Investor Presentation

Similar documents
Energy Coal CSG Investment Community Briefing. July 9, 2002 Sydney, Johannesburg and London

BHP Billiton Energy Coal Reliability, Insight, Innovation, Value. Presentation to METI Meeting Tokyo, January 2007

Mt Arthur Coal. Investor/Analyst Presentation September 2003

Australian Site Tour Mt Keith Operation. Jaco Harwig General Manager

BHP Billiton Coal CSG Analyst Visit Hunter Valley Energy Coal. Dave Murray President Coal. 2 nd November 2007

BHP Billiton Iron Ore Western Australia. Iron Ore. Presentation to Analysts June Ian Ashby, President and COO BHP Billiton Iron Ore

BRIEFING PAPER APRIL 2002 STRATEGIC FRAMEWORK

NEWCREST LOOKING TO THE FUTURE

WHITEHAVEN COAL LIMITED (ASX:WHC) AMENDED INVESTOR PRESENTATION

Improving productivity and sustainably lowering costs. Dean Dalla Valle President Coal 24 November 2014

Iron Ore Update. Ian Ashby President Iron Ore 6 May 2009

BHP Billiton Iron Ore. Asset Development Projects

RESTRUCTURING OF AUSTRALIAN EXPORT COAL INDUSTRY IMPACT OF CHINA AND INDIA. Bede Boyle and George Edwards. Coal Ventures Limited

THIRD QUARTER RESULTS

BHP Billiton: A Strategy of Diversification

South America Copper Site Visit Non-ferrous overview

Managing MNCs in China JP Morgan China Conference Clinton Dines President BHP Billiton China Beijing - April 25, 2007

Worsley Alumina. Julius Matthys, General Manager

Downer Rail. Monash University, Institute of Railway Technology Shaping the Future of Railway

PORT WARATAH COAL SERVICES

Whitehaven Coal Limited

For personal use only. Merrill Lynch Emerging Stars Conference

2007/08 Full Year Results Investor Briefing

Australian Site Tour Ravensthorpe Nickel Operation. Isak Buitendag General Manager

Performance Update Macquarie Conference

Recent Exploration of the Olympic Dam

Tax Contribution Report 2017

BHP Billiton Limited Annual General Meeting 2016

Alberto Calderon Group Executive and Chief Executive Aluminium, Nickel and Corporate Development

Policy into Practice. Health, Safety, Environment and Community Performance October 2002: London and Sydney

23 February The Manager Market Announcements Australian Securities Exchange Limited 20 Bridge Street SYDNEY NSW 2000.

For personal use only

Manganese Industry Outlook and Opportunities. Elsabe Muller General Manager, Manganese Marketing May 2014

SET Opportunity Day #3/2011

Analysts and Investors conference call. Q results. 15 May 2013

PROJECTS & TECHNICAL SERVICES

Caroona Coal Project. Gunnedah Coal Conference 20 September 2006

NEWS RELEASE 8 NOVEMBER Gladstone LNG Project Arrow-AGL Joint Venture Acquires Enertrade s Gas and Pipeline Business

ARTC & INLAND RAIL 14 NOVEMBER 2017 SIMON THOMAS, PROGRAMME DIRECTOR ARTC INLAND RAIL

Ramsay Health Care Limited Results Briefing Half Year ended 31 December 2018

Development Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines.

USA Acquisition Summary. December 2010

Agenda. Introduction Christine Ourmières-Widener. Financial Review Ian Milne. Performance Update & Outlook Christine Ourmières-Widener

Uniquely positioned to be Australia s next coal producer

2017 Major Projects Pipeline Report Adrian Hart, Senior Manager Infrastructure & Mining

An Update on Coal for the Bowen Basin

The Manager Company Announcements Australian Stock Exchange Limited Sydney NSW Dear Sir. Demerger of BHP Steel

BHP Billiton Stability, Growth, Value A CEO s perspective

OTOC Limited (ASX:OTC) Investor Update Annual General Meeting 2012

AerCap Holdings N.V. April 11, 2015

For personal use only

Ramsay Health Care Limited Results Briefing Year ended 30 June 2018

Results Presentation 27 May 2008

FIRST QUARTER 2017 RESULTS. 4 May 2017

3 Pilbara ports provide gateways

Virgin Australia Holdings Limited (ASX: VAH) H1 FY18 Results 1

Company Update. August 2015

December 2018 Quarterly Production Report

IAG results presentation. Quarter One th May 2018

Air Berlin PLC AGM 06 June 2013 London

Heathrow (SP) Limited

BHP Billiton Base Metals

GECAS is a preeminent aircraft asset manager & financier

GROWTH PLAN PRODUCTION FOCUS

Exploration. General Manager Minerals Development

NEWCREST Newcrest to acquire potential Tier 1 orebody in Canada Sandeep Biswas Managing Director and Chief Executive Officer

FULL YEAR RESULTS A RECORD YEAR OF GROWTH

75 Years of Thrills and Entertainment. The Rank Group Plc Preliminary Results to 30 June 2012

Overview. > Normalised earnings* before taxation of, up 30% > Statutory earnings before taxation of, up 40% > Statutory net profit after taxation of

Department of Employment, Economic Development and Innovation. Current Queensland coal infrastructure developments

For personal use only

hotels our business & passion

BHP Billiton Limited - Strategy, SWOT and Corporate Finance Report

Air Berlin PLC 15 th June, 2016 Annual General Meeting 2016 London

Building Long Term Shareholder Value

Qantas Airways Limited

Market Release 11 March 2019

Driving global growth

Shaping the Future of Railway Institute of Railway Technology

SAS Q3 2017/ August 2018

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION

29 December Canada Transportation Act Review Secretariat 350 Albert Street Ottawa ON K1A 0N5

Qantas Group - Positioned for Growth and Sustainable Returns

INLAND RAIL. Connecting Australia. 5 June 2018 National Infrastructure Summit inlandrail.com.au

For personal use only

QUARTERLY ACTIVITIES REPORT 31 JANUARY 2019

Building procurement capability through transformation. Jane Harley, Chief Procurement Officer Qantas Group

- A Growth Story. Michiel Hovers Vice President, Iron Ore Marketing 28 th February 2012

highlights Record Results Over $500m new contracts won since December 2005 Capacity increased; workforce over 3,000 >50%

SIA ANALYST/MEDIA BRIEFING Q2 and 1H FY17/18 Results 8 November 2017

STAYING TRUE. BofAML Global Transportation Conference. May

2012 Annual General Meeting. 23 October 2012

DOING BUSINESS IN INTERNATIONAL MARKETS 2014 ARSA STRATEGIC LEADERSHIP CONFERENCE OCTOBER 2014

Page 1. John Guscic Managing Director, Webjet Limited

MARRIOTT INTERNATIONAL 2017 SECURITY ANALYST MEETING. March 21, 2017

FAA s Modernization Plans

BHP Billiton Iron Ore Western Australia. Iron Ore. Mining Operations. Phil Price Vice President Integrated Planning

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

BHP Billiton Limited (BHP) - Financial and Strategic SWOT Analysis Review

WEBJETAGM Managing Director Update

Transcription:

Investor Presentation Mahomed Seedat President, Energy Coal June 2006

2 Disclaimer The views expressed here contain information derived from publicly available sources that have not been independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the information. Any forward looking information in this presentation has been prepared on the basis of a number of assumptions which may prove to be incorrect. This presentation must not be relied upon as a recommendation or forecast by BHP Billiton.

3 Agenda Energy Coal CSG overview HSEC Markets Financials Ingwe

Energy Coal CSG overview

5 Our Energy Coal business 14,000 + People 10 Operating assets 4 Continents 84,000,000 tonnes Coal produced, more than 2,000PJ 850,000,000 tonnes Dirt moved 30 products to 100 + customers via 300 + marketing contracts

BHP Billiton Energy Coal Position (2001 2005) 33 Mtpa New New Mexico 12 12 15 15 Mtpa Mtpa 3 Mtpa (2%) (56%) 26 Mtpa (42%) 6 Colombia 4 9 Mtpa Mtpa Export Domestic Source: BHP Billiton analysis Operated Non operated Pt Pt Arutmin 9.8 9.8 14.5 14.5 Mtpa Mtpa QLD/NSW Coal Coal 3 4 Mtpa Mtpa Ingwe Hunter Valley 64 64 56 56 Mtpa Mtpa 5 10 10 Mtpa Mtpa Export marketed

Energy Coal organisation President Energy Energy Coal Coal Mahomed Seedat Seedat Chief Chief Commercial Officer Officer Jon Jon Dudas Dudas President & COO COO New New Mexi Mexi co co Coal Coal Wayne Wayne Isaacs Isaacs President & COO COO Mt Mt Arthur Arthur Coal Coal Stephen Stephen David David Asset Asset Leader Leader Colombia & Business Manager Manager Americas Manie Manie Dreyer Dreyer President & COO COO Ingwe Ingwe Collieries Eliphus Eliphus Monkoe Monkoe VP VP Finance Finance Clayton Clayton Whipp Whipp (Ron (Ron Langford) Acting Acting VP VP HSEC HSEC & VP VP Bus Bus Improvmt. Henry Henry White White VP VP Strategy Strategy Energy Energy Coal Coal Craig Craig Renner Renner (Julian (Julian Beere) Beere) Chief Chief Information Officer Officer Louis Louis Retief Retief Sth Africa USA Australia The Hague 7 ( ):- new SA based incumbent

Energy Coal Reserves Distribution of Marketable Reserves by Asset Ingwe 51% New Mexico 17% Hunter Valley 13% Colombia 19% 12000 10000 8000 6000 Total Reserves Mt Ingwe 879Mt NMC 304Mt MAC 231Mt Colombia 334 Mt Colom bia HVEC Other MAC NMC Ingwe Other Ingwe Ops 1000 Export and Domestic Split Domestic Export 4000 2000 500 0 Marketable Reserves Measured Resources Indicated Resources Inferred Resources 8 0 Ingwe NMC MAC Colombia Note: Colombia data shown as BHP Billiton share (33.3% )

9 BHP Billiton Strategic Framework Leverage Global Brand and Footprint Cross-CS G Collaboration Technology Growth Options Global Capabilities, Local Presence Opportunity Discovering/Capture Opportunity Retention Approval Process Risk Managem ent Forecasting, Planning and Targets Expert Services Approval Process Customer-Centric Marketing EWRM Portfolio Management Value-Added Growth Stakeholder Relationships Win Win Relationships Quality Brand Project Execution Market Driven Project Pipeline Financial Strength and Discipline The BHP Billiton Way (Business Excellence and Knowledge Networks) World Class Assets Licence to Operate Project Definition Project Prioritisation Portfolio Model Strong A Credit Capital Managem ent People Processes Zero Harm Business Excellence Knowledge Networks Effici ent and Effective Operations Predictable Continuous Improvement Benchmarking Sustainable Development Zero Harm Guide to Business Conduct Diversity People Employer of Choice Global Capability Talent Development Performance-based Culture

10 Energy Coal Strategy Strategic Pillars BHP Billiton s Black Diamond 3. Grow and Optimise the Portfolio 4. Extend Our Marketing Advantage ( The Perfect Cut ) 5. Address Longer Term Discontinuities 2. Well Run Operations 1. Engaged People and Enhanced Organisational Capabilities

HSEC

12 The HSEC journey 20 15 10 5 0 4 3 2 1 0 Energy Coal where we have come from 18 16 18 9 6 6 Fatalities Classified Injury Frequency Rate FY02 FY03 FY04 FY05 FY06 5 0 FY96 FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 3 1 0 Focus on leading and lagging indicators KPI TRIFR Reduction Behaviour Based Safety Systems PL4 near miss reporting Fatal Risk Control Protocols Health targets and plan Environmental targets and plan Community targets and plan HSEC Standards Compliance

Financial performance

14 Energy Coal EBIT by Business Unit Half year ended 31 December % Change (US$M) Dec 2005 Dec 2004 % Change Ingwe New Mexico Hunter Valley Colombia Divisional Activities Total from Operations Third party products Energy Coal (total) - 44 20 99 (6) 157 48 205 124 44 36 97 (7) 294 2 296-100 - -44 +2 +14-47 -31

EBIT Trends 700 600 500 400 186 U nfav orable price/ FX/inflation and portfolio changes offset by volume and cost improv ement Fav orable pric e, volume and cost performance offs et partially by portfolio changes, FX and inflation Fav orable pric e v arianc e partially offset by FX and inflationary pressure particularly in Sth Africa 308 1H 06 v 1H 05: Fav orable v olume, F X and third party trading offset by price, cost pressure in Australia and Sth Africa, inflationary pressure partic ularly in Sth Africa and increase amortis ation. 300 200 100 0 350 66 149 308 205 124 85 2002 2003 2004 2005 2006 2H 1H Realised export price (RBCT FOB) $30.51 $25.14 $31.96 $45.79 $41.80 Rand 10.03 9.03 6.89 6.21 6.52 A$ 0.52 0.58 0.71 0.75 0.75 15

Operations and Growth

Portfolio actions to build long term performance BHP Billiton Merger Mt Arthur North approv ed Intercor acquisition Lake Mines divestment Rietspruit closure Sales of Delmas to Black Empowerment Positioned to deal in conv ergent European energy market Klipspruit minipit approv ed MAC South Pit Ex pansion Feasibility endors ed NC IG w ins tender for Newcastle 3 rd Port Agreement to div est ZAC Middelburg Middlings plant approv ed Anticipated Koornfontein sale 2001 2002 2003 2004 2005 Secured 75% of Arutmin marketing PT Arutmin divestment Establish H ague & Singapore marketing hubs Integrated C errejón C oal fully functional C omplete firs t structured marketing deal Secured 100% of Arutmin marketing C olombian ex pansion to 28Mtpa approved Move to One Book Agreement to div est Wy ong Sale of v arious resources to BEE parties Awarded tender for Caroona deposit 17 New Projec ts Portfolio Actions M arketing ac tivities

Energy Coal project pipeline Brownfield expansions/projects Greenfield expansions/projects Cerrejon Optimal Naudesbank Leandra New Mexico Coal Optimum Project NSW Port Project MAC Underground Douglas/MMS Optimisation Cerrejon to 32Mtpa MAC South Pit Expansion 18 Klipspruit Concept through Pre-feasibility Feasibility Execution

19 Ingwe - Location Richards Bay Type Capacity Life Klipspruit Ingwe Operations O/C mine 1.5 Mtpa Refer project PRETORI A JOHANNESBURG Type VEREENIGING Capacity Life Khutala U/G mine 14.2Mtpa 29 yrs Western Complex Klipspruit Project Type Capacity Life Khutala Douglas U/G O/Cmine 6.8 Mtpa (84% ) 29 yrs Type Capacity 15 Mtpa (84% ) Life Middelburg Douglas O/C mine 29 yrs Central Complex Middelburg Koornfontein Richards Bay Rail Line MPUMALANGA Optimum Type O/C mine Capacity 14.9 Mtpa Life 10 yrs Optimum Type Capacity Life Koornfontein Type Capacity U/G mine 5.6 Mtpa 3 yrs RBCT *multi-product Export port 26.2 Mtpa

20 Ingwe- key issues Ingwe Recovery Plan Eskom contracts Ingwe growth projects Portfolio optimisation

21 Ingwe Recovery Plan Safety first Started with Optimum Now being rolled out to the rest of the operations Key challenges Significant management changes on all sites Abnormal unseasonal rainfall Exposure of coal chain weaknesses Opportunities: Significant cost reduction Revenue improvement (volume/yield) Resizing and relocation of the Ingwe Corporate Centre

22 Ingwe Eskom Contracts 16 14 12 10 8 6 4 2 0 Eskom Sale Volumes (Mtpa) and Prices (ZAR) 2003 2004 2005 2006 YTD Duvha Kendal Hendrina Majuba Average price [RHS] Contract Pricing The Duvha, Hendrina and Majuba contracts are based upon fixed prices with escalation based on certain costs and inflation indices. The Kendal contract is a cost plus arrangement based on a formula that includes a return on invested capital and inflation prices escalation. 70 65 60 55 50 45 Contracted volumes Duvha 8.4Mtpa (10Mtpa 100%) supplied by Middelburg until the end of calendar 2014. Customer's option to extend for two additional 10 year periods to 2034. Hendrina 6.5Mtpa supplied by Optimum until the end of calendar 2008. Customer's option to extend for two additional 5 year periods to 2018. Kendal base 13.3Mtpa supplied by Khutala until November 30, 2033. The customer has option to extend based on available coal resources. Majuba: 2.7Mtpa until June 30, 2009

Ingwe Eskom Contracts cont. Ingwe s fixed price contracts (Hendrina and Duvha) are subject to PPI and CCI ( Cost of Coal ) inflation indices with an efficiency factor, as well as a bonus/penalty structure dependent on quality parameters As a result, the prices achieved lag the long term inflationary environment. Analysis - Hendrina 6.5Mtpa 2 40% 2 30% 2 20% 2 10% 23 2 00% 1 90% 1 80% 1 70% 1 60% 1 50% 1 40% 1 30% 1 20% 1 10% 1 00% 90% Jan-93 Jul-93 Jan-94 Jul-94 Jan-95 Jul-95 Jan-96 Jul-96 Jan-97 Jul-97 Jan-98 Jul-98 Jan-99 Jul-99 Jan-00 Jul-00 Jan-01 Jul-01 Jan-02 Jul-02 Jan-03 Jul-03 Jan-04 Jul-04 Jan-05 Jul-05 Base Price adj for CCI Base Price adj for PPI Base Price adj for CPI Adjusted Base Contract @ 6.5

24 Ingwe Growth Projects Ingwe Project Status Total volume 49mtpa Feasibility Concept Pre-feasibility 18 16 14 12 10 8 6 4 2 0 Export and Domestic Split Domestic Export DMO Optimum Leandra Klipsruit Naudesbank Feasibility Pre-feasibility Concept

25 Ingwe Portfolio Optimisation Douglas and Middelburg to be combined ZAC divested Koornfontein sale process currently underway (BEE transaction) Significant other transactions completed around reserve/resources sales (11) and others in process (4)

26 Hunter Valley Energy Coal

27 Mt Arthur Coal Growth Opportunities Mined Out Open Cut Areas

28 Mt Arthur Coal Growth Opportunities Focus on Process Improvement Mined Out Open Cut Areas Open Cut Reserve Area - 33 Yr

29 Mt Arthur Coal Growth Opportunities South Pit project Small capital investment Low cost incremental tonnes Mined Out Open Cut Areas Open Cut Reserve Area - 33 Yr Incremental Growth - Open Cut Area

30 Mt Arthur Coal Growth Opportunities Mt Arthur U/G Early assessment phase Very long life Low cost highwall access Mined Out Open Cut Areas Open Cut Reserve Area - 33 Yr Incremental Growth - Open Cut Area Major Growth Mt Arthur Underground Reserve Area

31 NSW Infrastructure Infrastructure constraints In CY 2004, a quota system was introduced by Port Waratah Coal Services ( PWCS ) Establishment of the Newcastle Coal Infrastructure Group ( NCIG ) NCIG proposal to lift coal loading capacity successful Rail constraints are being addressed by the Australian Rail Track Corporation (ARTC)

32 Caroona Coal Project Gunnedah Basin 350km 2 Exploration Area 260km to Newcastle Port BHP Billiton won competitive tender from NSW Government Too early for JORC resource number Exploration and assessment 4 to 5 years Initial coal quality 6300kcal/kg ar 10% ash <0.5% Sulphur Some coking properties

33 Chaco Wash New Mexico Coal COLORADO NEW MEXICO ARIZONA NAVAJO INDIAN RESERVATION Shiprock FOUR CORNERS POWER PLANT San San Juan Juan Mine Mine San Juan Generating Station UTE MOUNTAIN UTE INDIAN RESERVATION DEEP LEASE EXTENSION PILOT MINE San Juan River Navajo Navajo Mine Mine Permit Permit Area Area La Plata Haul road DEEP LEASE La Plata River Farmington La La Plata Plata Mine Mine Animas River Navajo Navajo Lease Lease Boundary Boundary Burnham Trading Post Approximate Scale 0 5 Miles

34 Desert Rock Energy Project DREP Desert Rock Energy Project up to 1500 MW mine-mouth power plant. Navajo Coal Company (BNCC) will be the coal supplier. Sithe Global s schedule shows financial close in late Q2 of CY2007, startup of first 750 MW unit in June 2010 and second 750 MW unit in June 2011. Transition to feasibility scheduled Q3 CY2006

35 Cerrejón - Location

36 Cerrejón Expansion to 32 Mtpa Estimated Total Cost of US$127M (100% terms) Major Mining Equipment 3 Komatsu PC8000 Hydraulic Excavators 14 Euclid-Hitachi EH5000 Haul Trucks 5 Caterpillar 789 Coal Trucks Locomotive & Railcars 2 GE Locomotives 80 Railcars Railway Upgrade 0.3 km extension of 3 sidings New 2.6 km siding Port Upgrade In Loading Upgrade Stockyard Expansion Out Loading Upgrade

37 Cerrejón Coal Optimal Expansion Capacity Expansion Schedule Expansion to 45Mtpa Prefeasability Study to be completed CY 2006 BHP Billiton execution approval to be completed Late 2007 Optimal Expansion production possible by 2010 Mine Infrastructure, Rail, and Port Facilities Key Environmental Issues Dust mitigation Rio Ranchería river diversion Relocation of Roche, Patilla, & Chancleta communities