KEEPING YOU INFORMED ON ALL CONSTRUCTION NEWS FROM THE ELEPHANT ISSUE 07 SPRING 2015

Similar documents
KEEPING YOU INFORMED ON ALL CONSTRUCTION NEWS FROM THE ELEPHANT ISSUE 08 SUMMER 2015

Welcome to public consultation for the redevelopment of the existing leisure centre site.

CONSULTATIVE GROUP 11 DECEMBER Lori Keeve Communications Grangegorman Development Agency

Bankside Venues 2012

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 12 January 2018

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 26 January 2018

OFFICE PREMISES & WAREHOUSE FOR SALE/TO LET

regent house heaton lane stockport SK4 1BS

regent house heaton lane stockport SK4 1BS

A CONTEMPORARY COLLECTION OF 1, 2 & 3 BEDROOM APARTMENTS AND DUPLEXES

to provide a stimulating, educational, comfortable and entertaining destination venue to Victorians, and to interstate and international visitors.

Welcome & Introduction. Steve Sawyer, Executive Director Manor Royal Business District

Sky Temporary Car Park Transport Statement

Catering Tender 2018 Expression of Interest

King s Cross Construction Impact Group Quarterly Monitoring Report 8 th June 2009

HISTORIC LOCATION STYLISH HOMES ROMAN FIELDS

ELEPHANT PARK BARNARD HOUSE & LEVY BUILDING A collection of 1, 2 and 3 bedroom homes available through L&Q s Shared Ownership scheme

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

VISION FOR BOROUGH HIGH STREET

Sidcup. Partners. Working Together

Mr. David Peng, General Manager, Kings Aviation. Set Up an AOC and Operating Helicopters in China

Station House. High specification offices located in the heart of Altrincham

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 5 January 2018

BUILDING GUIDELINES FOR RIVER RIDGE ASSOCIATION EFFECTIVE NOVEMBER 16, 2009

Park Board Chair and Commissioners

HAVELOCK NEWSLETTER HAVELOCK NEWSLETTER. ISSUE 15 Spring ISSUE 15. Spring

SALTAIRE FESTIVAL 2018

4countries. We understand the fundamentals. A trusted partner. We have delivered million sqm. 1.8 million car spaces.

One-day events. George expects his children to follow his Pakistani Muslim ways but his six sons and daughter have different ideas.

Inspire with a conference to remember

D L R C C T R A F F I C N E W S

Business Forum. 16 March 2016

TICKETS There are two easy ways to pick up your tickets:

LISTED BUILDING AND FIRE STATION CENTRAL SITE WHITGIFT STREET OLD PARADISE GARDENS

St. Patrick s Street Development Brief

Premier Inn, Windsor. Welcome

Colindale Gardens Site Visit

SYDNEY OPERA HOUSE. Artwork: Dreaming Sisters 2011 by Mary Smith. Copyright Mary Smith & Weave Arts Centre

CORPORATE MEMBERSHIP at Imperial War Museums

WELCOME. For further information please call the events team on WOLVERHAMPTON-RACECOURSE.CO.UK

Huronia/Midland Airport, CYEE

Cirque du Soleil. Feedback on a proposed 10 year agreement. The Adelaide City Council invites engagement from the community about.

Construction News. Granary Complex scoops Mayor of London s top prize

OPPORTUNITIES TO JOIN THE SILVERSTONE PARK COMMUNITY ENTER

Construction Staging Area Blue Jays Way (357 King Street West)

2018 AUSTRALIAN BREWERS CONFERENCE

Bow Arts mission is to support community renewal in East London by delivering Arts and Creative Services.

YOUR MOTABILITY EVENT GUIDE.

AUCKLAND TOWER AND AUCKLAND CASTLE OPENING DATES ANNOUNCED. Auckland Tower: Saturday, 21 July 2018 Auckland Castle: Saturday, 1 December 2018

SALISBURY NHS FOUNDATION TRUST

Access Statement for The Roald Dahl Museum and Story Centre

Offers Over 299,000 (Freehold) THE LOG CABIN HOTEL, GLEN DERBY, KIRKMICHAEL, PERTHSHIRE, PH10 7NA

Leicester Square Action Plan Summary

ISSUE 36 SEPTEMBER 2015 MOVING AHEAD CROSSRAIL PROJECT SEPTEMBER UPDATE WATCH! WATCH THE LATEST MOVING AHEAD VIDEO ON YOUTUBE.

Somerset House is a 4.5-acre site and has 5 entrances from the Strand, Victoria Embankment, Waterloo Bridge and two entrances from Lancaster Place.

Unit 4, Greens Industrial Park, Caldervale Road, Wakefield, WF1 5PF. Rateable Value 2017:

Digdens Rise, Epsom, KT18 7DL

Non-technical summary

AT THE HEART OF THE HVAC INDUSTRY

Borough High Street Low Emission Neighbourhood

Fringe Club and Corner 2016 Feedback on an event licence application for the Park Lands

HARMAN HOUSE CENTRAL UXBRIDGE. 1,000-12,954 sq ft

The Word triumphs at national RICS awards

VIP GOLD. VIP Gold Wristband: Includes (1) 3-Day VIP. Admission Pass into the Concert Grounds

MOVING AHEAD LINE TIME 4,700 + CROSSRAIL PROJECT MAY UPDATE 96% OF CONTRACTS AWARDED BY CROSSRAIL ARE TO COMPANIES WITHIN THE UK PROJECT

HOME OWNER PRE- DELIVERY INSTRUCTIONS

D L R C C T R A F F I C N E W S

Thamesmead newsletter April 2018

THE PLOUGH INN, MID STREET, KEITH, MORAY, AB55 5AE. A S GCommercial. Offers in the Region of 295,000 (Freehold)

Education Information Pack

Thursday 26 January 2012 Morning

London Bridge station opens upgrade works

We achieved our objective of completing stage 1 well in time for the Rolex Sydney Hobart Yacht Race 2017.

Make your reservation today at Central Reservations:

Delivering Social Value

Vodafone UK Travel to Work Policy

Smart decision makers relocate to The Quad

Media Pack 2018/

Wednesday 9 March 2016, 7.30pm at Southfield Primary School, Southfield Road, Bedford Park W4 1BD

APPLICANT NAME PROJECT DESCRIPTION AWARD

DXB Entertainments PJSC Announces First Half 2018 Financial Results

About this consultation

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

HANDBOOK. Parent. Summer Camp Guide. General Program Information. Gallery Hours: Tuesday - Sunday 12:00 pm - 4:30 pm

OFAC and BIS Amend Cuba Sanctions Regulations

ACCESS STATEMENT. Introduction. Pre-Arrival. Arrival & Car Parking Facilities

THE CLOSER THE BETTER

Business needs consumers! Get people back in to Port by attracting them!

Where Manchester s finest brew their best ideas

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B

Multi-storey station car park opens in New Year

warwicks mead Warwicks bench lane Guildford

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

An Entertainment Cruises Company

ITV is delighted to welcome you to this public exhibition showing plans for our new London headquarters.

INFORMATION FOR TEACHERS LEARNING LONDON AT THE VIEW FROM THE SHARD LEARNING PROGRAMME FOR SCHOOLS

THE PIAZZA. Findern Lane, Willington, Derbyshire DE65 6DW TO LET. New retail units and restaurant in a highly successful quality marina development

Ark-Shelter. www. ark-shelter.com. Bvba. Mobile Architecture

Message from the Managing Director... r...

CITY CENTER RETAIL SPACE AVAILABLE AT. NADINE WHISNANT lic

Transcription:

Building for future generations KEEPING YOU INFORMED ON ALL CONSTRUCTION NEWS FROM THE ELEPHANT ISSUE 07 SPRING 2015 See p.10 for events taking place this May 24/7 HELPLINE: 020 3600 0001 LENDLEASE.COM/ELEPHANTANDCASTLE Trafalgar Place nears completion see more inside... Investing in Elephant & Castle

WELCOME TO THE LATEST RE:BUILD, OUR REGULAR NEWSLETTER FOR LEND LEASE CONSTRUCTION AROUND THE ELEPHANT. Re:build is designed by Lend Lease to keep those who live in the vicinity of Elephant Park, One The Elephant (and the Castle Leisure Centre), and Trafalgar Place regularly informed with practical information about what s happening and when. We hope you find it informative but if you have any suggestions about the information you want to see in these newsletters or the way they are presented, please email us at ele-ask@lendlease.com or call 020 3600 0001. One The Elephant (p.8) (p.10) Elephant Park (p.4) Trafalgar Place (p.6)

The second phase of Elephant Park, West Grove, has now received planning permission and will begin construction by the end of the year. It will deliver 593 homes, as well as Walworth Square and new shops and restaurants SITE NEWS Construction on the first phase of Elephant Park known as South Gardens has now started. This phase will deliver 360 new homes by 2017. The main focus at the beginning of construction is on the foundations of the buildings, and part of this process involves the installation of 17-metre long concrete piles into the ground. The installation of these piles is now complete, with 520 being installed in total. Other works the development has been focussing on include the installation of underground services, such as drainage and power into the site. Residents may have noticed that some temporary roadworks have been in place on Heygate Foundation works have been the main focus at South Gardens Street, and this is due to the installation of these services. These works will continue into the summer. The site has also now transferred onto a permanent power supply, which means that generators are no longer required to provide power for all the construction activity. Furthermore, the power that is now being provided to the site is from a 100% renewable energy source. The site currently has approximately 100 workers on site each day. By the middle of 2016 this will have increased to around 750. LOOKING AHEAD May: Tower crane to be installed on-site June: Residents will start to see the concrete frame of the buildings come out of the ground 2016: South Gardens will reach peak capacity with over 700 workers on-site HOURS OF WORK Weekdays: 8am 6pm Saturday: 8am 1pm Sunday: Closed RESIDENT MEETINGS As well as keeping you up-to-date with the construction in these newsletters, we also host regular residents meetings. The next meetings for Elephant Park will be held at our offices on Level 10, Hannibal House, Elephant & Castle Shopping Centre, on: Wednesday 10 June, 6.30 8pm Wednesday 14 October, 6.30 8pm If you would like to attend these Occasional out-of-hours work may meetings please register by emailing be required, subject to agreement ele-ask@lendlease.com or calling 4 from Southwark Council. 020 3600 0001. 5 A view of Elephant Park with Heygate Street through the middle

SITE NEWS Trafalgar Place is almost complete, with the first residents set to move in during the second half of April. The site is therefore putting the final touches to the insides of the new homes and, in particular, focussing on a process that is commonly referred to as snagging. This is a colloquial term used in the construction industry that involves the inspection and correction of any minor issues with the new homes, so that they are ready for residents to move in. Trafalgar Place will create some great new publically accessible spaces for local people to enjoy, and the site is working to complete the landscaping works on these areas. One of them is New Paragon Walk (see photo to the right), which will provide a brand new route right through the middle of the site, connecting Henshaw Street to Rodney Road and eventually into the new Elephant Park site. These landscaping works, including other areas such as Victory Place, will continue into the summer and will be complete by the end of June. MOVE-IN PROCESS New residents will move in over a four month period between April and July. In order to ensure as little disruption as possible during this time, residents will be asked to book slots for moving into their properties. This will mean they have access to a designated parking space where they can park and unload, furthermore traffic marshals will then be on hand to direct residents to ensure the process is managed safely and efficiently. The striking brickwork at Trafalgar Place is designed to complement existing buildings in the local area HOURS OF WORK Weekdays: 8am 6pm Saturday: 8am 1pm Sunday: Closed No deliveries during school term between 8.15 9am & 3.15 4pm. Occasional out-of-hours work may be required, subject to agreement from Southwark Council. RESIDENT MEETINGS The next residents meetings to update you on construction progress will be held at the Balfour Street Cooperative Room, 67 Balfour Street, SE17 1PL, on the following dates: Tuesday 21 April, 6.30 8pm LOOKING AHEAD April: First residents move-in May: Site cabins on Victory Place to be moved and landscaping works to begin June: All works to be complete There is no need to register for these meetings, just feel free to stop by. Invitations will also be sent closer 6 to the time. 7 New Paragon Walk, looking west towards Rodney Road, will open in June and create a new public route through the site We are now looking for tenants for the new café space at Trafalgar Place, please get in touch if interested

LOOKING AHEAD May: New marketing suite opens in Pavilion building Summer 2015: Tower crane is removed from site Summer 2015: Site accommodation will move from current location into Pavilion building, allowing landscaping works to continue in that area SITE NEWS One The Elephant is progressing well, and residents will have noticed that the cladding to the building is now rising upwards quickly. The site is currently installing cladding at one floor per week, with all cladding works set to be complete by this summer. A lot of the landscaping works have now commenced. For example, paving and trees are now in place in front of the pavilion building, and the hoarding has started to be removed in order to allow these works. The site is also making good progress inside the buildings. Lifts have been installed in the pavilion building, and we re close to having installed all kitchens and bathrooms in the same building. We have also commenced works on our new sales and marketing suite, which will move from its current location at Artworks to the ground floor of the pavilion building from May. 8 The cladding on One The Elephant will be complete by summer this year THE CASTLE LEISURE CENTRE The external parts of the building are now substantially completed. The commissioning process, which ensures building services such as the plumbing and ventilation are in good working order has also commenced, while the fit-out of the café and reception is due to begin in May. Externally, the construction team is working with Lend Lease on a progressive withdrawal from the shared haul road. Finally, the team has arranged for the revenue generated from scrap recycling to be presented to a children s charity. HOURS OF WORK Weekdays: 8am 6pm Saturday: 8am 1pm Sunday: Closed Occasional out-of-hours work may be required, subject to agreement from Southwark Council. Aerial image taken in February of One The Elephant and Castle Leisure Centre RESIDENT MEETINGS The next residents meetings to update you on construction progress will be held at One The Elephant s site offices on the following dates: Thursday 7 May, 6.30 8pm Thursday 3 September, 6.30 8pm If you would like to attend these meetings please register by emailing ele-ask@lendlease.com or calling 020 3600 0001.

THE ARTWORKS NEWS NEW ART MARKET Every Saturday afternoon from 9 May the Courtyard at The Artworks is set to become home to Easels Art Market. Our first event will feature work from local Fine Artist Christopher Hanson and Caricature Painter Morris Thompson. On the day, we re also delighted to welcome Russian School Fine Artist Oksana Leadbitter, who will provide a live Open Day demonstration and promote her forthcoming on-site art classes. According to Jos Brient, the market s manager and co-founder of Azawala Gallery, South London has long been a secret hot spot for artists. Now Stevie Wonder by Oksana Leadbitter Easels Art Market wants to give their work a more public platform where locals and visitors can discover, enjoy and purchase their creations. www.facebook.com/easels.art SKETCHFEST COMEDY FESTIVAL COMES TO THE ARTWORKS Friday 1 May Sunday 3 May London SketchFest is a unique comedy festival dedicated to discovering Britain s funniest alternative comedy and best sketch comedy. After two years in East London, the festival is relocating to Elephant & Castle with The Artworks hosting Sketch Screen (the festival film competition), the Solo Series (a selection of the best one-man and one-woman wonders) and Sketch Scribe (an all-new sketch writer s competition). With plenty of independent places to grab a drink and a bite to eat in The Artworks you can expect a buzzing hub of comedy and community, open to all. For more visit: www.londonsketchfest.com ARTWORKS PROFILE Elephant Shack is an organic flatbread bakery and brew bar. From breakfast wraps to rare-breed cuts off the grill, food is fast, simple but delicious. Serving Nude coffee, craft beers and wines this cute space can also be hired for supper clubs and small events. Founders Catherine & Gary said We love seeing how many people who live locally meet for the first time over one of our coffees or wraps. Come by and say hi the next time you pass by! www.elephantshack.com 10 11

BUILD YOURSELF A CAREER Since starting construction back in the summer of 2013, we ve employed almost 300 Southwark residents on the regeneration, and over 100 of these have been previously unemployed. If you are looking for work then please get in contact with our partner Southwark Works. Call 0800 052 0540 or email info@southwarkworks.org.uk. Or visit Unit 239, Elephant & Castle Shopping Centre, London, SE1 6TE. Emma McCreery Breen, Assistant Project Manager Emma first worked for Lend Lease on an undergraduate placement scheme while studying Project Management, and has now joined permanently on the graduate scheme. Emma is responsible for planning and programming various works across Elephant Park, including the new site for Mobile Gardeners. Stephen Preston, Assistant Commercial Manager Stephen works in a team that manages Lend Lease s commercial relationships with its supply chain. After finishing his A Levels last year, Stephen has joined on a scheme that allows him to study Commercial Management at London South Bank University one day a week, and then spend the rest of the week in work at Elephant Park. Taylor Weekes, Office Junior Taylor joined the project through Be Onsite back in December last year. Taylor lives in Borough and, having attended Harris Academy Bermondsey, this is her first full-time job. Taylor is working up to being a personal assistant in future.