOLITAN STRATEGY

Caloundra South overview Ben Allen, General Manager Sustainable Communities

Sport Capital Improvement Plan. Paul Borci Manager, Campus Planning Property & Campus Services

ULDA Update Yarrabilba Project The Developers Perspective Tanya Martin Project Planner Communities Lend Lease June 2011

FREEHOLD FOR SALE Prime Residential Development Opportunity

Development Proposals

West End Action Plan. Draft June 2017

Amendments C207 & C208

REGIONAL BOARD REPORT

QUARTERLY UPDATE 31 MARCH 2017

CONNECTED URBAN LIVING

THE SYDNEY AIRPORT BUSINESS DISTRICT PROPERTY DEVELOPMENT OPPORTUNITIES

This is a submission to Council s Delivery Plan and Operational Plan

Strategies and Land Release

SPACE+ MACQUARIE CORPORATE PARK 8 KHARTOUM ROAD, MACQUARIE PARK

1. Panthers Entertainment 2. Sportsbet Stadium 3. Westfield Shopping Centre 4. Penrith Train Station

PCAL Case Study Retail Areas: Rouse Hill Town Centre

LOCATION + SPACE TRANZPORT DISTRIBUTION CENTRE 80 TURNER STREET, PORT MELBOURNE

TRANSPORT, TRAFFIC AND PARKING ASSESSMENT REPORT

LINKING WESTERN SYDNEY TO OPPORTUNITY

Exciting Residential Development Opportunity

EXCITING+ OPPORTUNITY POWER PARK INDUSTRIAL ESTATE STAGE 3 DISCOVERY ROAD, DANDENONG SOUTH, VICTORIA

Investor Briefings First-Half FY2016 Financial Results

STRATEGIC + LOCATION CAMPUS BUSINESS PARK 350 PARRAMATTA ROAD, HOMEBUSH NSW

draft planning controls

7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT

APPENDIX E. Urban Design

WEST VILLAGE IS A VISIONARY NEW GLOBAL NEIGHBOURHOOD, SET TO REDEFINE WEST END.

October 23, 2017 Council Workshop


QUALITY + LOCATION CITY WEST OFFICE PARK SAUNDERS STREET, PYRMONT

Land at Craigtoun St Andrews. Residential Development Opportunity

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report

Project No Brent Cross, Cricklewood London, UK Phase 1A North RMA

Context. Ivanhoe Estate at Macquarie Park. Ivanhoe Estate. Epping Boys High School. Macquarie University Sport & Aquatic Centre.

Transcription:

Green Fields Leppington

CONNTENTS 1.0 URBAN GROWTH - SYDNEY 2.0 MACRO CONTEXT 3.0 LOCAL ENVIRONMENTAL PLAN - LEPPINGTON 4.0 CONCEPT 5.0 GREEN ROOFS 6.0 APARTMENT REALISATION SCHEDULE 7.0 INFRASTRUCTURE 8.0 FEASIBILITY 9.0 LAND TITLE Highbreak Pty Ltd Green Fields Leppington Proposed Master Plan Pag 1

1.0 URBAN GROWTH SYDNEY Sydney is a global city, the premier city in Australia and the economic capital of the country. Sydney strong economy and spectacular natural environment and relaxed life style has made the city the envy of other cities in Australia and around the world. The government s Plan for Growing Sydney will develop a competitive economy with world class services and transport; to deliver greater choice to meet our changing needs and lifestyles. Government s objectives are to create a urban plan that connects where people live and work. Leppington is located within the South West Growth Centre of which Leppington is identified as a Strategic Centre. Leppington is approximately 50 kilometres from the Sydney CBD. South West Growth Centre is one of two growth centres outlined in the Government Strategy. The new proposed Badgerys Creek Airport is located within this South West Growth Centre exponentially increasing potential opportunities in the development of this strategic area. The following maps have been extracted from A Plan for Growing Sydney. For further information regarding the Government s vision for Sydney visit the following site; A Plan for Growing Sydney http://www.planning.nsw.gov.au/plans-for-your-area/sydney/a-plan-for-growing-sydney NSW Government A Plan for growing Sydney (connecting jobs and homes) Highbreak Pty Ltd Green Fields Leppington Proposed Master Plan Pag 2

NSW Government - Infrastructure connecting Western Sydney NSW Government - South West Subregion Highbreak Pty Ltd Green Fields Leppington Proposed Master Plan Pag 3

2.0 MACRO CONTEXT 2.1 The site is in an existing rural area approximately 50 kilometres from the Sydney CBD. The site is composed of two separate titles fronting Ingleburn Road Leppington. 2.2 The proposed town Centre is located in Leppington North which is on the northern side of Ingleburn Road. 2.3 A nursery is currently operative on the site. Tax advantages will apply if the site and the existing nursery are purchased as one unit. 2.4 Site area is 4.355 hectares (43,550m 2 ) 2.5 Site is approximately 800m from the recent constructed Leppington (Leppington North) train station. The immediate area on the opposite side of the station is the proposed civic centre. 2.6 Site is in close proximity to the M7 and M5 motorway. Other major infrastructure is planned to connect this south west subregion. Refer to page 3 Infrastructure connecting Western Sydney. 2.7 No visible evidence of site restrictions besides planning controls. Site Aerial View Site Location Highbreak Pty Ltd Green Fields Leppington Proposed Master Plan Pag 4

3.0 LOCAL ENVIRONMENTAL PLAN LEPPINGTON Zone: R3 Medium Density Residential F.S.R: 2.75:1 Floor Plate: 119,762m 2 Height: Realisation: 18 metres 1,000-1,100 two bedroom apartments The zoning map for North Leppington has been included to show the relationship of the site to the proposed town centre Reference: 1.0 Draft Leppington Precinct Plan http://planspolicies.planning.nsw.gov.au/index.pl?action=view_job&job_id=6776 2.0 Austral & Leppington North Precincts http://www.liverpool.nsw.gov.au/planninganddevelopment/strategic-planning/austral-and-leppington-north-precincts NSW Government Zoning Map, Leppington Highbreak Pty Ltd Green Fields Leppington Proposed Master Plan Pag 5

4.0 CONCEPT 4.1 Spatial composition The composition of the buildings adopted an irregular layout and various heights to emulate a eucalyptus forest. The change of heights, different setbacks, roof top gardens add visual texture generating visual intrigue and interest. A central boulevard has minimised extensive road systems and consequential hard surfaces. The proposal has maintains various open spaces with interconnecting pathways, cycle tracks and outdoor recreational areas. The rectangular blocks in the spatial plan represent location of proposed buildings. The design of each individual building will be determined at the next stage. Beneath the boulevard are the aqua lungs of the proposed water harvesting system that will maintain the landscaped areas and other specific uses. The concept will adopt an energy dependency policy; buildings will require photovoltaic windows and balustrades. The energy collected will be stored for the benefit of the community. Other passive design principles will also be a design requirement decreasing the dependence of energy for comfort. NSW Government - Zoning Map, Austral & North Leppington Master Plan of Site Arrangement of Proposed Built Form Highbreak Pty Ltd Green Fields Leppington Proposed Master Plan Pag 6

4.2 Visualisations Site 9:00AM Site Plan Site 12:00 Noon Highbreak Pty Ltd Green Fields Leppington Proposed Master Plan Pag 7

Site 3:00PM 3D View of Boulevard and building 5 & 15 5.0 GREEN ROOFS The roof garden insulates the building, helping simultaneously to mitigate the urban heat island effect and keep the immediate floor below cool. Introducing native vegetation will restore biodiversity and provide a habitat for local wildlife. The main cause of the urban heat island effect is from the modification of land surface and waste heat generated by energy usage. The proposed land usage: Building foot print - 30.0% Hard surfaces; roads and footpaths - 10.0% Landscape and recreational areas 60.0% Two principles adopted firstly reduction of thermal bulk and secondly the increase of vegetation result in lowering the micro temperatures offer shading, cooling effect of trees and the removal of carbon dioxide. Other benefits of a green roof are the social and physical benefits. The design will provide facilities encouraging interaction and social participation. Horticulture will also be an active part of the green roof. Examples: Highbreak Pty Ltd Green Fields Leppington Proposed Master Plan Pag 8

Highbreak Pty Ltd Green Fields Leppington Proposed Master Plan Pag 9

6.0 APARTMENT REALISATION SCHEDULE Schedule Building No No. of Storeys 3 BR/Floor 2 BR/Floor 1 BR/Floor Total 1 6 6 36 12 54 2 5 5 30 10 45 3 8 8 48 16 72 4 7 7 42 14 63 5 10 10 60 20 90 6 8 8 48 16 72 7 8 8 48 16 72 8 7 7 42 14 63 9 9 9 54 18 81 10 7 7 42 14 63 11 8 8 48 16 72 12 9 9 54 18 81 13 10 10 60 20 90 14 7 7 42 14 63 15 8 8 48 16 72 16 5 5 30 10 45 17 6 6 36 12 54 18 7 7 42 14 63 Totals 135 135 810 270 1,215 Ratio (%) 11% 67% 22% 100% Roof Top Gardens Apartments, Permissible Gross Floor Area FSR2.75:1 (119,762m 2 ) 3 BR 2BR 1BR No. proposed Areas Circulation/Services Totals 125m 2 135 16,875m 2 90m 2 810 72,900m 2 50m 2 270 13,500m 2 16,487m 2 (13.7%) Totals 1,215 103,275 m 2 16,487m 2 119,762 m 2 1. The above schedules are approximate based on the floor plate allocated per building. The apartment s internal areas reflect the current development trend. 2. Total number of apartments is subject to the developer s internal spatial requirements, composition and configuration. 3. The number of apartments permissible in reference to the F.S.R is approximately 1,100 two bedrooms apartments. This number varies subject to composition of 1BR, 2BR and 3BR. 4. Proposed heights are greater than those prescribed by the LEP. Variation approval is required. 5. To comply with height would imply greater massing which will impact upon the amenities. 6. Buildings 5 and 15 include subject to council approval: Community function rooms residents only Gym Community medical centre, residents only Highbreak Pty Ltd Green Fields Leppington Proposed Master Plan Pag 10

7.0 INFRASTRUCTURE Leppington Train Station is fully operational located next to the proposed Town and Civic Centres. A proposed pedestrian bridge over Ingleburn Road will connect Green Fields Leppington to the proposed Town Centre and Leppington Train Station. Green Fields Leppington is located opposite the proposed Town Centre and is approximately 800m from the Leppington Train Station. 8.0 FEASIBILITY The feasibility and cash flow report has been professionally prepared and is available upon request. The master plan allows flexibility; several options are available reducing the impact on cash flow. 9.0 LAND TITLE The masterplan includes six (6) independent groups each composed of three (3) integrated buildings with a common sub terrain carpark. This allows for flexibility in developing the site in terms of equity and market. Ownership will incorporate a Community Title Subdivision with one Community Title and six (6) Strata Lots in total, seven (7) titles. The proposed titles will allow the owner of the site to progressively stage the development or on-sell the Strata Lots to other developers. Each group of three buildings may also be staged once the sub terrain carpark has been constructed. This option would require a design concept allowing staging. The masterplan and proposed tile structure allows flexibility in the proposed development. DISCLAIMER Leppington Train Station This preliminary feasibility report is for general information purposes only and is subject to further enquires and changes being made. In providing a preliminary feasibility report or any representation in this document I have relied on external advice or a number assumptions, contingencies and other presumptions which are, of their very nature, uncertain in outcome or effect. Accordingly the author does not make any representation or warranty as to the accuracy or reliability of the information or representations contained within this document. Without limiting the generality of the foregoing, I expressly disclaim any liability in relation to any information or representation/s contained in this report where loss is suffered due to any: 1. assumptions providing to be incorrect or inaccurate; 2. estimate or outcome contained in this report not being achieved; 3. statement as to future matters set out in this document proving incorrect or inaccurate; 4. any opinion or advice set out proving incorrect or inaccurate. Any interested party should satisfy themselves with their own enquires. Highbreak Pty Ltd Green Fields Leppington Proposed Master Plan Pag 11